Exhibit 5 - Specifications~22.pdf
PDF 3 MB Posted
- Solicitation number
- S-73000-00017629
- Issued by
- Oregon
About this file
Summary of Exhibit 5 - Specifications
This document comprises the Special Provisions for Maintenance Highway Construction issued by the Oregon Department of Transportation (ODOT) for a pavement repair project on Interstate 405 (I405) in Multnomah County. The project involves a 2-inch grind and inlay operation on the Kerby Entrance Ramp at mile point 2.88-2.99 on the Stadium Freeway, including cold plane pavement removal, tack coat application, temporary and permanent pavement markings, and comprehensive traffic control measures. The work zone covers 739 linear feet with varying width on the southbound (SB) lane. The contractor must achieve substantial completion by September 30, 2026, with a final completion deadline of October 15, 2026. Work is to commence upon notice to proceed. The project specifications reference the 2024 Oregon Standard Specifications for Construction, with detailed technical requirements outlined in Sections 00200 and beyond, supplemented by modifications specific to this contract documented in the Special Provisions and Standard Drawings.
The work encompasses furnishing Level 4 Dense Asphalt Concrete Pavement (ACP) mixture with a minimum compaction requirement of 91% of Maximum Aggregate Mixture Density (MAMD), along with all associated traffic control devices, temporary pavement markings (to be applied using temporary paint only), and permanent durable striping. The contractor bears responsibility for developing and implementing an approved Traffic Control Plan (TCP) with all costs for traffic control, erosion and sediment control, environmental protection, and work zone maintenance included within the bid items. No separate payment is provided for temporary traffic control, erosion control, or environmental protection. Notably, the project area disturbs zero acres on Agency-owned land, making NPDES 1200-CA permit coverage inapplicable. Testing requirements include minimum sampling and testing protocols for each 1,000 tons of asphalt placement, with the contractor responsible for quality control and quality assurance throughout construction. Any defective pavement must be repaired at no additional cost to the State in accordance with ODOT District 2B guidelines for pavement restoration.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment B - Sample Contract~13.docx | DOCX document | |
| Attachment A Form A-2_Bid Pricing Form~2.xlsx | XLSX spreadsheet | |
| 00017629_RFCQ.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIAL PROVISIONS
FOR MAINTENANCE HIGHWAY CONSTRUCTION
OREGON DEPARTMENT OF TRANSPORTATION
SALEM, OREGON
2" GRIND AND INLAY
I405 MP 2.88-2.99 KERBY ENTRANCE RAMP PAVEMENT REPAIR
STADIUM FREEWAY
MULTNOMAH COUNTY
JULY 2026
2” GRIND AND INLAY
SPECIAL PROVISIONS 2
DESCRIPTION OF WORK
2” GRIND AND INLAY WITH JOINT REPAIR
STADIUM FREEWAY
MULTNOMAH COUNTY
Scope- Contract requires Contractor furnish, place and compact 2-inches of Level 4, ½” Dense ACP Mixture, cold plane pavement removal at 2-inches, provide and apply tack coat, furnish and install temporary pavement markings, furnish and install permanent striping and traffic control. Comply with the 2024 Oregon Standard Specifications for Construction.
Location of Work—this work will be on Stadium Freeway’s (I405) E Freemont Interchange Connection 2 in the location as described below.
TABLE 1: WORK ZONE
Hwy Mile Point Direction Lane Repair Length
Total Width
(FT) (FT)
I405 2.88-2.99 SB A 2" Grind & Inlay 739 Varies
Above identified areas will be marked with white lines on the right shoulder. Remove all striping.
COMPLETION TIME LIMIT
Complete all Work to be done under the Contract not later than October 15, 2026. Work can begin upon notice to proceed. Substantially complete all Work to be done under the Contract not later than September 30, 2026.
APPLICABLE SPECFICATIONS
The 2024 Oregon Standard Specifications for Construction (“Standard Specifications”) include detailed technical specifications in Sections 00200 and beyond that apply to this ITB and any resulting Contract. Some sections of the technical specifications may be identified and modified in the Plans and Special Provisions. Sections of the technical specifications not identified in the Plans and Special Provisions remain applicable to the Contract according to their original terms.
Sections in Part 00100 of the Standard Specifications (General Conditions) are not applicable to the Contract unless they are specifically identified in the Plans and Special Provisions as being applicable. However, if a Part 00100 section that has been identified as being
SPECIAL PROVISIONS 3
applicable references another section in Part 00100, or a technical specification (Parts 00200 and beyond) references a section from Part 00100, that section from Part 00100 applies to the Contract for purposes of supporting and giving full effect to the specification that referenced it. Bidders can access the Standard Specifications online at:
http://www.oregon.gov/ODOT/Business/Pages/Standard_Specifications.aspx
All number references in these Special Provisions shall be understood to refer to the Sections and subsections of the Standard Specifications bearing like numbers and to Sections and subsections contained in these Special Provisions in their entirety.
CLASS OF PROJECT
This is a State Project.
SPECIAL PROVISIONS 4
TABLE OF CONTENTS FOR SPECIAL PROVISIONS
SECTION 00210 - MOBILIZATION
SECTION 00220 - ACCOMMODATIONS FOR PUBLIC TRAFFIC
SECTION 00221 - COMMON PROVISIONS FOR WORK ZONE TRAFFIC
CONTROL
SECTION 00222 – TEMPORARY TRAFFIC CONTROL SIGNS
SECTION 00223 - WORK ZONE TRAFFIC CONTROL LABOR AND VEHICLES
SECTION 00224 - TEMPORARY TRAFFIC CHANNELIZING DEVICES
SECTION 00225 - TEMPORARY PAVEMENT MARKINGS
SECTION 00280 - EROSION AND SEDIMENT CONTROL
SECTION 00290 - ENVIRONMENTAL PROTECTION
SECTION 00310 - REMOVAL OF STRUCTURES AND OBSTRUCTIONS
SECTION 00490 - WORK ON EXISTING SEWERS AND STRUCTURES
SECTION 00620 - COLD PLANE PAVEMENT REMOVAL
SECTION 00730 - EMULSIFIED ASPHALT TACK COAT
SECTION 00744 - ASPHALT CONCRETE PAVEMENT
SECTION 00850 - COMMON PROVISIONS FOR PAVEMENT MARKINGS
SECTION 00865 - LONGITUDINAL PAVEMENT MARKINGS - DURABLE
SUPPLEMENTAL SPECIAL PROVISIONS
GUIDELINE FOR PAVEMENT RESTORATION OF DEFECTIVE WORK IN ODOT RIGHT-
OF-WAY
PLANS
STANDARD DRAWINGS
SPECIAL PROVISIONS 5
SECTION 00210 - MOBILIZATION
Comply with Section 00210 of the Standard Specifications.
SECTION 00220 - ACCOMMODATIONS FOR PUBLIC TRAFFIC
Comply with Section 00220 of the Standard Specifications modified as follows:
00220.01(b) Abbreviations - Delete this subsection.
00220.02(a) General Requirements - Add the following bullet to the end of the bullet list:
• When paving operations create an abrupt edge, protect traffic by installing signing according to the "Divided Highway or Freeway Two Lane Closure" detail shown on the Standard Drawings.
00220.40(e-1) Closed Lanes - Replace this subsection, except for the subsection number and title, with the following:
One or more Traffic Lanes may be closed on the Stadium Freeway (I405) when allowed, shown, or directed during the following periods of time except as indicated in 00220.40(e-2):
Single Lane Closures – One Traffic Lane on Stadium Freeway (I405) may be closed during the following times:
• Monday – Thursday, between 10:00 p.m. and 5:00 a.m.
• Friday -Saturday, between 10:00 p.m. and 7:00 a.m.
00220.60(a)(1) Contractor Responsibility - Replace this subsection, except for the subsection number and title, with the following:
If this Work is not completed and in place, the Agency may do the Work according to 00220.60(d).
(a) Do the following at no additional cost to the Agency:
• Keep surfaces being used by Public Traffic free of all dirt, mud, gravel, materials, and debris.
• Repair damage to surfaces caused by the Contractor's operations.
• Maintain all detour and stage construction Surfacing as specified or directed.
• Keep the surfaces being used by bicycles free of all dirt, mud, gravel and other harmful material. The surface includes bike paths, bike lanes, roadway shoulders or the outside 6 feet of the roadway. Roadways shall be free of barricades or other objects and all lanes opened to traffic during all the non-restrictive timeframes.
SPECIAL PROVISIONS 6
(b) Before periods of no active Work that last longer than seven consecutive Days, unless otherwise directed, do the following:
• Provide temporary pedestrian surfaces meeting the requirements of the MUTCD and Section 00228.
• Provide traversable bicycle and pedestrian routes with surfaces free of dirt, mud, gravel, and debris.
(c) Before periods of no active Work that is anticipated to last or lasts longer than 30 consecutive Days, unless otherwise directed, do the following:
• Provide paved Traffic Lanes at least 12 feet wide, with 2-foot wide paved Shoulders for each direction of traffic.
• Do not leave abrupt edges.
• Remove or cover temporary construction signs unless otherwise directed.
• Clean, install, and reinstall all necessary pedestrian, motor vehicle, and bicycle channelization and pavement markings, unless otherwise directed.
SECTION 00221 - COMMON PROVISIONS FOR WORK ZONE TRAFFIC CONTROL
Comply with Section 00221 of the Standard Specifications modified as follows:
00221.06 Traffic Control Plan – Replace this subsection, except for the subsection number and title, with the following:
The Contractor will use a TCP developed by the Contractor and submit Unstamped Working Drawings that include the proposed TCP showing all TCM and quantities of TCD, and the following, 5 Calendar Days before the preconstruction conference:
• A temporary pedestrian accessible route plan that includes:
o Details and features used to provide pedestrian accessibility.
o Pedestrian staging Plans at a scale no smaller than 1 inch = 50 feet.
o Temporary alternate facilities or detour routes for pedestrian traffic.
• Staging sequences and details for Work affecting vehicular, pedestrian, and bicycle traffic.
• Proposed order and duration of the TCM.
• A detailed temporary striping plan if the existing striping is affected.
00221.60 Temporary Traffic Control Devices – Replace the paragraph that begins “TCD delivered to the Project Site found…” with the following paragraph:
Repair or replace TCD delivered to the Project Site found to be in “marginal” or “unacceptable” condition, at no additional cost to the Agency.
00221.88 Measurement, Method “B” – Under this method, no measurement of quantities will be made.
SPECIAL PROVISIONS 7
00221.90(b) Temporary Protection and Direction of Traffic – Replace the bullet that begins “Providing, Surfacing, maintain…” with the following bullet:
• Providing, surfacing, maintaining, removing, and restoring the TPAR.
00221.98 Payment, Method “B” – Lump Sum Basis – Work zone traffic control will be paid for at the Contract Lump Sum amount for the item “Temporary Work Zone Traffic Control, Complete”.
Payment will be payment in full for furnishing, installing, moving, operating, maintaining, inspecting and removing Materials and TCD, and for furnishing all Equipment, labor and Incidentals necessary to complete the Work as specified.
SECTION 00222 – TEMPORARY TRAFFIC CONTROL SIGNS
Comply with Section 00222 of the Standard Specifications modified as follows:
00222.40(e) Temporary Sign Placement - Add the following to the end of the bullet list:
• Install a 72 by 24-inch "CONSTRUCTION VEHICLE DO NOT FOLLOW" (CW23-14) sign on rigid substrate on the back of all material or Equipment delivery vehicles.
00222.45(b) Portable Changeable Message Signs - Add the following bullet to the end of this subsection:
• At least seven Calendar Days before the Pacific Highway Lane closure, place one or more PCMS displaying the following message as shown, or as directed:
Panel 1 Panel 2 (Name/# of highway) CLOSURE (Location) (Time Frame) CLOSURE (Time Frame)
00222.80 Measurement - Replace this subsection, except for the subsection number and title, with the following:
No measurement will be made for this work.
00222.90 Payment - Add the following paragraph after the paragraph that begins “No separate or additional payment…”:
No separate or additional payment will be made for this work.
SECTION 00223 - WORK ZONE TRAFFIC CONTROL LABOR AND VEHICLES
Comply with Section 00223 of the Standard Specifications.
SPECIAL PROVISIONS 8
SECTION 00224 - TEMPORARY TRAFFIC CHANNELIZING DEVICES
Comply with Section 00224 of the Standard Specifications.
SECTION 00225 - TEMPORARY PAVEMENT MARKINGS
Comply with Section 00225 of the Standard Specifications modified as follows:
00225.42 Temporary Pavement Markings - Replace the sentence that begins “Temporary Pavement Markings may be placed using…” with the following sentence:
Temporary pavement markings may be placed using temporary paint only.
SECTION 00280 - EROSION AND SEDIMENT CONTROL
Comply with Section 00280 of the Standard Specifications modified as follows:
00280.00 Scope - Replace the paragraph that begins "This Work also consists of providing temporary …" with the following paragraphs and bullets:
This Work also consists of providing temporary erosion and sediment control (ESC) measures and furnishing, installing, moving, operating, maintaining, inspecting, and removing ESC throughout the Project area according to the Standard Drawings, the erosion and sediment control plan (ESCP), the Specifications, or as directed, until the site is permanently stabilized. Included also is the monitoring of weather, of stormwater and receiving waters, the reporting of monitoring observations, the reporting of corrective actions (when necessary) and the updates and revisions of the ESCP, including ESCP cover sheet, necessary to keep it representative of current site conditions and compliant with the NPDES 1200-CA, 1200-CN, OR 1200-C permit if applicable.
Conditions requiring NPDES 1200 permits are as follows:
• Projects with one acre of ground disturbance or more on Agency owned land are regulated under the Agency’s 1200-CA permit.
• When Project Work on Agency owned land disturbs less than one acre, but ground disturbances on non-Agency owned lands combined with Project ground disturbances on Agency owned land total one acre or more the Agency Project Work will be regulated by the Agency’s 1200-CA permit. The Contractor is responsible for acquiring the 1200- C permit for all areas of disturbance on non-Agency owned land.
When the combined areas of disturbance of all Project related activities is less than one acre, no NPDES 1200 permit coverage is required.
SPECIAL PROVISIONS 9
The area of ground disturbance on Agency owned land is 0 acres.
Delete the paragraph that begins “When contaminants, pollutants or hazardous materials…”.
Add the following paragraph to the end of this subsection:
The Agency’s NPDES 1200-CA permit is not applicable to this Project. Comply with all applicable conditions of this Section.
Add the following subsection:
00280.01 Submittals – Submit documentation that the compost material meets the requirements of Section 03020 for its intended use and is available for use according to the Project schedule in 00180.41 according to 00150.37, within 30 Calendar Days of Award of the Contract,.
00280.02 Definitions - Delete the definition Wet Season Work
00280.04 Erosion and Sediment Control Plan on Agency Controlled Lands - Replace the bullet that begins “Information required under 1200-CA…” with the following bullet:
• Information required under 1200-CA permit, if applicable.
00280.06 Erosion and Sediment Control Manager - Delete this subsection.
00280.80 Measurement - Replace this subsection, except for the subsection number and title, with the following:
No extra measurement will be made for this work.
00280.90 Payment – Replace this subsection, except for the subsection number and title, with the following:
No separate or additional payment will be made for erosion and sediment control.
SECTION 00290 - ENVIRONMENTAL PROTECTION
Comply with Section 00290 of the Standard Specifications modified as follows:
00290.90 Payment – Replace this subsection, except for the subsection number and title, No separate or additional payment will be made for environmental protection.
SPECIAL PROVISIONS 10
SECTION 00310 - REMOVAL OF STRUCTURES AND OBSTRUCTIONS
00310.90 Payment - Replace this subsection, except for the subsection number and title, No separate or additional payment will be made for removal or disposal Work included in Section 00330 according to 00310.02.
SECTION 00490 - WORK ON EXISTING SEWERS AND STRUCTURES
Comply with Section 00490 of the Standard Specifications modified as follows:
Comply with Section 00490 of the Standard Specifications modified as follows:
00490.10 Materials - Add the following to the end of this subsection:
Portland Cement Concrete Repair Materials……………02015.20
00490.11 High Early Strength Concrete - Replace this subsection, except for the
Furnish high early strength concrete meeting one of the following requirements:
• Commercial Grade Concrete designed to achieve high early strength utilizing accelerating admixture from 02040.10, Type III cement from Section 02010, or rapid setting cement from Section 02011.
• A Portland cement concrete repair material from 02015.20, rapid setting or very rapid setting.
Add the following to the end of the subsection:
Follow Method ‘C”, “Circular Cut” for manhole adjustments per Standard Drawing RD 360.
00490.80 Measurement - Replace this subsection, except for the subsection number and title, with the following:
No extra measurement will be made for this work.
00490.90 Payment - Replace this subsection, except for the subsection number and title, No separate or additional payment will be made for work on existing sewers and structures.
SPECIAL PROVISIONS 11
SECTION 00620 - COLD PLANE PAVEMENT REMOVAL
Comply with Section 00620 of the Standard Specifications modified as follows:
00620.40(b) Depth 1 inch to 2 inches - Replace this subsection, except for the subsection number and title, with the following:
If the depth of the existing Pavement to be removed is 2 inches or less, but more than 1 inch and the section is under traffic, schedule the Work so the full width and length of travel lanes Pavement can be removed during the same shift. Remove the Shoulder area within 24 hours.
00620.40(c) Depth over 2 inches - Replace this subsection, except for the subsection number and title, with the following:
If the depth of the existing Pavement to be removed is over 2 inches and the section is under traffic, schedule the Work so the full width and length of the travel lanes and Shoulders can be removed, leaving no longitudinal or transverse drop-offs, during the same shift.
00620.41 Surface Tolerance - Replace this subsection, except for the subsection number and title, with the following:
Test with a 12-foot straightedge furnished and operated by the Contractor, as directed. The maximum variation of the top of the ridges from the testing edge of the straightedge, between any two ridge contact points, is 1/4 inch.
00620.43 Maintenance Under Traffic - Replace this subsection, except for the subsection number and title, with the following:
Traffic is not allowed on the cold planed surface. Before opening the area to traffic, pave the surface according to 00744.51.
SECTION 00730 - EMULSIFIED ASPHALT TACK COAT
Comply with Section 00730 of the Standard Specifications modified as follows:
00730.11 Emulsified Asphalt - Replace the paragraph that begins “Excessive delay in the …” with the following paragraph:
Excessive delay in the use of the Emulsified Asphalt or excessive pumping of the Emulsified Asphalt may significantly reduce the viscosity and may make the material unsuitable for tack coat use. For this reason limit pumping between the bulk storage tank, hauling transportation, field storage tanks and distributor to an absolute minimum to maintain proper viscosity. Final acceptance of Emulsified Asphalt is at the point of application.
SPECIAL PROVISIONS 12
Replace the paragraph that begins “Obtain samples according …” with the following paragraph:
Obtain samples according to AASHTO R 66 prior to dilution with water, if allowed, according to Section 00165. Samples are tested at the ODOT Materials Laboratory, or other laboratory as designated by the Agency. Emulsified Asphalt is tested within 30 Calendar Days from the date it is sampled.
Replace the sentence that begins “Furnish CSS-1, CSS-1h…” with the following sentence:
Furnish CSS-1, CSS-1h, CMS-2, CMS-2S, CMS-2h, CRS-1, CRS-2, HFRS-2, HFMS-2 or HPTC as selected by the Contractor.
Replace the paragraph that begins “Dilution of the tack coat …” with the following paragraph:
Except for HPTC, dilution of the tack coat material may be allowed to a maximum 1:1 ratio.
Determine the proportion of water to be added to the Emulsified Asphalt. Do not dilute the Emulsified Asphalt until the Engineer approves the dilution ratio. Add the water to the Emulsified Asphalt and mix according to the asphalt Supplier. For HPTC, dilution of the tack coat material is allowed only by the asphalt Supplier at a ratio meeting the requirements of ODOT's publication Standard Specifications for Asphalt Materials.
SECTION 00744 - ASPHALT CONCRETE PAVEMENT
Comply with Section 00744 of the Standard Specifications modified as follows:
00744.10(a) New Coarse and Fine Aggregates - Replace the paragraph that begins "Testing of Aggregates …" with the following paragraph:
Testing of Aggregates for soundness, durability, and harmful substances is at the discretion and expense of the Agency.
00744.10(a)(1) Soundness - Replace the paragraph that begins "Provide Coarse …" with the following paragraph:
Furnish Coarse and Fine Aggregate with a weighted loss not exceeding 12 percent when subjected to five cycles of the soundness test using sodium sulfate solution according to
AASHTO T 104.
00744.10(a)(2) Durability - Replace the paragraph that begins "Provide Aggregate …" with the following paragraph:
Furnish Aggregate not exceeding the following maximum values:
00744.10(a)(3) Fractured Faces - Replace the paragraph that begins "Provide crushed Aggregate …" with the following paragraph:
Furnish crushed Aggregate with not less than the minimum number of fractured faces as determined by AASHTO T 335 as follows:
SPECIAL PROVISIONS 13
00744.10(b) Reclaimed Asphalt Pavement - Replace this subsection, except for the
RAP Material used in the production of new ACP is optional. No more than 30 percent RAP Material is allowed in the new ACP Pavement. Use RAP Aggregates in the ACP that are no larger than the specified maximum allowable Aggregate size before entering the cold feed.
Blend the RAP Material with new Aggregate to provide a mixture according to the JMF within the tolerances specified.
00744.10(c)(5) Establishing Mix Design Inputs - Replace the paragraph that begins "Blend the RAS …" with the following paragraph:
Blend the RAS or RAM with new Aggregate to provide a mixture according to the JMF within the tolerances specified.
00744.11(a) Asphalt Cement - Replace this subsection, except for the subsection number and title, with the following:
Furnish asphalt cement according to ODOT's publication Standard Specifications for Asphalt Materials. The applicable Specifications are those contained in the current publication on the date the Project is advertised. Use the grade of asphalt that is specified in the Special Provisions.
Provide Level 3 grade asphalt cement for this Project.
00744.13 Job Mix Formula Requirements - Replace the paragraph that begins "Develop the JMF …" with the following paragraph:
Develop the JMF according to the ODOT Contractor Mix Design Guidelines for Asphalt Concrete; or verify according to the ODOT mix design verification process. Submit the proposed JMF and supporting data to the Engineer for review and approval at least 10 Calendar Days before anticipated use. Perform a new TSR if the source of the asphalt cement changes.
00744.14 Tolerances and Limits - Replace the paragraph that begins "Develop the JMF …" with the following paragraph:
When a JMF tolerance applies to a constituent, full tolerance is given even if it exceeds the control points established in 00744.12(b). Full tolerance is given for RAP, RAS, or RAM content even if it exceeds the limits established in 00744.10.
00744.16 Sampling and Testing - Replace this subsection, except for the subsection number and title, with the following:
For each 1,000 Tons of placement, have a CAT I perform a minimum of one of each of the following test methods as modified in the MFTP:
• Asphalt Content - AASHTO T 308 with ODOT TM 323 determined Calibration Factor
• Gradation - AASHTO T 30
SPECIAL PROVISIONS 14
• Mix Moisture - AASHTO T 329
• Maximum Specific Gravity - AASHTO T 209
• Field Compacted Gyratory Specimens - ODOT TM 326
When less than 1,000 Tons of mix is placed in a Day, perform a minimum of one series of tests per Day. Provide test results to the Engineer by the middle of the following work shift.
The Engineer may waive the requirement for any of AASHTO T 308, AASHTO T 30, AASHTO T 329, and ODOT TM 326 on a daily basis. The Engineer may waive the requirement for AASHTO T 209 when less than 500 Tons of ACP is placed in a single work shift.
Provide samples or split samples to the Engineer when requested.
00744.17 Acceptance - Replace this subsection, except for the subsection number and title, with the following:
If the test result for each mix gradation constituent, asphalt content, and density measurement is within the Specification limits, the Material is accepted. If the asphalt content, one or more gradation constituents, or the density measurement are not within the specification limits, the Material that is not within the Specification limits is accepted according to 00150.25.
00744.41 Mixing Temperature - Replace the table with the following:
Temperature, °F Type Maximum Minimum Behind at Mixer Paver
HMAC 350 240
WMAC 350 215
00744.23 Pavers - Replace the bullet that begins "Self-contained, self-propelled …" with the following bullet:
• Self-contained, self-propelled, supported on tracks or wheels, that does not contact the mixture being placed.
Replace the bullet that begins "Equipped with augers …" with the following bullet:
• Equipped with augers and a screed or strike-off assembly, heated if necessary, that:
Replace the bullet that begins "Equipped with a paver …" with the following bullet:
• Equipped with a paver control system that:
00744.41 Mixing Temperatures- Replace the paragraph that begins "Establish the allowable …" with the following paragraph:
Establish the allowable mixing and placement temperature ranges by the JMF. Measure the mixture temperature at the discharge of the mixer. Measure the placement temperature behind the paver. The allowable production temperatures may be adjusted based on the
SPECIAL PROVISIONS 15
asphalt cement Supplier's recommendation if approved by the Engineer. The maximum mixture temperature and the minimum placement temperature is as follows:
00744.42 Tack Coat - Replace the paragraph that begins "Treat all paved surfaces …" with the following paragraph:
Treat all paved surfaces on and against where ACP is to be placed with an asphalt tack coat according to Section 00730. Before applying the tack coat, clean and dry the surface to be tacked.
Replace the paragraph that begins "Treat all waterproofing membranes …" with the following paragraph:
Treat all waterproofing membranes on and against where ACP is to be placed with an asphalt tack coat meeting the requirements of 00744.11(a) or as recommended by the membrane manufacturer.
00744.43(a) Hauling - Replace the paragraph that begins "ACP will be …" with the following paragraph:
ACP is rejected before placing if one or more of the following occurs:
00744.44 Longitudinal Joints - Replace the paragraph that begins "At longitudinal joints …" with the following paragraph:
At longitudinal joints, bond, compact and finish the new ACP equal to the ACP against where it is placed.
00744.44(a) Location - Replace the paragraph that begins "Place the ACP …" with the following paragraph:
Place the ACP in Panel widths that hold the number of longitudinal joints to a minimum. Offset the longitudinal joints in one Panel by at least 6 inches from the longitudinal joints in the Panel immediately below.
00744.44(b) Drop-Offs - Replace the bullet that begins "Construct, maintain, remove …" with the following bullet:
• Construct, maintain, remove, and dispose of the temporary wedge at no additional cost to the Agency. ACP for the temporary wedge is paid for at the Contract unit price.
00744.45(a)(1) Temporary End Panel - Replace the bullet that begins "For wedges that will be under traffic for less …" with the following bullet:
• For wedges that are under traffic for less than 24 hours, construct an 8-foot-long wedge (1V:50H taper rate).
Replace the bullet that begins "For wedges that will be under traffic for 24 …" with the
• For wedges that are under traffic for 24 hours or longer, construct a 25-foot-long wedge (1V:160H taper rate).
Replace the bullet that begins "Construct, maintain, remove …" with the following bullet:
SPECIAL PROVISIONS 16
• Construct, maintain, remove, and dispose of the temporary wedge at no additional cost to the Agency. ACP for the temporary wedge is paid for at the Contract unit price.
00744.45(a)(3) Excess Asphalt Concrete Pavement - Replace this subsection, except for the subsection number and title, with the following:
After completing a temporary end Panel as specified, dispose of unused, remaining ACP as directed. Payment is made for the entire load of ACP, but is limited to only one load for each joint of each Panel.
00744.45(a)(5) Joint Requirements - Replace this subsection, except for the subsection number and title, with the following:
Compact both sides of the joint to the specified density. Test the joint surface according to
00744.70 with a straightedge placed across the joint.
00744.49 Compaction - Replace the paragraph that begins "Determine compliance with…" with the following paragraph:
Determine compliance with density Specifications by random testing of the compacted surface with calibrated nuclear gauges. Determine the density by averaging QC tests performed by a CDT with the nuclear gauge operated in the backscatter mode according to AASHTO T 335 at one random location for each 100 Tons of asphalt concrete placed, but take no less than three tests each shift. Do not locate the center of a density test less than 1 foot from the Panel edge. Calculate MAMD according to ODOT TM 305. The Engineer may waive compaction testing requirements when less than 500 Tons of ACP is placed in a single work shift.
Replace the bullet that begins "Thin Pavements - Leveling …" with the following bullet:
• Thin Pavements - Leveling, patches, or where the nominal compacted thickness of a Course of ACP is less than 2 inches.
Add the following subsection:
00744.51 Opening Sections to Traffic - Schedule work so that, during the same shift, the surfaces being paved are paved full width and length through the wearing Course before opening to traffic.
SECTION 00850 - COMMON PROVISIONS FOR PAVEMENT MARKINGS
Comply with Section 00850 of the Standard Specifications modified as follows:
00850.11 Flexible Bituminous Adhesive - Replace this subsection, except for the subsection number and title, with the following:
At least 2 weeks before using, submit for Agency testing and approval a 15-pound brick sample of flexible bituminous adhesive for each manufacturer lot number, including
SPECIAL PROVISIONS 17
previously tested and approved lot numbers that are over 1 year old, that are used on the Project. All previously rejected lot number samples will not be retested. Agency testing and approval is only for acceptance of use of the adhesive.
00850.30 Manufacturer’s Representative - Replace this subsection, except for the subsection number and title, with the following:
For Sections referencing 00850.30, the services of a manufacturer’s representative are not required. Place Pavement markings only when the Pavement is ready for the Pavement marking material according to the manufacturer’s installation instructions.
00850.44 Alignment Layout – Replace the paragraph that begins "Place control points for lines every …" with the following paragraph:
Place control points for lines every 40 feet on tangent and every 25 feet on a curve. Place layout transition details at the start of pavement markings, where pavement markings transition into a different pavement marking, and at the end of pavement markings. Using these control points and layout transition details, layout a continuous narrow guideline for each line, along one edge of, or uniformly offset from the intended permanent line location.
Do not proceed with installation until the guidelines are approved by the Engineer.
00850.45 Installation - Replace the sentence that begins "Apply pavement marking …" with the following sentence:
Apply pavement marking Materials to clean dry Pavement surfaces and according to the following:
Replace the bullet that begins "The Pavement surface …" with the following bullet:
• Ensure the Pavement surface is not visible through the pavement marking.
Replace the bullet that begins "The top of pavement …" with the following bullet:
• Provide a smooth and uniform top of pavement marking.
Replace the bullet that begins "Skip line ends …" with the following bullet:
• Provide square and clean skip line ends.
