Addenda_2.pdf

PDF 164 KB Posted

Attached to
PIP-II F-37 BUILDING LWC PUMP ROOM PIPING SYSTEM INSTALLATION
Solicitation number
378854_MR
Issued by

About this file

This is Addenda No. 02 to a federal solicitation for PIP-II F-37 LCW Pump Room Piping issued by Fermi National Accelerator Laboratory (FNAL). The addendum was issued on November 3, 2026, with a proposal due date of November 19, 2026. Solicitation No. 378854_MR contains clarifications addressing seven questions received from bidders regarding project scope and technical requirements.

Key clarifications include: a heat exchanger rigging submittal is attached to the addendum; no Johnson Controls interface with the Metasys System is required; shop fabricated pipe spools may be hydrotested with regular water if fully dried and cleaned afterward; bidders must bid specifications as written and may only substitute flanged joints for field welds or Van Stone Flanges by following RFP substitution procedures and providing deduct pricing; no additional electrical drawings will be issued beyond bid documents; and FNAL will handle PLC programming with contractors responsible only for wiring. All other terms and conditions of the original solicitation remain unchanged. Bidders must acknowledge receipt of this amendment via email to the FFDG Procurement Specialist. Michele Reynolds, PIP-II Procurement Manager, serves as the point of contact at (630) 840-2448 or micheler@fnal.gov.

View the file

Other files

File Type Posted
HX drawing for F37.pdf PDF
PIP-II Pipe Support Analysis and Design Deliverable PO 683434.pdf PDF
PIP-II F37 Pump Room Concrete Pad Specification.pdf PDF
Flowserve pump data proposed.pdf PDF
Addenda_1.pdf PDF
EXHIBIT_18_Injury_Illness_Questionaire.pdf PDF
EXHIBIT_14_Proposal Certifications.pdf PDF
EXHIBIT_7_ADDENDUM TO FESHM.pdf PDF
EXHIBIT_9_010010 General Requirements.pdf PDF
378854_MR.pdf PDF
EXHIBIT_20_SF1413-23a.pdf PDF
EXHIBIT_24_Sample Subcontract.pdf PDF
EXHIBIT_4_ED0042585_PIP-II_F37_Bldg_Low_Conductivity_Water_Specification.pdf PDF
EXHIBIT_2_FFDG_General_Terms_and_Conditions.pdf PDF
EXHIBIT_13_CESHC.pdf PDF
EXHIBIT_6_5031_1 Piping Systems March 2025.pdf PDF
EXHIBIT_15_SARC.pdf PDF
EXHIBIT_3_ED0042584_PIP-II_Low_Conductivity_Water_LCW_System_Instrumentation_Specification.pdf PDF
EXHIBIT_5_F37_LCW_Electrical_Statement_of_Work_and_prints_rev_A.pdf PDF
EXHIBIT_19_General_Decision_Number_IL20260008_05_18_2026.pdf PDF
EXHIBIT_12_014100 Quality Requirements.pdf PDF
EXHIBIT_10_013100 ESH Requirements.pdf PDF
EXHIBIT_8_FESHM 5034 Pressure Testing.pdf PDF
EXHIBIT_16__2025_Construction_Insurance_Requirements.pdf PDF
EXHIBIT_23_Performance Bond.pdf PDF
EXHIBIT_22_Payment Bond.pdf PDF
EXHIBIT_25_Drawings.zip ZIP file
EXHIBIT_21_Bid_Bond.pdf PDF
EXHIBIT_17_FL-55.pdf PDF
EXHIBIT_11_013300 Submittals.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDA TO SOLICITATION

ADDENDA NO. 02 DATE OF AMENDMENT: NOVEMBER 3, 2026

SOLICITATION NO. 378854_MR DATE ISSUED: NOVEMBER 3, 2026

PROJECT NO. PROPOSAL DUE DATE: NOVEMBER 19, 2026

TITLE OF PROJECT: PIP-II F-37 LCW PUMP ROOM PIPING

Bidders must acknowledge this amendment immediately upon receipt by one of the following methods:

• Via email to the FFDG Procurement Specialist

Below are clarification questions received (exactly as written), and FFDG’s answers for the above-referenced solicitation:

Q1: Please provide the submittal for the heat exchanger for rigging?

A1: Attached.

Q2: Clarify if there will need to be a Johnson Controls Interface with the Metyasys System as part of our scope of work.

A2: No Johnson controls interface is needed.

Q3: Can we hydrotest shop fabricated pipe spools with regular water?

A3: Yes, but they must be fully dried and cleaned.

Q4: Can flanged joint be substituted for field weld joints?

A4: Please bid what is specified, and if you would like to substitute, please follow the process outlined in the RFP document, including providing a deduct price for the substitution.

Q5: Are Van Stone Flanges allowed?

A5: Please bid what is specified, and if you would like to substitute, please follow the process outlined in the RFP document, including providing a deduct price for the substitution.

Q6: Will there be electrical drawings issued with the bid documents for electricians to price their work?

A6: No additional drawings will be issued.

Q7: Clarify the extent of our scope of work on the PLC Controls.

A7: FNAL will do the programming, and you will be responsible only for wiring.

ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.

Fermi National Accelerator Laboratory P.O. Box 500 Batavia, IL 60510 M.S 210

Michele Reynolds PIP-II Procurement Manager

(630) 840-2448 Email: micheler@fnal.gov mailto:micheler@fnal.gov

File details come from the government source that posted it. Updated .