T-38A/B/C Pacer Classic III (PCIII) Phase III & Talon Repair Inspection and Maintenance (TRIM) Program

Award Notice Posted

Not the latest version. See the latest pre-solicitation from .

Solicitation number
FA8220-19-R-0001
Agency
Awarded
to CPI Aerostructures Inc.
Set-aside
Total Small Business

Opportunity facts

Contract number
FA8220-19-D-0002 Federal IDV award
PSC
Not on record
Place of performance
TBD, United States

Notice details come from SAM.gov. Updated .

About this opportunity

This Award Notice is for the T-38A/B/C Pacer Classic III Phase III and Talon Repair Inspection and Maintenance program. The Department of the Air Force Materiel Command Lifecycle Management Center at Hill Air Force Base seeks to award an indefinite-delivery/indefinite-quantity contract to provide up to 180 structural modification kits over four years for Pacer Classic III and up to 169 kits and fastener kits over ten years for Talon Repair Inspection and Maintenance, with an estimated total value of $65.7 million over an 11-year period from 2019 to 2030.

Notice text

15 versions

Update #15 · Latest ·

The Air Force awarded a contract for T-38A/B/C Pacer Classic III - Phase III & Talon Repair Inspection and Maintenance (TRIM), in accordance with (IAW) the Statement of Work (SOW). The contractor shall provide T-38A/B/C Structural and Fastener kits IAW the SOW. The period of performance is July 2019 through July 2024 for the basic 5-year period, with an additional 5-year option period. This requirement was awarded as a small business set-aside. All Government requirements have been identified and can be referenced in the CLINs listed above. Requirements consist of Structural and Fastener Kits, First Articles, Data, Contractor Travel, Schedule Incentive, Option for Qualifying Additional Sources, Contractor Acquired Property, and Supplemental Kits with First Articles. This acquisition utilized a Subjective Past Performance and Cost/Price tradeoff source selection procedures in accordance with FAR 15.101-1, as supplemented. Tradeoffs were not made and no additional credit was given for exceeding acceptability. Award was made to the technically acceptable offer with the lowest evaluated cost/price, which is deemed responsible in accordance with the Federal Acquisition Regulations and whose proposal conformed to the solicitation requirements.

Delivery schedule: TBD on each Delivery Order.


Duration of the contract period: The total duration of this contract, including the exercise of any options shall not exceed 11 years total. The duration of this contract is comprised of a 5 year basic period and a 5 year option period for ordering, to include an additional 1 year for delivery.

. Awarded Vendors: CPI Aerostructures Inc.. Contract Award Dollar Amount: $65,700,000.00 Ceiling. Contract Award Date: 2019-07-26.

Update #14 ·

2/26/2019:
The purpose of this action is to post amendment #0009 to the Request for Proposal (RFP) for this effort. Please note that the due date for proposals has been extended until March 4th at 2:00PM MST.
2/19/2019:
The purpose of this action is to post amendment #0008 to the Request for Proposal (RFP) for this effort. Please note that the due date for proposals has been extended until February 27th at 2:00PM MST.
1/30/2019:
The purpose of this action is to post amendment #0007 to the Request for Proposal (RFP) for this effort. Please note that the due date for proposals has been extended until February 20th at 2:00PM MST.
1/24/2019:
The purpose of this action is to post amendment #0006 to the Request for Proposal (RFP) for this effort. Please note that the due date for proposals remains the same as January 31st at 2:00PM MST.
1/22/2019:
The purpose of this action is to post amendment #0005 to the Request for Proposal (RFP) for this effort. Please note that the due date for proposals remains the same as January 31st at 2:00PM MST.
1/18/2019:
The purpose of this action is to post amendment #0004 to the Request for Proposal (RFP) for this effort. Please note that the due date for proposals has been extended until January 31st at 2:00PM MST.
1/15/2019:
The purpose of this action is to post amendment #0003 to the Request for Proposal (RFP) for this effort. Please note that the due date for proposals remains the same as January 23rd at 2:00PM MST.
1/7/2019:
The purpose of this action is to post amendment #0002 to the Request for Proposal (RFP) for this effort. Please note that the due date for proposals has been extended until Wednesday January 23rd 2019 at 2:00PM MST.
12/12/2018:
The purpose of this action is to post amendment #0001 to the Request for Proposal (RFP) for this effort. Please note that the due date for proposals has been extended until Thursday January 10th 2019 at 2:00PM MST.
11/5/2018:
The purpose of this action is to post the final Request for Proposal (RFP) for this effort. Please note that the due date for proposals is by 19 December 2018 at 2:00PM MST.
11/5/2018:
The purpose of this action is to post an update (revision 01) to the Draft RFP Q & A's.
10/23/2018:
The purpose of this action is to post a revised Pre-solicitation Synopsis.
9/20/2018:
The purpose of this action is to post the Questions and Answers for the Draft RFP.
9/14/2018:
The purpose of this action is to post the Pre-solicitation Synopsis for the T-38A/B/C Pacer Classic III (PCIII) Phase III & Talon Repair Inspection and Maintenance (TRIM) Request for Proposal. The anticipated release for the Final RFP is in October 2018..

Update #13 ·

2/19/2019:
The purpose of this action is to post amendment #0008 to the Request for Proposal (RFP) for this effort. Please note that the due date for proposals has been extended until February 27th at 2:00PM MST.
1/30/2019:
The purpose of this action is to post amendment #0007 to the Request for Proposal (RFP) for this effort. Please note that the due date for proposals has been extended until February 20th at 2:00PM MST.
1/24/2019:
The purpose of this action is to post amendment #0006 to the Request for Proposal (RFP) for this effort. Please note that the due date for proposals remains the same as January 31st at 2:00PM MST.
1/22/2019:
The purpose of this action is to post amendment #0005 to the Request for Proposal (RFP) for this effort. Please note that the due date for proposals remains the same as January 31st at 2:00PM MST.
1/18/2019:
The purpose of this action is to post amendment #0004 to the Request for Proposal (RFP) for this effort. Please note that the due date for proposals has been extended until January 31st at 2:00PM MST.
1/15/2019:
The purpose of this action is to post amendment #0003 to the Request for Proposal (RFP) for this effort. Please note that the due date for proposals remains the same as January 23rd at 2:00PM MST.
1/7/2019:
The purpose of this action is to post amendment #0002 to the Request for Proposal (RFP) for this effort. Please note that the due date for proposals has been extended until Wednesday January 23rd 2019 at 2:00PM MST.
12/12/2018:
The purpose of this action is to post amendment #0001 to the Request for Proposal (RFP) for this effort. Please note that the due date for proposals has been extended until Thursday January 10th 2019 at 2:00PM MST.
11/5/2018:
The purpose of this action is to post the final Request for Proposal (RFP) for this effort. Please note that the due date for proposals is by 19 December 2018 at 2:00PM MST.
11/5/2018:
The purpose of this action is to post an update (revision 01) to the Draft RFP Q & A's.
10/23/2018:
The purpose of this action is to post a revised Pre-solicitation Synopsis.
9/20/2018:
The purpose of this action is to post the Questions and Answers for the Draft RFP.
9/14/2018:
The purpose of this action is to post the Pre-solicitation Synopsis for the T-38A/B/C Pacer Classic III (PCIII) Phase III & Talon Repair Inspection and Maintenance (TRIM) Request for Proposal. The anticipated release for the Final RFP is in October 2018..

Update #12 ·

1/30/2019:
The purpose of this action is to post amendment #0007 to the Request for Proposal (RFP) for this effort. Please note that the due date for proposals has been extended until February 20th at 2:00PM MST.
1/24/2019:
The purpose of this action is to post amendment #0006 to the Request for Proposal (RFP) for this effort. Please note that the due date for proposals remains the same as January 31st at 2:00PM MST.
1/22/2019:
The purpose of this action is to post amendment #0005 to the Request for Proposal (RFP) for this effort. Please note that the due date for proposals remains the same as January 31st at 2:00PM MST.
1/18/2019:
The purpose of this action is to post amendment #0004 to the Request for Proposal (RFP) for this effort. Please note that the due date for proposals has been extended until January 31st at 2:00PM MST.
1/15/2019:
The purpose of this action is to post amendment #0003 to the Request for Proposal (RFP) for this effort. Please note that the due date for proposals remains the same as January 23rd at 2:00PM MST.
1/7/2019:
The purpose of this action is to post amendment #0002 to the Request for Proposal (RFP) for this effort. Please note that the due date for proposals has been extended until Wednesday January 23rd 2019 at 2:00PM MST.
12/12/2018:
The purpose of this action is to post amendment #0001 to the Request for Proposal (RFP) for this effort. Please note that the due date for proposals has been extended until Thursday January 10th 2019 at 2:00PM MST.
11/5/2018:
The purpose of this action is to post the final Request for Proposal (RFP) for this effort. Please note that the due date for proposals is by 19 December 2018 at 2:00PM MST.
11/5/2018:
The purpose of this action is to post an update (revision 01) to the Draft RFP Q & A's.
10/23/2018:
The purpose of this action is to post a revised Pre-solicitation Synopsis.
9/20/2018:
The purpose of this action is to post the Questions and Answers for the Draft RFP.
9/14/2018:
The purpose of this action is to post the Pre-solicitation Synopsis for the T-38A/B/C Pacer Classic III (PCIII) Phase III & Talon Repair Inspection and Maintenance (TRIM) Request for Proposal. The anticipated release for the Final RFP is in October 2018..

Update #11 ·

1/24/2019:
The purpose of this action is to post amendment #0006 to the Request for Proposal (RFP) for this effort. Please note that the due date for proposals remains the same as January 31st at 2:00PM MST.
1/22/2019:
The purpose of this action is to post amendment #0005 to the Request for Proposal (RFP) for this effort. Please note that the due date for proposals remains the same as January 31st at 2:00PM MST.
1/18/2019:
The purpose of this action is to post amendment #0004 to the Request for Proposal (RFP) for this effort. Please note that the due date for proposals has been extended until January 31st at 2:00PM MST.
1/15/2019:
The purpose of this action is to post amendment #0003 to the Request for Proposal (RFP) for this effort. Please note that the due date for proposals remains the same as January 23rd at 2:00PM MST.
1/7/2019:
The purpose of this action is to post amendment #0002 to the Request for Proposal (RFP) for this effort. Please note that the due date for proposals has been extended until Wednesday January 23rd 2019 at 2:00PM MST.
12/12/2018:
The purpose of this action is to post amendment #0001 to the Request for Proposal (RFP) for this effort. Please note that the due date for proposals has been extended until Thursday January 10th 2019 at 2:00PM MST.
11/5/2018:
The purpose of this action is to post the final Request for Proposal (RFP) for this effort. Please note that the due date for proposals is by 19 December 2018 at 2:00PM MST.
11/5/2018:
The purpose of this action is to post an update (revision 01) to the Draft RFP Q & A's.
10/23/2018:
The purpose of this action is to post a revised Pre-solicitation Synopsis.
9/20/2018:
The purpose of this action is to post the Questions and Answers for the Draft RFP.
9/14/2018:
The purpose of this action is to post the Pre-solicitation Synopsis for the T-38A/B/C Pacer Classic III (PCIII) Phase III & Talon Repair Inspection and Maintenance (TRIM) Request for Proposal. The anticipated release for the Final RFP is in October 2018..

Update #10 ·

1/22/2019:
The purpose of this action is to post amendment #0005 to the Request for Proposal (RFP) for this effort. Please note that the due date for proposals remains the same as January 31st at 2:00PM MST.
1/18/2019:
The purpose of this action is to post amendment #0004 to the Request for Proposal (RFP) for this effort. Please note that the due date for proposals has been extended until January 31st at 2:00PM MST.
1/15/2019:
The purpose of this action is to post amendment #0003 to the Request for Proposal (RFP) for this effort. Please note that the due date for proposals remains the same as January 23rd at 2:00PM MST.
1/7/2019:
The purpose of this action is to post amendment #0002 to the Request for Proposal (RFP) for this effort. Please note that the due date for proposals has been extended until Wednesday January 23rd 2019 at 2:00PM MST.
12/12/2018:
The purpose of this action is to post amendment #0001 to the Request for Proposal (RFP) for this effort. Please note that the due date for proposals has been extended until Thursday January 10th 2019 at 2:00PM MST.
11/5/2018:
The purpose of this action is to post the final Request for Proposal (RFP) for this effort. Please note that the due date for proposals is by 19 December 2018 at 2:00PM MST.
11/5/2018:
The purpose of this action is to post an update (revision 01) to the Draft RFP Q & A's.
10/23/2018:
The purpose of this action is to post a revised Pre-solicitation Synopsis.
9/20/2018:
The purpose of this action is to post the Questions and Answers for the Draft RFP.
9/14/2018:
The purpose of this action is to post the Pre-solicitation Synopsis for the T-38A/B/C Pacer Classic III (PCIII) Phase III & Talon Repair Inspection and Maintenance (TRIM) Request for Proposal. The anticipated release for the Final RFP is in October 2018..

Update #9 ·

1/18/2019:
The purpose of this action is to post amendment #0004 to the Request for Proposal (RFP) for this effort. Please note that the due date for proposals has been extended until January 31st at 2:00PM MST.
1/15/2019:
The purpose of this action is to post amendment #0003 to the Request for Proposal (RFP) for this effort. Please note that the due date for proposals remains the same as January 23rd at 2:00PM MST.
1/7/2019:
The purpose of this action is to post amendment #0002 to the Request for Proposal (RFP) for this effort. Please note that the due date for proposals has been extended until Wednesday January 23rd 2019 at 2:00PM MST.
12/12/2018:
The purpose of this action is to post amendment #0001 to the Request for Proposal (RFP) for this effort. Please note that the due date for proposals has been extended until Thursday January 10th 2019 at 2:00PM MST.
11/5/2018:
The purpose of this action is to post the final Request for Proposal (RFP) for this effort. Please note that the due date for proposals is by 19 December 2018 at 2:00PM MST.
11/5/2018:
The purpose of this action is to post an update (revision 01) to the Draft RFP Q & A's.
10/23/2018:
The purpose of this action is to post a revised Pre-solicitation Synopsis.
9/20/2018:
The purpose of this action is to post the Questions and Answers for the Draft RFP.
9/14/2018:
The purpose of this action is to post the Pre-solicitation Synopsis for the T-38A/B/C Pacer Classic III (PCIII) Phase III & Talon Repair Inspection and Maintenance (TRIM) Request for Proposal. The anticipated release for the Final RFP is in October 2018..

Update #8 ·

1/15/2019:
The purpose of this action is to post amendment #0003 to the Request for Proposal (RFP) for this effort. Please note that the due date for proposals remains the same as January 23rd at 2:00PM MST.
1/7/2019:
The purpose of this action is to post amendment #0002 to the Request for Proposal (RFP) for this effort. Please note that the due date for proposals has been extended until Wednesday January 23rd 2019 at 2:00PM MST.
12/12/2018:
The purpose of this action is to post amendment #0001 to the Request for Proposal (RFP) for this effort. Please note that the due date for proposals has been extended until Thursday January 10th 2019 at 2:00PM MST.
11/5/2018:
The purpose of this action is to post the final Request for Proposal (RFP) for this effort. Please note that the due date for proposals is by 19 December 2018 at 2:00PM MST.
11/5/2018:
The purpose of this action is to post an update (revision 01) to the Draft RFP Q & A's.
10/23/2018:
The purpose of this action is to post a revised Pre-solicitation Synopsis.
9/20/2018:
The purpose of this action is to post the Questions and Answers for the Draft RFP.
9/14/2018:
The purpose of this action is to post the Pre-solicitation Synopsis for the T-38A/B/C Pacer Classic III (PCIII) Phase III & Talon Repair Inspection and Maintenance (TRIM) Request for Proposal. The anticipated release for the Final RFP is in October 2018..

Update #7 ·

1/7/2019:
The purpose of this action is to post amendment #0002 to the Request for Proposal (RFP) for this effort. Please note that the due date for proposals has been extended until Wednesday January 23rd 2019 at 2:00PM MST.
12/12/2018:
The purpose of this action is to post amendment #0001 to the Request for Proposal (RFP) for this effort. Please note that the due date for proposals has been extended until Thursday January 10th 2019 at 2:00PM MST.
11/5/2018:
The purpose of this action is to post the final Request for Proposal (RFP) for this effort. Please note that the due date for proposals is by 19 December 2018 at 2:00PM MST.
11/5/2018:
The purpose of this action is to post an update (revision 01) to the Draft RFP Q & A's.
10/23/2018:
The purpose of this action is to post a revised Pre-solicitation Synopsis.
9/20/2018:
The purpose of this action is to post the Questions and Answers for the Draft RFP.
9/14/2018:
The purpose of this action is to post the Pre-solicitation Synopsis for the T-38A/B/C Pacer Classic III (PCIII) Phase III & Talon Repair Inspection and Maintenance (TRIM) Request for Proposal. The anticipated release for the Final RFP is in October 2018..

Update #6 ·

12/12/2018:
The purpose of this action is to post amendment #0001 to the Request for Proposal (RFP) for this effort. Please note that the due date for proposals has been extended until Thursday January 10th 2019 at 2:00PM MST.
11/5/2018:
The purpose of this action is to post the final Request for Proposal (RFP) for this effort. Please note that the due date for proposals is by 19 December 2018 at 2:00PM MST.
11/5/2018:
The purpose of this action is to post an update (revision 01) to the Draft RFP Q & A's.
10/23/2018:
The purpose of this action is to post a revised Pre-solicitation Synopsis.
9/20/2018:
The purpose of this action is to post the Questions and Answers for the Draft RFP.
9/14/2018:
The purpose of this action is to post the Pre-solicitation Synopsis for the T-38A/B/C Pacer Classic III (PCIII) Phase III & Talon Repair Inspection and Maintenance (TRIM) Request for Proposal. The anticipated release for the Final RFP is in October 2018..

Update #5 ·

11/5/2018:
The purpose of this action is to post the final Request for Proposal (RFP) for this effort. Please note that the due date for proposals is by 19 December 2018 at 2:00PM MST.
11/5/2018:
The purpose of this action is to post an update (revision 01) to the Draft RFP Q & A's.
10/23/2018:
The purpose of this action is to post a revised Pre-solicitation Synopsis.
9/20/2018:
The purpose of this action is to post the Questions and Answers for the Draft RFP.
9/14/2018:
The purpose of this action is to post the Pre-solicitation Synopsis for the T-38A/B/C Pacer Classic III (PCIII) Phase III & Talon Repair Inspection and Maintenance (TRIM) Request for Proposal. The anticipated release for the Final RFP is in October 2018..

Update #4 ·

11/5/2018
The purpose of this action is to post an update (revision 01) to the Draft RFP Q & A's.
10/23/2018:
The purpose of this action is to post a revised Pre-solicitation Synopsis.
9/20/2018:
The purpose of this action is to post the Questions and Answers for the Draft RFP.
9/14/2018:
The purpose of this action is to post the Pre-solicitation Synopsis for the T-38A/B/C Pacer Classic III (PCIII) Phase III & Talon Repair Inspection and Maintenance (TRIM) Request for Proposal. The anticipated release for the Final RFP is in October 2018..

Update #3 ·

10/23/2018:
The purpose of this action is to post a revised Pre-solicitation Synopsis.
9/20/2018:
The purpose of this action is to post the Questions and Answers for the Draft RFP.
9/14/2018:
The purpose of this action is to post the Pre-solicitation Synopsis for the T-38A/B/C Pacer Classic III (PCIII) Phase III & Talon Repair Inspection and Maintenance (TRIM) Request for Proposal. The anticipated release for the Final RFP is in October 2018..

Update #2 ·

9/20/2018:
The purpose of this action is to post the Questions and Answers for the Draft RFP.
9/14/2018:
The purpose of this action is to post the Pre-solicitation Synopsis for the T-38A/B/C Pacer Classic III (PCIII) Phase III & Talon Repair Inspection and Maintenance (TRIM) Request for Proposal. The anticipated release for the Final RFP is in October 2018..

Update #1 ·

9/14/2018:
The purpose of this action is to post the Pre-solicitation Synopsis for the T-38A/B/C Pacer Classic III (PCIII) Phase III & Talon Repair Inspection and Maintenance (TRIM) Request for Proposal. The anticipated release for the Final RFP is in October 2018..

Files

File Type Posted
FA822019R0001_______0009.pdf PDF
FA822019R0001_______0008.pdf PDF
FA822019R0001_______0007.pdf PDF
RFP_Attachment_6_Phase-III_TRIM_TEP_Pricing_Matrix_R01_23Jan19.xlsx XLSX spreadsheet
FA822019R0001_______0006.pdf PDF
Question_&_Answer_for_RFP_23Jan19.xlsx XLSX spreadsheet
RFP_Attachment_15_Section_M_R02_23Jan19.pdf PDF
RFP_Attachment_14_Section_L_R02_23Jan19.pdf PDF
FA822019R0001_______0005.pdf PDF
Question_&_Answer_for_RFP_18Jan2019.xlsx XLSX spreadsheet
FA822019R0001_______0004.pdf PDF
Question_&_Answer_for_RFP_14Jan2019.xlsx XLSX spreadsheet
FA822019R0001_______0003.pdf PDF
FA822019R0001_______0002.pdf PDF
FA822019R0001_______0001.pdf PDF
RFP_Attachment_14_Section_L_R01_04Dec18.pdf PDF
T-38_TRIM_Projected_Delivery_Schedule_03Dec18.pdf PDF
T-38_PCIII_Projected_Delivery_Schedule_03Dec18.pdf PDF
Question_&_Answer_for_RFP_04Dec18.pdf PDF
RFP_Attachment_15_Section_M_R01_04Dec18.pdf PDF
RFP_Attachment_6_Phase-III_TRIM_TEP_Pricing_Matrix_05Nov18.xlsx XLSX spreadsheet
RFP_Attachment_13_TRIM_Incentive_Table_05Nov18.xlsx XLSX spreadsheet
RFP_Attachment_1_Past_Performance_Information_PPI_Instructions_05Nov18.pdf PDF
RFP_Attachment_8_PPI_Tool_05Nov18.accdb MDB file
RFP_Attachment_10_CDRLs_TRIM_16Oct18.pdf PDF
RFP_Attachment_11_T38_TRIM_PCIII_SOW_05Nov18.pdf PDF
RFP_Attachment_16_AFMCForm158_T-38_25Sep18.pdf PDF
RFP_Attachment_14_Section_L_05Nov18.pdf PDF
FA822019R0001.pdf PDF
RFP_Attachment_3_Teaming_Partner_Consent_Letter_05Nov18.pdf PDF
RFP_Attachment_15_Section_M_05Nov18.pdf PDF
RFP_Attachment_4_Past_Performance_Questionnaire_05Nov18.pdf PDF
RFP_Attachment_2_Past_Performance_Information_Sheet_05Nov18.pdf PDF
RFP_Attachment_17_DDForm1653_T-38_24Oct18.pdf PDF
RFP_Attachment_12_TRIM_Incentive_Plan_05Nov18.pdf PDF
RFP_Attachment_7_Cross_Reference_Matrix_05Nov18.pdf PDF
RFP_Attachment_5_Client_Authorization_05Nov18.pdf PDF
RFP_Attachment_9_CDRLs_Phase_III_16Oct18.pdf PDF
Question_and_Answer_for_Draft_RFP_R01_05Nov18.pdf PDF
Pre-Solicitation_Synopsis_of_FA8220-19-R-0001_PCIII_Phase_III_and_TRIM_R01.docx DOCX document
Question_and_Answer_for_Draft_RFP.pdf PDF
Synopsis_of_FA8220-19-R-0001_PCIII_Phase_III_and_TRIM.docx DOCX document
Show all 42

Notice history

Notice Type Posted
Contractor Field Team Latest pre-solicitation Pre-Solicitation
This notice Award Award Notice

Similar open opportunities

Opportunity Agency Set-aside Responses due
T-38 Accessory Drive Gearbox Remanufacture NAICS 336413 Air Force Sustainment Center No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors