2026 MBM OR 217 Various Locations Bridge Paving

Closed State & local contract opportunity Posted

Solicitation number
S-73000-00017124
State
Oregon
Responses due

Opportunity facts

UNSPSC codes
Show all 25

Opportunity details come from oregonbuys.gov. Updated .

About this opportunity

The Oregon Department of Transportation (ODOT) is requesting bids on bridge paving work at various locations on OR 217 in Washington County under ITB S-73000-00017124, with bids due June 18, 2026. The project involves three bridge structures with a combined deck area of approximately 30,282 square feet and includes cold planing, micro-milling, membrane removal and installation, dense asphalt concrete placement, striping, and rumble strip installation across Hwy 144 over Hwy 29 (Bridge 09611), Hwy 144 over Beaverton Hillsdale Highway (Bridge 09612), and Hwy 144 Fanno Creek Crossing (Bridge 09457).

All work must comply with the 2024 Oregon Standard Specifications for Construction and prevailing wage rates established by the Oregon Bureau of Labor and Industries for BOLI Region 2, effective April 5, 2026. Bidders must hold current State Construction Contractors Board licensing and Public Works bonding prior to commencing work and provide satisfactory performance references from similar projects completed within the last three years.

The project cost estimate is $1,000,000 to $1,500,000 for bonding purposes. Bid security equal to 10% of the total bid amount is required. Payment is unit-priced based on actual measured quantities, which include 3,401 square yards of bridge deck cold plane removal, 3,667 square yards of bonded membrane removal, 1,533 tons of Level 4 dense asphalt concrete, and 0.21 miles of sinusoidal rumble strips across both continuous and gap patterns. Substantial completion is required by September 30, 2026, with final completion by October 15, 2026. Liquidated damages of $2,500 per calendar day apply for delays beyond substantial completion and $500 per 15 minutes per lane for unauthorized lane closures. Work is restricted to single-lane closures between 10:00 p.m. and 5:00 a.m. Sunday through Thursday, or 10:00 p.m. and 6:00 a.m. Friday and Saturday. ODOT will retain 5% of progress payments as retainage. Award will be made to the lowest responsive, responsible bidder and is contingent upon receipt of sufficient funding. No pre-bid conference is scheduled.

Opportunity text

The work, includes, but is not limited to: Contract requires Contractor furnish, place and compact of Level 4, ½" Dense ACP Mixture, cold plane pavement removal, micro-mill asphalt off of bridge decks, remove bonded membrane, furnish and place rolled membrane, provide and apply tack coat, furnish and install temporary pavement markings, furnish and install permanent striping, install rumble strips and traffic control.

Files

File Type Posted
Attachment B - Sample PI Contract.docx DOCX document
Preliminary Bid Results~81.xlsx XLSX spreadsheet
Attachment A Form A-2 Bid Pricing Form SS.xlsx XLSX spreadsheet
Exhibit 5 - Specifications~10.pdf PDF
00017124_Invitation to Bid.docx DOCX document

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity