PIP-II F-37 building LWC pump room piping system installation
Open Solicitation Posted
- Solicitation number
- 378854_MR
- Agency
-
Fermi National Accelerator Laboratory
Office of Science, Department of Energy
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 23822 Plumbing, Heating, and Air-Conditioning Contractors
- Place of performance
- Batavia, Illinois 60510, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
Fermi National Accelerator Laboratory seeks fabrication and installation of a Low Conductivity Water piping system in the F-37 Building pump room at its Batavia, Illinois facility, with proposals due November 19, 2026, at 2:00 p.m. CDT and questions due November 5, 2026, at 4:00 p.m. CDT. This is an unrestricted procurement with a small business size standard of $19 million; NAICS code 23822, Plumbing, Heating, and Air-Conditioning Contractors; PSC K056.
The mandatory pre-proposal meeting and site visit is October 27, 2026, at 10:00 a.m. CDT. Offerors must submit Access Request forms at least seven days in advance and provide valid REAL ID-compliant identification; attendees must be U.S. Citizens. The site is a secured DOE facility with restrictions on weapons, explosives, controlled substances, and smoking; all vehicles are subject to search.
Work encompasses supply and installation of all piping, valves, instrumentation, structural supports, and electrical components for the LCW system serving two 50 HP centrifugal pumps, a shell-and-tube heat exchanger, a 250-gallon expansion reservoir, and process equipment including deionization skids and particulate filters. Installation specifications require ASME B31.3 Process Piping and ASME Boiler and Pressure Vessel Code compliance using ASTM A312 304/304L stainless steel pipe rated 150 PSIG and 200°F. All welding requires Procedure Qualification Records and Welder Performance Qualifications approved by Fermilab before work begins, with internal argon gas purging mandatory during welding. The piping system must undergo preliminary pneumatic pressure testing at 12 PSIG followed by hydrostatic testing per FESHM 5031.1 and FESHM 5034, overseen by Fermilab Test Coordinator and witnessed by ES&H representatives.
Offerors must demonstrate at least ten years of comparable contracting experience (firm or key personnel), relevant past project experience, and compliance with applicable safety codes and standards. Performance bond and payment bond of 100 percent are required if the contract exceeds $150,000 and $35,000 respectively. A bid guarantee of not less than 20 percent of the bid price (not to exceed $3 million) is required with the proposal. A small business subcontracting plan is required if the awardee exceeds $19 million in size and the subcontract exceeds $750,000. The subcontract is subject to Davis-Bacon prevailing wage determinations with weekly certified payroll submissions through LCPTracker.
Evaluation uses lowest price-technically acceptable based on past performance and technical qualifications. The subcontractor must provide comprehensive quality control and quality assurance plans, maintain detailed project schedules with defined milestones, submit shop drawings and as-built documentation, and comply with Fermilab Environmental, Safety & Health Manual requirements including 10 CFR 851, OSHA standards, and task-specific Job Hazard Analyses. All contractor personnel must complete Subcontractor Orientation and General Employee Radiological Training and obtain identification badging. Insurance requirements include Commercial General Liability ($1,000,000 per occurrence, $2,000,000 aggregate), Automobile Liability ($1,000,000), Excess Liability ($1,000,000 for subcontracts under $3.5 million), Workers' Compensation with statutory limits and $1,000,000 Employer's Liability, and Contractor's Pollution Liability ($1,000,000 per occurrence and aggregate).
Contact Michele Reynolds, Procurement Specialist, at micheler@fnal.gov or (630) 840-2448 for questions.
Notice text
This scope of work includes fabricating and installing a Low Conductivity Water (LCW) Piping System in the F-37 Pump Room.
PLEASE NOTE the important information related to this RFP:
- Pre-Proposal Meeting and Site Visit: Ocotber 27, 10:00a CDT
- Last Day for Questions: November 5, 2026, 4:00p CDT
- PROPOSALS DUE: November 19, 2026, 2:00p CDT
To attend the Pre-Proposal Meeting and Site Visit, PPE is required.
As Fermilab is a federal facility, to access the Fermilab site, offerors MUST complete an Access Request form AT LEAST SEVEN (7) DAYS IN ADVANCE OF THE MEETING. AS THIS IS A SECURED DOE SITE, FNAL IS UNABLE TO PROCESS ACCESS REQUESTS THAT ARE NOT RECEIVED 7 DAYS PRIOR TO THE PRE-SOLICITATION CONFERENCE. Additionally, to obtain on-site access approval, attendees must be a U.S. Citizen and have a REAL ID.
Please note that when entering Fermilab:
- All vehicles are subject to search
- No weapons, firearms, or ammunition (regardless of concealed carry permit) are allowed on-site.
- No explosives or any other apparatus or material hazardous to the public or property are allowed on site.
- No possession or illegal use of controlled substances or intoxicants, or being under their influence, is allowable.
- No personal alcohol or marijuana
- No Smoking or vaping within buildings and within 15-25 feet of entrances
- Illinois Rules of the Road are to be followed while driving on Fermilab’s premises.
Files
Show all 25
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB | Fermi National Accelerator Laboratory | No set-aside | |
| PIP-II CM 2K Reclosable Pressure Safety Relief Valves | Fermi National Accelerator Laboratory | No set-aside | |
| PIP-II Niobium Sheets, Rings, and Disks | Fermi National Accelerator Laboratory | No set-aside | |
| Wilson Hall Floor 16 Electric and Elevator Machine Rooms Fire Rating and Mechanical Upgrade | Fermi National Accelerator Laboratory | Total Small Business | |
| Bar Grating and Saddle Clips | Fermi National Accelerator Laboratory | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity