Pactola Loop B Campground Reconstruction Project

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
1240LT26Q0010
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
Custer, South Dakota 57730, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The USDA Forest Service is soliciting quotations for the Pactola Loop B Campground Reconstruction Project under Solicitation Number 1240LT26Q0010. The project involves comprehensive reconstruction of Loop B at Pactola Reservoir Campground in South Dakota, including road improvements, expansion of camping spurs from 20 to 36 sites, construction of a new 20-stall Osprey Trailhead parking area, relocation of the host site, water system upgrades with a new precast concrete treatment building, electrical infrastructure improvements, and associated site work. The contractor must demonstrate experience in campground construction, general contracting, and road construction, with on-site personnel including a superintendent and water system installers meeting South Dakota licensing requirements. Evaluation will be based on three factors: Technical Approach (40% weight) requiring demonstration of understanding of scope of work and a detailed construction schedule, Past Performance (evaluation of relevant experience from the last five years with customer references), and Price. The deadline for submitting questions was February 12, 2026, at 9:00 a.m. Central Time, and quotations are due by 9:00 a.m. Central Time on March 10, 2026, submitted via email to Contract Specialist Janice King and Contracting Officer Lucas Dahlman.

This solicitation is not designated as a set-aside for any particular business category, though it is issued under NAICS Code 237310 (Highway, Street, and Bridge Construction) with a $45 million small business size standard. The project value is estimated between $1,000,000 and $5,000,000, with the period of performance running from April 1, 2026, through May 20, 2027, and work commencing no sooner than March 1, 2026. The place of performance is Custer, South Dakota 57730, specifically at Pactola Reservoir Campground on the Black Hills National Forest. Four amendments were issued between February 12 and March 3, 2026, providing responses to contractor questions and specification updates. Contractors must submit a 20% bid guarantee with their quotations and provide performance and payment bonds at 100% of the original contract award price within ten days of award, with all pricing to remain firm for 90 calendar days.

Notice text

5 versions

Update #5 · Latest ·

PROJECT'S NAME: PACTOLA LOOP B CAMPGROUND RECONSTRUCTION PROJECT

Quotes are due by 9:00 a.m. Central Time on March 10, 2026. (Questions were due by 9:00 a.m. Central Time on February 12, 2026. Due to time constraints, and passage of the expiration date for questions, the Government may not respond to additional questions recieved after the issuance of this Amendment.)

Please read this message and ALL documents associated with this project in their entirety.  Quotes shall be emailed by the due date and time to the Contract Specialist, Janice King, at janice.king@usda.gov AND to the Conracting Officer, Lucas Dahlman at lucas.dahlman@usda.gov. 

03/03/2026:  Issuance of Amendment Four (A0004_Summary of Changes_Pactola Loop B Reconstruction).  This Amendment was issued to provide answers to additional contractor's (questions 23-26) and to incorporate Attach 4.  -Updated Pactola Loop B Specifications_02March2026.  Going forward, use the Specifications issued in the latest Amendment that includes in its title, the latest date of issuance. To date, the latest Specifications issued is:  Attach 4. Updated Pactola Loop B Specifications - 02March2026.  You will find the A0004 Summary of Changes and Attach 4. Updated Pactola Loop B Specifications - 02March2026 documents in the Attachment/Links section. Please note:  Due to time constraints, and passage of the expiration date for questions, the Government may not respond to additional questions received after the issuance of this Amendment.  Quotes are due by 9:00 a.m. Central Time on March 10, 2026.  See Attach 1 for quote submission requirements. 

02/26/2026:  Issuance of Amendment Three (A0003_Summary of Changes_Pactola Loop B Reconstruction).  This Amendment was issued to provide answers to additional contractor's questions 18-22.  Due to time constraints, and passage of the expiration date for questions, the Government may not respond to additional questions recieved after the issuance of this Amendment. You will find this document in the Attachment/Links section.  Quotes are due by 9:00 a.m. Central Time on March 10, 2026.  See Attach 1 for quote submission requirements. 

02/24/2026:  Issuance of Amendment Two (A0002_Summary of Changes_Pactola Loop B Reconstruction).  This amendment was issued to provide answers to the additional contractor's questions received, incorporate an updated Attachment 4 which is:  Attach 4 - Updated Pactola Loop B Specifications dated 23FEB2026, and to incorporate Attachment 16 which is: Attach 16 - Well Log_1977 Pactola CG.  Going forward, use the newly incorporated Attach 4 -  Updated Pactola Loop B Specifications dated 23FEB2026 instead of the initial version dated 16Jan2026.  In addition, use Attach 16 - Well Log_1977 Pactola CG to assist with question #10 of the Amendment Two (A0002_Summary of Changes_Pactola Loop B Reconstruction).  You will find these documents, along with Amendment Two (A0002_Summary of Changes_Pactola Loop B Reconstruction), in the Attachment/Links section.  Quotes are due by 9:00 a.m. Central Time on March 10, 2026.  See Attach 1 for quote submission requirements. 

02/12/2026:  Issuance of Amendment One (A0001_Summary of Changes_Pactola Loop B Reconstruction).  This amendment was issued to provide answers to contractor's questions and to provide the site visit's attendee's list.  See this document in the Attachment/Links section.  Quotes are due by 9:00 a.m. Central Time on March 10, 2026.  See Attach 1 for quote submission requirements. 

See Attach 1 - Solicitation Terms and Conditions with its supporting Attachments, Attach 2 -15.  Read each document in its entireity.  Attachments are located in the Attachments/Links section. 

Solicitation Number 1240LT26Q0010 is being issued as a Request for Quotation for The Pactola Campground Loop B Construction Project.  The Campground is on a Forest Service loop road adjacent to Pactola Reservoir. The road is approximately 14 ft wide. The road will be modified with curve widening and shaping for drainage and new surfacing. Generally, the road width will be 16’ for one-way traffic and 24’ for two-way traffic. A new 20 parking stall trailhead will be constructed for the Osprey Trail. The existing Osprey Trail trailhead will be repurposed as overflow and boat trailer parking serving Loop B. Furthermore, Loop B currently has 20 spurs that are primitive and poorly defined. The Campground will be improved to have a total of 36 camping spurs as Base Items. There is currently one Host Site, with power, water, and wastewater vault, located near the center of the campground. The Host Site and associated infrastructure will be relocated to the beginning of the Loop, for improved service to campers. The existing Host Site will become a “Volunteer Site” with upgraded water and electric service and continued use of the sewage vault; there is an Option Item to remove and replace the sewage vault with a new concrete vault. Water system work for this project consists of decommissioning the existing pumphouse and replacing it with a new precast concrete treatment building with upgraded plumbing and controls, replacing all the distribution piping and installing new hydrants. Plan sheets showing additional tent sites on the west side of Loop B and a toilet located in the infield of the Osprey Trailhead parking area are for future construction and will not be part of this contract. This is a Congressionally directed Great American Outdoors Act project that will make improvements to the road - to include design, construction and resurfacing. Pactola Campground Loop B will be reconstructed to increase capacity, improve the water system, and improve host sites with repaired sewage vaults. Camp sites will be designed for modern recreational vehicles using modern design and furnished with modern amenities. The Pactola Reservoir Campground is a seasonal campground operated from approximately mid-May to mid-September annually. The Campground has three Loops: A, B, and C. This project is for reconstruction of Loop B. The Project will be referred to as “Pactola Loop B CG” or “Loop B” throughout the Specifications and Contract documents. The water system at Pactola Reservoir Campground consists of a well with a submersible pump, steel below ground water storage tank, and distribution system with 7 points of use. This system is classified as a Transient Non-Community Public water system. The water system is in poor condition. The well needs pump controls, treatment system, and pump house are not functioning properly, are not compliant with codes and require replacement. The distribution system has numerous leaks, is in poor condition and requires replacement. The existing hydrants are not accessible and require upgrades. The stick-built pumphouse building is in poor condition and has inadequate lighting and inadequate ventilation. 

Update #4 ·

PROJECT'S NAME: PACTOLA LOOP B CAMPGROUND RECONSTRUCTION PROJECT

Quotes are due by 9:00 a.m. Central Time on March 10, 2026. (Questions were due by 9:00 a.m. Central Time on February 12, 2026. Due to time constraints, and passage of the expiration date for questions, the Government may not respond to additional questions recieved after the issuance of this Amendment.)

Please read this message and ALL documents associated with this project in their entirety.  Quotes shall be emailed by the due date and time to the Contract Specialist, Janice King, at janice.king@usda.gov AND to the Conracting Officer, Lucas Dahlman at lucas.dahlman@usda.gov. 

02/26/2026:  Issuance of Amendment Three (A0003_Summary of Changes_Pactola Loop B Reconstruction).  This Amendment was issued to provide answers to additional contractor's questions 18-22.  Due to time constraints, and passage of the expiration date for questions, the Government may not respond to additional questions recieved after the issuance of this Amendment. You will find this document in the Attachment/Links section.  Quotes are due by 9:00 a.m. Central Time on March 10, 2026.  See Attach 1 for quote submission requirements. 

02/24/2026:  Issuance of Amendment Two (A0002_Summary of Changes_Pactola Loop B Reconstruction).  This amendment was issued to provide answers to the additional contractor's questions received, incorporate an updated Attachment 4 which is:  Attach 4 - Updated Pactola Loop B Specifications dated 23FEB2026, and to incorporate Attachment 16 which is: Attach 16 - Well Log_1977 Pactola CG.  Going forward, use the newly incorporated Attach 4 -  Updated Pactola Loop B Specifications dated 23FEB2026 instead of the initial version dated 16Jan2026.  In addition, use Attach 16 - Well Log_1977 Pactola CG to assist with question #10 of the Amendment Two (A0002_Summary of Changes_Pactola Loop B Reconstruction).  You will find these documents, along with Amendment Two (A0002_Summary of Changes_Pactola Loop B Reconstruction), in the Attachment/Links section.  Quotes are due by 9:00 a.m. Central Time on March 10, 2026.  See Attach 1 for quote submission requirements. 

02/12/2026:  Issuance of Amendment One (A0001_Summary of Changes_Pactola Loop B Reconstruction).  This amendment was issued to provide answers to contractor's questions and to provide the site visit's attendee's list.  See this document in the Attachment/Links section.  Quotes are due by 9:00 a.m. Central Time on March 10, 2026.  See Attach 1 for quote submission requirements. 

See Attach 1 - Solicitation Terms and Conditions with its supporting Attachments, Attach 2 -15.  Read each document in its entireity.  Attachments are located in the Attachments/Links section. 

Solicitation Number 1240LT26Q0010 is being issued as a Request for Quotation for The Pactola Campground Loop B Construction Project.  The Campground is on a Forest Service loop road adjacent to Pactola Reservoir. The road is approximately 14 ft wide. The road will be modified with curve widening and shaping for drainage and new surfacing. Generally, the road width will be 16’ for one-way traffic and 24’ for two-way traffic. A new 20 parking stall trailhead will be constructed for the Osprey Trail. The existing Osprey Trail trailhead will be repurposed as overflow and boat trailer parking serving Loop B. Furthermore, Loop B currently has 20 spurs that are primitive and poorly defined. The Campground will be improved to have a total of 36 camping spurs as Base Items. There is currently one Host Site, with power, water, and wastewater vault, located near the center of the campground. The Host Site and associated infrastructure will be relocated to the beginning of the Loop, for improved service to campers. The existing Host Site will become a “Volunteer Site” with upgraded water and electric service and continued use of the sewage vault; there is an Option Item to remove and replace the sewage vault with a new concrete vault. Water system work for this project consists of decommissioning the existing pumphouse and replacing it with a new precast concrete treatment building with upgraded plumbing and controls, replacing all the distribution piping and installing new hydrants. Plan sheets showing additional tent sites on the west side of Loop B and a toilet located in the infield of the Osprey Trailhead parking area are for future construction and will not be part of this contract. This is a Congressionally directed Great American Outdoors Act project that will make improvements to the road - to include design, construction and resurfacing. Pactola Campground Loop B will be reconstructed to increase capacity, improve the water system, and improve host sites with repaired sewage vaults. Camp sites will be designed for modern recreational vehicles using modern design and furnished with modern amenities. The Pactola Reservoir Campground is a seasonal campground operated from approximately mid-May to mid-September annually. The Campground has three Loops: A, B, and C. This project is for reconstruction of Loop B. The Project will be referred to as “Pactola Loop B CG” or “Loop B” throughout the Specifications and Contract documents. The water system at Pactola Reservoir Campground consists of a well with a submersible pump, steel below ground water storage tank, and distribution system with 7 points of use. This system is classified as a Transient Non-Community Public water system. The water system is in poor condition. The well needs pump controls, treatment system, and pump house are not functioning properly, are not compliant with codes and require replacement. The distribution system has numerous leaks, is in poor condition and requires replacement. The existing hydrants are not accessible and require upgrades. The stick-built pumphouse building is in poor condition and has inadequate lighting and inadequate ventilation. 

Update #3 ·

PROJECT'S NAME: PACTOLA LOOP B CAMPGROUND RECONSTRUCTION PROJECT

Quotes are due by 9:00 a.m. Central Time on March 10, 2026. (Questions were due by 9:00 a.m. Central Time on February 12, 2026. Due to time constraints, and passage of the expiration date for questions, the Government may not respond to additional questions recieved after the issuance of this Amendment.

Please read this message and ALL documents associated with this project in their entirety.  Quotes shall be emailed by the due date and time to the Contract Specialist, Janice King, at janice.king@usda.gov AND to the Conracting Officer, Lucas Dahlman at lucas.dahlman@usda.gov. 

02/24/2026:  Issuance of Amendment Two (A0002_Summary of Changes_Pactola Loop B Reconstruction).  This amendment was issued to provide answers to the additional contractor's questions received, incorporate an updated Attachment 4 which is:  Attach 4 - Updated Pactola Loop B Specifications dated 23FEB2026, and to incorporate Attachment 16 which is: Attach 16 - Well Log_1977 Pactola CG.  Going forward, use the newly incorporated Attach 4 -  Updated Pactola Loop B Specifications dated 23FEB2026 instead of the initial version dated 16Jan2026.  In addition, use Attach 16 - Well Log_1977 Pactola CG to assist with question #10 of the Amendment Two (A0002_Summary of Changes_Pactola Loop B Reconstruction).  You will find these documents, along with Amendment Two (A0002_Summary of Changes_Pactola Loop B Reconstruction), in the Attachment/Links section.  Quotes are due by 9:00 a.m. Central Time on March 10, 2026.  See Attach 1 for quote submission requirements. 

02/12/2026:  Issuance of Amendment One (A0001_Summary of Changes_Pactola Loop B Reconstruction).  This amendment was issued to provide answers to contractor's questions and to provide the site visit's attendee's list.  See this document in the Attachment/Links section.  Quotes are due by 9:00 a.m. Central Time on March 10, 2026.  See Attach 1 for quote submission requirements. 

See Attach 1 - Solicitation Terms and Conditions with its supporting Attachments, Attach 2 -15.  Read each document in its entireity.  Attachments are located in the Attachments/Links section. 

Solicitation Number 1240LT26Q0010 is being issued as a Request for Quotation for The Pactola Campground Loop B Construction Project.  The Campground is on a Forest Service loop road adjacent to Pactola Reservoir. The road is approximately 14 ft wide. The road will be modified with curve widening and shaping for drainage and new surfacing. Generally, the road width will be 16’ for one-way traffic and 24’ for two-way traffic. A new 20 parking stall trailhead will be constructed for the Osprey Trail. The existing Osprey Trail trailhead will be repurposed as overflow and boat trailer parking serving Loop B. Furthermore, Loop B currently has 20 spurs that are primitive and poorly defined. The Campground will be improved to have a total of 36 camping spurs as Base Items. There is currently one Host Site, with power, water, and wastewater vault, located near the center of the campground. The Host Site and associated infrastructure will be relocated to the beginning of the Loop, for improved service to campers. The existing Host Site will become a “Volunteer Site” with upgraded water and electric service and continued use of the sewage vault; there is an Option Item to remove and replace the sewage vault with a new concrete vault. Water system work for this project consists of decommissioning the existing pumphouse and replacing it with a new precast concrete treatment building with upgraded plumbing and controls, replacing all the distribution piping and installing new hydrants. Plan sheets showing additional tent sites on the west side of Loop B and a toilet located in the infield of the Osprey Trailhead parking area are for future construction and will not be part of this contract. This is a Congressionally directed Great American Outdoors Act project that will make improvements to the road - to include design, construction and resurfacing. Pactola Campground Loop B will be reconstructed to increase capacity, improve the water system, and improve host sites with repaired sewage vaults. Camp sites will be designed for modern recreational vehicles using modern design and furnished with modern amenities. The Pactola Reservoir Campground is a seasonal campground operated from approximately mid-May to mid-September annually. The Campground has three Loops: A, B, and C. This project is for reconstruction of Loop B. The Project will be referred to as “Pactola Loop B CG” or “Loop B” throughout the Specifications and Contract documents. The water system at Pactola Reservoir Campground consists of a well with a submersible pump, steel below ground water storage tank, and distribution system with 7 points of use. This system is classified as a Transient Non-Community Public water system. The water system is in poor condition. The well needs pump controls, treatment system, and pump house are not functioning properly, are not compliant with codes and require replacement. The distribution system has numerous leaks, is in poor condition and requires replacement. The existing hydrants are not accessible and require upgrades. The stick-built pumphouse building is in poor condition and has inadequate lighting and inadequate ventilation. 

Update #2 ·

PROJECT'S NAME: PACTOLA LOOP B CAMPGROUND RECONSTRUCTION PROJECT

Quotes are due by 9:00 a.m. Central Time on March 10, 2026. (Questions were due by 9:00 a.m. Central Time on February 12, 2026); Quotes shall be emailed by the due datesand time to the Contract Specialist, Janice King, at janice.king@usda.gov AND to the Conracting Officer, Lucas Dahlman at lucas.dahlman@usda.gov. 

02/12/2026:  Issuance of Amendment One (A0001_Summary of Changes_Pactola Loop B Reconstruction).  This amendment was issued to provide answers to contractor's questions and to provide the site visit's attendee's list.  See this document in the Attachment/Links section.  Quotes are due by 9:00 a.m. Central Time on March 10, 2026.  See Attach 1 for quote submission requirements. 

See Attach 1 - Solicitation Terms and Conditions with its supporting Attachments, Attach 2 -15.  Read each document in its entireity.  Attachments are located in the Attachments/Links section. 

Solicitation Number 1240LT26Q0010 is being issued as a Request for Quotation for The Pactola Campground Loop B Construction Project.  The Campground is on a Forest Service loop road adjacent to Pactola Reservoir. The road is approximately 14 ft wide. The road will be modified with curve widening and shaping for drainage and new surfacing. Generally, the road width will be 16’ for one-way traffic and 24’ for two-way traffic. A new 20 parking stall trailhead will be constructed for the Osprey Trail. The existing Osprey Trail trailhead will be repurposed as overflow and boat trailer parking serving Loop B. Furthermore, Loop B currently has 20 spurs that are primitive and poorly defined. The Campground will be improved to have a total of 36 camping spurs as Base Items. There is currently one Host Site, with power, water, and wastewater vault, located near the center of the campground. The Host Site and associated infrastructure will be relocated to the beginning of the Loop, for improved service to campers. The existing Host Site will become a “Volunteer Site” with upgraded water and electric service and continued use of the sewage vault; there is an Option Item to remove and replace the sewage vault with a new concrete vault. Water system work for this project consists of decommissioning the existing pumphouse and replacing it with a new precast concrete treatment building with upgraded plumbing and controls, replacing all the distribution piping and installing new hydrants. Plan sheets showing additional tent sites on the west side of Loop B and a toilet located in the infield of the Osprey Trailhead parking area are for future construction and will not be part of this contract. This is a Congressionally directed Great American Outdoors Act project that will make improvements to the road - to include design, construction and resurfacing. Pactola Campground Loop B will be reconstructed to increase capacity, improve the water system, and improve host sites with repaired sewage vaults. Camp sites will be designed for modern recreational vehicles using modern design and furnished with modern amenities. The Pactola Reservoir Campground is a seasonal campground operated from approximately mid-May to mid-September annually. The Campground has three Loops: A, B, and C. This project is for reconstruction of Loop B. The Project will be referred to as “Pactola Loop B CG” or “Loop B” throughout the Specifications and Contract documents. The water system at Pactola Reservoir Campground consists of a well with a submersible pump, steel below ground water storage tank, and distribution system with 7 points of use. This system is classified as a Transient Non-Community Public water system. The water system is in poor condition. The well needs pump controls, treatment system, and pump house are not functioning properly, are not compliant with codes and require replacement. The distribution system has numerous leaks, is in poor condition and requires replacement. The existing hydrants are not accessible and require upgrades. The stick-built pumphouse building is in poor condition and has inadequate lighting and inadequate ventilation. 

Update #1 ·

PROJECT'S NAME: PACTOLA LOOP B CAMPGROUND RECONSTRUCTION PROJECT

Questions are due by 9:00 a.m. Central Time on February 12, 2026; Quotes are due by 9:00 a.m. Central Time on March 10, 2026.  Questions and Quotes shall be emailed by the due dates and time to the Contract Specialist, Janice King, at janice.king@usda.gov AND to the Conracting Officer, Lucas Dahlman at lucas.dahlman@usda.gov. 

See Attach 1 - Solicitation Terms and Conditions with its supporting Attachments, Attach 2 -15.  Read each document in its entireity.  Attachments are located in the Attachments/Links section. 

Solicitation Number 1240LT26Q0010 is being issued as a Request for Quotation for The Pactola Campground Loop B Construction Project.  The Campground is on a Forest Service loop road adjacent to Pactola Reservoir. The road is approximately 14 ft wide. The road will be modified with curve widening and shaping for drainage and new surfacing. Generally, the road width will be 16’ for one-way traffic and 24’ for two-way traffic. A new 20 parking stall trailhead will be constructed for the Osprey Trail. The existing Osprey Trail trailhead will be repurposed as overflow and boat trailer parking serving Loop B. Furthermore, Loop B currently has 20 spurs that are primitive and poorly defined. The Campground will be improved to have a total of 36 camping spurs as Base Items. There is currently one Host Site, with power, water, and wastewater vault, located near the center of the campground. The Host Site and associated infrastructure will be relocated to the beginning of the Loop, for improved service to campers. The existing Host Site will become a “Volunteer Site” with upgraded water and electric service and continued use of the sewage vault; there is an Option Item to remove and replace the sewage vault with a new concrete vault. Water system work for this project consists of decommissioning the existing pumphouse and replacing it with a new precast concrete treatment building with upgraded plumbing and controls, replacing all the distribution piping and installing new hydrants. Plan sheets showing additional tent sites on the west side of Loop B and a toilet located in the infield of the Osprey Trailhead parking area are for future construction and will not be part of this contract. This is a Congressionally directed Great American Outdoors Act project that will make improvements to the road - to include design, construction and resurfacing. Pactola Campground Loop B will be reconstructed to increase capacity, improve the water system, and improve host sites with repaired sewage vaults. Camp sites will be designed for modern recreational vehicles using modern design and furnished with modern amenities. The Pactola Reservoir Campground is a seasonal campground operated from approximately mid-May to mid-September annually. The Campground has three Loops: A, B, and C. This project is for reconstruction of Loop B. The Project will be referred to as “Pactola Loop B CG” or “Loop B” throughout the Specifications and Contract documents. The water system at Pactola Reservoir Campground consists of a well with a submersible pump, steel below ground water storage tank, and distribution system with 7 points of use. This system is classified as a Transient Non-Community Public water system. The water system is in poor condition. The well needs pump controls, treatment system, and pump house are not functioning properly, are not compliant with codes and require replacement. The distribution system has numerous leaks, is in poor condition and requires replacement. The existing hydrants are not accessible and require upgrades. The stick-built pumphouse building is in poor condition and has inadequate lighting and inadequate ventilation. 

Files

File Type Posted
Final Summary of Changes _A0004_Pactola Loop B.pdf PDF
Attach 4. Updated Pactola Loop B Specifications_02March2026.pdf PDF
Final_SUMMARY OF CHANGES_A0003_Pactola Loop B Reconstruction Project.pdf PDF
Final_SUMMARY OF CHANGES_A0002_Pactola Loop B Reconstruction Project.pdf PDF
Attach 4. Updated Pactola Loop B Specifications_ 23Feb2026.pdf PDF
Attach 16. Well Log _1977 Pactola CG.pdf PDF
A0001_SUMMARY OF CHANGES_Pactola Loop B Reconstruction Project.pdf PDF
Attach 2. Statement of Work PACTOLA LOOP B_ 8Dec25.pdf PDF
Attach 7. Plans Section C6_C7 Details 2Feb2026.pdf PDF
Attach 9. Plans Section C8_1 Sign Layout 2Feb2026.pdf PDF
Attach 11. Plans Section A_S_M Structures Mechanical 2Feb2026.pdf PDF
Attach 1. Solicitation_Terms and Agreement_Pactola Loop B_01.30.2026.pdf PDF
Attach 3. Schedule of Items_Pactola Loop B 16Jan2026.xlsx XLSX spreadsheet
Attach 13. Combined Plans_Drawings _Reduced 2Feb2026.pdf PDF
Attach 4. Pactola Loop B Specifications 16Jan2025.pdf PDF
Attach 6. Plans Section C1_C5 Site Plans 2Feb2026.pdf PDF
Attach 8. Plans Section C8_0 Sign Layout 2Feb2026.pdf PDF
Attach 10. Plans Section C8_2 Sign Details 2Feb2026.pdf PDF
Attach 14. Site Map Pactola Loop B.pdf PDF
Attach 15. Wage Determination SD20260001_01.30.2026.pdf PDF
Attach 5. Plans Section G Title Sheet 2Feb2026.pdf PDF
Attach 12. Plans Section E Electrical 2Feb2026.pdf PDF
Show all 22

Notice history

Notice Type Posted
Pactola Loop B Campground Reconstruction Project Award Award Notice
This notice Latest solicitation Solicitation
Pactola Loop B Campground Reconstruction Project Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
GAOA Grizzly Bear Campground South Dakota, United States · NAICS 237990 Region 2 - Rocky Mountain Region Total Small Business
GAOA Kents Lk. CG Reconstruction, Fishlake NF, Utah Beaver, Utah 84713, United States · NAICS 237990 Forest Service Total Small Business
Construct North Unit Visitor Center at BADL NAICS 236220 National Park Service No set-aside
Fenn Ranger Station roofing replacement Kooskia, Idaho 83539, United States · NAICS 238160 Forest Service Total Small Business
Shirley Creek Campground Improvements Bedford, Indiana 47421, United States · NAICS 238910 Forest Service Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity