FA822019R0001_______0003.pdf
PDF 277 KB Posted
- Attached to
- T-38A/B/C Pacer Classic III (PCIII) Phase III & Talon Repair Inspection and Maintenance (TRIM) Program
- Solicitation number
- FA8220-19-R-0001
About this file
This document is a pre-solicitation synopsis for a request for proposal related to the T-38A/B/C Pacer Classic III Phase III and Talon Repair Inspection and Maintenance program. The synopsis provides notice that the Air Force Materiel Command Lifecycle Management Center intends to release a final RFP in October 2018 seeking products and services including aircraft modification kits, hardware kits, data deliverables, travel support, and early delivery incentives. Interested offerors are advised to monitor the Federal Business Opportunities website in October for additional details on response dates and requirements.
Amendment #0003
View the file
Other files
Show all 41
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
JS
2. AMENDMENT/MODIFICATION NO.
FA8220-19-R-0001-0003
3. EFFECTIVE DATE
15 JAN 2019
4. REQUISITION/PURCHASE REQ. NO.
F2DCCP
5. PROJECT NO (If applicable)
6. ISSUED BY CODE
DEPARTMENT OF THE AIR FORCE, DIRECTORATE OF CONTRACTING
AFLCMC WLDKAA
6072 FIR AVENUE BLDG 1233
HILL AIR FORCE BASE UT 84056-5820
BUYER: Casey J. Hodson/AFLCMC casey.hodson@us.af.mil Phone: (801) 777- 8416 Fax: (801) 777-5777 No Collect Calls
7. ADMINISTERED BY (If other than item 6) CODEFA8220
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
CODE
X
9A. AMENDMENT OF SOLICITATION NO.
FA822019R0001
9B. DATED (SEE ITEM 11)
5-NOV-2018
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods. ( a ) By completing Items 8 and 15, and returning copies of the amendment; ( b ) By acknowledging receipt of this amendment on each copy of the offer submitted; or ( c ) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
ROUTINE
T-38 Pacer Classic III - Phase III and TRIM Aircraft Structural Modification Kits and Fastener Modification Kits.
Notice to Offeror(s)/Supplier(s): Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs.
15A. NAME AND TITLE OF SIGNER (Type or print)
15B. CONTRACTOR/OFFEROR
BY ________________________________________________________
(Signature of person authorized to sign)
15C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16B. UNITED STATES OF AMERICA
BY ____________________________________________________
(Signature of Contracting Officer)
16C. DATE SIGNED
FACILITY CODE
NSN 7540-01-152-8070
PREVIOUS EDITION UNUSABLE
30-105 STANDARD FORM 30 (REV. 10-83)
PRESCRIBED BY GSA
FAR (48 CFR) 53.243
X
X X
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
FA8220-19-R-0001-0003
Continuation of block 14. DESCRIPTION OF AMENDMENT/MODIFICATION
The purpose of this amendment is to identify and perform the following actions:
1. The proposal due date remains unchanged as Wednesday January 23rd 2019 at
2:00PM MST.
2. The Transportation FOB is being corrected as follows:
Base Ordering Period CLINs: 0003, 0005, 0007, 0009, 0011, 0013, 0015, 0017, 0019, 0023, 0025, 0027, 0033, 0035, 0037, 0039, 0041, 0043, 0045, 0047, 0057, and 0058:
From: Destination To: Origin
Optional Ordering Period CLINs:1003, 1005, 1007, 1009, 1011, 1013, 1015, 1017, 1019, 1023, 1025, 1027, 1033, 1035, 1037, 1039, 1041, 1043, 1045, 1047, 1057, and 1058:
From: Destination To: Origin
3. All RFP questions and answers to date have been posted to the Federal Business Opportunities (FBO) website along with this amendment, under the following filename:
a. Question & Answer for RFP_14Jan2019
All other terms and conditions remain unchanged.
PART I - THE SCHEDULE
SECTION B
SUPPLIES OR SERVICES AND PRICES/COSTS
1. Scope/Purpose This contract is an Indefinite Delivery/Indefinite Quantity (IDIQ) contract for the Pacer Classic III - Phase III and Talon Repair Inspection and Maintenance (TRIM) Aircraft Structural Modification Kits, Fastener Kits, Travel, and Data, Early Delivery Incentive, Option for Qualifying Addtional Sources, Non-Recurring Engineering, and Supplemental Kits, in support of the T-38 program.
Contract Line Item Numbers (CLINs) and Terms and Conditions (T&Cs) are annotated for the acquisition of the T-38 kits and support in accordance with the Statement of Work (SOW) in Section J, Attachment 11. Each Delivery Order (DO) shall stand alone, but can be combined with other orders for quantity ranges/pricing purposes if awarded at the same time, and shall specify the kits and/or support being acquired. Section J, Attachment 6, Total Evaluated Price Pricing Matrix, CLINs 0001 through 0057 and Section J, Attachment 6, Supplemental Kits Labor Categories, CLIN 0056 as submitted by the offerors will be used to establish contract unit prices and labor rates eleven years from date of award.
2. Technical Data Packages The Technical Data Package (TDP) is provided separately on DVD. Offerors may request a copy of the TDP by e-mailing the Contracting Officer (CO), russell.walter.1@us.af.mil; or Contract Specialists (CS) casey.hodson@us.af.mil. When a TDP is requested, offerors will be provided with a Nondisclosure Agreement (NDA) form if the government does not currently have an NDA with them. When the completed nondisclosure form has been returned to the CO or CS, a copy of the TDP will be mailed to the address provided on the form.
3. Liquidated Damages The contract will include FAR 52.211-11, Liquidated Damages - Supplies, Services, or Research and Development for use only when the contractor is late on delivery of aircraft kits, the contracting officer has taken all reasonable steps to mitigate liquidated damages, and the government suffers damages. In accordance with FAR 52.211-11(c), if any of the nine (9) source directed parts in Table 1 - PCIII Source Directed Parts or the six (6) source directed parts in Table 2 - TRIM Source Directed Parts of the SOW are determined to be the cause of late delivery and the contractor is not deemed at fault, liquidated damages will not apply. The contractor shall take reasonable steps to avoid incurring liquidated damages to include, but are not limited to:
a. Establishing subcontracts lead time away for source directed parts to meet each DO's requirements;
b. Providing adequate oversight of subcontractors; and
c. Providing documentation and notify the Government immediately upon learning late delivery is anticipated or imminent source directed parts will result in late delivery.
If the government assesses liquidated damages, each instance of late delivery liquidated damages will be assessed as shown in the liquidated damages table below:
4. Period of Performance The base ordering period for this contract will be five years from contract award, estimated as 1 April 2019 to 31 March 2024. There is also an optional five year ordering period if exercised, and is estimated as 1 April 2024 to 31 March 2029. An additional one year for delivery is allowed for any orders placed at the end of an ordering period.
The total Period of Performance for this contract is to be completed within eleven years, estimated as 31 March 2030.
5. Pricing All unit/total pricing for this effort shall be submitted in RFP Attachment #6 Total Evaluated Pricing Matrix only.
6. Communications Please note that instructions/details for providing proposal information are identified in Section L paragraph 2 "Communications," and should be followed to avoid potential problems with proposal submission.
7. CLIN Structure CLINs 0001-0057 designate the Basic Ordering Period.
CLINs 1001-1057 designate the Optional Ordering Period.
Basic Ordering Period April 1, 2019 - March 31, 2024
PHASE III - AIRCRAFT MODIFICATION KIT
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Amount
61 KT *Submit in Pricing Matrix
* The contractor shall complete Attachment 6, Unit Pricing Matrix, showing quantity price breaks by calendar year as applicable to the SOW requirements associated with this CLIN.
The contractor shall reference the corresponding Form 462-Attachment A and any other documents within the Technical Data Package (TDP), for a list of all applicable engineering data requirements and restrictions.
This kit contains the following source directed parts and includes clarifying language pertaining to Liquidated Damages:
*110-1101-13 Upper (Cockpit)
Longeron F.S.
144-284 LH
*3-11413-3 Steel Dorsal
Longeron, F.S.
284-445, LH
2-11412-13 Upper (Center) Longeron, F.S.
284-325, LH
2-11308-13 Lower (Center) Longeron, F.S. 284-325, LH
3-11608-503 C.F.S. 487.223
Former
*110-1101-14 Upper (Cockpit)
Longeron F.S.
144-284 RH
*3-11413-4 Steel Dorsal
Longeron, F.S.
284-445, RH
2-11412-14 Upper (Center) Longeron, F.S.
284-325, RH
2-11308-14 Lower (Center) Longeron, F.S. 284-325, RH
The Government anticipates ordering complete PC III aircraft kits using CLIN 0001. In the instance individual kits are ordered, liquidated damages will apply as shown in the liquidated damages calculation table below.
FAR 52.211-11, Liquidated Damages - Supplies, Services, or Research and Development is for use only when the contractor is late on delivery of aircraft kits, the contracting officer has taken all reasonable steps to mitigate liquidated damages, and the government suffers damages. In accordance with FAR 52.211-11(c), if any of the nine
(9) source directed parts in Table 1 - Source Directed Parts of the SOW are determined to be the cause of late delivery and the contractor is not deemed at fault, liquidated damages will not apply. The contractor shall take reasonable steps to avoid incurring liquidated damages to include, but are not limited to:
a. Establishing subcontracts lead time away for source directed parts to meet each DO's requirements;
b. Providing adequate oversight of subcontractors; and
c. Providing documentation and notify the Government immediately upon learning late delivery is anticipated or imminent source directed parts will result in late delivery.
If the government assesses liquidated damages, for each instance of late delivery liquidated damages will be assessed as shown:
FY19
Number of kits with the same delivery date
Liquidated Damages
Amount per kit, per day
Number of kits delivered by contractual delivery date
Maximum number of business days per kit liquidated damages assessed (note 1)
Daily Amount Per Kit
Number of Late
Kits
Maximum Number of Days (note
2)
Maximum amount of liquidated damages assessed
1 $8,589.60 0 5 $8,589.60 1 5 $42,948.00
2 $4,294.80 0 5 $4,294.80 2 5 $42,948.00
1 3 $4,294.80 1 3 $12,884.40
3 $2,863.20 0 5 $2,863.20 3 5 $42,948.00
1 3 $2,863.20 2 3 $17,179.20
2 1 $2,863.20 1 1 $2,863.20
4 $2,147.40 0 5 $2,147.40 4 5 $42,948.00
1 3 $2,147.40 3 3 $19,326.60
2 1 $2,147.40 2 1 $4,294.80
3 1 $2,147.40 1 1 $2,147.40
1 If late delivery results from one or more of the nine (9) source directed parts and the contractor is not deemed at fault for late delivery, the Government will not assess liquidated damages.
2 The maximum number of business days per kit is the government’s best estimate of the number of days kitters would remain at stop work.
NSN: 1560-K0-106-112A XE
PHASE III - Aircraft Modification Kit Procurement The contractor shall provide the Pacer Classic III Aircraft Modification Kit A IAW the attached SOW. First Article requirements specified in CLINS 0003, 0005, 0007, 0009, 0011, 0013, 0015, 0017 and 0019 are required prior to ordering.
Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
AS9100 9100 IAW SOW 5.1
Buy American Act/Balance of Payments Program IUID Required: Yes
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A FB3089 ORIGIN
Type / Ship To PACRN Mark For
A FB3089 PAA
Type / Ship To Quantity (U/I) *ARO Approval of
First Article _ Req No / Pri
Required Delivery
A FB3089 61 KT *12 Months
Proposed Delivery
A FB3089 61 KT
PHASE III - DORSAL LONGERON KIT
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Amount
43 KT *Submit in Pricing Matrix
* The contractor shall complete Attachment 6, Unit Pricing Matrix, showing quantity price breaks by calendar year as applicable to the SOW requirements associated with this CLIN.
The contractor shall reference the corresponding Form 462-Attachment A and any other documents within the Technical Data Package (TDP), for a list of all applicable engineering data requirements and restrictions.
NSN: 1560-K0-106-112B XE
PHASE III - Dorsal Longeron Kit The contractor shall provide the Dorsal Longeron Kit (FS 284 to FS 445, L/R) IAW the attached SOW. First Article Test is required IAW SOW 3.4 unless waived.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
AS9100 9100 IAW SOW 5.1
Buy American Act/Balance of Payments Program IUID Required: Yes
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A FB3089 ORIGIN
Type / Ship To PACRN Mark For A FB3089 PAB Acct 09 Type / Ship To Quantity (U/I) *ARO Approval of
First Article _ Req No / Pri
Required Delivery
A FB3089 43 KT *12 Months Non-MilStrip
Proposed Delivery
A FB3089 43 KT
PHASE III - DORSAL LONGERON KIT - FIRST ARTICLE
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount 1 KT *Submit in Pricing Matrix
* The contractor shall complete Attachment 6, Unit Pricing Matrix, with First Article pricing.
The contractor shall reference the corresponding Form 462-Attachment A and any other documents within the Technical Data Package (TDP), for a list of all applicable engineering data requirements and restrictions.
NSN: 1560-K0-106-112B XE
PHASE III - Dorsal Longeron Kit - First Article The contractor shall provide the Dorsal Longeron Kit (FS 284 to FS 445, L/R) IAW the attached SOW. First Article Test is required IAW SOW 3.4 unless waived. First Article Forms are located in the Technical Data Package.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required
Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
AS 9102 IAW SOW 3.4
Buy American Act/Balance of Payments Program IUID Required: Yes
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A FB2029 ORIGIN
Type / Ship To PACRN Mark For A FB2029 PAC Acct 09 Type / Ship To Quantity (U/I) *ARO Notice to
Proceed _ Req No / Pri
Required Delivery
A FB2029 1 KT *12 Months Non-MilStrip
Proposed Delivery
A FB2029 1 KT
PHASE III - UPPER COCKPIT LONGERON KIT
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Amount
43 KT *Submit in Pricing Matrix
* The contractor shall complete Attachment 6, Unit Pricing Matrix, showing quantity price breaks by calendar year as applicable to the SOW requirements associated with this CLIN.
The contractor shall reference the corresponding Form 462-Attachment A and any other documents within the Technical Data Package (TDP), for a list of all applicable engineering data requirements and restrictions.
NSN: 1560-K0-106-112C XE
PHASE III - Upper Cockpit Longeron Kit The contractor shall provide the Upper Cockpit Longeron Kit (FS 144 to FS 284, L/R) IAW the attached SOW. First Article Test is required IAW SOW 3.4 unless waived.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
AS9100 9100 IAW SOW 5.1
Buy American Act/Balance of Payments Program IUID Required: Yes
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A FB3089 ORIGIN
Type / Ship To PACRN Mark For
A FB3089 PAD
Type / Ship To Quantity (U/I) *ARO Approval of
First Article _ Req No / Pri
Required Delivery
A FB3089 43 EA *12 Months Non-MilStrip
Proposed Delivery
A FB3089 43 EA
PHASE III - UPPER COCKPIT LONGERON KIT - FIRST ARTICLE
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount 1 KT *Submit in Pricing Matrix
* The contractor shall complete Attachment 6, Unit Pricing Matrix, with First Article pricing.
The contractor shall reference the corresponding Form 462-Attachment A and any other documents within the Technical Data Package (TDP), for a list of all applicable engineering data requirements and restrictions.
NSN: 1560-K0-106-112C XE
PHASE III - Upper Cockpit Longeron Kit - First Article The contractor shall provide the Upper Cockpit Longeron Kit (FS 144 to FS 284, L/R) IAW the attached SOW. First Article Test is required IAW SOW 3.4 unless waived. First Article Forms are located in the Technical Data Package.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
AS 9102 IAW SOW 3.4
Buy American Act/Balance of Payments Program IUID Required: Yes
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A FB2029 ORIGIN
Type / Ship To PACRN Mark For
A FB2029 PAE
Type / Ship To Quantity (U/I) *ARO Notice to Proceed
_ Req No / Pri
Required Delivery
A FB2029 1 KT *12 Months Non-MilStrip
Proposed Delivery
A FB2029 1 KT
PHASE III - CENTER LONGERON KIT
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Amount
43 KT *Submit in Pricing Matrix
* The contractor shall complete Attachment 6, Unit Pricing Matrix, showing quantity price breaks by calendar year as applicable to the SOW requirements associated with this CLIN.
The contractor shall reference the corresponding Form 462-Attachment A and any other documents within the Technical Data Package (TDP), for a list of all applicable engineering data requirements and restrictions.
NSN: 1560-K0-106-112D XE
PHASE III - Center Longeron Kit The contractor shall provide the Center Longeron Kit (FS 284 to FS 325, L/R) IAW the attached SOW. First Article Test is required IAW SOW 3.4 unless waived.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
AS9100 9100 IAW SOW 5.1
Buy American Act/Balance of Payments Program IUID Required: Yes
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A FB3089 ORIGIN
Type / Ship To PACRN Mark For
A FB3089 PAF
Type / Ship To Quantity (U/I) *ARO Approval of
First Article _ Req No / Pri
Required
A FB3089 43 KT *12 Months Non-MilStrip
Proposed Delivery
A FB3089 43 KT
PHASE III - CENTER LONGERON KIT - FIRST ARTICLE
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount 1 KT *Submit in Pricing Matrix
* The contractor shall complete Attachment 6, Unit Pricing Matrix, with First Article pricing.
The contractor shall reference the corresponding Form 462-Attachment A and any other documents within the Technical Data Package (TDP), for a list of all applicable engineering data requirements and restrictions.
NSN: 1560-K0-106-112D XE
PHASE III - Center Longeron Kit - First Article The contractor shall provide the Center Longeron Kit (FS 284 to FS 325, L/R) IAW the attached SOW. First Article Test is required IAW SOW 3.4 unless waived. First Article Forms are located in the Technical Data Package.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
AS 9102 IAW SOW 3.4
Buy American Act/Balance of Payments Program IUID Required: Yes
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A FB2029 ORIGIN
Type / Ship To PACRN Mark For
A FB2029 PAG
Type / Ship To Quantity (U/I) *ARO Notice to
Proceed _ Req No / Pri
Required Delivery
A FB2029 1 KT *12 Months Non-MilStrip
Proposed
A FB2029 1 KT
PHASE III - INBOARD LOWER LONGERON KIT
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Amount
43 KT *Submit in Pricing Matrix
* The contractor shall complete Attachment 6, Unit Pricing Matrix, showing quantity price breaks by calendar year as applicable to the SOW requirements associated with this CLIN.
The contractor shall reference the corresponding Form 462-Attachment A and any other documents within the Technical Data Package (TDP), for a list of all applicable engineering data requirements and restrictions.
NSN: 1560-K0-106-112E XE
PHASE III - Inboard Lower Longeron Kit The contractor shall provide the Inboard Lower Longeron Kit (FS 325 to FS 388, L/R) IAW the attached SOW. First Article Test is required IAW SOW 3.4 unless waived.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
AS9100 9100 IAW SOW 5.1
Buy American Act/Balance of Payments Program IUID Required: Yes
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A FB3089 ORIGIN
Type / Ship To PACRN Mark For
A FB3089 PAH
Type / Ship To Quantity (U/I) *ARO Approval of
First Article _ Req No / Pri
Required Delivery
A FB3089 43 KT *12 Months Non-MilStrip
Proposed Delivery
A FB3089 43 KT
PHASE III - INBOARD LOWER LONGERON KIT - FIRST ARTICLE
Item No.
Firm Fixed Price
PHASE III - INBOARD LOWER LONGERON KIT - FIRST ARTICLE
Quantity U/I Unit Price Amount 1 KT *Submit in Pricing Matrix
* The contractor shall complete Attachment 6, Unit Pricing Matrix, with First Article pricing.
The contractor shall reference the corresponding Form 462-Attachment A and any other documents within the Technical Data Package (TDP), for a list of all applicable engineering data requirements and restrictions.
NSN: 1560-K0-106-112E XE
PHASE III - Inboard Lower Longeron Kit - First Article The contractor shall provide the Center Longeron Kit (FS 284 to FS 325, L/R) IAW the attached SOW. First Article Test is required IAW SOW 3.4 unless waived. First Article Forms are located in the Technical Data Package.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
AS 9102 IAW SOW 3.4
Buy American Act/Balance of Payments Program IUID Required: Yes
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A FB2029 ORIGIN
Type / Ship To PACRN Mark For
A FB2029 PAI
Type / Ship To Quantity (U/I) *ARO Notice to
Proceed _ Req No / Pri
Required Delivery
A FB2029 1 KT *12 Months Non-MilStrip
Proposed Delivery
A FB2029 1 KT
PHASE III - BULKHEAD ASSEMBLY KIT
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Amount
43 KT *Submit in Pricing Matrix
* The contractor shall complete Attachment 6, Unit Pricing Matrix, showing quantity price breaks by calendar year as applicable to the SOW requirements associated with this CLIN.
The contractor shall reference the corresponding Form 462-Attachment A and any other documents within the Technical Data Package (TDP), for a list of all applicable engineering data requirements and restrictions.
NSN: 1560-K0-106-112F XE
PHASE III - Bulkhead Assembly Kit The contractor shall provide the Bulkhead Assembly Kit at FS 388.75 IAW the attached SOW. First Article Test is required IAW SOW 3.4 unless waived.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
AS9100 9100 IAW SOW 5.1
Buy American Act/Balance of Payments Program IUID Required: Yes
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A FB3089 ORIGIN
Type / Ship To PACRN Mark For
A FB3089 PAJ
Type / Ship To Quantity (U/I) *ARO Approval of
First Article _ Req No / Pri
Required Delivery
A FB3089 43 EA *12 Months
Proposed Delivery
A FB3089 43 EA
PHASE III - BULKHEAD ASSEMBLY KIT - FIRST ARTICLE
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount 1 KT *Submit in Pricing Matrix
* The contractor shall complete Attachment 6, Unit Pricing Matrix, with First Article pricing.
The contractor shall reference the corresponding Form 462-Attachment A and any other documents within the Technical Data Package (TDP), for a list of all applicable engineering data requirements and restrictions.
NSN: 1560-K0-106-112F XE
PHASE III - Bulkhead Assembly Kit - First Article The contractor shall provide the Bulkhead Assembly Kit at FS 388.75 IAW the attached SOW. First Article Test is required IAW SOW 3.4 unless waived. First Article Forms are located in the Technical Data Package.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
AS 9102 IAW SOW 3.4
Buy American Act/Balance of Payments Program IUID Required: Yes
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A FB2029 ORIGIN
Type / Ship To PACRN Mark For
A FB2029 PAK
Type / Ship To Quantity (U/I) *ARO Notice to
Proceed _ Req No / Pri
Required Delivery
A FB2029 1 KT *12 Months
Proposed Delivery
A FB2029 1 KT
PHASE III - FORMER KIT
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Amount
43 EA *Submit in Pricing Matrix
* The contractor shall complete Attachment 6, Unit Pricing Matrix, showing quantity price breaks by calendar year as applicable to the SOW requirements associated with this CLIN.
The contractor shall reference the corresponding Form 462-Attachment A and any other documents within the Technical Data Package (TDP), for a list of all applicable engineering data requirements and restrictions.
NSN: 1560-K0-106-112G XE
PHASE III - Former Kit The contractor shall provide the Former Kit IAW the attached SOW. First Article Test is required IAW SOW 3.4 unless waived.
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
AS9100 9100 IAW SOW 5.1
Buy American Act/Balance of Payments Program IUID Required: Yes
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A FB3089 ORIGIN
Type / Ship To PACRN Mark For
A FB3089 PAL
Type / Ship To Quantity (U/I) *ARO Approval of
First Article _ Req No / Pri
Required Delivery
A FB3089 43 EA *12 Months
Proposed Delivery
A FB3089 43 EA
PHASE III - FORMER KIT - FIRST ARTICLE
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount 1 KT *Submit in Pricing Matrix
* The contractor shall complete Attachment 6, Unit Pricing Matrix, with First Article pricing.
The contractor shall reference the corresponding Form 462-Attachment A and any other documents within the Technical Data Package (TDP), for a list of all applicable engineering data requirements and restrictions.
NSN: 1560-K0-106-112G XE
PHASE III - Former Kit - First Article The contractor shall provide the Former Kit IAW the attached SOW. First Article Test is required IAW SOW 3.4 unless waived.
First Article Forms are located in the Technical Data Package.
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
AS 9102 IAW SOW 3.4
Buy American Act/Balance of Payments Program IUID Required: Yes
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A FB2029 ORIGIN
Type / Ship To PACRN Mark For
A FB2029 PAM
Type / Ship To Quantity (U/I) *ARO Notice to
Proceed _ Req No / Pri
Required Delivery
A FB2029 1 KT *12 Months
Proposed Delivery
A FB2029 1 KT
PHASE III - ANGLE KIT
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Amount
43 KT *Submit in Pricing Matrix
* The contractor shall complete Attachment 6, Unit Pricing Matrix, showing quantity price breaks by calendar year as applicable to the SOW requirements associated with this CLIN.
The contractor shall reference the corresponding Form 462-Attachment A and any other documents within the Technical Data Package (TDP), for a list of all applicable engineering data requirements and restrictions.
NSN: 1560-K0-106-112H XE
PHASE III - Angle Kit The contractor will provide the Angle Kit IAW the attached SOW. First Article Test is required IAW SOW 3.4 unless waived.
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
AS9100 9100 IAW SOW 5.1
Buy American Act/Balance of Payments Program
IUID Required: Yes
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A FB3089 ORIGIN
Type / Ship To PACRN Mark For
A FB3089 PAN
Type / Ship To Quantity (U/I) *ARO Approval of
First Article _ Req No / Pri
Required Delivery
A FB3089 KT *12 Months
Proposed Delivery
A FB3089 KT
PHASE III - ANGLE KIT - FIRST ARTICLE
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount 1 KT *Submit in Pricing Matrix
* The contractor shall complete Attachment 6, Unit Pricing Matrix, with First Article pricing.
The contractor shall reference the corresponding Form 462-Attachment A and any other documents within the Technical Data Package (TDP), for a list of all applicable engineering data requirements and restrictions.
NSN: 1560-K0-106-112H XE
PHASE III - Angle Kit - First Article The contractor will provide the Angle Kit IAW the attached SOW. First Article Test is required IAW SOW 3.4 unless waived. First Article Forms are located in the Technical Data Package.
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
AS 9102 IAW SOW 3.4
Buy American Act/Balance of Payments Program IUID Required: Yes
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A FB2029 ORIGIN
Type / Ship To PACRN Mark For
A FB2029 PAO
Type / Ship To Quantity (U/I) *ARO Notice to
Proceed _ Req No / Pri
Required Delivery
A FB2029 1 KT *12 Months
Proposed Delivery
A FB2029 1 KT
PHASE III - COCKPIT FLOOR KIT
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Amount
43 KT *Submit in Pricing Matrix
* The contractor shall complete Attachment 6, Unit Pricing Matrix, showing quantity price breaks by calendar year as applicable to the SOW requirements associated with this CLIN.
The contractor shall reference the corresponding Form 462-Attachment A and any other documents within the Technical Data Package (TDP), for a list of all applicable engineering data requirements and restrictions.
NSN: 1560-K0-106-112K XE
PHASE III - Cockpit Floor Kit The contractor will provide the Cockpit Floor Kit IAW the attached SOW. First Article Test is required IAW SOW 3.4 unless waived.
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
AS9100 9100 IAW SOW 5.1
Buy American Act/Balance of Payments Program IUID Required: Yes
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A FB3089 ORIGIN
Type / Ship To PACRN Mark For
A FB3089 PAP
Type / Ship To Quantity (U/I) *ARO Approval of
First Article _ Req No / Pri
Required Delivery
A FB3089 KT *12 Months
Proposed Delivery
A FB3089 KT
PHASE III - COCKPIT FLOOR KIT - FIRST ARTICLE
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount 1 KT *Submit in Pricing Matrix
* The contractor shall complete Attachment 6, Unit Pricing Matrix, with First Article pricing.
The contractor shall reference the corresponding Form 462-Attachment A and any other documents within the Technical Data Package (TDP), for a list of all applicable engineering data requirements and restrictions.
NSN: 1560-K0-106-112K XE
PHASE III - Cockpit Floor Kit - First Article The contractor will provide the Cockpit Floor Kit IAW the attached SOW. First Article Test is required IAW SOW 3.4 unless waived. First Article Forms are located in the Technical Data Package.
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
AS 9102 IAW SOW 3.4
Buy American Act/Balance of Payments Program IUID Required: Yes
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A FB2029 ORIGIN
Type / Ship To PACRN Mark For
A FB2029 PAQ
Type / Ship To Quantity (U/I) *ARO Notice to
Proceed _ Req No / Pri
Required Delivery
A FB2029 1 KT *12 Months
Proposed
PHASE III - FUEL CELL FLOOR KIT
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Amount
43 KT *Submit in Pricing Matrix
* The contractor shall complete Attachment 6, Unit Pricing Matrix, showing quantity price breaks by calendar year as applicable to the SOW requirements associated with this CLIN.
The contractor shall reference the corresponding Form 462-Attachment A and any other documents within the Technical Data Package (TDP), for a list of all applicable engineering data requirements and restrictions.
NSN: 1560-K0-106-112L XE
PHASE III - Fuel Cell Floor Kit The contractor will provide the Fuel Cell Floor Kit IAW the attached SOW. First Article Test is required IAW SOW 3.4 unless waived.
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
AS9100 9100 IAW SOW 5.1
Buy American Act/Balance of Payments Program IUID Required: Yes
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A FB3089 ORIGIN
Type / Ship To PACRN Mark For
A FB3089 PAR
Type / Ship To Quantity (U/I) *ARO Approval of
First Article _ Req No / Pri
Required Delivery
A FB3089 KT *12 Months
Proposed Delivery
A FB3089 KT
PHASE III - FUEL CELL FLOOR KIT - FIRST ARTICLE
Item No.
PHASE III - FUEL CELL FLOOR KIT - FIRST ARTICLE
Quantity U/I Unit Price Amount 1 KT *Submit in Pricing Matrix
*The contractor shall complete Attachment 6, Unit Pricing Matrix, with First Article pricing.
The contractor shall reference the corresponding Form 462-Attachment A and any other documents within the Technical Data Package (TDP), for a list of all applicable engineering data requirements and restrictions.
NSN: 1560-K0-106-112L XE
PHASE III - Fuel Cell Floor Kit - First Article The contractor will provide the Fuel Cell Floor Kit IAW the attached SOW. First Article Test is required IAW SOW 3.4 unless waived. First Article Forms are located in the Technical Data Package.
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
AS 9102 IAW SOW 3.4
Buy American Act/Balance of Payments Program IUID Required: Yes
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A FB2029 ORIGIN
Type / Ship To PACRN Mark For
A FB2029 PAS
Type / Ship To Quantity (U/I) *ARO Notice to
Proceed _ Req No / Pri
Required Delivery
A FB2029 1 KT *12 Months
Proposed Delivery
A FB2029 1 KT
PHASE III - FASTENERS, WHOLE KIT M
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Amount
61 KT *Submit in Pricing Matrix
* The contractor shall complete Attachment 6, Pricing Matrix, showing quantity price breaks by fiscal year as applicable to the SOW requirements associated with this CLIN.
The contractor shall reference the corresponding Form 462-Attachment A and any other documents within the Technical Data Package (TDP), for a list of all applicable engineering data requirements and restrictions.
NSN: 1560-K0-106-112M XE
Phase III - Fasteners, Whole Kit M The contractor will provide the Fastener Kit in accordance with the attached SOW.
The contractor shall provide Fastener Kit M, which is comprised of kits N, P, & Q, for the Pacer Classic III Modification. The Bill of Materials (BOM) for Kits M, N, P & Q will be provided with the Technical Data Package IAW SOW Attachment 4. The specific BOM shall be attached to the Delivery Order. The Bill of Materials for Fastener Kits M, N, P, & Q were developed at Government expense under contract FA8223-11-D-0001-0003, therefore the Government asserts unlimited rights to this Bill of Materials.
Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
AS9100 9100 IAW SOW 5.1
Buy American Act/Balance of Payments Program IUID Required: Yes
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A FB3089 ORIGIN
Type / Ship To Quantity (U/I) *ARO Approval of
First Article _ Req No / Pri
Required Delivery
A FB3089 61 KT *12 Months
Proposed Delivery
A FB3089 61 KT
TYPE/CODE: A FB3089
TYPE/CODE: A FB2029
1. First Articles and Production kits are FOB origin. Ship first articles to FB2029 and production kits to FB3089.
2. Origin for FOB location & inspection/acceptance will be at awardee's proposed location.
3.Two GBL transportation MORDs will be established after contract award: One for each TAC code.
4. GBL transportation for production kits is from FOB Origin to FB3089, RANDOLPH AFB, TX.
5. GBL transportation for first article kits is from FOB Origin to FB2029, Hill AFB, UT.
*First article testing and shipment to and from First Article Lab are required before acceptance of first kit.
Reserved
Reserved
This CLIN is reserved.
PHASE III - FASTENERS, SUB KIT N
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Amount
43 KT *Submit in Pricing Matrix
* The contractor shall complete Attachment 6, Pricing Matrix, showing quantity price breaks by fiscal year as applicable to the SOW requirements associated with this CLIN.
The contractor shall reference the corresponding Form 462-Attachment A and any other documents within the Technical Data Package (TDP), for a list of all applicable engineering data requirements and restrictions.
NSN: 1560-K0-106-112N XE
PHASE III - Fasteners, Sub Kit N The contractor shall provide the "N" Fastener Kit.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
AS9100 9100 IAW SOW 5.1
Buy American Act/Balance of Payments Program IUID Required: Yes
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A FB3089 ORIGIN
Type / Ship To PACRN Mark For A FB3089 AA Acct 09 Type / Ship To Quantity (U/I) *ARO Approval of
First Article _ Req No / Pri
Required Delivery
A FB3089 43 KT *12 Months Non-MilStrip
Proposed
A FB3089 43 KT
TYPE/CODE: A FB3089
TYPE/CODE: A FB2029
1. First Articles and Production kits are FOB origin. Ship first articles to FB2029 and production kits to
FB3089.
2. Origin for FOB location & inspection/acceptance will be at awardee's proposed location.
3.Two GBL transportation MORDs will be established after contract award: One for each TAC code.
4. GBL transportation for production kits is from FOB Origin to FB3089, RANDOLPH AFB, TX.
*First article testing and shipment to and from First Article Lab are required before acceptance of first kit.
PHASE III - FASTENERS, SUB KIT N - FIRST ARTICLE
Firm Fixed Price Quantity U/I Unit Price Amount 1 KT *Submit in Pricing Matrix
* The contractor shall complete Attachment 6, Pricing Matrix, with First Article pricing.
The contractor shall reference the corresponding Form 462-Attachment A and any other documents within the Technical Data Package (TDP), for a list of all applicable engineering data requirements and restrictions.
NSN: 1560-K0-106-112N XE
PHASE III - Fasteners, Sub Kit N - First Article The contractor shall provide Fastener Kit "N" IAW the attached SOW and Bill of Materials (BOM). First Article Test is required IAW SOW 3.4 and BOM unless waived. First Article Forms are located in the Technical Data Package.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
AS 9102 IAW SOW 3.4
Buy American Act/Balance of Payments Program IUID Required: Yes
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A FB2029 ORIGIN
Type / Ship To PACRN Mark For A FB2029 AB Acct 09 Type / Ship To Quantity (U/I) *ARO Notice to
Proceed
Required Delivery
A FB2029 1 KT *12 Months Non-MilStrip
Proposed Delivery
A FB2029 1 KT
TYPE/CODE: A FB3089 TYPE/CODE: A
FB2029
1. First Articles and Production kits are FOB origin. Ship first articles to FB2029 and production kits to
FB3089.
2. Origin for FOB location & inspection/acceptance will be at awardee's proposed location.
3. Two GBL transportation MORDs will be established after contract award: One for each TAC code.
4. GBL transportation for production kits is from FOB Origin to FB3089, RANDOLPH AFB, TX.
PHASE III - FASTENERS, SUB KIT P
Firm Fixed Price Best Estimated Qty
U/I Unit Price Amount
43 KT *Submit in Pricing Matrix
* The contractor shall complete Attachment 6, Pricing Matrix, showing quantity price breaks by fiscal year as applicable to the SOW requirements associated with this CLIN.
The contractor shall reference the corresponding Form 462-Attachment A and any other documents within the Technical Data Package (TDP), for a list of all applicable engineering data requirements and restrictions.
NSN: 1560-K0-106-112P XE
PHASE III - Fasteners, Sub Kit P The contractor shall provide the "P" Fastener Kit.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
AS9100 9100 IAW SOW 5.1
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A FB3089 ORIGIN
Type / Ship To PACRN Mark For A FB3089 AC Acct 09 Type / Ship To Quantity (U/I) *ARO Approval of
First Article _ Req No / Pri
Required Delivery
A FB3089 43 KT *12 Months Non-MilStrip
Proposed Delivery
A FB3089 43 KT
TYPE/CODE: A FB3089
TYPE/CODE: A FB2029
1. First Articles and Production kits are FOB origin. Ship first articles to FB2029 and production kits to
FB3089.
2. Origin for FOB location & inspection/acceptance will be at awardee's proposed location.
3.Two GBL transportation MORDs will be established after contract award: One for each TAC code.
4. GBL transportation for production kits is from FOB Origin to FB3089, RANDOLPH AFB, TX.
*First article testing and shipment to and from First Article Lab are required before acceptance of first kit.
PHASE III - FASTENERS, SUB KIT P - FIRST ARTICLE
Firm Fixed Price Quantity U/I Unit Price Amount 1 KT *Submit in Pricing Matrix
* The contractor shall complete Attachment 6, Pricing Matrix, with First Article pricing.
The contractor shall reference the corresponding Form 462-Attachment A and any other documents within the Technical Data Package (TDP), for a list of all applicable engineering data requirements and restrictions.
NSN: 1560-K0-106-112P XE
PHASE III - Fasteners, Sub Kit P - First Article The contractor shall provide Fastener Kit "P" IAW the attached SOW and Bill of Materials (BOM). First Article Test is required IAW SOW 3.4 and BOM unless waived. First Article Forms are located in the Technical Data Package.
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
AS 9102 IAW SOW 3.4
Buy American Act/Balance of Payments Program IUID Required: Yes
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A FB2029 ORIGIN
Type / Ship To PACRN Mark For A FB2029 AD Acct 09 Type / Ship To Quantity (U/I) *ARO Notice to
Proceed _ Req No / Pri
Required Delivery
A FB2029 1 KT *12 Months Non-MilStrip
Proposed Delivery
A FB2029 1 KT
TYPE/CODE: A FB3089 TYPE/CODE: A
FB2029
1. First Articles and Production kits are FOB origin. Ship first articles to FB2029 and production kits to
FB3089.
2. Origin for FOB location & inspection/acceptance will be at awardee's proposed location.
3. Two GBL transportation MORDs will be established after contract award: One for each TAC code.
PHASE III - FASTENERS, SUB KIT Q
Firm Fixed Price Best Estimated Qty
U/I Unit Price Amount
43 KT *Submit in Pricing Matrix
* The contractor shall complete Attachment 6, Pricing Matrix, showing quantity price breaks by fiscal year as applicable to the SOW requirements associated with this CLIN.
The contractor shall reference the corresponding Form 462-Attachment A and any other documents within the Technical Data Package (TDP), for a list of all applicable…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .