WFE Solenoid/Corrector Magnet Spares
Open Solicitation Posted
- Solicitation number
- 389116swk
- Agency
-
Fermi National Accelerator Laboratory
Office of Science, Department of Energy
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 332999 All Other Miscellaneous Fabricated Metal Product Manufacturing
- PSC
- 5945 Relays And Solenoids
- Place of performance
- Batavia, Illinois, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
Fermi Forward Discovery Group, LLC (FFDG), which manages Fermi National Accelerator Laboratory for the U.S. Department of Energy Office of Science, is soliciting firm-fixed price proposals for two WFE solenoid and corrector magnet packages (RFP 389116swk, part F00484505) on behalf of Fermilab, with questions due November 30, 2026 and proposals due January 5, 2027. The procurement carries no set-aside.
Amendment 01, issued November 17, 2026, extended the proposal deadline from December 9, 2026 to 5:00 p.m. Central on January 5, 2027. Offerors must acknowledge the amendment by completing the SARC and PROC-FRM-466 forms or by email before the deadline. The amendment permits use of lower-tier manufacturers' facilities and test capabilities with clear attribution and applicable approval, but requires clear delineation of in-house versus subcontracted work, particularly quality control responsibilities.
Delivery is to Fermilab Receiving Warehouse 2 in Batavia, Illinois, FOB Fermilab, with all freight included in the quotation and Net 30 payment terms. The Batavia location is also the place of performance named in the notice.
The subcontractor designs, manufactures, and delivers two solenoid packages with integrated dipole correctors for Fermilab's AD-Proton Source Department, steering and focusing a 30 keV H- beam into the RFQ accelerator. Solenoid requirements include a 0.3 T2 m integrated field strength at 300 A peak, maximum 6.5 kW power dissipation, 1% field homogeneity in the good field region, minimum 80 mm inner beam pipe diameter, and maximum 400 mm outer diameter. Dipole correctors must deliver a 0.5 mT m field integral at maximum 15 A with 5% field uniformity. Deliverables include drawing sets, quality control plans, material certifications, factory and site acceptance test reports, and magnetic measurement plans and reports. Three design reviews apply (kickoff, Preliminary Design Review at 50% maturity, and Final Design Review at 90-100% maturity), and FFDG approval is required before production. The schedule runs approximately 40 weeks from receipt of order, with deliveries in one batch.
Source selection is best value with trade-off, where non-cost factors are approximately equal to or significantly more important than cost. Award is made without discussions. Evaluation factors, ranked by importance, are the technical proposal per the SOW, price, infrastructure capabilities (manufacturing, fabrication, magnetic testing, and quality assurance), schedule with a Gantt chart, and past experience with similar fabrication and quality control. The notice assigns no numerical weights.
Required proposal forms are the completed RFP page, SARC Form (Rev. 8), and PROC-FRM-466. Any resulting subcontract is governed by the FFDG General Terms and Conditions for Commercial Products and Commercial Services (10.2026). The prime contract is DE-AC02-07CH11359. The NAICS code is 332999 and the PSC is 5945. Procurement questions go to Spencer Keske, Procurement Specialist III, at skeske@fnal.gov or 630-840-3323.
Notice text
Please see attached for Fermilab RFP# 389116swk and associated documentation. Please ensure that you review the RFP document fully, as it outlines how to submit a complete proposal package.
Important information related to this RFP:
- Proposals Due: 5pm Central, December 9, 2026
- Question Due Date: 5pm Central, November 30, 2026
- This is a Best Value with Trade-Off source selection. Please review the RFP document for more information
Please reach out with any questions or comments pertaining to this RFP, thank you.
Files
| File | Type | Posted |
|---|---|---|
| RFP 389116swk Amendment 01.pdf | ||
| RFP 389116swk Rev 1.pdf | ||
| RFP 389116swk Amendment 01.pdf | ||
| WFE Solenoid SOW 389116swk.pdf | ||
| F00484505---DWG1.pdf | ||
| RFP 389116swk.pdf | ||
| F10009710_-_PDF_1.pdf |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Advanced Light Source Upgrade (ALS-U) STORAGE RING (SR) BENDB AND BENDC MAGNETS | Department of Energy | No set-aside | |
| Electron Storage Ring D2 Dipole Magnets | Office of Science | No set-aside | |
| Kautz road substation construcion, UIP subproject 2- KRS | Fermi National Accelerator Laboratory | No set-aside | |
| Utility excavation and repair services IDIQ | Fermi National Accelerator Laboratory | Total Small Business | |
| Wilson Hall Floor 16 Electric and Elevator Machine Rooms Fire Rating and Mechanical Upgrade | Fermi National Accelerator Laboratory | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity