This is Addenda No. 02 to a federal solicitation for PIP-II F-37 LCW Pump Room Piping issued by Fermi National Accelerator Laboratory (FNAL). The addendum was issued on November 3, 2026, with a proposal due date of November 19, 2026. Solicitation No. 378854_MR contains clarifications addressing seven questions received from bidders regarding project scope and technical requirements.
Key clarifications include: a heat exchanger rigging submittal is attached to the addendum; no Johnson Controls interface with the Metasys System is required; shop fabricated pipe spools may be hydrotested with regular water if fully dried and cleaned afterward; bidders must bid specifications as written and may only substitute flanged joints for field welds or Van Stone Flanges by following RFP substitution procedures and providing deduct pricing; no additional electrical drawings will be issued beyond bid documents; and FNAL will handle PLC programming with contractors responsible only for wiring. All other terms and conditions of the original solicitation remain unchanged. Bidders must acknowledge receipt of this amendment via email to the FFDG Procurement Specialist. Michele Reynolds, PIP-II Procurement Manager, serves as the point of contact at (630) 840-2448 or micheler@fnal.gov.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDA TO SOLICITATION
ADDENDA NO. 02 DATE OF AMENDMENT: NOVEMBER 3, 2026
SOLICITATION NO. 378854_MR DATE ISSUED: NOVEMBER 3, 2026
PROJECT NO. PROPOSAL DUE DATE: NOVEMBER 19, 2026
TITLE OF PROJECT: PIP-II F-37 LCW PUMP ROOM PIPING
Bidders must acknowledge this amendment immediately upon receipt by one of the following methods:
• Via email to the FFDG Procurement Specialist
Below are clarification questions received (exactly as written), and FFDG’s answers for the above-referenced solicitation:
Q1: Please provide the submittal for the heat exchanger for rigging?
A1: Attached.
Q2: Clarify if there will need to be a Johnson Controls Interface with the Metyasys System as part of our scope of work.
A2: No Johnson controls interface is needed.
Q3: Can we hydrotest shop fabricated pipe spools with regular water?
A3: Yes, but they must be fully dried and cleaned.
Q4: Can flanged joint be substituted for field weld joints?
A4: Please bid what is specified, and if you would like to substitute, please follow the process outlined in the RFP document, including providing a deduct price for the substitution.
Q5: Are Van Stone Flanges allowed?
A5: Please bid what is specified, and if you would like to substitute, please follow the process outlined in the RFP document, including providing a deduct price for the substitution.
Q6: Will there be electrical drawings issued with the bid documents for electricians to price their work?
A6: No additional drawings will be issued.
Q7: Clarify the extent of our scope of work on the PLC Controls.
A7: FNAL will do the programming, and you will be responsible only for wiring.
ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
Fermi National Accelerator Laboratory P.O. Box 500 Batavia, IL 60510 M.S 210
Michele Reynolds PIP-II Procurement Manager
(630) 840-2448 Email: micheler@fnal.gov mailto:micheler@fnal.gov