Question_and_Answer_for_Draft_RFP.pdf

PDF 92 KB Posted

Attached to
T-38A/B/C Pacer Classic III (PCIII) Phase III & Talon Repair Inspection and Maintenance (TRIM) Program
Solicitation number
FA8220-19-R-0001
Issued by

About this file

This document contains questions and answers related to a draft request for proposal for T-38 Pacer Classic III Phase III and Talon Repair Inspection and Maintenance programs. The Air Force is seeking proposals for continued aircraft maintenance and repair services for 59 T-38A/B aircraft and an unspecified number of T-38C aircraft. Key details include incentive plans applying only to TRIM kits, definitions of critical subcontractors as those performing at least 20% of contract value or manufacturing/assembly work, and page count exclusions for cover pages and integrated master schedules in proposals.

Q&A for the Draft RFP

View the file

Other files

File Type Posted
FA822019R0001_______0009.pdf PDF
FA822019R0001_______0008.pdf PDF
FA822019R0001_______0007.pdf PDF
RFP_Attachment_14_Section_L_R02_23Jan19.pdf PDF
RFP_Attachment_6_Phase-III_TRIM_TEP_Pricing_Matrix_R01_23Jan19.xlsx XLSX spreadsheet
Question_&_Answer_for_RFP_23Jan19.xlsx XLSX spreadsheet
RFP_Attachment_15_Section_M_R02_23Jan19.pdf PDF
FA822019R0001_______0006.pdf PDF
FA822019R0001_______0005.pdf PDF
FA822019R0001_______0004.pdf PDF
Question_&_Answer_for_RFP_18Jan2019.xlsx XLSX spreadsheet
Question_&_Answer_for_RFP_14Jan2019.xlsx XLSX spreadsheet
FA822019R0001_______0003.pdf PDF
FA822019R0001_______0002.pdf PDF
RFP_Attachment_15_Section_M_R01_04Dec18.pdf PDF
RFP_Attachment_14_Section_L_R01_04Dec18.pdf PDF
T-38_TRIM_Projected_Delivery_Schedule_03Dec18.pdf PDF
Question_&_Answer_for_RFP_04Dec18.pdf PDF
FA822019R0001_______0001.pdf PDF
T-38_PCIII_Projected_Delivery_Schedule_03Dec18.pdf PDF
RFP_Attachment_4_Past_Performance_Questionnaire_05Nov18.pdf PDF
RFP_Attachment_15_Section_M_05Nov18.pdf PDF
RFP_Attachment_3_Teaming_Partner_Consent_Letter_05Nov18.pdf PDF
RFP_Attachment_8_PPI_Tool_05Nov18.accdb MDB file
RFP_Attachment_13_TRIM_Incentive_Table_05Nov18.xlsx XLSX spreadsheet
RFP_Attachment_6_Phase-III_TRIM_TEP_Pricing_Matrix_05Nov18.xlsx XLSX spreadsheet
RFP_Attachment_16_AFMCForm158_T-38_25Sep18.pdf PDF
RFP_Attachment_1_Past_Performance_Information_PPI_Instructions_05Nov18.pdf PDF
RFP_Attachment_11_T38_TRIM_PCIII_SOW_05Nov18.pdf PDF
RFP_Attachment_14_Section_L_05Nov18.pdf PDF
FA822019R0001.pdf PDF
RFP_Attachment_10_CDRLs_TRIM_16Oct18.pdf PDF
RFP_Attachment_9_CDRLs_Phase_III_16Oct18.pdf PDF
RFP_Attachment_12_TRIM_Incentive_Plan_05Nov18.pdf PDF
RFP_Attachment_17_DDForm1653_T-38_24Oct18.pdf PDF
RFP_Attachment_7_Cross_Reference_Matrix_05Nov18.pdf PDF
RFP_Attachment_2_Past_Performance_Information_Sheet_05Nov18.pdf PDF
RFP_Attachment_5_Client_Authorization_05Nov18.pdf PDF
Question_and_Answer_for_Draft_RFP_R01_05Nov18.pdf PDF
Pre-Solicitation_Synopsis_of_FA8220-19-R-0001_PCIII_Phase_III_and_TRIM_R01.docx DOCX document
Synopsis_of_FA8220-19-R-0001_PCIII_Phase_III_and_TRIM.docx DOCX document
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

19 Section L.II.A.2: “2. Print shall be no smaller than a font size of 12…”

1. Recommend the addition that “Charts, graphs, drawings, diagrams, supporting illustrations, or spreadsheets…” print shall be no smaller than a font size of 10.

The Government agrees and has updated the font size to allow no smaller than a font size of 10.

No.

These are organized by subkit (BXE, CXE, DXE, etc). Each subkit should have a form 185 (BOM) and EDL (Engineering Data List) file. Under each folder should be a zip folder which contains the pdf drawing data and an HTML file that can be used to link the desired page of specification or drawing. If a drawing is missing, please contact the Government contracting office listed on the RFP.

The mylars are listed in the EDL and associated HTML file as “MY.” The loft data book is NAI57-84 for T-38. Since there are some parts based off of F-5, also included is NAI62-82.

How is the information on the TDP DVD's organized? (We are having trouble matching items on the BOM to specific drawings/file names.)

Similar, but different for A/B models. The Base Kit A will be required for each TRIM model (A/B and C models).

The B kit will be required just for A/B (currently 59 aircraft) not for the C models.

Yes, the Incentive Plan is just for TRIM Kits.

Yes, submit both documents.

No, the spreadsheet is provided for information only. No, alternate percentages need not be submitted.

Offerors are not ranked by the technical volume. See Section M for significance.

Significantly more in accordance with Section M, as its a subjective tradeoff.

Advance funding will not be provided up front for expedite purposes.

FAT lab has a total of 120 days which should be included into the decision for accelerated production. DCMA support for source inspection would support accelerated production with prior notice to government.

Yes. Through an Engineering Assistance Request (EARs).

Not specified contractually. The government will respond to technical questions no later than 10 business days. If additional information or further analysis is required, the response time may be extended up to 20 business days.

If late delivery results from one or more of the source directed parts listed for each program, and the contractor is not deemed at fault for late delivery, the Government will not assess liquidated damages.

Two PMRs could possibly require travel per year.

Locations will alternate between: Contractor facilities, Hill AFB, or Randolph AFB.

Are there any 3d models (.stp files, etc.) available for any of these parts?

Is there a master data set available that includes mylar's and loft data?

Please advise, if a decision has been made not to include the purchased hardware with the Pacer (III) and TRIM kits for FA8220-18-R-0001.

Do the TRIM Kits roll-up into 1 kit similar to the Phase III top kit and is that how the Government intends to procure? What’s the difference between the Base Kit A and Base Kit B?

In the Past Performance Section, do we submit the Attachment 2 documents along with the printout generated by the PPI tool?

Are we supposed to submit the Incentive spreadsheet with our proposal? Are we to provide alternate percentages and if so, how does that get evaluated/factored into award decision?

Section M states that the Technical Volume is either acceptable or unacceptable. Since it’s the most important factor, does the Government intend to rank each offerors volume?

How much more weight is given to the Technical and Past Performance Volumes over the Cost/Price Volume in the evaluation?

To achieve early delivery, is customer willing to provide funds for expedites or up-front material purchase either through advance funding or performance-based payments?

Will customer provide dedicated engineering support to resolve engineering issues such as engineering errors, obsolete hardware and chemicals no longer commercially available?

What is the time limit that the Govt. has to respond to technical questions (to avoid affecting delivery schedule and financial penalties)?

Will there be penalties for schedule delays on source-directed parts?

How much travel will be required for progress meetings?

What location will meetings be held?

Will Government source inspection support an accelerated production schedule?

Draft RFP Q&A for FA8220-18-R-0001/FA8220-19-R-0001, T-38 Pacer Classic III (PCIII) - Phase III & Talon Repair Inspection and Maintenance (TRIM) Offeror Question

Please confirm the Incentive plan applies only to the TRIM Kits and not to the Phase III Kits.

We are attempting to get a few SAR’s ready to submit and are missing one of the part number drawings. We have drawings for 2-11412 and 2-11308 but are missing drawings for 3-11608. Is there a possibility of providing the drawing for 3-11608 for us to work the SAR on that part number?

Government Response

Drawing 3-11608 is included in the PCIII and TRIM TDPs. Please let us know of any issues.

The government has decided to include any applicable Fastener requirements for the Pacer Classic III Phase III and TRIM efforts within the solicitation CLIN structure.

Section L.II.D.2: “Each offeror/joint venture member shall complete a separate Past Performance Information Sheet (See RFP Attachment 2) for three (3) active or completed contract… For each critical subcontractor included in the offeror's proposal, a Past Performance Information Sheet for three (3) of their most recent and relevant contracts shall also be included.”

1. Recommend the deletion of “three (3)”. There isn’t enough page count in Volume III Past Performance to include three narratives from each subcontractor and three narratives from the Prime.

Alternately, limit the PPIS from each critical subcontractor to 1 per Section L.II.D.7.

Alternately, limit the page count of the volume based on each submitted PPIS; for example, if 3 PPIS from the Prime, and 3 PPIS from one critical subcontractor, and 3 PPIS from another critical subcontractor are required, then a page limitation of 6 per PPIS (reference Section L.II.D.7) plus an additional 5 pages for the other required information would establish a total page limitation of 59.

Alternately, keep the 6 page page limitation for each PPIS, but exclude it from the total volume page count.

Section L.II.D.7: “This is in addition to qualifying critical subcontractors for the current effort (as specified in Section L) being able to provide one Past Performance Information Sheet…”

1. Conflicts with Section L.II.D.2 requiring three (3) PPIS from each critical subcontractor.

1. The Government agrees with keeping the 6 page limitation for each PPIS, but to exclude it from the total volume page count.

The government has corrected Section L paragraph II. D. 7. to include the following: "This is in addition to qualifying critical subcontractors for the current effort (as specified in Section L) being able to provide three Past Performance Information Sheet providing past performance data for tasks they will execute under the proposed T- 38 Pacer Classic III (PCIII) Phase III and Talon Repair Inspection and Maintenance (TRIM) contract."

Section L.II.A.3: “The page limitations include any cover page…”

1. Recommend that the cover page be excluded from the page count.

Additionally, exclude the detailed IMS required of Subfactor C, para 3.3.1 from the page count.

Section L.II.D.1: “Offerors shall submit present and past performance information for itself and any joint venture member, as well as each proposed critical subcontractor in accordance with the format contained in the “Past Performance Information Instructions” (See RFP Attachment 1) and the following paragraphs. A critical subcontractor is defined as an entity (subcontractor and/or teaming contractor), other than the offeror itself that will perform at least 20% of the manufacturing and/or assembly work by part quantity or weight…”

1. Recommend that a critical subcontractor be defined as performing at least 20% of the total contract value.

Alternately, omit “by weight” and define the critical subcontractor to at least 20% of the manufacturing and/or assembly work by part quantity.

The cover page (one page) and IMS will be excluded from the page count.

1. The Government definition will remain as previously stated in Section L.

Sheet1

File details come from the government source that posted it. Updated .