This document is a specification section for the PIP-II F37 Pump Room project detailing requirements for foundations, bases, and supports for mechanical equipment.

The contractor must furnish and install foundations, bases, and supports for mechanical equipment not specifically provided by other subcontractors. All concrete foundations, bases, and supports shall be reinforced concrete, while steel bases and supports must receive a prime coat of zinc chromate or red metal primer, followed by a final gray enamel coat upon completion. Concrete bases (housekeeping pads) shall be nominally 4 inches thick and extend 3 inches on all sides of equipment, or 6 inches larger than the factory base. When a base is located less than 12 inches from a wall, the base must extend to the wall to prevent dirt accumulation. The contractor shall provide all concrete materials and workmanship conforming to Portland Cement Association standards, reinforced with 6"x6", W1.4-W1.4 welded wire fabric, with concrete capable of withstanding 3,000 pounds compression per square inch at 28 days. Centrifugal pumps are identified as equipment requiring bases under this specification.

View the file

Other files

File Type Posted
Addenda_2.pdf PDF
HX drawing for F37.pdf PDF
PIP-II Pipe Support Analysis and Design Deliverable PO 683434.pdf PDF
Flowserve pump data proposed.pdf PDF
Addenda_1.pdf PDF
EXHIBIT_18_Injury_Illness_Questionaire.pdf PDF
EXHIBIT_14_Proposal Certifications.pdf PDF
EXHIBIT_7_ADDENDUM TO FESHM.pdf PDF
EXHIBIT_9_010010 General Requirements.pdf PDF
378854_MR.pdf PDF
EXHIBIT_20_SF1413-23a.pdf PDF
EXHIBIT_24_Sample Subcontract.pdf PDF
EXHIBIT_4_ED0042585_PIP-II_F37_Bldg_Low_Conductivity_Water_Specification.pdf PDF
EXHIBIT_2_FFDG_General_Terms_and_Conditions.pdf PDF
EXHIBIT_13_CESHC.pdf PDF
EXHIBIT_6_5031_1 Piping Systems March 2025.pdf PDF
EXHIBIT_15_SARC.pdf PDF
EXHIBIT_3_ED0042584_PIP-II_Low_Conductivity_Water_LCW_System_Instrumentation_Specification.pdf PDF
EXHIBIT_5_F37_LCW_Electrical_Statement_of_Work_and_prints_rev_A.pdf PDF
EXHIBIT_19_General_Decision_Number_IL20260008_05_18_2026.pdf PDF
EXHIBIT_12_014100 Quality Requirements.pdf PDF
EXHIBIT_10_013100 ESH Requirements.pdf PDF
EXHIBIT_8_FESHM 5034 Pressure Testing.pdf PDF
EXHIBIT_16__2025_Construction_Insurance_Requirements.pdf PDF
EXHIBIT_23_Performance Bond.pdf PDF
EXHIBIT_22_Payment Bond.pdf PDF
EXHIBIT_25_Drawings.zip ZIP file
EXHIBIT_21_Bid_Bond.pdf PDF
EXHIBIT_17_FL-55.pdf PDF
EXHIBIT_11_013300 Submittals.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PIP-II F37 Pump Room

FOUNDATIONS, BASES, AND SUPPORTS

A. Basic Requirements:

1. Furnish and install foundations, bases, and supports (not specifically indicated on the Drawings or in the Specifications of either the General Construction or Mechanical work as provided by another subcontractor) for mechanical equipment.

2. All concrete foundations, bases and supports, shall be reinforced. All steel bases and supports shall receive a prime coat of zinc chromate or red metal primer. After completion of work, give steel supports a final coat of gray enamel.

B. Concrete Bases (Housekeeping Pads):

1. Unless shown otherwise on the drawings, concrete bases shall be nominal 4 inches thick and shall extend 3 inches on all sides of the equipment (6 inches larger than factory base).

2. Where a base is less than 12 inches from a wall, extend the base to the wall to prevent a “dirt-trap”.

3. Concrete materials and workmanship required for the subcontractor's work shall be provided by him. Materials and workmanship shall conform to the applicable standards of the Portland Cement Association.

Reinforce with 6”x6”, W1.4-W1.4 welded wire fabric. Concrete shall withstand 3,000 pounds compression per square inch at 28 days.

4. Equipment requiring bases is as follows:

a. Centrifugal Pumps