HX drawing for F37.pdf

PDF 426 KB Posted

Attached to
PIP-II F-37 BUILDING LWC PUMP ROOM PIPING SYSTEM INSTALLATION
Solicitation number
378854_MR
Issued by

About this file

This is a technical drawing and specification document for a horizontal heat exchanger manufactured by ChemTed LLC, located in Rio Vista, Texas. The document contains detailed engineering specifications, material of construction details, design parameters, and manufacturing requirements for a shell-and-tube heat exchanger unit.

The exchanger is designed for a maximum allowable working pressure of 300 psig on the shell side and 150 psig on the tube side, with design temperatures of 400°F for the shell and 350°F for the tube side. The unit features stainless steel construction for key components including the shell, channels, nozzles, and flanges, with carbon steel materials used for other structural elements. Construction specifications include comprehensive tolerances, weld details, hydrostatic testing requirements at 450 psig, and surface preparation and coating requirements using Sherwin-Williams MacroPoxy products. The document specifies a capacity of approximately 5.8 million BTU/hour for medium liquid water flow conditions, with detailed dimensional drawings, bill of materials, loading calculations for fixed and sliding saddle supports, and nozzle schedule information. The exchanger is marked "Release for Fabrication" and includes revision history documenting design approvals and modifications during the product development and quality improvement process. This is a proprietary design document restricted from reproduction or use without prior written authorization from ChemTed LLC.

View the file

Other files

File Type Posted
Addenda_2.pdf PDF
PIP-II Pipe Support Analysis and Design Deliverable PO 683434.pdf PDF
PIP-II F37 Pump Room Concrete Pad Specification.pdf PDF
Flowserve pump data proposed.pdf PDF
Addenda_1.pdf PDF
EXHIBIT_18_Injury_Illness_Questionaire.pdf PDF
EXHIBIT_14_Proposal Certifications.pdf PDF
EXHIBIT_7_ADDENDUM TO FESHM.pdf PDF
EXHIBIT_9_010010 General Requirements.pdf PDF
378854_MR.pdf PDF
EXHIBIT_20_SF1413-23a.pdf PDF
EXHIBIT_24_Sample Subcontract.pdf PDF
EXHIBIT_4_ED0042585_PIP-II_F37_Bldg_Low_Conductivity_Water_Specification.pdf PDF
EXHIBIT_2_FFDG_General_Terms_and_Conditions.pdf PDF
EXHIBIT_13_CESHC.pdf PDF
EXHIBIT_6_5031_1 Piping Systems March 2025.pdf PDF
EXHIBIT_15_SARC.pdf PDF
EXHIBIT_3_ED0042584_PIP-II_Low_Conductivity_Water_LCW_System_Instrumentation_Specification.pdf PDF
EXHIBIT_5_F37_LCW_Electrical_Statement_of_Work_and_prints_rev_A.pdf PDF
EXHIBIT_19_General_Decision_Number_IL20260008_05_18_2026.pdf PDF
EXHIBIT_12_014100 Quality Requirements.pdf PDF
EXHIBIT_10_013100 ESH Requirements.pdf PDF
EXHIBIT_8_FESHM 5034 Pressure Testing.pdf PDF
EXHIBIT_16__2025_Construction_Insurance_Requirements.pdf PDF
EXHIBIT_23_Performance Bond.pdf PDF
EXHIBIT_22_Payment Bond.pdf PDF
EXHIBIT_25_Drawings.zip ZIP file
EXHIBIT_21_Bid_Bond.pdf PDF
EXHIBIT_17_FL-55.pdf PDF
EXHIBIT_11_013300 Submittals.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

t

File details come from the government source that posted it. Updated .