This document is a cross reference matrix for a request for proposal related to the T-38A/B/C Pacer Classic III Phase III and Talon Repair Inspection and Maintenance program. The matrix outlines nine subfactors under three categories: technical capabilities for parts manufacturing and procurement, technical capabilities for drawing interpretation, and program management. It provides references to statements of work and technical data packages for each evaluation item. Offerors are to demonstrate their ability to produce compliant parts, interpret engineering drawings, and manage subcontractors and risks. The solicitation number is FA8220-19-R-0001 and was posted by the Department of the Air Force Materiel Command Lifecycle Management Center at Hill Air Force Base to support the T-38 aircraft fleet.

Cross Reference Matrix

View the file

Other files

File Type Posted
FA822019R0001_______0009.pdf PDF
FA822019R0001_______0008.pdf PDF
FA822019R0001_______0007.pdf PDF
RFP_Attachment_14_Section_L_R02_23Jan19.pdf PDF
RFP_Attachment_6_Phase-III_TRIM_TEP_Pricing_Matrix_R01_23Jan19.xlsx XLSX spreadsheet
Question_&_Answer_for_RFP_23Jan19.xlsx XLSX spreadsheet
RFP_Attachment_15_Section_M_R02_23Jan19.pdf PDF
FA822019R0001_______0006.pdf PDF
FA822019R0001_______0005.pdf PDF
FA822019R0001_______0004.pdf PDF
Question_&_Answer_for_RFP_18Jan2019.xlsx XLSX spreadsheet
Question_&_Answer_for_RFP_14Jan2019.xlsx XLSX spreadsheet
FA822019R0001_______0003.pdf PDF
FA822019R0001_______0002.pdf PDF
RFP_Attachment_15_Section_M_R01_04Dec18.pdf PDF
RFP_Attachment_14_Section_L_R01_04Dec18.pdf PDF
T-38_TRIM_Projected_Delivery_Schedule_03Dec18.pdf PDF
Question_&_Answer_for_RFP_04Dec18.pdf PDF
FA822019R0001_______0001.pdf PDF
T-38_PCIII_Projected_Delivery_Schedule_03Dec18.pdf PDF
RFP_Attachment_4_Past_Performance_Questionnaire_05Nov18.pdf PDF
RFP_Attachment_15_Section_M_05Nov18.pdf PDF
RFP_Attachment_3_Teaming_Partner_Consent_Letter_05Nov18.pdf PDF
RFP_Attachment_8_PPI_Tool_05Nov18.accdb MDB file
RFP_Attachment_13_TRIM_Incentive_Table_05Nov18.xlsx XLSX spreadsheet
RFP_Attachment_6_Phase-III_TRIM_TEP_Pricing_Matrix_05Nov18.xlsx XLSX spreadsheet
RFP_Attachment_16_AFMCForm158_T-38_25Sep18.pdf PDF
RFP_Attachment_1_Past_Performance_Information_PPI_Instructions_05Nov18.pdf PDF
RFP_Attachment_11_T38_TRIM_PCIII_SOW_05Nov18.pdf PDF
RFP_Attachment_14_Section_L_05Nov18.pdf PDF
FA822019R0001.pdf PDF
RFP_Attachment_10_CDRLs_TRIM_16Oct18.pdf PDF
RFP_Attachment_9_CDRLs_Phase_III_16Oct18.pdf PDF
RFP_Attachment_12_TRIM_Incentive_Plan_05Nov18.pdf PDF
RFP_Attachment_17_DDForm1653_T-38_24Oct18.pdf PDF
RFP_Attachment_2_Past_Performance_Information_Sheet_05Nov18.pdf PDF
RFP_Attachment_5_Client_Authorization_05Nov18.pdf PDF
Question_and_Answer_for_Draft_RFP_R01_05Nov18.pdf PDF
Pre-Solicitation_Synopsis_of_FA8220-19-R-0001_PCIII_Phase_III_and_TRIM_R01.docx DOCX document
Question_and_Answer_for_Draft_RFP.pdf PDF
Synopsis_of_FA8220-19-R-0001_PCIII_Phase_III_and_TRIM.docx DOCX document
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP Attachment 7 – Cross Reference Matrix Sec. L, II.B.2 Sec. M, II.B.1

Subfactors

Technical Rqmts Doc

SOW, TDP

Section L Paragraph

Section M Paragraph CDRL

Proposal (Offeror

Completes) For each subfactor, identify risks, if any, associated proposed approach and actions offeror will take to mitigate identified risks.

SOW 3.10 Vol. II, C.2.

Vol. II, C.1

A005 B005

Subfactor A: Technical Capabilities; Parts Manufacturing and Procurement Plan

Vol. II, C.2

Vol. II, C.2.1

1. Demonstrate ability to produce parts compliant with the PCIII and TRIM TDPs, to include detailed description of:

--facilities and equipment, --manufacturing tooling, both existing and planned;

Explain how each pertains to the process of manufacturing and integration of PCIII and TRIM parts, to include fasteners. Proposal shall include: sources for all required forgings and extruded parts in the TDP; and sources for all items in the BOM. If no source, provide plan.

SOW 3.1

SOW 3.3 – 3.6

SOW 3.11 – 3.13

SOW 5.0 – 5.1.3

TDP to include EDL

Vol. II, C.3.1.1

Vol. II, C.2.1.1

A007 B007

2. For the following evaluated components:

--P/N 2-11756-523/-524, Bulkhead at

FS388.75

--P/N 3-11493-1/-2, Dorsal Shim --P/N 3-11613-19, Upper Skin, FS

445.00 to 531.00 --P/N 40S101-100, Tapered Shim --P/N 2-11668-5, Bolt Offeror shall describe capability and capacity to:

a) obtain required materials with applicable material certifications;

b) design/build/obtain tooling to aid in manufacturing of parts;

c) machine parts;

d) form/contour/manipulate large and small extrusions and unformed stock;

e) post process (i.e. heat treat, peen, anodize, plate, coat);

f) apply metrology and inspection for dimensional conformity;

g) perform nondestructive testing.

SOW 2.2

SOW 3.1

SOW 3.3 – 3.6

SOW 3.11 – 3.13

SOW 5.0 – 5.1.3

TDP to include EDL

Vol. II, C.3.1.2

Vol. II, C.2.1.2

Subfactor B: Technical Capabilities; Drawing Interpretation

Technical Rqmts Doc

SOW, TDP

Section L Paragraph

Section M Paragraph

CDRL Proposal (Offeror Completes)

3. Using the 3-11611 drawing and associated dimension data for the CFS 505.075 former assembly, P/N 3-11611-503, provide narrative with illustrations to demonstrate the ability to correctly determine the following characteristics:

a) In the plane of the CFS 505.075 and below the Horizontal Reference Plane (HRP), what is the distance between the trace of the Firewall Moldline on CFS 505.075 and the Fuselage Moldline at a distance of

12.5 inches outboard of the airplane centerline?

b) Determine the number of cooling holes, the corresponding diameter, and their locations above the Horizontal Reference Line (HRL) in the 3-11611-31/-32 Formers for this assembly configuration.

SOW 3.1

SOW 3.3 – 3.6

SOW 3.11 – 3.13

SOW 5.0 – 5.1.3

TDP to include EDL

Vol. II, C.3.2.1, C.3.2.1.1, C.3.2.1.2

Vol. II, C.2.2, C.2.2.1- C.2.2.4.3

4. Provide a narrative with illustrations to demonstrate the ability to correctly interpret drawing 3-11805 located in the PCIII Technical Data Package. The technical proposal shall:

a) Provide the configuration to be produced and identification of the components of the 3-11805-49 assembly;

b) Provide the dimension (in inches) from the bottom edge of the doubler to the Horizontal Reference Line.

SOW 3.1

SOW 3.3 – 3.6

SOW 3.11 – 3.13

SOW 5.0 – 5.1.3

TDP to include EDL

Vol. II, C.3.2.2, C.3.2.2.1, C.2.2.2

Vol. II, C.2.2,

5. Provide a narrative with illustrations to demonstrate the ability to correctly interpret drawing 3-11613 located in the TRIM Technical Data Package. The technical proposal shall:

a) List all of the final skin thicknesses required to make for the -19 configuration;

b) Identify number and location of all cutouts (including circular) and provide dimensions for each on the -19 configuration

SOW 3.1

SOW 3.3 – 3.6

SOW 3.11 – 3.13

SOW 5.0 – 5.1.3

TDP to include EDL

Vol. II, C.3.2.3, C.3.2.3.1, C.3.2.3.2

Vol. II, C.2.2, Continued next page

Subfactor B: Technical Capabilities; Drawing Interpretation

Technical Rqmts Doc

SOW, TDP

Section L Paragraph

Section M Paragraph

CDRL Proposal (Offeror Completes)

6. Using the 2-11668 drawing and associated specifications, please identify and explain how the answer was determined for the following:

a) What is the minimum allowable distance from the forging flow lines between the intersection of the longitudinal axis of the bolt and the approximate transverse axis of the flow lines to the bearing surface of the bolt?

b) What is the minimum number of fatigue cycles that should be conducted in the fatigue test for a passing condition?

c) For a lot or batch size of 30, what is the required number of samples for fatigue testing?

SOW 3.1

SOW 3.3 – 3.6

SOW 3.11 – 3.13

SOW 5.0 – 5.1.3

TDP to include EDL

Vol. II, C.3.2.4, C.3.2.4.1, C.3.2.4.2, C.3.2.4.3

Vol. II, C.2.2, Subfactor C:

Program Management

Technical Rqmts Doc

SOW, TDP

Section L Paragraph

Section M Paragraph

CDRL Proposal (Offeror Completes)

Provide your supply chain management approach, risk management approach and a description of your logistical capacity for obtaining modification components. The technical proposal shall include:

SOW 2.2.1,

SOW 3.10

Vol. II, C.3.3

Vol. II, C2.3

7. RESOURCE MGMT: The prime contractor’s organizational structure which identifies key personnel. The proposal shall clearly document the primary roles and lines of responsibility, and technical interface with subject matter experts. The proposal shall illustrate all planned subcontractor relationships to include name and CAGE code with letter of intent between prime and sub agreeing to be on contract within 90 days of contract award. Proposal shall include a detailed IMS as specified.

SOW 2.2.1,

SOW 3.9,

SOW 3.11

Vol. II, C.3.3.1

Vol. II, C.2.3.1

A006 B006

8. SUBCONTRACTOR MGMT:

Offeror shall describe a clear and feasible approach to managing all subcontractors, partners, and sub-tier subcontractors/partners to meet quality system requirements, as well as supply chain partners and the process in which these partners are evaluated and selected. This includes supplier’s commitments to adequately demonstrate their ability to achieve Government desired full rate production.

SOW 2.1.1,

SOW 3.4.1,

SOW 5.1.1

Vol. II, C.3.3.2

Vol. II, C.2.3.2

9. RISK MGMT: Offeror shall provide a complete description of risk management processes, explaining the criteria, methods, and procedures that would be used to identify the critical items associated with the implementation of this contract.

SOW 2.2.1

SOW 3.10

Vol. II, C.3.3.3

Vol. II, C.2.3.3