00850.46 Placement Tolerance - Replace the bullet that begins "Skip Cycle …" with the
• Skip Cycle: A tolerance of 1/10 of the skip line length on the first skip line of a run, but on cycle within one skip
00850.47(c) Retroreflectivity - Replace the paragraph that begins "Except for paint applications …" with the following paragraph:
Except for paint applications, evaluate longitudinal and transverse marking retroreflectivity according to ODOT TM 777. Acceptance is according to the following:
SPECIAL PROVISIONS 18
In the bullet that begins “Longitudinal Markings”, replace the paragraph that begins "Each longitudinal marking …" with the following paragraph:
• Each longitudinal marking sublot is accepted if the average of the measurements and at least 90 percent of the individual measurements within the sublot meet or exceed the required minimum initial retroreflectivity.
In the bullet that begins “Transverse Markings”, replace the paragraph that begins "Each transverse marking …" with the following paragraph:
• Each transverse marking sublot is accepted if the average of the measurements and at least 90 percent of the individual measurements within the sublot meet or exceed the required minimum initial retroreflectivity.
SECTION 00865 - LONGITUDINAL PAVEMENT MARKINGS - DURABLE
Comply with Section 00865 of the Standard Specifications modified as follows:
00865.45 Installation - Replace the bullet that begins "For grooved markings, grind …" with the following bullet:
• For grooved markings, grind the slot depth as shown. Apply the specified marking Material centered in the slot as shown. Ensure the top of the marking is flat or slightly convex.
00865.75 Manufacturer Warranty - Replace the paragraph that begins "Furnish a manufacturer …" with the following paragraph:
Provide a manufacturer warranty that unconditionally warrants to the Agency the product(s) and installation under this Section against failure, according to this Subsection and 00170.85(c)(1). Use Agency-supplied warranty forms, available from the Engineer.
00865.90 Payment - Replace the paragraph that begins "In items (a) and (b), …" with the following paragraph:
In items (a) and (b), the word "Surface" or "Grooved" is inserted in the first blank and the word "Profiled" or "Non-Profiled" is inserted in the second blank.
Replace the paragraph that begins "In items (e) and (f), …" with the following paragraph:
In items (e) and (f), "Rolled-In" or "Grooved" is inserted in the first blank and "Patterned" or "Non-Patterned" is inserted in the second blank.
Replace the paragraph that begins "In items (g) and (h), …" with the following paragraph:
In items (g) and (h), the word "Surface" or "Grooved" is inserted in the first blank and the word "Profiled" or "Non-Profiled" is inserted in the second blank.
SPECIAL PROVISIONS 19
Replace the paragraph that begins "Payment will be payment …" with the following paragraph:
Payment will be payment in full for furnishing and placing all Materials, and for providing all Equipment, labor, and Incidentals necessary to complete the Work as specified.
SPECIAL PROVISIONS 20
SUPPLEMENTAL SPECIAL PROVISIONS
1. The quantities in the bid item list are intended to serve only as a guide to bidders, and are not to be construed as a guarantee. All quantities are estimated, and are for bid purposes only. The quantity for each bid item includes all labor, equipment and materials for all activities associated with this project. The Oregon Department of Transportation (ODOT) reserves the right to adjust quantities and add or delete, as needed.
2. Contractor will be responsible for traffic control measures for all closures, based on approved traffic control plan (TCP).
3. The total number of PCMS required for the project will be determined by the Contractor’s
TCP.
4. Contractor to contact the Owner’s Authorized Representative and schedule the Pre-- Construction Meeting within the timeframe required in the Contract and must be held at least Fourteen (14) days prior to the start of work.
5. The mobility restriction notice required will be submitted by ODOT based on the accepted schedule and requires 14 day notice.
6. Contractor to keep the sidewalk/pedestrian path along the entrance ramp open to pedestrian and bike traffic.
7. Contractor required to keep the scuppers at the bottom of the center barrier exposed during and after construction.
8. Asphalt mix to be a recently approved ODOT asphalt mix design, submittal shall be the Oregon Department of Transportation Materials Laboratory approval form.
9. Contractor shall provide weigh slips for each load of ACP material placed in performance of Work under the Contract. Contractor to provide the first weigh slip to the Inspector for review and then Contractor shall collect all other weigh slips during the shift and give the group of them to the inspector at the end of the shift.
10. To prevent rutting or other distortion, protect sections of newly finished dense-graded asphalt from traffic until the surface temperature has cooled below 140°F.
11. All new transverse joint pavement edges shall be sand sealed. This work will be considered incidental to the bid items.
12. Contractor shall be responsible to provide quality control and quality assurance for the project. The Contractor shall meet the compaction requirement listed in Section 00744.49 of a minimum of 91% of MAMD. The Project Manager reserves the right to take and re-test material samples, and based upon such test results, to reject any material not meeting the referenced Specifications. It is agreed and understood that the Contractor shall replace all rejected material with material meeting the Specifications at no additional cost to the State.
SPECIAL PROVISIONS 21
13. Contractor is responsible for placing all new lines in the same location and configuration as all existing lines. Cost to control work to meet this responsibility is incidental to the bid items.
14. Defective pavement will be repaired, at no additional cost to the State, according to the ODOT District 2B: Guideline for Pavement Restoration of Defective Work.
15. Contractor’s employees and their subcontractors may not wear clothing, hats, vests, etc. that have the ODOT name or “flying T” symbol.
16. There is public interest in the work. Contractor is advised to use courtesy and respect in any work site interaction with the public and to refer all public relations matters to the ODOT Project Manager.
17. Contractor shall implement safety policies, procedures and practices in conformance with all applicable local, state and federal laws, rules and regulations including but not limited to:
a. Applicable OSHA safety regulations
b. ANSI Z 133.1 Safety standards agreed upon by ODOT and local jurisdiction The
Manual of Uniform Traffic Control Devices (MUTCD)
c. Any other applicable safety laws, regulations and codes.
18. All equipment utilized during this contract shall be in good and serviceable condition.
19. In addition to the notifications required under the standard specifications and special provisions, contractor will also:
A. At least 72 hours prior to executing lane and/or complete roadway closures on I405 notify:
i. The ODOT Project Manager: 971-673-1343
ii. Portland Bureau of Transportation Dispatch Center: 503-823-1700
iii. Portland Bureau of Emergency Management: 503-823-0911
B. At the time of lane and/or complete roadway closures and again when the lane and/or complete roadway is opened on I405 notify:
i. ODOT Traffic Management Operations Center (TMOC): 503-283-
20. Any illegal camp cleanup required prior to the start of work will be coordinated by
ODOT. The Contractor shall notify the Project Manager 10 working days before the scheduled start date to allow for the cleanup to be posted and completed.
Contractor to account for this time in their schedule. Contractor shall occupy the site and begin work immediately following the camp cleanup. If there is evidence that additional cleanups will be required based on camper presence or personal property found at the site, notify the Project Manager so it can be scheduled. Contractor may
SPECIAL PROVISIONS 22
not move or remove any personal property from the site. No monetary compensation will be considered for any camp cleanup delay.
21. Any illegal camp cleanup required after the start of work will be coordinated by ODOT. The Contractor shall notify the Project Manager to allow for the cleanup to be posted and completed. Contractor shall occupy the site and continue work immediately following the camp cleanup. If there is evidence that additional cleanups will be required based on camper presence or personal property found at the site, notify the Project Manager so it can be scheduled. Contractor may not move or remove any personal property from the site. Any time delay caused by campers occupying the site after the start of work, when they had not been present prior to the start of work, will be added to the end of the contract. No monetary compensation will be considered for any camp cleanup delay.
22. Correspondence for the project is required to have the project name “I405 MP 2.88-
2.99 KERBY ENTRANCE RAMP Pavement Repair” in the subject line and copy Amythest Lee: Amythest.M.Lee@odot.oregon.gov . Correspondence without the project name in the subject line will not be addressed.
23. Do not combine correspondence for multiple contracts, all correspondence needs to be kept separated.
24. The invoices, certified payrolls (if applicable) and project submittals are to be submitted via email to the Owner’s Authorized Representative.
25. Certified Payroll Report file names are to include the project name, contractor or sub-contractor name and week ending date for the report period.
26. Invoices are to have the contract name and contract number listed on them and the following billing address:
ODOT District 2B 9200 SE Lawnfield Rd Clackamas OR 97015
Updated 11/9/2020
Region 1 Maintenance Guidelines for Pavement Restoration or Defective Work
This guideline applies anytime the asphalt saw cut does not fall at a lane line, striping is removed and not replaced in the same location or when defective paving has to be replaced.
Base Objective: Motorist cannot feel the repaired pavement. Prolong the working life of the asphalt pavement and reduce future maintenance costs.
Repair Guidelines:
1. Pavement condition new or like new (1‐3 years old): Complete a 2” grind and inlay with the same Level of ACP required in the contract (Level 3 minimum) for an area that covers the entire lane width of every lane affected by 100 foot long. The length to be centered on the defective/saw cut area if the defective area is small. If the area is larger than 100 feet then complete a 2” grind and inlay with the same Level of ACP required in the contract for an area that covers the entire lane width of every lane affected by the entire length of the defective/saw cut area.
2. Pavement condition anything less than new (3 years or older): Complete a 2” grind and inlay with the same Level of ACP required in the contract (Level 3 minimum) for an area that covers the entire lane width of every lane affected by 50 foot long. The length to be centered on the defective/saw cut area if the defective area is small. If the area is larger than 50 feet then complete a 2” grind and inlay with the same Level of ACP required in the contract for an area that covers the entire lane width of every lane affected by the entire length of the defective area.
3. When there are several smaller areas that are within a short distance of each other complete one continuous repair.
4. The District Manager or their designated representative will determine the limits of the repair based on these guidelines.
Stacy STUBBLEFIELD Text Box I405 MP 2.88-2.99 Kerby Entrance Ramp Pavement Repair 2" Grind and Inlay
Stacy STUBBLEFIELD Text Box MP 2.88 End 2" Grind and Inlay
Stacy STUBBLEFIELD Line
Stacy STUBBLEFIELD Text Box North
NTS
Stacy STUBBLEFIELD Line
Stacy STUBBLEFIELD Text Box MP 2.99 Begin 2" Grind and Inlay
Stacy STUBBLEFIELD Line
RD360
ADJUSTMENT
MANHOLE FRAME
R D
.d g n
21-JUL-2015N/A
J U
L wearing course
Asph. conc.
base course
Asph. conc.
(Or others listed in ODOT's QPL) as reqd.
Conc. manhole adjustment rings
(See general note 10)
Mortar 2" max.
See Alternate "A"
Raise as dir.
& frame
Manhole cover
C u t li n e
C u t li n e
Finish grade or hoop
#4 bar
" min. (Typ.)2
(Typ.)
3" min.
Thkn. - 2" min.
Asph. conc.
12" min.
Thkn. - 2" min.
Asph. conc.
12" min.
(Min. 12" thkn.)
P.C. concrete
Backfill with early strength
(Min. 12" thkn.)
P.C. concrete
Backfill with early strength
(Or others listed in ODOT's QPL) as reqd.
Conc. manhole adjustment rings
Raise as dir.
See Alternate "A"
(See general note 10)
Mortar 2" max.
or hoop
#4 bar
" min. (Typ.)2
(Typ.)
3" min.
12" min. 12" min.
Finish grade wearing course
Asph. conc.
base course
Asph. conc.
C u t li n e
C u t li n e
& frame
Manhole cover wearing course
Asph. conc.
base course
Asph. conc.
(Min. 12" thkn.)
P.C. concrete
Backfill with early strength
(Or others listed in ODOT's QPL) as reqd.
Conc. manhole adjustment rings
C u t li n e
C u t li n e
12" min. 12" min.
Finish grade & frame
Manhole cover
Raise as dir.
See Alternate "A"
(See general note 10)
Mortar 2" max.
(Typ.)
3" min.
" min. (Typ.)2 or hoop
#4 bar
- 2 each
#4 bar Cut line frame
Manhole cover & frame
Manhole cover &
Cut line
- 2 each
#4 hoop o f t r a v e l
D ir e c ti o n
12" min.
m in
(T yp
Manhole frame adjusment ring
Conc. manhole
Manhole note 10)
(See general
Mortar 2" max.
12. See Std. Dwg. RD356 for manhole covers and frames.
11. See Std. Dwg. RD336 for tracer wire details.
10. Use epoxy for synthetic grade rings.
9. See appropriate manhole standard drawings for details not shown.
8. See Std. Dwg. RD336 for manhole steps details.
7. Finish joint with asphalt seal and sand.
6. Apply tack coat to edges of existing pavement before installing patch.
5. Protect from traffic loading until conc. has cured to 3000 psi.
concrete.
4. Backfill with early strength Portland Cement Concrete. All concrete shall be commercial grade and leveling mortar, as shown.
3. Raise manhole cover and frame to finish grade by installing conc. manhole adjustment rings
2. Saw cut square or circular excavation around manhole 12" min. from manhole frame.
1. Cover manhole with building paper and const. asph. conc. base course and wearing courses.
GENERAL NOTES FOR ALL DETAILS ON THIS SHEET:
SQUARE CUT
PLAN
CIRCULAR CUT
PLAN
METHOD "A"
METHOD "B"
METHOD "C"
ALTERNATE "A"
the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: June 1, 2026 - November 30, 2026
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
Standard Drawing, while
The selection and use of this
RD610
DETAILS
PAVEMENT (ACP)
ASPHALT CONCRETE
R D
.d g n
25-JUL-2017N/A
J U
L
1" in 5'
Feather base course Taper 1" in 5'
AT GRAVEL APPROACHES
METHOD OF FEATHERING ACP PAVEMENT
OR BRIDGE ENDS WHEN NOT OVERLAYING THE BRIDGE
ACP PAVEMENT MATCH AT PROJECT ENDS
METHOD OF MATCHING EXTG. ACP INLAY SURFACING
TABLE 1
METHOD A *
METHOD B *
TAPER LENGTHS
ACP wearing course
(When present)
Feather ACP base course
Extg. pvmt.
See "EDGE DETAIL"
Extg. pvmt.
wearing course thkn.
ACP unfeathered
See project plans for method.
Taper (See Table 1)
Cold plane pvmt. removal
Taper (See Table 1)
Cold plane pvmt. removal
Posted Speed Taper Length
1" per 50'45 mph
1" per 100'> 45 mph
See "EDGE DETAIL"
Extg. pvmt.
wearing course thkn.
ACP unfeathered top ACP base course
Construct non-feathered
(See "EDGE DETAIL")
Top of ACP base, Extg. pvmt.
ACP wearing course
(When present)
Feather ACP base course
Extg. gravel surfacewearing course thkn.
ACP unfeathered
Thkn. - Var. (2" to 0)
Aggr. base
Thkn. - Var. (2" to 0)
(When present)
Asph. conc. base course
(Thkn. as shown on plans)
ACP wearing course
Extg. pvmt.
Thkn. - 2"
(When present)
ACP base course e x tg p v m t.
E d g e o f
See "EDGE DETAIL"
ACP wearing courseExtg. pvmt.
See "EDGE DETAIL"
Extg. A.C. pvmt.
Cold plane pvmt. removal
(Inlay to extg. asphalt conc. pvmt.)
not acceptable
Mill edge as shown
Nom. depth
Sawcut & seal
EDGE DETAIL
the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: June 1, 2026 - November 30, 2026
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
TM500
STANDARD DETAIL BLOCKS
PAVEMENT MARKING
T M
.d g n
Changed Min. widths for CH, TM, TM-40, and TS07-2020
07-01-2020N/A
DISABLED PARKING DETAIL (white)
4" white edge line
Edge of pavement
17'
1'
20'
4"
Direction of Traffic
36° 36°
3'
4'
36° 3'
4'
LL
L
L
LL
LL
L
LLL
LL
L
TS
LL
LL
L
L
LL
4'
Direc tionofTr affic
36° 3'
L
9'
3'
8" white line
1'
20'
4'
4" 8 " white line
12'12'12'
L For traversable medianL
9'
3'
L
12'
LL
1'
' 6
1'
For Centerline
DLL DLL-2
36°
36° 3'
Direction of Traffic
BYLD
L E G E N D
36°
36°
Direction of Traffic
CH
For lane lines in drop lanes
LL
For lane lines in acceleration/deceleration lanes
40'
40'
40'
10'
10'
40'
For lane extensions and bike lane extensions For lane extensionsFor lane extensions
TM-40
30'10'
8'
40'
20'
30'
10'
40' 40'
30'
30'
(Typ.)
Wheel Stop
YD
NPL
YBWB
TWL
WD-2
NPR
ND
Direction of Traffic
YLD
TM
4 " space
NDW
Thru Traffic Side
WD
D
YW-2W
2'
4" space
36°
36°
L
4" space
4" space
4"
4"
30'
4" YELLOW LINE
4" WHITE BROKEN LINE
4" space
LL
L
L
LL
LL L
L
LL
8'8'
6'6' 6'
2'2'
8'
1' space
8'
4" YELLOW BROKEN LINE
8" WHITE LINE4" WHITE LINE
10'
40'40'
8'
2'
1'
1'
1'
8" WHITE DOTTED LANE LINE4" WHITE DOTTED LANE LINE
Yellow Line Narrow Double
Yellow Line Narrow Double
YIELD LINE (white) for field layout angle orientation for field layout angle orientationfor field layout angle orientation striping plans
Lane line dimensions are shown on the Or Thru Traffic Side
Direction Of Traffic, Increasing Stationing
1' WHITE BARS AT 20' SPACING
CHEVRON BARS
BICYCLE YIELD LINE (white)
4" YELLOW LINES
NO-PASS RIGHT
Yellow Line Narrow Double for field layout angle orientation
4" white line
R o u te
A c c e s s ib le w h ite lin e
1' WHITE BARS AT 20' SPACING
TRANSVERSE SHOULDER BARS
4" YELLOW DOTTED LINE
4" white line
1' YELLOW BARS AT 40' SPACING
TRANSVERSE MEDIAN BARS
distance between left turn refuges exceeds 200' For use at painted medians where
Increasing Stationing Increasing Stationing
Yellow Line Narrow Double
2' (Typ.)
8" WHITE DOTTED LINE4" WHITE DOTTED LINE
1' YELLOW BARS AT 20' SPACING
TRANSVERSE MEDIAN BARS
3' 5"
4" YELLOW LINES
NO-PASS LEFT
4" YELLOW LINES
TWO-WAY LEFT TURN
TWO 4" WHITE LINES
NARROW DOUBLE NO-LANE CHANGE
TWO 4" YELLOW LINES
DOUBLE NO-PASS
TWO 4" YELLOW LINES
NARROW DOUBLE NO-PASS
(thru traffic side )
HC
4.5' min.
min.
4.5' min.
4.5' min.
4.5' the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: June 1, 2026 - November 30, 2026
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
TM520
SURFACE INSTALLED PROFILED
METHOD 'A' & METHOD 'D'
DURABLE PAVEMENT MARKINGS
T M
.d g n
07-05-2013N/A
8'
4"…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .