RFP_Attachment_12_TRIM_Incentive_Plan_05Nov18.pdf
PDF 838 KB Posted
- Attached to
- T-38A/B/C Pacer Classic III (PCIII) Phase III & Talon Repair Inspection and Maintenance (TRIM) Program
- Solicitation number
- FA8220-19-R-0001
About this file
This document contains an attachment to a Request for Proposal (RFP) for the T-38A/B/C Pacer Classic III (PCIII) Phase III & Talon Repair Inspection and Maintenance (TRIM) Program. The attachment provides details on an incentive plan to accelerate delivery of TRIM aircraft structural parts kits, including maximum incentive amounts up to $200,000 for early delivery of the first kit by 26 weeks. It outlines definitions, calculation methodology, and payment terms for incentives tied to delivery dates between 26 to 4 weeks prior to the required delivery date of June 2021 for the first kit under Delivery Order 0001. Enclosure 1 lists the individual parts and structures included in each of the five TRIM aircraft parts kits by National Stock Number. Enclosure 2 provides an example incentive table with delivery dates and associated premium payments. Enclosure 3 outlines the anticipated delivery order schedule and quantities for kits through Fiscal Year 2029 involving the USAF and Navy for TRIM of T-38A/B/C aircraft.
TRIM Incentive Plan
View the file
Other files
Show all 41
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation Number: FA8220-19-R-0001
Delivery Incentive Agreement
For Accelerated Delivery of
T-38 Talon Repair Inspection and Maintenance (TRIM)
Aircraft Structural Parts Kits
05 November 2018
Table of Contents
I. Overview
II. Definitions
III. Maximum Incentive Amounts:
IV. Calculation of Earned Incentive Amounts:
V. Incentive Payment Schedule
VI. Adjustments to Incentive Completion Dates
Enclosure 1 – TRIM Aircraft Parts Kit for T-38A/B Aircraft
Enclosure 2 – Government Incentive Table
Enclosure 3 – Government Kit Buy
I. Overview
The Government requires designated T-38 aircraft to receive structural component replacements as specified in the Talon Repair, Inspection, and Maintenance (TRIM) T-
38A/B/C Structural Retrofit program. The Government intends to offer the incentive described herein upon the issuance of the initial delivery order (DO 0001) to accelerate the schedule for the production and delivery of the First Article Test (FAT) Kit and, in turn, the initial lot of TRIM aircraft parts kit(s) and TRIM Fastener kit(s).
The incentive agreement described herein does not alter the contractually required delivery dates; it only adds an incentive to deliver conforming parts of the specified
TRIM kit(s) earlier than contractually required. Initially, the Government is interested in early delivery of the following: the FAT items, the complete set #1 of the T-38A/B
TRIM aircraft parts kit (CLIN 0030 and 0031) for the prototype installation/validation, and complete set of T-38A/B Fasteners kit(s) (CLIN 0042 through 0045). Although not offered in DO 0001, the complete set #2 of the TRIM aircraft parts kit for the verification installation will fall under DO 0002. If an incentive is to be offered in DO
0002, the Government will communicate the applicable incentive along with the issuance of DO 0002. Qualification for delivery incentive is subject to passage of any required FAT and delivery of 100% complete and conforming aircraft parts kit and fastener kit, subject to Inspection of Supplies (FAR 52.246-2). The contractor will not be penalized for failing to deliver earlier than the contractual delivery dates for DO
0001. Please refer to Enclosure 2 of this document for the Incentive table and Enclosure
3 for Delivery Schedule and anticipated initial delivery orders. All requirements stated in the Statement of Work (SOW) and Contract Data Requirements List (CDRL) continue to apply in this agreement.
II. Definitions
For purposes of this agreement, the following terms are described as follows:
2.1 “TRIM aircraft parts kit” for T-38A/B aircraft is equivalent to the line items for the kit NSN 1560K0104791AXE and 1560K0104791BXE, as well as
1560K0104791HXE and 1560K0104791KXE.
2.2 Line Item means the basic structural element in a procurement instrument that describes and organizes the required product or service for pricing, delivery, inspection, acceptance, invoicing, and payment. The use of the term “line item” includes “subline item,” as applicable.
2.3 FAT: Coordinate and comply with FAT requirements as described in SOW paragraph 3.4. First Article (FA) Forms are located in the Technical Data Package
(TDP).
2.4 Conforming Parts: parts are considered conforming when built to specifications utilizing all applicable drawing views and information; for example, a part is in conformance when dimensions are measured/determined to be within allowed tolerance; additionally, the part is trimmed correctly and has sufficient edge distance per the drawing and Attachment A, as applicable.
2.5 Delivery is said to occur at FOB Origin (DCMA final inspection, DCMA acceptance and the point of time at which the entire set of TRIM Parts, 1560K0104791AXE, -BXE, -HXE, -KXE, is ready for DCMA transportation).
2.6 Latent Defects means a defect that exists at the time of acceptance but cannot be discovered by a reasonable inspection (FAR, Part 2, Subpart 2.1). Responsibility of the Contractor is further described in FAR 52.246-2.
2.7 “Prototype Installation” refers to the first-time installation of the TRIM aircraft parts kit (1560K0104791AXE and 1560K0104791BXE) and fasteners on the
“validation” or prototype T-38 aircraft. The second TRIM aircraft parts kit installation is considered the verification aircraft installation. Collectively, validation/verification is performed on the TRIM aircraft parts kit, including fasteners, and the installation process.
2.8 The term “initial lot” is defined as follows: the quantity of TRIM Aircraft Parts
Kits stated in the delivery order(s) placed upon contract award.
III. Maximum Incentive Amounts:
The Government intends to establish this optional Contract Line Item Number (CLIN
X053) with DO 0001, in order to provide an incentive to the contractor to accelerate the manufacturing/parts production process to deliver TRIM aircraft parts kit(s) and fasteners kit(s) earlier than contractually required.
For the final RFP, the Incentive Table has been populated with a Government example of the base kit cost and reflects the potential of a 100% premium on kit 1 to the eligible contractor. The incentive structure is intended to motivate the contractor to perform in a manner that rewards them for delivering kit #1 several weeks sooner than June 2021.
The contractor can also use the spreadsheet to calculate/complete the TRIM Incentive
Table for an alternate scenario, as follows:
3.1) Enter a projected Base Kit Cost in Column C, cell C6; column AB will duplicate column C (upon contract award, the base kit cost would later be adjusted to the negotiated per kit cost);
3.2) Click into the cell (i.e. D6) to display formula then enter the percent of base kit as the multiplier to calculate incentive (change “=+AB6*2” to “=+AB6*2.05” to result in
105% premium for delivering 26 weeks early);
3.3) Adjust the rest of the bi-weekly formulas on a downward sliding scale 24 weeks, 22 weeks, 20 weeks, etc.
Please be advised the Government values early delivery of kits 1 & 2 significantly more than early delivery of kits 3 & 4; also, early delivery of only 4 weeks is of little value to the Government, but early delivery by 12 to 14 weeks or more is highly-valued.
Enclosure #2 reflects the Incentive Table for this example; the maximum TRIM Early
Delivery Incentive that can be earned during DO 0001 is:
Kit #1 $200,000 (if delivered 26 weeks ahead of schedule)
Kit #2 $ N/A (if delivered 26 weeks ahead of schedule)
Lot $200,000 (if DO 0001 was for 1 kit and it was delivered early as shown)
IV. Sample Calculation of Earned Incentive Amounts:
An example scenario of the potential incentive that may be earned by the contractor has been provided and includes the following assumptions:
4.1 March 29, 2019: Basic Contract Award occurs with DO 0001 issued for a lot of 1 kit as identified by kit NSNs: AXE, BXE, HXE, and KXE.
4.2 March 29, 2020: required FA submittals to the Government FAT lab begin NLT
March 29, 2020; FA submittals will be in aggregate at the sub-kit level.
4.3 September 1, 2020: the final FA sub-kit submitted NLT September 1, 2020.
4.4 June 1, 2021: required delivery of Kit #1.
Example: Basic Contract Award occurs March 29, 2019 with DO 0001 issued for a lot of 1 kit per each kit NSN, required FAs are submitted in a timely manner, and all components pass FAT the first time around. Contractor applies the resources needed to accelerate the delivery of TRIM aircraft parts kits and fastener kits to support an earlier delivery and aircraft induction for the Prototype Installation #1. Calculation of incentive amount earned in this example at the dates shown below is as follows:
March 1, 2021: Kit #1 delivered 14 weeks early; earn incentive of $140,000
V. Incentive Payment Schedule
Any incentive earned will be paid out in one lump sum after completion of all of the following:
5.1 All parts requiring first article pass FAT. Contractor shall allow up to 120 days for Government FAT process and return of FAs.
5.2 All parts listed in kit NSN 1560K0104791-AXE, -BXE, -HXE, and -KXE for kit
#1 are accepted by DCMA at FOB Origin and the entire kit is packaged for shipment/ready for DCMA transportation, with no short shipments.
5.3 TRIM kit quality is subject to Inspection of Supplies (FAR 52.246-2).
5.4 TRIM incentive period and incentive earned amount is documented via contract modification. Such contract modification and lump sum payment to the contractor shall occur within 60 days after completion of delivery as shown above.
VI. Adjustments to Incentive Completion Dates
No adjustments to incentive completion dates in Section IV of this agreement will be granted unless a single Government-caused delay induces a schedule delay of at least
15 business days beyond the dates identified in the attached baseline incentive schedule. The contractor shall provide written notice to immediately inform the
Government when they believe there is a Government-caused delay.
Enclosure 1 – TRIM Aircraft Parts Kit for T-38A/B Aircraft – Page 1
Continued next page
DATE
KIT NSN TCTO MOD NO.
A B C
CONFIG KIT QTY CONFIG KIT QTY CONFIG KIT QTY
1 1560-01-464-0088 2-11402-9 1
2 1560-01-464-0095 2-11402-10 1
3 1560-01-423-7351 2-11755-19 1
4 1560-01-423-7352 2-11755-20 1
5 1560-01-665-5010 200610158-10 1
6 1560-01-665-5012 200610158-20 1
REQUEST FOR TCTO KIT ASSEMBLY
NUMBER OF KITS REQUIRED FOR THESE CONFIGURATIONS
DATES REQUIRED BY
20180501
ITEM NO.
ITEM
STOCK NO. PART NO.
SOURCE OF
SUPPLY U/I
1T-38A-998
NOUN
1560K0104791BXE
Bulkhead, Nacelle at FS 332.50
Bulkhead, Nacelle at FS 332.50
QUP UNIT COST
Bulkhead, Nacelle at FS 362.00
Lower Cockpit Longeron Splice Repair
Lower Cockpit Longeron Splice Repair
Bulkhead, Nacelle at FS 362.00
DATE
KIT NSN TCTO MOD NO.
A B C
CONFIG KIT QTY CONFIG KIT QTY CONFIG KIT QTY
1 1560-01-623-1279 2-11308-13 1
2 1560-01-623-1273 2-11308-14 1
3 1560-01-586-6083 2-11309-1 1
4 1560-01-586-6077 2-11309-2 1
5 1560-01-631-8574 2-11412-13 1
6 1560-01-631-7445 2-11412-14 1
7 1560-01-631-5596 2-11325-1 1
8 1560-01-631-5081 2-11325-2 1
9 1560-01-631-6388 2-11326-1 1
10 1560-01-631-6387 2-11326-2 1
11 1560-01-631-5083 2-11327-1 1
12 1560-01-631-5085 2-11327-2 1
13 1560-01-631-5595 2-11328-1 1
14 1560-01-631-5597 2-11328-2 1
15 1560-01-631-6170 2-11330-1 1
16 1560-01-631-5084 2-11330-2 1
17 1560-01-631-4787 2-11331-1 1
18 1560-01-631-4781 2-11331-2 1
19 1560-01-631-5600 2-11332-1 1
20 1560-01-631-5080 2-11332-2 1
21 1560-01-631-5930 2-11333-1 1
22 1560-01-631-6205 2-11333-2 1
23 1560-01-631-6229 2-11335-1 1
24 1560-01-631-6230 2-11335-2 1
25 1560-01-631-6239 2-11336-1 1
26 1560-01-631-6254 2-11336-2 1
27 1560-01-631-4763 2-11337-1 2
28 1560-01-631-7027 2-11337-2 2
29 1560-01-631-7016 2-11339-1 1
30 1560-01-631-6281 2-11339-2 1
REQUEST FOR TCTO KIT ASSEMBLY
NUMBER OF KITS REQUIRED FOR THESE CONFIGURATIONS
DATES REQUIRED BY
20180501
ITEM NO.
ITEM
STOCK NO. PART NO.
SOURCE OF
SUPPLY U/I
1T-38A-998
NOUN
1560K0104791CXE
Lower Center Longeron (FS 284 to FS 325)
Lower Center Longeron (FS 284 to FS 325)
QUP UNIT COST
Clip
Clip
Clip
Clip
Clip
Clip
Bulkhead Upper Cap at FS 325
Upper Center Longeron (FS 284 to FS 325)
Upper Center Longeron (FS 284 to FS 325)
Clip
Clip
Clip
Bulkhead Upper Cap at FS 325
Clip
Clip
Clip
Clip
Clip
Clip
Clip
Clip
Clip
Clip
Clip
Clip
Clip
Clip
Clip
Enclosure 1 – TRIM Aircraft Parts Kit for T-38A/B Aircraft – Page 2
Continued next page
KIT NSN TCTO MOD NO.
A B C
CONFIG KIT QTY CONFIG KIT QTY CONFIG KIT QTY
1 1560-00-101-9298 2-31435-501 1
2 1560-00-101-9299 2-31435-502 1
3 1560-01-024-6735 3-11227-11 1
4 1560-01-024-6736 3-11227-12 1
5 1560-01-631-6394 3-11606-17 1
6 1560-01-624-5710 3-11608-503 1
7 1560-00-920-8714 3-11611-503 1
REQUEST FOR TCTO KIT ASSEMBLY
NUMBER OF KITS REQUIRED FOR THESE CONFIGURATIONS
DATES REQUIRED BY
20180427
ITEM NO.
ITEM
STOCK NO. PART NO.
SOURCE OF
SUPPLY U/I
1T-38A-998
NOUN
1560K0104791EXE
Angle, Vertical Stabilizer Attach
Angle, Vertical Stabilizer Attach
QUP UNIT COST
Support, Attach Lower Aft CFS 487.223 to FS 508.316
Former at FS 486
Former at CFS 487.223
Former at CFS 505.075
Support, Attach Lower Aft CFS 487.223 to FS 508.316
DATE
KIT NSN TCTO MOD NO.
A B C
CONFIG KIT QTY CONFIG KIT QTY CONFIG KIT QTY
1 1560-01-602-2365 3-11617-5 1
2 1560-01-631-7836 3-11781-101 1
3 1560-01-631-7837 3-11781-102 1
4 1560-01-631-5451 3-11781-104 1
5 1560-01-631-7167 3-11781-127 1
6 1560-01-631-7170 3-11781-128 1
7 1560-01-631-7248 3-11781-129 1
8 1560-01-631-4840 3-11781-131 1
9 1560-01-631-4849 3-11781-132 1
10 1560-01-631-7844 3-11781-133 1
11 1560-01-631-4862 3-11781-135 1
12 1560-01-631-4870 3-11781-136 1
13 1560-01-631-4813 3-11781-139 1
14 1560-01-631-7252 3-11781-33 6
15 1560-01-632-3433 3-11781-77 2
16 1560-01-631-4809 3-11781-87 3
17 1560-01-632-5474 3-11781-93 1
18 1560-01-631-7843 3-11781-94 1
19 1560-01-631-7250 3-11781-97 1
20 4710-01-632-2528 3-52597-1 1
21 4710-01-632-2526 3-52597-2 1
22 NSL 51B108-06 4
23 1560-00-768-3053 70C410 2
24 1560-00-785-5792 70C421-1 2
25 5306-00-292-5517 AN42B-3A 2
26 5340-00-721-8182 AN743-13 2
27 5310-01-400-3787 AN960D10L 2
28 5320-00-781-0485 BA6A3H 2
29 5320-00-759-3367 HL18-5-3 36
30 5320-00-498-3589 HL18-5-4 6
REQUEST FOR TCTO KIT ASSEMBLY
NUMBER OF KITS REQUIRED FOR THESE CONFIGURATIONS
DATES REQUIRED BY
20180427
ITEM NO.
ITEM
STOCK NO. PART NO.
SOURCE OF
SUPPLY U/I
1T-38A-998
NOUN
1560K0104791FXE
Tunnel Control Cover, FS 388.75 - . FS 445.00
Angle
QUP UNIT COST
Tube Assembly
Angle
Panel
Panel
Doubler
Clip
Angle
Pan
Pan
Pan
Stiffener
Stiffener
Angle
Strip
Doubler
Angle
Angle
Pan
Tube Assembly
Bracket Assembly, Nutplate
Support, Fuel Cell Lacing
Support, Fuel Cell Lacing
Pin-Rivet, Threaded
Bolt, Eye
Bracket, Support Clamp
Pin-Rivet, Threaded
Washer, Flat
Rivet, Blind
Enclosure 1 – TRIM Aircraft Parts Kit for T-38A/B Aircraft – Page 3
Enclosure 1 Continued – TRIM Fastener Kit contents
1. Kit NSN 1560K0104791HXE TRIM BASE HARDWARE (as itemized on AFMC IMT 185)
2. Kit NSN 1560K0104791KXE T-38 AB HARDWARE (as itemized on AFMC IMT 185)
A B C
CONFIG KIT QTY CONFIG KIT QTY CONFIG KIT QTY
31 5320-01-006-3987 HL18-6-3 8
32 5320-01-013-9691 HL18-6-4 4
33 5320-00-999-9407 HL18PB-6-4 18
34 5320-00-076-4071 HL70-5 42
35 5320-00-631-3429 HL70-6 12
36 5320-00-968-9212 HL79-6 18
37 5320-00-117-6953 MS20426AD4-8 52
38 5320-00-117-6885 MS20426AD5-8 54
39 5320-00-808-7822 MS20470AD3-8 24
40 5320-00-117-6830 MS20470AD4-8 116
41 5320-00-117-6841 MS20470AD5-8 1115
42 5320-01-247-9034 MS20470E6-8 192
43 5320-00-685-0821 MS20615-5M5 12
44 5310-00-807-1474 MS21042L3 2
45 5310-00-740-5096 NA2132D62 2
46 5320-00-005-8310 NAS1398D4A4 4
47 5310-00-777-5791 NAS686-A3 1
48 5310-00-778-9480 NAS687-A3 2
Rivet, Solid
Nut, Self-Locking
Nut, Self-Locking
Nutplate, Self-Locking
Nutplate, Self-Locking
CONTINUATION
UNIT COST TOTAL COST
ITEM
NO.
ITEM
STOCK NO. PART NO. NOUN
NUMBER OF KITS REQUIRED FOR THESE CONFIGURATIONS
DATES REQUIRED BY
Pin-Rivet, Threaded
Pin-Rivet, Threaded
Pin-Rivet, Threaded
Collar, Pin-Rivet
Rivet, Blind
Collar, Pin-Rivet
Collar, Pin-Rivet
Rivet, Solid
Rivet, Solid
Rivet, Solid
Rivet, Solid
Rivet, Solid
Rivet, Solid
DATE
KIT NSN TCTO MOD NO.
A B C
CONFIG KIT QTY CONFIG KIT QTY CONFIG KIT QTY
1 1560-01-003-7244 3-11613 -19 1
2 1560-01-665-7666 3-11322-502 1
Aft Fuselage Upper Skin (FS 445 to canted FS 505/FS 531)
Skin, Side, (FS 284 to FS 325)
QUP UNIT COST
REQUEST FOR TCTO KIT ASSEMBLY
NUMBER OF KITS REQUIRED FOR THESE CONFIGURATIONS
DATES REQUIRED BY
20180501
ITEM NO.
ITEM
STOCK NO. PART NO.
SOURCE OF
SUPPLY U/I
1T-38A-998
NOUN
1560K0104791GXE
Enclosure 2 – Draft Incentive Table (Tailored to 1 kit in DO 0001)
Enclosure 3 – Draft Kit Buy Schedule
(Subject to change until contract award)
T-38 Talon Repair Inspection and Maintenance (TRIM) Program: Incentive for Early Delivery of First Delivery Order ~~~DRAFT for RFP/Subject to change until contract award or bilateral contract modification~~~
Base Kit Cost =
(AXE+BXE+HXE+KXE+LXE
T-26 wks
Payment
Incentive
T-26 wks
T-24 wks
Payment
Incentive
T-24 wks
T-22 wks
Payment
Incentive
T-22 wks
T-20 wks
Payment
Incentive
T-20 wks
T-18 wks
Payment
Incentive
T-18 wks
T-16 wks
Payment
Incentive
T-16 wks
1/FA 200,000$ 400,000 200,000 390,000 190,000 380,000 180,000 370,000 170,000 360,000 160,000 350,000 150,000
2 - - - - - - - - - - - -
3 - - - - - - - - - - - -
4 - - - - - - - - - - - -
5 - - - - - -
6 - - - - - -
7 - - - - - -
Total 200,000$ 400,000 390,000 380,000 370,000 360,000 350,000
Incentive >>>>>>>> 200,000$ 190,000$ 180,000$ 170,000$ 160,000$ 150,000$
DO 0001
& Kit No.
T-14 wks
Payment
Incentive
T-14 wks
T-12 wks
Payment
Incentive
T-12 wks
T-10 wks
Payment
Incentive
T-10 wks
T-8 wks
Payment
Incentive
T-8 wks
T-6 wks
Payment
Incentive
T-6 wks
T-4 wks
Payment
Incentive
T-4 wks On-Time
340,000 140,000 330,000 130,000 320,000 120,000 300,000 100,000 260,000 60,000 230,000 30,000 200,000$
340,000 330,000 320,000 300,000 260,000 230,000 200,000$
140,000$ 130,000$ 120,000$ 100,000$ 60,000$ 30,000$
TRIM D.O. Issued FY19 FY20 FY21 FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29 Sub-Total
TRIM T-38A/B/C Kits 1 13 16 23 26 26 27 27 159
USAF Sub-total 1 13 0 16 23 26 26 27 27 0 0 159
TRIM T-38Cs *Navy* Kits 1 2 2 2 2 1 10
TRIM Kit Buys 1 13 0 17 25 28 28 29 28 0 0 169
TRIM FAT in FY20
(A/B models) 1 *2 additional TRIM A/B kits may be ordered in FY22 to have on-hand, but would not coincide with an aircraft induction in FY22-FY23.
T-38 TRIM Projected Buy Schedule >> as of 11 Sep 18
Anticipated delivery order(s) upon contract award:
DO 0001* issued on or near 29 Mar 19
Kit # Delivery Date Aircraft MDS
001 01 Jun 21 T-38B val/ver *1 kit in DO 0001
DO 0002** issued 1 Oct 19 (FY22 inductions)
Kit # Delivery Date Aircraft MDS
002 01 Sep 21 T-38A val/ver
003 13 Jun 22 T-38A
004 13 Jun 22 T-38A **3 kits in DO 0002
DO 0003** issued 1 Oct 19 (FY23 inductions)
Kit # Delivery Date Aircraft MDS
005 ## Aug 22 T-38A
006 ## Aug 22 T-38A
007 ## Aug 22 T-38A
008 ## Dec 22 T-38A
009 ## Dec 22 T-38A
010 ## Dec 22 T-38A
011 ## Mar 23 T-38A
012 ## Mar 23 T-38A
013 ## Mar 23 T-38A
014 ## May 23 T-38A **10 kits in DO 0003
**DO 0002 and DO 0003 are being provided for informational purposes only.
At this time, these DOs are not subject to the Early
Delivery incentive CLIN.
File details come from the government source that posted it. Updated .