Attach 11. Plans Section A_S_M Structures Mechanical 2Feb2026.pdf

PDF 17 MB Posted

Attached to
Pactola Loop B Campground Reconstruction Project
Solicitation number
1240LT26Q0010
Issued by

About this file

Summary

This is a set of construction design drawings (100% Construction Documents) for the Pactola Campground Loop B Reconstruction project located at Black Hills National Forest, Mystic Ranger District, South Dakota. The project is being managed by the USDA Forest Service Rocky Mountain Region (R2) and prepared by Olsson - Engineering and Citrine - Engineering. The drawings include modular building designs (precast concrete toilet vaults and pump house buildings), structural site plans showing 44 campsite locations with utilities, mechanical/plumbing systems, and electrical infrastructure. Key structural elements include new precast restroom buildings on concrete vaults, hydrant installations at three types (H1, H2, and H3 configurations), a 2,000-gallon sewage vault system, water distribution piping using HDPE and PVC materials, and site demolition requirements. The project includes multiple bid options, including Option 1 for additional host/volunteer site improvements and Option 6 for an Osprey Trailhead toilet facility.

The construction plans specify detailed technical requirements across multiple disciplines: structural concrete work with 4,000 PSI minimum compressive strength, reinforcing steel per ASTM specifications, modular building installation on prepared bases, and comprehensive mechanical/plumbing systems including water meters, disinfection piping, hydrant assemblies with various faucet types, and drain-to-daylight laterals. Demolition work includes removal of existing storage tanks, pump houses, septic vaults, and hydrant assemblies. The utility infrastructure requires coordination between water and sewer systems with minimum 10-foot separation, utility trenching specifications, and marking of shutoff valves with carsonite posts color-coded by function (red for fill valves, blue for drain valves). Construction is dated 05.28.2025, indicating the document completion date for the 100% design phase.

View the file

Other files

File Type Posted
Final Summary of Changes _A0004_Pactola Loop B.pdf PDF
Attach 4. Updated Pactola Loop B Specifications_02March2026.pdf PDF
Final_SUMMARY OF CHANGES_A0003_Pactola Loop B Reconstruction Project.pdf PDF
Final_SUMMARY OF CHANGES_A0002_Pactola Loop B Reconstruction Project.pdf PDF
Attach 4. Updated Pactola Loop B Specifications_ 23Feb2026.pdf PDF
Attach 16. Well Log _1977 Pactola CG.pdf PDF
A0001_SUMMARY OF CHANGES_Pactola Loop B Reconstruction Project.pdf PDF
Attach 4. Pactola Loop B Specifications 16Jan2025.pdf PDF
Attach 6. Plans Section C1_C5 Site Plans 2Feb2026.pdf PDF
Attach 8. Plans Section C8_0 Sign Layout 2Feb2026.pdf PDF
Attach 10. Plans Section C8_2 Sign Details 2Feb2026.pdf PDF
Attach 14. Site Map Pactola Loop B.pdf PDF
Attach 15. Wage Determination SD20260001_01.30.2026.pdf PDF
Attach 1. Solicitation_Terms and Agreement_Pactola Loop B_01.30.2026.pdf PDF
Attach 3. Schedule of Items_Pactola Loop B 16Jan2026.xlsx XLSX spreadsheet
Attach 13. Combined Plans_Drawings _Reduced 2Feb2026.pdf PDF
Attach 2. Statement of Work PACTOLA LOOP B_ 8Dec25.pdf PDF
Attach 7. Plans Section C6_C7 Details 2Feb2026.pdf PDF
Attach 9. Plans Section C8_1 Sign Layout 2Feb2026.pdf PDF
Attach 5. Plans Section G Title Sheet 2Feb2026.pdf PDF
Attach 12. Plans Section E Electrical 2Feb2026.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A1.1

MODULAR

BUILDINGS

PRECAST CONCRETE

BUILDING

CONCRETE SLAB

COMPACTED AGGEGATE

BASE

UNDISTURBED

SOIL

SEE MEP

FOR FLOOR

PENETRATIONS

ACTIVE

DOOR

3'-0" X 6'-8"

INSULATED HM

DOOR (PAIR) &

FRAMESLOPE 1/8" PER

FT TOWARD

DOORWAY

ENTRANCE SLAB

SEE STRUCTURAL

NOT TO SCALE

MODULAR PUMP HOUSE BUILDING

NOT TO SCALE

SIDE ELEVATION

2C

NOT TO SCALE

FRONT ELEVATION

2B

NOT TO SCALE

REAR ELEVATION

2E

NOT TO SCALE

SECTION

2D

NOT TO SCALE

MODULAR PUMP HOUSE - PLAN

2A

COMPACTED AGGEGATE

BASE

NOT TO SCALE

MODULAR DOUBLE TOILET BUILDING- PLAN

NOT TO SCALE

SIDE ELEVATION

1D

NOT TO SCALE

BACK ELEVATION

1C

NOT TO SCALE

SIDE ELEVATION

1B

NOT TO SCALE

FRONT ELEVATION

1A

NOT TO SCALE

BUILDING SECTIONS

1E

PRECAST CONCRETE

BUILDING

VAULTS

3'-0" X 6'-8"

HM DOOR

AND FRAME

TWO PIECE VENT PIPE

15'-0" OVERALL HEIGHT

GRAB BARS

TP DISPENSER DOOR STOP

DOOR STOP

EXTERIOR STONE

TEXTURE - TBD

HORIZONTAL

LAP- COLOR TBD

CEDAR

SHAKE- COLOR TBD

BARNWOOD- COLOR TBD

CEDAR SHAKE-

COLOR TBD

PRECAST CONCRETE

BUILDING

TOILET RISER

FOR REFERENCE ONLY

DO NOT USE FOR THE CONSTRUCTION OF THE MODULAR BUILDINGS. DRAWING IS

TO SHOW INTENDED LAYOUT AND DESIGN OF THE MODULAR BUILDINGS. THE

MANUFACTURER OF THE MODULAR BUILDINGS IS TO PROVIDE SHOP DRAWINGS

MEETING SPECIFICATIONS FOR APPROVAL. SEE DIVISION 1.

DATENO. REVISION / ISSUE

UNITED STATES

DEPARTMENT OF AGRICULTURE

FOREST SERVICE

R2

ROCKY MOUNTAIN REGION

PACTOLA

CAMPGROUND LOOP B

RECONSTRUCTION

100% CDs

BLACK HILLS

NATIONAL FOREST

MYSTIC RANGER DISTRICT

05.28.2025 52

550 East St. Louis Street Springfield, MO 65806 Olsson - Engineering South Dakota COA #C-159 olsson.com

TEL 417.890.8802

1343 SOUTH 75TH STREET

OMAHA NE 68124

744 Horizon Court, #135 Grand Junction, CO 81506 Citrine - Engineering South Dakota COA #FL269825 citrinellc.com

TEL 303.325.3460

DATENO. REVISION / ISSUE

UNITED STATES

DEPARTMENT OF AGRICULTURE

FOREST SERVICE

GENERAL CONCRETE

NOTES

R2

ROCKY MOUNTAIN REGION

PACTOLA

CAMPGROUND

LOOP B

RECONSTRCUTION

BLACK HILLS

NATIONAL FOREST

MYSTIC RANGER DISTRICT

TT

SR

05.28.2025

S0.1 29 52

550 East St. Louis Street Springfield, MO 65806 Olsson - Engineering South Dakota COA #C-159 olsson.com

TEL 417.890.8802

1343 SOUTH 75TH STREET

OMAHA NE 68124

744 Horizon Court, #135 Grand Junction, CO 81506 Citrine - Engineering South Dakota COA #FL269825 citrinellc.com

TEL 303.325.3460

1. REFER TO ACI 318, BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE FOR CONCRETE CONSTRUCTION REQUIREMENTS

2. PROVIDE CONCRETE WITH A MINIMUM COMPRESSIVE STRENGTH OF 4000 PSI AT 28 DAYS. SUBMIT ENGINEERED CONCRETE MIX DESIGNS, INCLUDING BACKUP DATA FOR EACH TYPE OF CONCRETE PROPOSED FOR USE PRIOR TO THE START OF CONSTRUCTION.

IDENTIFY WHERE EACH DIFFERENT CONCRETE MIX IS INTENDED TO BE USED.

3. PROVIDE AIR ENTRAINMENT PER ACI 318 FOR ALL EXTERIOR CONCRETE. LIMIT WATER CEMENT RATIO FOR ALL CONCRETE TO 0.45.

FOR INTERIOR SLAB ON GROUND, LIMIT CEMENT CONTENT TO 620 POUNDS PER CUBIC YARD.

4. PROVIDE FOUR TEST CYLINDERS FOR EVERY 50 CUBIC YARDS, OR LESS (EACH DAY) AND FURNISH TEST REPORTS FOR 7, 14, AND 28

DAY COMPRESSION TESTS.

5. WATER MAY BE ADDED INITIALLY TO CONCRETE WHICH ARRIVES AT THE SITE IF AFTER ADDITION OF THE WATER THE MAXIMUM WATER/CEMENT RATIO IS NOT EXCEEDED. RETEMPERING AFTER INITIAL SLUMP ADJUSTMENT IS NOT PERMITTED.

6. FABRICATE AND PLACE REINFORCING STEEL IN ACCORDANCE WITH ACI 318 BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE, ACI SP-66 DETAILING MANUAL, ACI 301 SPECIFICATIONS FOR STRUCTURAL CONCRETE FOR BUILDINGS.

7. PROVIDE REINFORCING STEEL CONFORMING TO ASTM A615 GRADE 60. SUBMIT REINFORCING STEEL SHOP DRAWINGS FOR

APPROVAL PRIOR TO THE START OF CONSTRUCTION.

8. PROVIDE ACI CLASS B REINFORCING BAR SPLICES BUT NOT LESS THAN 12 INCHES OF LAP.

9. PROVIDE CORNER REINFORCING BARS AT ALL EXTERIOR CORNERS OF CONCRETE WORK. CORNER BARS TO MATCH HORIZONTAL

REINFORCING.

10. PROVIDE TWO #4 REBAR AT 4'-0" LONG (MINIMUM) AT ALL RE-ENTRANT CORNERS OF SLABS, FOOTINGS, AND WALLS. PLACE REBAR 2"

CLEAR FROM THE CORNER AT 45°. SEE TYPICAL RE-ENTRANT CORNER DETAIL.

11. PROVIDE #4 REBAR REINFORCEMENT SPACED AT 12" O.C. CONFORMING TO ASTM A615 IN ALL SLABS ON GROUND UNLESS

OTHERWISE NOTED.

12. PROVIDE THE FOLLOWING CONCRETE COVER IN ACCORDANCE WITH ACI 318:

13. PROVIDE ANCHOR BOLTS THAT CONFORM TO ASTM F1554 GRADE 55 SUPPLEMENT S1 WITH HEAVY HEX NUTS AND FLAT WASHERS, UNLESS NOTED OTHERWISE. HOT DIP GALVANIZE ALL ANCHOR BOLT ASSEMBLIES.

14. SET CAST-IN-PLACE ANCHOR BOLTS WITH TEMPLATES TO ELEVATIONS SHOWN ON DRAWINGS PRIOR TO CONCRETE BEING PLACED.

"WET-STICKING" ANCHORS IS STRICTLY PROHIBITED.

15. VERIFY THAT ALL OPENINGS, INSERTS, ANCHOR BOLTS, EMBEDDED PIPING, REBAR, DOWELS, CONDUITS, GROUNDING WIRES, DUCTWORK, ETC. ARE IN PLACE BEFORE PLACING CONCRETE. "WET-STICKING" EMBEDMENTS IS STRICTLY PROHIBITED.

16. PROVIDE REINFORCING STEEL FREE OF OIL, MUD, HARDENED CONCRETE, LOOSE SCALE, AND RUST.

17. BRACE, TIE, AND SUPPORT REINFORCING WITH CHAIRS IN ACCORDANCE WITH ACI 315.

18. DO NOT WELD REINFORCING STEEL UNLESS INDICATED ON THE DRAWINGS.

19. PROVIDE 3/4" X 45° CHAMFER ON ALL EXPOSED EDGES.

20. PROVIDE 1/2" BITUMINOUS FIBER BOARD AT ALL SLAB ON GROUND EXPANSION JOINTS UNLESS NOTED OTHERWISE. TOOL ALL CONCRETE EDGES AND WITH THEM SEMI-RIGID EPOXY JOINT FILLER WITH 100% SOLIDS AND A TYPE A SHORE DUROMETER

HARDNESS OF 80 ACCORDING TO ASTM D2240.

21. PROVIDE CONTRACTION JOINTS IN ALL SLABS ON GROUND WITH A MINIMUM DEPTH OF 1/3 OF THE CONCRETE THICKNESS AT THE LOCATIONS SHOWN ON THE DRAWING. TOOL JOINTS AFTER INITIAL FLOAT OR SAW-CUT WITHIN 8 HOURS OF PLACEMENT.

22. DO NOT USE CONCRETE CONSTRUCTION JOINTS UNLESS SHOWN ON DRAWINGS OR APPROVED IN WRITING BY THE ENGINEER.

23. USE CONTINUOUS WATERSTOP AT ALL HORIZONTAL AND VERTICAL CONCRETE JOINTS WHERE WATERSTOP IS INDICATED ON THE

DRAWINGS. USE FACTORY MADE SPLICES AT INTERSECTING WALLS.

24. FOR BONDING NEW CONCRETE TO EXISTING CONCRETE, USE A TWO COMPONENT EPOXY BONDING ADHESIVE COMPLYING WITH ASTM C881 SUITABLE FOR THE APPLICATION TEMPERATURE. ROUGHEN AND CLEAN THE EXISTING CONCRETE AND APPLY IN

ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS.

25. DO NOT PLACE CONCRETE INTO ANY FORM OR EXCAVATION CONTAINING TRASH, FREE WATER, ICE, OR FROZEN GROUND.

26. USE APPROPRIATE METHODS TO MINIMIZE FREE-FALL DISTANCE OF CONCRETE. DO NOT USE VIBRATORS TO TRANSPORT CONCRETE. DO NOT ALLOW CONCRETE TO FLOW HORIZONTALLY WITHIN FORMS OVER A DISTANCE EXCEEDING 5 FEET.

27. FINISH SLABS, PADS, AND RAMPS TO WITHIN 1/8 INCH OF ELEVATIONS SHOWN ON DRAWINGS.

28. PROVIDE A TROWELED FINISH ON TYPICAL INTERIOR SURFACES. PROVIDE A NON-SLIP BROOM FINISH ON TYPICAL EXTERIOR SURFACES. SCREED AND FLOAT CONCRETE AND USE A STIFF BRUSH OR BROOM TO PRODUCE A PROFILE OF 3/64 INCH IN ONE

DIRECTION, PERPENDICULAR TO TRAFFIC IF APPLICABLE

29. PROVIDE A CLEAR, NON-YELLOWING, WATER BASED CURING AND SEALING COMPOUND ON FLOOR SLABS AND EXPOSED SURFACES

UNLESS NOTED OTHERWISE.

30. REFER TO ACI 305 FOR REQUIREMENTS FOR PLACING CONCRETE IN HOT WEATHER AND TO ACI 306 FOR REQUIREMENTS FOR

PLACING CONCRETE IN COLD WEATHER.

31. USE NON-SHRINK, NON-METALLIC, FACTORY PREMIXED CEMENTITIOUS GROUT WITH NO DRYING, SHRINKAGE, OR SETTLEMENT AT ANY AGE. COMPRESSIVE STRENGTH PER ASTM C109 OF NOT LESS THAN 5000 PSI AT 7 DAYS AND 7500 PSI AT 28 DAYS WHEN PLACED

IN FLOWABLE CONSISTENCY. MIX AND PLACE PER MANUFACTURER'S INSTRUCTIONS.

GENERAL CONCRETE NOTES

CONCRETE CAST AGAINST EARTH OR FILL 3 IN

CONCRETE EXPOSED TO WEATHER OR IN CONTACT WITH THE GROUND

NO 5 BAR AND SMALLER 1 1/2 IN

NO 6 BAR AND LARGER 2 IN

CONCRETE NOT EXPOSED TO WEATHER OR IN CONTACT WITH THE GROUND

SLABS AND WALLS 3/4 IN

BEAMS AND COLUMNS 1 1/2 IN

HO

ST

S

IT

E

VO

LU

NT

EE

R

SI

TE

H

O

ST

S

IT

E

H O

ST

S

IT

E

DUMPSTER

DUMPSTER

DUMPSTER

VO

LU

NT

EE

R

SI

TE

VO

LU

NT

EE

R

SI

TE

DUMPSTER

D U

M

PSTER

W

S

O W

S

O

W

S

O W

S

O

8"

M

"16

6"

"16

6"

6"

6"

6"

8"

W

M

6" 9"

6"

9"

6" 6"

9"

6"

" 15

6"

9"

6"

6"

6"

9"

9"

6"

9"

9"

9"

9"

9"

" 12 "6"

9"

9"

" 12

9"

6"

9"

9"

9"

9"

9"

6"

6"

9"

9"

9"

9"

6"

9"

6"

6"

6"

6"

9"

9"

6"

6"

"9"

9"

9"

"12

6"

6"

9"

9"

9"

"15

9"

6"

9"

9"

9"

9"

6"

6"

9"

9"

9"

9"

9"

6"

9"

9"

9"

6"

" 18

9"

9"

9"

9"

" 18

9"

6"

"12

9"

6"

9"

9"

9"

9"

6"

9"

9"

9"

9"9"

9"

9" 9"

9"12

6"

9"

9" 18

9"

6"

9"

D

.4

F.

F.

E.

E E

SD

SD

SD

.5

F.

F.

E.

3' 3'

2'

T

T

W

W

W

W

W

W

W

W

W

P-UGP-UGP-UG

P-UG

P-UG

P-UG

P-UG

P-UGP-UGP-UGP-UG

P- U

G

CP

-1

CP

-2

W

S

O W

S

O

W

S

O W

S

O

8"

4"

"20

" 12

"16

" 14

8"

M

8"

" 12

6"

8"

8"

6"

8"

8"

6"

8"

" 8"

" 6"

6"

6" 6"

6"

6"

8"

8"

6"

.28 F.

F.E

W

M

9"

6"

9"

6"

6"

9"

6"

6"

9"

9"

9"

9"

9"

6" 9"

6"

6"

6"

9"

6"

6"

" 24

" 21

6"

6"

9"

9"

9"

6"

6"

9"

9"

9"

6"

6"

9"

6"

9"

9"

6"

9"

6"

9"

9"

6"

9"

9"

9"

9"

6"

6"

9"

9"

6"

6"

9"

9"

9"

9"

9"

6"

9"

6"

9"

9"

9"

9"

9"

9"

9"

6"

6"

9"

6"

"15

6"

9"

6"

6"

6"

9"

6"

6"

9" 9"

9"

9"

9"

6"

9"

6"

6"

9"

9"

9"

6"

6"

9"

9"

9"

9"

9"

9"

"15

9"

9"

9"

9"

9"

9"

9"

9"

6"

.2

F.

F.

E.

D

.4

F.

F.

E.

E E

SD

SD

3' 3'

3'

3'3'

5'

3'

4'

W

W

W W

S

O W

S

O

W

S

O W

S

O

M

W

M

D

E E

SD

SD

T

W

W

W

P-UG

P-UG

P-UG

P-UG

P-UG

P-UG

P-UG

P-UGP-UGP-UGP-UG

P- U

G

P-U G

P-UG

P-UG

P-

UG

P- U

G

P-

UG

P- U

G

P-

UG

P-UG

P-UG

T

" 15

NEW CONCRETE PAD FOR HYDRANT.

SEE DETAIL C AND D ON SHEET S2.0

FOR MORE INFORMATION

NEW DOUBLE TOILET ON PRECAST

CONCRETE VAULT WITH APRON.

SEE DETAILS A AND B ON SHEET S2.0

FOR MORE INFORMATION

NEW PRECAST PUMPHOUSE BUILDING

ON COMPACTED BASE WITH APRON.

SEE DETAIL E ON SHEET S2.0

FOR MORE INFORMATION

NEW CONCRETE PAD FOR HYDRANT.

SEE DETAIL C AND D ON SHEET S2.0

FOR MORE INFORMATION

NEW CONCRETE PAD FOR HYDRANT.

SEE DETAIL C AND D ON SHEET S2.0

FOR MORE INFORMATION

NEW CONCRETE PAD FOR HYDRANT.

SEE DETAIL C AND D ON SHEET S2.0

FOR MORE INFORMATION

#25

#26

#27 #28

#24

#31 #30

#29

#32

#33

#23

#21

#22

#44

#20

#19

#18

#17

#16

#15

#14

#13

#12

#10

#9

#8

#7

#6

#5

#4

#3

#39

#41

#40

#42

#43

#35

#3

HO

ST

/V

OL

UN

TE

ER

S

IT

E

#3

HO

ST

/V

OL

UN

TE

ER

S

IT

E

#3

HO

ST

/V

OL

UN

TE

ER

S

IT

E #3

HO

ST

/V O

LU

NT

EE

R

SI

TE

#1 H

O

ST

/V O

LU

N

TE

ER

S

IT

E

#2 H

O

ST

/V O

LU

N

TE

ER

S

IT

E

DATENO. REVISION / ISSUE

UNITED STATES

DEPARTMENT OF AGRICULTURE

FOREST SERVICE

STRUCTURAL SITE

PLAN

R2

ROCKY MOUNTAIN REGION

PACTOLA

CAMPGROUND

LOOP B

RECONSTRUCTION

BLACK HILLS

NATIONAL FOREST

MYSTIC RANGER DISTRICT

TT

SR

05.28.2025

S1.1 30 52

550 East St. Louis Street Springfield, MO 65806 Olsson - Engineering South Dakota COA #C-159 olsson.com

TEL 417.890.8802

1343 SOUTH 75TH STREET

OMAHA NE 68124

SCALE IN FEET

40' 80'20'0'

NO SCALE

VAULT FRONT ELEVATIONA

S2.0

13'-0" MIN

6" COMPACTED

AGGREGATE BASE

COMPACTED

SUBGRADE

PROVIDE LEVELING SAND

AS NEEDED

TOP OF GRADE

TY

P.

BACKFILL

4' -4

PRECAST VAULTPRECAST VAULT

PRECAST RESTROOM

BUILDING

COMPACTED

SUBGRADE

11'-11" MIN

BACKFILL

PRECAST VAULT

NO SCALE

VAULT SIDE ELEVATIONB

S2.0

PRECAST RESTROOM

BUILDING

6" COMPACTED

AGGREGATE BASE

D S2.0

3' -0

SLOPE PAD TO DRAIN TOWARDS

LOWER GRADE SIDE OF HYDRANT, MAX.

2% SLOPE

2%

3' -0

3'-0"6'-0"

2' -6

5" CONCRETE SLAB, LIGHT

BROOM FINISH

6" COMPACTED AGGREGATE

BASE

COMPACTED

SUBGRADE

5"

PLACE 12 CY OF GRAVEL (1'

DEEP) FLUSH WITH TOP OF

CONCRETE AT EACH

HYDRANT LOCATION. PLACE

ON LOWER GRADE SIDE OF

HYDRANT

PLACE 3'x3'x6" GRAVEL FLUSH

WITH TOP OF CONCRETE AT

EACH HYDRANT LOCATION

3'x3'x6" GRAVEL.

GRAVEL SPLASH AREA.

NOT REQUIRED IF

HYDRANT POST IS

LOCATED IN ASPHALT OR

HYDRANT HAS NO HOSE

BIBB.

2" RADIUS

6' -0

#4 REBAR STEEL REINFORCEMENT,

CENTER IN SLAB, 18" O.C. EACH WAY

3" TYP.

(2) 4x8 TREATED TIMBER

POSTS, S4S

3' -0

3'

-0

3"

30° CHAMFER

C S2.0

PAD AT HYDRANT DETAIL

NO SCALE

18" TYP BOTH DIRECTIONS

D S2.0

SECTION AT HYDRANT PAD

NO SCALE

6" TY

P.

6" COMPACTED

AGGREGATE BASE

EDGE OF BUILDING

BACKFILL

TOP OF GRADE

E S2.0

SECTION AT PRECAST PUMPHOUSE

NO SCALE

12'-0"

5" THICK 10'-6" X 12'-0"

PRECAST SLAB

SLOPE 2%

3'-6" APRON

3" MIN.

TYP.

1' -0

5" THICK CONCRETE

APRON

#4 CONT., TYP.

#4 @ 12" O.C. EACH WAY,

MID-DEPTH OF SLAB

8"

PROVIDE NON FROST SUSCEPTIBLE

FILL UNDER SLAB TO A DEPTH

BELOW THE FROST LINE TO

PREVENT FROST HEAVE FROM

BUILDING SLAB

GEOGRID FILTER FABRIC

GEOGRID FILTER FABRIC

1'-0" 1'-0"

DATENO. REVISION / ISSUE

UNITED STATES

DEPARTMENT OF AGRICULTURE

FOREST SERVICE

TYPICAL CONCRETE

DETAILS

R2

ROCKY MOUNTAIN REGION

PACTOLA

CAMPGROUND

LOOP B

RECONSTRUCTION

BLACK HILLS

NATIONAL FOREST

MYSTIC RANGER DISTRICT

TT

JR

05.28.2025

S2.0 31 52

550 East St. Louis Street Springfield, MO 65806 Olsson - Engineering South Dakota COA #C-159 olsson.com

TEL 417.890.8802

1343 SOUTH 75TH STREET

OMAHA NE 68124

744 Horizon Court, #135 Grand Junction, CO 81506 Citrine - Engineering South Dakota COA #FL269825 citrinellc.com

TEL 303.325.3460

F S2.0

SECTION AT ELECTRICAL EQUIPMENT RACK

U-BOLTS, TYPICAL

1-1/2"x1-1/2" STRUT, TYPICAL.

AS REQUIRED FOR EQUIPMENT AND

CONDUIT SUPPORT.

MOUNTING RACK AND PIPE SHALL

BE PAINTED WITH TWO COATS OF

RUST INHIBITING ENAMEL.

COLOR SHALL BE FOREST SERVICE

BROWN.

2" DIA. GALVANIZED STEEL

PIPE WITH END CAP.

1'-0" DIA. x 3'-0" SONOTUBE

CONCRETE FOOTING

1'-0"Ø

3' -0

" M

IN

BE

LO

W G

R

AD

E

6"

1'-0"Ø

6"

2" DIA. STD. GALVANIZED STEEL

PIPE EMBEDDED INTO CONCRETE

FOOTING. PIPE SHALL BE PAINTED

FOREST SERVICE BROWN

SIZE OF RACK TO

BE AS REQUIRED

FOR EQUIPMENT SIZE

S

IT

E

VO

LU

NT

EE

R

SI

TE

H

O

ST

S

IT

E

H O

ST

S

IT

E

DUMPSTER

DUMPSTER

DUMPSTER

VO

LU

NT

EE

R

SI

TE

VO

LU

NT

EE

R

SI

TE

DUMPSTER

D U

M

PSTER

W

S

O W

S

O

W

S

O W

S

O

8"

M

"16

6"

"16

6"

6"

6"

6"

8"

W

M

6" 9"

6"

9"

6" 6"

9"

6"

" 15

6"

9"

6"

6"

6"

9"

9"

6"

9"

9"

9"

9"

9"

" 12 "6"

9"

9"

" 12

9"

6"

9"

9"

9"

9"

9"

6"

6"

9"

9"

9"

9"

6"

9"

6"

6"

6"

6"

9"

9"

6"

6"

"9"

9"

9"

"12

6"

6"

9"

9"

9"

"15

9"

6"

9"

9"

9"

9"

6"

6"

9"

9"

9"

9"

9"

6"

9"

9"

9"

6"

" 18

9"

9"

9"

9"

" 18

9"

6"

"12

9"

6"

9"

9"

9"

9"

6"

9"

9"

9"

9"9"

9"

9" 9"

9"12

6"

9"

9" 18

9"

6"

9"

D

.4

F.

F.

E.

E E

SD

SD

SD

.5

F.

F.

E.

3' 3'

2'

T

T

W

W

W

W

W

W

W

W

W

P-UGP-UGP-UG

P-UG

P-UG

P-UG

P-UG

P-UGP-UGP-UGP-UG

P- U

G

CP

-1

CP

-2

W

S

O W

S

O

W

S

O W

S

O

8"

4"

"20

" 12

"16

" 14

8"

M

8"

" 12

6"

8"

8"

6"

8"

8"

6"

8"

" 8"

" 6"

6"

6" 6"

6"

6"

8"

8"

6"

.28 F.

F.E

W

M

9"

6"

9"

6"

6"

9"

6"

6"

9"

9"

9"

9"

9"

6" 9"

6"

6"

6"

9"

6"

6"

" 24

" 21

6"

6"

9"

9"

9"

6"

6"

9"

9"

9"

6"

6"

9"

6"

9"

9"

6"

9"

6"

9"

9"

6"

9"

9"

9"

9"

6"

6"

9"

9"

6"

6"

9"

9"

9"

9"

9"

6"

9"

6"

9"

9"

9"

9"

9"

9"

9"

6"

6"

9"

6"

"15

6"

9"

6"

6"

6"

9"

6"

6"

9" 9"

9"

9"

9"

6"

9"

6"

6"

9"

9"

9"

6"

6"

9"

9"

9"

9"

9"

9"

"15

9"

9"

9"

9"

9"

9"

9"

9"

6"

.2

F.

F.

E.

D

.4

F.

F.

E.

E E

SD

SD

3' 3'

3'

3'3'

5'

3'

4'

W

W

W W

S

O W

S

O

W

S

O W

S

O

M

W

M

D

E E

SD

SD

T

W

W

W

P-UG

P-UG

P-UG

P-UG

P-UG

P-UG

P-UG

P-UGP-UGP-UGP-UG

P- U

G

P-U G

P-UG

P-UG

P-

UG

P- U

G

P-

UG

P- U

G

P-

UG

P-UG

P-UG

T

" 15

NEW DOUBLE TOILET ON PRECAST

CONCRETE VAULT WITH APRON.

SEE DETAILS A AND B ON SHEET S2.0

FOR MORE INFORMATION

#25

#26

#27 #28

#24

#31 #30

#29

#32

#33

#23

#21

#22

#44

#20

#19

#18

#17

#16

#15

#14

#13

#12

#10

#9

#8

#7

#6

#5

#4

#3

#39

#41

#40

#42

#43

#35

#3

HO

ST

/V

OL

UN

TE

ER

S

IT

E

#3

HO

ST

/V

OL

UN

TE

ER

S

IT

E

#3

HO

ST

/V

OL

UN

TE

ER

S

IT

E #3

HO

ST

/V O

LU

NT

EE

R

SI

TE

#1 H

O

ST

/V O

LU

N

TE

ER

S

IT

E

#2 H

O

ST

/V O

LU

N

TE

ER

S

IT

E

NEW CONCRETE PAD FOR HYDRANT.

SEE DETAIL C ON SHEET S2.0 FOR MORE INFORMATION

DATENO. REVISION / ISSUE

UNITED STATES

DEPARTMENT OF AGRICULTURE

FOREST SERVICE

STRUCTURAL

BID OPTION

SITE PLAN

R2

ROCKY MOUNTAIN REGION

PACTOLA

CAMPGROUND

LOOP B

RECONSTRUCTION

BLACK HILLS

NATIONAL FOREST

MYSTIC RANGER DISTRICT

TT

SR

05.28.2025

S6.0 32 52

550 East St. Louis Street Springfield, MO 65806 Olsson - Engineering South Dakota COA #C-159 olsson.com

TEL 417.890.8802

1343 SOUTH 75TH STREET

OMAHA NE 68124

SCALE IN FEET

40' 80'20'0'

OPTION 1

PACTOLA STRUCTURAL BID OPTIONS

OPTION # DESCRIPTION

1 ADDITIONAL HOST/VOLUNTEER

SITE IMPROVEMENTS

6 OSPREY TRAILHEAD TOILET

OPTIONS LISTED ABOVE SHALL BE COORDINATED WITH ALL OTHER DISCIPLINE

SHEETS. REFERENCE DWG. C7.0, M6.0, AND E7.0.

OPTION 6

W

S

O

W

S O

W

S

O W S

O

E

M

W

S O

W

S O

W

S

O

W

M

E

D

.4

F.

F.

E.

E E

SD

SD

SD

.5

F.

F.

E.

T

T

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W W

W

W

P-UGP-UGP-UG

P-UG

P-UG

P-UG

P-UG

P-UGP-UGP-UGP-UG

P- U

G

W

S

O

W

S O

W

S

O W S

O

E

M

.28 F.

F.E

W

S O

W

S O

W

S

O

W

M

E

.2

F.

F.

E.

D

.4

F.

F.

E.

E E

SD

SD

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

WW

W

S

O

W

S O

W

S

O W S

O

E

M

W

S O

W

S O

W

S

O

W

M

E

D

E E

SD

SD

T

W

W

W

P-UG

P-UG

P-UG

P-UG

P-UG

P-UG

P-UG

P-UGP-UGP-UGP-UG

P-

U G

P-U G

P-UG

P-UG

P-

UG

P- U

G

P-

UG

P- U

G

P-

UG

P-UG

P-UG

P-U G

W

W

W

W W

W

W

W

W

T

" 15

W

S O

W

S O

W

W

S O

W

S O

W

W

S O

W

S O

W

WELL HEAD PUMP

PUMP HOUSE

DATENO. REVISION / ISSUE

UNITED STATES

DEPARTMENT OF AGRICULTURE

FOREST SERVICE

MECHANICAL/PLUMBING

SITE DEMOLITION PLAN

R2

ROCKY MOUNTAIN REGION

PACTOLA

CAMPGROUND

LOOP B

RECONTRUCTION

BLACK HILLS

NATIONAL FOREST

MYSTIC RANGER DISTRICT

JR

SR

05.28.2025

MD1.1

33 52

550 East St. Louis Street Springfield, MO 65806 Olsson - Engineering South Dakota COA #C-159 olsson.com

TEL 417.890.8802

1343 SOUTH 75TH STREET

OMAHA NE 68124

744 Horizon Court, #135 Grand Junction, CO 81506 Citrine - Engineering South Dakota COA #FL269825 citrinellc.com

TEL 303.325.3460

3 6

SCALE IN FEET

40' 80'20'0'

1 2

1. ABANDON IN PLACE.

DEMOLITION LEGEND

DEMOLITION KEYNOTES:

DEMO EXISTING AND TEMPORARY STORAGE TANKS AND 3-2" WATER SHUTOFF VALVES.

HYDRANT ASSEMBLIES (QTY 6)-DEMO 1 EA -1" CURB VALVE AND 1" DRAIN VALVE.

DEMO PUMP HOUSE AND 3- 2" WATER SHUTOFF VALVES.

OPTIONAL DEMO SEPTIC VAULT, INCLUDING SURFACE PUMP OUT CONNECTION, CRUSH IN PLACE AND BACK FILL.

DEMO WATER METER, PIPING AND VALVES.

DEMO DISINFECTION SYSTEM INCLUDING DOSING PUMP, TANK AND VALVES AND TUBING.

DEMOLITION NOTES:

1. ALL DEMOLITION IS TO BE PERFORMED IN ACCORDANCE WITH ALL APPLICABLE CITY, COUNTY, STATE AND/OR GOVERNING BODY'S STANDARDS.

2. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL PERMITS ASSOCIATED WITH THE DEMOLITION WORK AS DESCRIBED & SHOWN ON THESE PLANS.

3. THE EXISTING UTILITY LOCATIONS SHOWN ON THE PLANS ARE APPROXIMATE AND MAY NOT INCLUDE ALL LINES PRESENT. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL "811", AND COORDINATE FIELD LOCATION OF EXISTING UNDERGROUND UTILITIES PRIOR TO BEGINNING DEMOLITION ACTIVITIES. !!KNOW WHAT'S BELOW. CALL BEFORE YOU DIG!!

4. CONTRACTOR SHALL COORD. WITH ELECTRIC, TELEPHONE/FIBER, AND CABLE PROVIDERS TO TERMINATE ALL EXISTING SERVICES TO BUILDINGS MARKED FOR DEMOLITION ON THESE PLANS.

CONTRACTOR SHALL VERIFY WITH UTILITY PROVIDERS THAT SERVICES ARE DISCONNECTED PRIOR TO ANY REMOVAL OF INTERNAL SERVICE LINES.

5. THE DEMOLITION PLAN AND EXISTING CONDITIONS SHOWN ARE APPROXIMATE. CONTRACTOR SHALL INSPECT AND FIELD VERIFY THE EXISTING SITE CONDITIONS TO BECOME ACQUAINTED WITH ALL EXISTING CONDITIONS WHICH EFFECT ANY AND ALL WORK ASSOCIATED WITH THE DEMOLITION PLANS.

6. ALL EXISTING BUILDING RELATED FEATURES NOT SHOWN ON THIS PLAN SHALL BE COORD. WITH ALL OTHER PLANS ASSOCIATED WITH THIS PROJECT. ALL CONCRETE OR ASPHALT PAVEMENT, CURB & GUTTER, RETAINING WALLS AND MISCELLANEOUS STRUCTURES INCLUDING BUT NOT LIMITED TO WATER HYDRANTS, FIRE RINGS, PICNIC TABLES, SITE NUMBERING POSTS, WHEELSTOPS, KIOSKS, INFO BOARDS, AND MISCELLANEOUS DEBRIS SHALL BE DEMOLISHED AND REMOVED FROM THE SITE AND SHALL BE DISPOSED OF OFF-SITE AT CONTRACTORS

EXPENSE TO AN APPROVED LANDFILL, UNLESS OTHERWISE NOTED.

7. IN THE EVENT THE CONTRACTOR ENCOUNTERS ON THE SITE MATERIAL REASONABLY BELIEVED TO BE ASBESTOS, LEAD-BASED PAINT, OR ANY OTHER HAZARDOUS MATERIAL, CONTRACTOR

SHALL IMMEDIATELY NOTIFY THE CONTRACTING OFFICER

8. DEBRIS SHALL NOT BE BURIED ON SITE. ALL UNSUITABLE MATERIAL AND DEBRIS SHALL BE REMOVED FROM THE SITE AND PROPERLY DISPOSED OFF-SITE IN ACCORDANCE WITH ALL CITY, STATE, COUNTY & FEDERAL LAWS AND ORDINANCES. NO ON-SITE BURNING WILL BE PERMITTED.

9. IF EXISTING UN-CAPPED WATER WELLS ARE DISCOVERED ON-SITE, CONTRACTOR SHALL IMMEDIATELY NOTIFY THE CONTRACTING OFFICER.

10. CONTRACTOR SHALL COORDINATE WITH FOREST SERVICE TO PUMP SEPTIC VAULTS OF ALL WASTEWATER AND SLUDGE. CONTRACTOR SHALL REMOVE EXISTING VAULTS AND ANY ASSOCIATED APPURTENANCES IN ACCORDANCE WITH CITY, COUNTY, STATE, AND FEDERAL LAWS AND ORDINANCES.

11. ANY AREA DISTURBED BY DEMOLITION THAT WILL NOT BE DISTURBED IN PROPOSED GRADING ACTIVITIES SHOWN ON THESE PLANS SHALL HAVE TOPSOIL PLACED, SEEDED AND MULCHED

ACCORDING TO THE CONTRACT SPECIFICATIONS.

12. OWNER HAS FIRST RIGHT OF REFUSAL OF ALL MATERIALS REMOVED FROM THE SITE.

DUMPSTER

DUMPSTER

DUMPSTER

D U

M

PSTER

W

S

O W

S

O

W

S

O W S

O

8"

M

"16

6"

"16

6"

6"

6"

6"

8"

W

M

6" 9"

6"

9"

6" 6"

9"

6"

" 15

6"

9"

6"

6"

6"

9"

9"

6"

9"

9"

9"

9"

9"

" 12 "6"

9"

9"

" 12

9"

6"

9"

9"

9"

9"

9"

6"

6"

9"

9"

9"

9"

6"

9"

6"

6"

6"

6"

9"

9"

6"

6"

"9"

9"

9"

"12

6"

6"

9"

9"

"15

9"

6"

9"

9"

9"

6"

6"

9"

9"

9"

9"

6"

9"

9"

6"

" 18

9"

9"

9"

9"

" 18

9"

6"

"12

9"

6"

9"

9"

9"

9"

6"

9"

9"

9"

9"9"

9"

9" 9"

9"12

6"

9"

9" 18

9"

6"

9"

D

.4

F.

F.

E.

E E

SD

SD

SD

.5

F.

F.

E.

T

T

W

W

W

W

W

W

W

W

W

P-UGP-UGP-UG

P-UG

P-UG

P-UG

P-UG

P-UGP-UGP-UGP-UG

P- U

G

CP

-1

CP

-2

W

S

O W

S

O

W

S

O W S

O

8"

4"

"20

" 12

"16

" 14

8"

M

8"

" 12

6"

8"

8"

6"

8"

8"

6"

8"

" 8"

" 6"

6"

6" 6"

6"

6"

8"

8"

6"

.28 F.

F.E

W

M

9"

6"

9"

6"

6"

9"

6"

6"

9"

9"

9"

9"

9"

6" 9"

6"

6"

6"

9"

6"

6"

" 24

" 21

6"

6"

9"

9"

9"

6"

6"

9"

9"

9"

6"

6"

9"

6"

9"

9"

6"

9"

6"

9"

9"

6"

9"

9"

9"

9"

6"

6"

9"

9"

6"

6"

9"

9"

9"

9"

9"

6"

9"

6"

9"

9"

9"

9"

9"

9"

9"

6"

6"

9"

6"

"15

6"

9"

6"

6"

6"

9"

6"

6"

9" 9"

9"

9"

9"

6"

9"

6"

6"

9"

9"

9"

6"

6"

9"

9"

9"

9"

9"

9"

"15

9"

9"

9"

9"

9"

9"

9"

9"

6"

.2

F.

F.

E.

D

.4

F.

F.

E.

E E

SD

SD

W

W

W W

S

O W

S

O

W

S

O W S

O

M

W

M

D

E E

SD

SD

T

W

W

W

P-UG

P-UG

P-UG

P-UG

P-UG

P-UG

P-UG

P-UGP-UGP-UGP-UG

P-

U G

P-U G

P-UG

P-UG

P-

UG

P- U

G

P-

UG

P- U

G

P-

UG

P-UG

P-UG

T

" 15

#1 H

O

ST

/V O

LU

N

TE

ER

S

IT

E

#3

HO

ST

/V O

LU

NT

EE

R

SI

TE

W

W

W

W

W

W

W

W

W

WW

W

W

W

W

W

W

W

W W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

#25

#26

#27 #28

#24

#31 #30

#29

#32

#33

#23

#21

#22

#44

#20

#19

#18

#17

#16

#15

#14

#13

#12

#10

#9

#8

#7

#6

#5

#4

#3

#39

#41

#40

#42

#43

#35

#3

HO

ST

/V

OL

UN

TE

ER

S

IT

E

#3

HO

ST

/V

OL

UN

TE

ER

S

IT

E

#3

HO

ST

/V

OL

UN

TE

ER

S

IT

E

#2 H

O

ST

/V O

LU

N

TE

ER

S

IT

E

DATENO. REVISION / ISSUE

UNITED STATES

DEPARTMENT OF AGRICULTURE

FOREST SERVICE

MECHANICAL/PLUMBING

SITE PLAN

R2

ROCKY MOUNTAIN REGION

PACTOLA

CAMPGROUND

LOOP B

RECONSTRUCTION

BLACK HILLS

NATIONAL FOREST

MYSTIC RANGER DISTRICT

JR

SR

05.28.2025

M1.1 34 52

550 East St. Louis Street Springfield, MO 65806 Olsson - Engineering South Dakota COA #C-159 olsson.com

TEL 417.890.8802

1343 SOUTH 75TH STREET

OMAHA NE 68124

744 Horizon Court, #135 Grand Junction, CO 81506 Citrine - Engineering South Dakota COA #FL269825 citrinellc.com

TEL 303.325.3460

SCALE IN FEET

40' 80'20'0'

GENERAL NOTES:

1. REF SPECIFICATION 331116 WATER DISTRIBUTION FOR PIPING SYSTEM CONSTRUCTION AND

MATERIALS.

A. HDPE PIPE AND FITTINGS U/G POTABLE WATER.

B. PVC PIPE AND FITTINGS PUMP HOUSE WATER AND DISINFECTION FEED SYSTEM.

C. GALVANIZED CARBON STEEL - HYDRANT A/G PIPING.

2. REF SPECIFICATION 331219 WATER HYDRANTS.

3. REF SPECIFICATION 223000 PLUMBING EQUIPMENT.

4. REF SPECIFICATION 332600 DISINFECTION FEED SYSTEM.

5. WATER LINE LOCATIONS TO BE STAKED IN FIELD BY THE CONTRACTOR AND APPROVED BY

CONTRACTING OFFICER.

6. COORDINATE WITH CONTRACTING OFFICER FOR MINOR SHIFTS IN WATER LINE ROUTING TO AVOID

MAJOR VEGETATION OR EXISTING SITE CONDITIONS.

7. ALL DRAIN TO DAYLIGHT LATERALS TO BE STAKED IN FIELD BY CONTRACTOR AND APPROVED BY

CONTRACTING OFFICER.

8. WATER/SEWER - 10 FT SEPARATION REQUIRED BETWEEN WATER AND SEWER LINES AND

HOOK-UPS.

B

M1.3

A

M1.2

C

M1.4

S

IT

E

VO

LU

NT

EE

R

SI

TE

H

O

ST

S

IT

E

H O

ST

S

IT

E

DUMPSTER

VO

LU

NT

EE

R

SI

TE

VO

LU

NT

EE

R

SI

TE

DUMPSTER

W

S

O W

S

O

8"

6" 9"

6"

9"

6" 6"

9"

6"

" 15

9"

9"

9"

9"

9"

6"

6"

9"

9"

9"

9"

6"

9"

6"

6"

6"

6"

9"

6"

6"

"9"

9"

9"

"12

6"

6"

9"

9"

6"

D

SD

SD

SD

SD

SD

SD

W

W

W

W

W

W

P-UGP-UGP-UGP-UGP-UG

P-UG

P-UG

P-UG

P-UG

P-UG

P-UG

P-UG

P-UG

P-UG

P- U

G

CP

-2

W

S

O W

S

O

8"

4"

"20

" 12

"16

" 14

8"

9"

6"

9"

6"

6"

9"

9"

9"

6"

6"

9"

6"

9"

9"

6"

9"

6"

9"

9"

6"

9"

9"

9"

9"

6"

6"

9"

9"

6"

6"

9"

9"

9"

9"

6"

9"

6"

9"

9"

9"

9"

9"

9"

9"

6"

.2

F.

F.

E.

D

SD

SD

SD

SD

W

W

W

W

W

W

S

O W

S

O D

SD

SD

SD

SD

SD

SD

P-UG

P-UG

P-UG

P-UG

P-UG

P-UG

P-UGP-UG

P-UG

P-UG

P-UG

P-UG

P-UG

P-UG

T P-

U G

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W W

W

W

W

W

W W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W W

EXISTING PVC

NEW HDPE

N: 648206.11 E: 1134776.09

EL: 4655

N: 648203.99 E: 1134761.52

EL: 4655

2" PVC- EXISTING

2" PVC- EXISTING

DRAIN

N: 648741.82

E: 1134490.46

EL: 4658

H3 HYDRANT

N: 648725.18

E: 1134515.11

EL: 4660

DRAIN

N: 648691.27

E: 1134503.84

EL: 4658

DRAIN

N: 648646.61 E: 1134506.29

EL: 4658

H3 HYDRANT

N: 648675.74

E: 1134522.15

EL: 4659

H3 HYDRANT

N: 648633.67

E: 1134530.15

EL: 4659

DRAIN

N: 648552.40 E: 1134512.13

EL: 4655

H3 HYDRANT

N: 648535.99

E: 1134535.99

EL: 4657

#4

#3

#35

#3

HO

ST

/V

OL

UN

TE

ER

SI

TE

#3

HO

ST

/V

OL

UN

TE

ER

SI

TE

#3

HO

ST

/V

OL

UN

TE

ER

SI

TE

#3

HO

ST

/V O

LU

NT

EE

R

SI

TE

#1 H

O

ST

/V O

LU

N

TE

ER

SI

TE

#2 H

O

ST

/V O

LU

N

TE

ER

SI

TE

DATENO. REVISION / ISSUE

UNITED STATES

DEPARTMENT OF AGRICULTURE

FOREST SERVICE

MECHANICAL/PLUMBING

ENLARGED SITE PLAN

R2

ROCKY MOUNTAIN REGION

PACTOLA

CAMPGROUND

LOOP B

RECONSTRUCTION

BLACK HILLS

NATIONAL FOREST

MYSTIC RANGER DISTRICT

JR

SR

05.28.2025

M1.2 35 52

550 East St. Louis Street Springfield, MO 65806 Olsson - Engineering South Dakota COA #C-159 olsson.com

TEL 417.890.8802

1343 SOUTH 75TH STREET

OMAHA NE 68124

744 Horizon Court, #135 Grand Junction, CO 81506 Citrine - Engineering South Dakota COA #FL269825 citrinellc.com

TEL 303.325.3460

ENLARGED SITE PLANA

M1.2 1" = 20'

M

AT

C H

LI

N

E

- S

EE

S

H

EE

T M

1.

FO

R

C O

N

TI

N U

AT

IO

N

M

AT

C H

LI

N

E

- S

EE

S

H

EE

T M

1.

FO

R

C O

N

TI

N U

AT

IO

N

SCALE IN FEET

20' 40'10'0'

GENERAL NOTES: LEGEND:

WATER PIPE

HYDRANT

COORDINATE CALLOUT WITH ELEVATION

SEPTIC VAULT

WATER SHUTOFF VALVE W/ CARSONITE

POST (RED)

WATER SHUTOFF VALVE W/ CARSONITE

POST (BLUE)

W

R

B

R

R

R

R

B

B

B

B

EXAMPLE SHUTOFF VALVE

MARKER POST

(SEE NOTE 10)

1. REF SPECIFICATION 331116 WATER DISTRIBUTION FOR PIPING SYSTEM CONSTRUCTION AND MATERIALS.

A. HDPE PIPE AND FITTINGS U/G POTABLE WATER.

B. PVC PIPE AND FITTINGS PUMP HOUSE WATER AND DISINFECTION FEED SYSTEM.

C. GALVANIZED CARBON STEEL - HYDRANT A/G PIPING.

2. REF SPECIFICATION 331219 WATER HYDRANTS.

3. REF SPECIFICATION 223000 PLUMBING EQUIPMENT.

4. REF SPECIFICATION 332600 DISINFECTION FEED SYSTEM.

5. WATER LINE LOCATIONS TO BE STAKED IN FIELD BY THE CONTRACTOR AND APPROVED BY CONTRACTING

OFFICER.

6. COORDINATE WITH CONTRACTING OFFICER FOR MINOR SHIFTS IN WATER LINE ROUTING TO AVOID MAJOR

VEGETATION OR EXISTING SITE CONDITIONS.

7. ALL DRAIN TO DAYLIGHT LATERALS TO BE STAKED IN FIELD BY CONTRACTOR AND APPROVED BY

CONTRACTING OFFICER.

8. UNLESS OTHERWISE NOTED:

A. ALL MAIN RUNS ARE 2" HDPE SDR11 PIPE MATERIAL.

B. ALL LATERALS TO HYDRANTS ARE 1" HDPE SDR11 PIPE MATERIAL.

9. SITE COORDINATES/ELEVATIONS ARE ESTIMATED AND SHOULD BE VERIFIED BY CONTRACTOR.

10. ALL FILL VALVES AND DRAIN VALVES TO BE MARKED WITH BROWN CARSONITE POST WITH 8" COLORED

STICKER ON TOP. FILL VALVES TO BE MARKED RED AND DRAIN VALVES TO BE MARKED BLUE.

H O

ST

S

IT

E

DUMPSTER

D U

M

PSTER

W

S

O W S

O

M

"16

6"

"16

6"

6"

6"

6"

8"

6"

6"

9"

9"

9"

9"

9"

" 12 "6"

9"

9"

6"

"12

9"

9"

9"

6"

9"

9"

9"

9" 18

9"

SD

SD

SD

SD

.5

F.

F.

E.

T

W

W

W

W

W

W

W

W

W

W W

W

CP

-1

W

S

O W S

O

M

8"

" 12

6"

8"

8"

6"

8"

8"

6"

8"

" 8"

" 6"

6"

6" 6"

6"

6"

8"

8"

6"

9"

9"

9"

9"

9"

9"

6" 9"

6"

6"

6"

9"

6"

6"

" 24

" 21

6"

"24

6"

9"

6"

9"

9"

6"

6"

9"

9"

9"

"15

9"

9"

9"

9"

9"

SD

W

W

S

O W S

O

M

SD

SD

SD

W

W

W

W

W

W

P-

UG

P- U

G

P- U

G

P-

UG

P- U

G P-

U G

P- U

G

P-

UG

P-

UG

P-UG

P-UG

P-UG

P-UG

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

WH2 HYDRANT

N: 649250.47 E: 1134926.86

EL: 4636

N: 649019.76 E: 1135074.32

EL: 4634

H2 HYDRANT

N: 649013.76 E: 1135089.06

EL: 4632

DRAIN

N: 649029.53 E: 1135103.19

EL: 4629

DRAIN

N: 649224.40 E: 1134934.95

EL: 4633

H3 HYDRANT

H3 HYDRANT

N: 648680.59 E: 1134854.96

EL: 4642

DRAIN

N: 648647.35

E: 1134791.60

EL: 4642

DRAIN

N: 648680.40 E: 1134825.76

EL: 4640

N: 648610.89 E: 1134867.36

EL: 4645

N: 648688.19 E: 1134924.44

EL: 4644

#20

#18

#17

#16

#15

#14

#13

#12

#10

#9

#8

#7

#6

#5

#4

#3

#39

#41

#40

#42

#43

#2 H

O

ST

/V O

LU

N

TE

ER

SI

TE

DATENO. REVISION / ISSUE

UNITED STATES

DEPARTMENT OF AGRICULTURE

FOREST SERVICE

MECHANICAL/PLUMBING

ENLARGED SITE PLAN

R2

ROCKY MOUNTAIN REGION

PACTOLA

CAMPGROUND

LOOP B

RECONSTRUCTION

BLACK HILLS

NATIONAL FOREST

MYSTIC RANGER DISTRICT

JR

SR

05.28.2025

M1.3 36 52

550 East St. Louis Street Springfield, MO 65806 Olsson - Engineering South Dakota COA #C-159 olsson.com

TEL 417.890.8802

1343 SOUTH 75TH STREET

OMAHA NE 68124

744 Horizon Court, #135 Grand Junction, CO 81506 Citrine - Engineering South Dakota COA #FL269825 citrinellc.com

TEL 303.325.3460

ENLARGED SITE PLANA

M1.3 1" = 20'

SCALE IN FEET

20' 40'10'0'

MATCHLINE - SEE SHEET M1.4 FOR CONTINUATION

M

AT

C H

LI

N

E

- S

EE

S

H

EE

T M

1.

FO

R

C O

N

TI

N U

AT

IO

N

R B

R

B

GENERAL NOTES: LEGEND:

W

R

B

1. REF SPECIFICATION 331116 WATER DISTRIBUTION FOR PIPING SYSTEM CONSTRUCTION AND MATERIALS.

A. HDPE PIPE AND FITTINGS U/G POTABLE WATER.

B. PVC PIPE AND FITTINGS PUMP HOUSE WATER AND DISINFECTION FEED SYSTEM.

C. GALVANIZED CARBON STEEL - HYDRANT A/G PIPING.

2. REF SPECIFICATION 331219 WATER HYDRANTS

3. REF SPECIFICATION 223000 PLUMBING EQUIPMENT.

4. REF SPECIFICATION 332600 DISINFECTION FEED SYSTEM.

5. WATER LINE LOCATIONS TO BE STAKED IN FIELD BY THE CONTRACTOR AND APPROVED BY CONTRACTING

OFFICER.

6. COORDINATE WITH CONTRACTING OFFICER FOR MINOR SHIFTS IN WATER LINE ROUTING TO AVOID MAJOR

VEGETATION OR EXISTING SITE CONDITIONS.

7. ALL DRAIN TO DAYLIGHT LATERALS TO BE STAKED IN FIELD BY CONTRACTOR AND APPROVED BY

CONTRACTING OFFICER.

8. UNLESS OTHERWISE NOTED:

A. ALL MAIN RUNS ARE 2" HDPE SDR11 PIPE MATERIAL.

B. ALL LATERALS TO HYDRANTS ARE 1" HDPE SDR11 PIPE MATERIAL.

9. SITE COORDINATES/ELEVATIONS ARE ESTIMATED AND SHOULD BE VERIFIED BY CONTRACTOR.

10. ALL FILL VALVES AND DRAIN VALVES TO BE MARKED WITH BROWN CARSONITE POST WITH 8" COLORED

STICKER ON TOP. FILL VALVES TO BE MARKED RED AND DRAIN VALVES TO BE MARKED BLUE.

EXAMPLE SHUTOFF VALVE

MARKER POST

(SEE NOTE 10)

6"

6"

6"

W

M

6"

9"

6"

6"

6"

9"

9"

6"

9"

9"

9"

9"

9"

9"

6"

6"

9"

9"

9"

9"

9"

6"

6"

9"

9"

9"

6"

" 18

9"

9"

9"

9"

" 18

9"

6"

"12

9"

9"

9"

6"

9"

9"

.4

F.

F.

E.

E E

T

P-UG

P-UG

P-UGP-UG

P-UG

P-UGP-UGP-UGP-UG

P- U

G

P- U

G

6"

6" 6"

6"

.28 F.

F.E

W

M

9"

6"

6"

9"

9"

9"

9"

9"

6" 9"

6"

6"

6"

9"

"15

6"

9"

6"

6"

6"

9"

9"

6"

6"

9" 9"

9"

9"

9"

6"

9"

6"

6"

9"

9"

6"

6"

9"

9"

9"

.4

F.

F.

E.

E E

W

M

E ET

W

W

W

W

P-UG

P-UG

P-UGP-UG

P-UGP-UGP-UGP-UGP-UG

P- U

G

P- U

G

P- U

G

P-U G

P-UG

P-UG

P-UG

P-

UG

P-

UG

P-

UG

P- U

G

P- U

G

P- U

G

W

W

W

W

W W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W W

W

W

W

W

W

W

W

W

H2 HYDRANT

N: 648913.39

E: 1134551.46

EL: 4664

DRAIN

N: 648919.07

E: 1134583.67

EL: 4663

#25

#26

#27

#28

#24

#31

#30

#29

#32

#33

#23

#21

#22

#44

#20

#19

#18

#17

#41

#42

#43

DATENO. REVISION / ISSUE

UNITED STATES

DEPARTMENT OF AGRICULTURE

FOREST SERVICE

MECHANICAL/PLUMBING

ENLARGED SITE PLAN

R2

ROCKY MOUNTAIN REGION

PACTOLA

CAMPGROUND

LOOP B

RECONSTRUCTION

BLACK HILLS

NATIONAL FOREST

MYSTIC RANGER DISTRICT

JR

SR

05.28.2025

M1.4 37 52

550 East St. Louis Street Springfield, MO 65806 Olsson - Engineering South Dakota COA #C-159 olsson.com

TEL 417.890.8802

1343 SOUTH 75TH STREET

OMAHA NE 68124

744 Horizon Court, #135 Grand Junction, CO 81506 Citrine - Engineering South Dakota COA #FL269825 citrinellc.com

TEL 303.325.3460

ENLARGED SITE PLANA

M1.4 1" = 30'

SCALE IN FEET

30' 60'15'0'

MATCHLINE - SEE SHEET M1.3 FOR CONTINUATION

M

AT

C H

LI

N

E

- S

EE

S

H

EE

T M

1.

FO

R

C O

N

TI

N U

AT

IO

N

R

B

B R

R

GENERAL NOTES: LEGEND:

WATER PIPE

HYDRANT

COORDINATE CALLOUT WITH ELEVATION

SEPTIC VAULT

WATER SHUTOFF VALVE W/ CARSONITE

POST (RED)

WATER SHUTOFF VALVE W/ CARSONITE

POST (BLUE)

W

R

B

EXAMPLE SHUTOFF VALVE

MARKER POST

(SEE NOTE 10)

1. REF SPECIFICATION 331116 WATER DISTRIBUTION FOR PIPING SYSTEM CONSTRUCTION AND MATERIALS.

A. HDPE PIPE AND FITTINGS U/G POTABLE WATER.

B. PVC PIPE AND FITTINGS PUMP HOUSE WATER AND DISINFECTION FEED SYSTEM.

C. GALVANIZED CARBON STEEL - HYDRANT A/G PIPING.

2. REF SPECIFICATION 331219 WATER HYDRANTS.

3. REF SPECIFICATION 223000 PLUMBING EQUIPMENT.

4. REF SPECIFICATION 332600 DISINFECTION FEED SYSTEM.

5. WATER LINE LOCATIONS TO BE STAKED IN FIELD BY THE CONTRACTOR AND APPROVED BY CONTRACTING

OFFICER.

6. COORDINATE WITH CONTRACTING OFFICER FOR MINOR SHIFTS IN WATER LINE ROUTING TO AVOID MAJOR

VEGETATION OR EXISTING SITE CONDITIONS.

7. ALL DRAIN TO DAYLIGHT LATERALS TO BE STAKED IN FIELD BY CONTRACTOR AND APPROVED BY

CONTRACTING OFFICER.

8. UNLESS OTHERWISE NOTED:

A. ALL MAIN RUNS ARE 2" HDPE SDR11 PIPE MATERIAL.

B. ALL LATERALS TO HYDRANTS ARE 1" HDPE SDR11 PIPE MATERIAL.

9. SITE COORDINATES/ELEVATIONS ARE ESTIMATED AND SHOULD BE VERIFIED BY CONTRACTOR.

10. ALL FILL VALVES AND DRAIN VALVES TO BE MARKED WITH BROWN CARSONITE POST WITH 8" COLORED

STICKER ON TOP. FILL VALVES TO BE MARKED RED AND DRAIN VALVES TO BE MARKED BLUE.

4' -7

GRADE

RINGS

FINISHED GRADE

ASTM 3034 4" PVC

W/ GASKETED JOINTS

FROM HOST HOOK-UP

GASKETED JOINT

WITHIN 5 FT.

OF SEWAGE VAULT

4"x4"x4" TEE

ASTM 3034 PVC

W/SOLVENT WELD

JOINTS

10"

6"

4"

4"

12'-8"

5' -1

0"

MASTIC JOINT SEALANT

BETWEEN FRAME AND GRADE RINGS

MASTIC JOINT SEALANT

BETWEEN ALL CONCRETE

(GRADE RINGS, TANK SECTIONS)

MONOLITHIC CONCRETE TANK

1' -4

GROUT FRAME TO SEWAGE VAULT

W/NON-SHRINK GROUT

6"

6" DEPTH

AGGREGATE BASE

NOTE

BACKFILL WITH

COMMON BACKFILL

MATERIAL

1'-0"

MIN.

EACH

SIDE

2' MIN COVER

CAP OUTLET OF

SEWAGE VAULT

HIGH WATER

LEVEL

HIGH-HIGH WATER

LEVEL

HIGH-HIGH WATER

LEVEL, AUDIBLE

HIGH WATER

LEVEL, VISUAL

ALUMINUM FRAME AND COVER

LABELED W/"SEWER"

SET COVER 1" ABOVE FINISHED GRADE

ELEVATION TO BE SET BY CO

CONFINED SPACE SIGN SHALL BE PERMANENTLY INSTALLED ON LID NOTE 1

NOTE 1

12'-8"

6' -8

Ø2'-0"

4" PVC FROM

HOST SEWER HOOK-UP

Ø0'-1" B

M5.0

CLEANOUT BODY AND

PVC THREADED PLUG

BRASS SASH CHAIN W/

THREADED SHOULDER PATTERN

EYE-BOLT SECURED W/ WASHER IN CONCRETE

AND WASHER & S.S. NUTS IN PVC PLUG

EYE BOLT SHALL TURN FREELY IN PLUG

45°

2'-0" SQUARE

6" 6"

4" PVC

CONCRETE

BASE

2' -6

" M

IN

1'-3"

1% SLOPE MINIMUM TO

SEWAGE VAULT INLET

ELEV. TOP OF

SLAB TO BE

APPROVED BY C.O.

INV. EL. TO BE

APPROVED BY C.O.

SLOPE TO DRAIN

TOWARDS PIPE

2'-0"

6"

2'-0"

CONCRETE BASE

CLEANOUT BODY AND

BASE PLUG (THREADED)

SLOPE CONCRETE

TO DRAIN TOWARDS

INLET

RETRACTABLE

HANDLE

R1'-0

SEWER

DATENO. REVISION / ISSUE

UNITED STATES

DEPARTMENT OF AGRICULTURE

FOREST SERVICE

MECHANICAL DETAILS

NEW SEWAGE VAULT

R2

ROCKY MOUNTAIN REGION

PACTOLA

CAMPGROUND

LOOP B

RECONSTRUCTION

BLACK HILLS

NATIONAL FOREST

MYSTIC RANGER DISTRICT

JR

SR

05.28.2025

M5.0 38 52

550 East St. Louis Street Springfield, MO 65806 Olsson - Engineering South Dakota COA #C-159 olsson.com

TEL 417.890.8802

1343 SOUTH 75TH STREET

OMAHA NE 68124

744 Horizon Court, #135 Grand Junction, CO 81506 Citrine - Engineering South Dakota COA #FL269825 citrinellc.com

TEL 303.325.3460

2000 GALLON PRE CAST CONCRETE SEWAGE VAULT PLANA

M5.0 NO SCALE

2000 GALLON PRE CAST CONCRETE SEWAGE VAULT SECTIONB

M5.0 NO SCALE

HOST SEWER HOOK-UPC

M5.0 NO SCALE

SEWAGE VAULT COVER DETAILD

M5.0 NO SCALE

NOTES

1. INDICATORS SHALL BE IN FULL VIEW OF HOST SITE.

WITH BOTH VISUAL AND AUDIBLE ALARMS.

- FOR HIGH WATER LEVEL (VISUAL ALARM)

- FOR HIGH-HIGH WATER LEVEL (AUDIBLE ALARM).

- EXISTING MECH FLOAT ASSY SHALL BE ABANDONED

IN PLACE.

DATENO. REVISION / ISSUE

UNITED STATES

DEPARTMENT OF AGRICULTURE

FOREST SERVICE

MECHANICAL DETAILS

PUMPHOUSE WATER

METER AND

DISINFECTION PIPING

R2

ROCKY MOUNTAIN REGION

PACTOLA

CAMPGROUND

LOOP B

RECONSTRUCTION

BLACK HILLS

NATIONAL FOREST

MYSTIC RANGER DISTRICT

JR

SR

05.28.2025

M5.1 39 52

550 East St. Louis Street Springfield, MO 65806 Olsson - Engineering South Dakota COA #C-159 olsson.com

TEL 417.890.8802

1343 SOUTH 75TH STREET

OMAHA NE 68124

744 Horizon Court, #135 Grand Junction, CO 81506 Citrine - Engineering South Dakota COA #FL269825 citrinellc.com

TEL 303.325.3460

CHLORINE SOLUTION TANK WITH CHEMICAL METERING PUMP

1" WATER METER

1" SCH 80 PVC

1" HDPE TO STORAGE TANK

1" HDPE FROM WELL

1" PVC BALL VALVE

CHEMICAL INJECTOR FITTING TO BE INSTALLED IN VERTICAL POSITION INTO BOTTOM OF PIPE

PRESSURE GAGE

SMOOTH NOZZLE SAMPLE SPIGOT

AIR RELIEF VALVE

BRONZE CHECK VALVE

HDPE TO PVC COUPLER

PIPE SUPPORT

6" DIA. HOLE IN FLOOR SLAB, FILL ANNULAR SPACE WITH FOAM, TYP.

6" PIPE SLEEVE THROUGH CONCRETE SLAB (TYP.) FILL ANNULAR SPACE WITH FOAM

UNION, TYP.

6" DIA HOLE IN FLOOR SLAB FOR 1" HDPE PIPE AND 1" ELECTRICAL CONDUIT, FILL ANNULAR SPACE WITH FOAM, TYP.

KEYED NOTES: XX

SLOPE PIPES TO DRAIN IN DIRECTION OF ARROWS, TYP.

DIRECTION OF FLOW

KEY:

11 13

PLUMBING PLANA

M5.1 NO SCALE

PLUMBING ISOMETRICB

M5.1 NO SCALE

14 6 11 15 8 6

8'-0"1'-0"

1'-4"

PLUMBING DETAILC

M5.1 NO SCALE

PI

8 6

5" MIN. 10" MIN.

3'-6"

6" CUTOUT6" CUTOUT

CUTOUT ℄

C U

TO

U

T

C U

TO

U

T

8"

2'-4"

1'-2"1'-2"

FRONT 4x8 TREATED

LANDSCAPE TIMBER, S4S

3' -0

4x8 POST WITH 2"x2" NOTCH CUT FOR PIPE

1" DIA. HOLE FOR PIPE

FINISHED GRADE

6 CARRIAGE BOLTS

COUNTERSINK BOLT

2" DIA. HOLE FOR

HOSE BIB

TOP OF POST

AT BACK

2"

3' -2

FINISHED GRADE 1'

-1

1"

1' -3

BACK BOARD ABOVE

GROUND ONLY

2" DIA. ACCESS

FOR HOSE BIB

6 CARRIAGE BOLTS

1' -1

1"

1"

3"

HYDRANT NOTES:

THREE DIFFERENT TYPES OF HYDRANTS WILL BE USED.

H1 HAWS SELF CLOSING FAUCET ONLY.

H2 HAWS SELF CLOSING FAUCET AND THREADED HOSE.

BIB WITH TEE KEY INCLUDING VACUUM BREAKER.

H3 HOSE BIB WITH TEE KEY AND VACUUM BREAKER.

H2 HYDRANTS WILL BE PLACED AT ALL TOILET LOCATIONS,

H3 HYDRANTS WILL BE PLACED ONLY AT THE HOST SITE, AND

THE H1 HYDRANTS WILL BE USED AT ALL OTHER HYDRANT

LOCATIONS.

EXACT LOCATIONS OF HYDRANTS WILL BE STAKED IN THE

FIELD.

CAMPGROUND HYDRANT PLAN DETAILC

5.2

ROUTED PIPE CASED

5.2

CAMPGROUND HYDRANT SIDE VIEWE

5.2

REAR 4x8 TREATED

LANDSCAPE TIMBER, S4S

HOSE BIB

2' -6

"FAUCET

H1 HYDRANT DETAILG

5.2

FAUCET

NOTE: H1 HYDRANTS WILL

BE INSTALLED AT

ALL OTHER LOCATIONS

H2 HYDRANT DETAILH

5.2

FAUCET

THREADED HOSE BIB

NOTE: H2 HYDRANTS WILL

BE INSTALLED AT

TOILET LOCATIONS

H3 HYDRANT DETAILI

5.2

THREADED HOSE BIB

NOTE: THE H3 HYDRANT

WILL BE INSTALLED AT THE

HOST SITE ONLY

COUNTERSINK

GALV. NUT

AND WASHER

MIN. 1"

3/8" DIA.x 6 1/2"

HOT DIP GALV.

CARRIAGE BOLT

1"

POST BOLT DETAILF

5.2

SEE PLAN DETAIL

THIS SHEET

2.5 GPM FLOW CONTROL

HOSE BIB W/

TEE KEY

VACUUM BREAKER

W/ MANUAL DRAIN

TWO 4x8 TREATED LANDSCAPE TIMBER POSTS, S4S

1' -6

2' -4

" 3' -0

2.5" RADIUS

HAWS SELF-CLOSING FAUCET

W/FLOW RESTRICTOR

MODEL 6252 EHLF OR APPROVED EQUAL

6' -0

6'-0"

PAD SHALL SLOPE TO DRAIN TOWARDS

SIDE OF HYDRANT, MIN. 2% GRADE

4"UNION 4" MIN.

ABOVE GRADE

2%

5' +/-

1" PE, SLOPE TO DRAIN

45° ELBOW, TYP.

GSP/PE COMPRESSION

FITTING

1/2" GSP

CONCRETE PAD WITH #4

REBAR ON 12" O.C.

6" TYP BOTH

DIRECTIONS

18" TYP BOTH DIRECTIONS

3" TYP BOTH

DIRECTIONS

SECTION OF CAMPGROUND HYDRANTA

5.2

CONCRETE HYDRANT PADB

5.2

E 5.2

SURROUND GRAVEL SIDE

WITH LANDSCAPING

TIMBER

CURB STOP VALVE

5"

3'x3'x6" GRAVEL.

GRAVEL SPLASH AREA. NOT

REQUIRED IF HYDRANT POST IS

LOCATED IN ASPHALT OR

HYDRANT HAS NO HOSE BIBB.

3" TYP. 3"

ATTACH PIPE TO

POST WITH

PIPE STRAPS

3' -0

3' -0

3'-0"

5" CONCRETE SLAB, LIGHT

BROOM FINISH

#4 REBAR STEEL REINFORCEMENT,

CENTER IN SLAB, 18" O.C. EACH WAY

DATENO. REVISION / ISSUE

UNITED STATES

DEPARTMENT OF AGRICULTURE

FOREST SERVICE

MECHANICAL DETAILS

HYDRANT DETAILS

R2

ROCKY MOUNTAIN REGION

PACTOLA

CAMPGROUND

LOOP B

RECONSTRUCTION

BLACK HILLS

NATIONAL FOREST

MYSTIC RANGER DISTRICT

JR

SR

05.28.2025

M5.2 40 52

550 East St. Louis Street Springfield, MO 65806 Olsson - Engineering South Dakota COA #C-159 olsson.com

TEL 417.890.8802

1343 SOUTH 75TH STREET

OMAHA NE 68124

744 Horizon Court, #135 Grand Junction, CO 81506 Citrine - Engineering South Dakota COA #FL269825 citrinellc.com

TEL 303.325.3460

TYPE DESCRIPTION LOCATION QUANTITY

H2 HAWS SELF CLOSING FAUCET, THREADED HOSE

BIBB AND VACUUM BREAKER ALL TOILETS 3

H3 HOSE BIBB WITH TEE KEY AND VACUUM BREAKER HOST & VOLUNTEER SITES 4

2%2%

6"

TRANSITION FITTING,

HDPE TO GSP

CURB BOX

LID WITH BOLT

GSP

CURB STOP

5'-0" 5'-0"

GSP

STATIONARY ROD

TRANSITION FITTING,

HDPE TO GSP

24" DIA x6" THICK FORMED CONCRETE

PAD WITH SCRIBED DIRECTION IN

CONCRETE FOR OPEN/CLOSE, LIGHT

BROOM FINISH

VA

R

IE

S

D

D

1' -0

*** 2'-0" MIN. COVER OVER WATER LINE

2'-0" MIN. COVER OVER ELECTRICAL

UTILITY LINE DEPTHS

6" MIN. BEDDING WHEN

REQUIRED, SEE

SPECIFICATIONS

SELECT BACKFILL

DETECTABLE WARNING

TAPE, 12" ABOVE TOP

OF WATER LINE

BACKFILL

D + 2'-0"

MAX.

WIDEN TRENCH

AS NEEDED

ABOVE PIPE FOR

WORKER SAFETY

WATER LINE

TRACER WIRE INSTALLED ABOVE

WATER LINE, SEE TRENCH

SPECIFICATION

VA

R

IE

S

D 1'

-0

6" MIN. BEDDING WHEN

REQUIRED, SEE

SPECIFICATIONS

SELECT BACKFILL

DETECTABLE WARNING TAPE,

8" BELOW GRADE OVER ALL

UTILITY LINES

BACKFILL

D1 + D2 + D3 + 3'-0"

MAX.

WIDEN TRENCH

AS NEEDED

ABOVE PIPE FOR

WORKER SAFETY

WATER LINE

ELECTRICAL CONDUIT

6"

1'-0" 1'-0"

6"

8"

NOTE

THE LAST 10 FT. OF DRAIN

LINE SHALL BE GALVANIZED

STEEL PIPE

6" A

IR

G

AP

EXISTING GRADE

3 CY OF STONE

RIPRAP

EXCAVATE BELOW DRAIN OUTLET

TO PROVIDE 6" AIR GAP, GRADE

OUTLET TO DRAIN

ZINC PLATED SUCTION STRAINER W/

304 SS 24 MESH SCREEN COVER

AND SS HOSE CLAMP

TRANSITION FITTING,

HDPE TO GSP

1" HDPE GSP

GSP SLOPE TO

DRAIN 1% MIN.

0'-4 1/2" +/- 0'-1 1/2"

DATENO. REVISION / ISSUE

UNITED STATES

DEPARTMENT OF AGRICULTURE

FOREST SERVICE

MECHANICAL DETAILS

MISCELLANEOUS

UTILITY DETAILS

R2

ROCKY MOUNTAIN REGION

PACTOLA

CAMPGROUND

LOOP B

RECONSTRUCTION

BLACK HILLS

NATIONAL FOREST

MYSTIC RANGER DISTRICT

JR

SR

05.28.2025

M5.3 41 52

550 East St. Louis Street Springfield, MO 65806 Olsson - Engineering South Dakota COA #C-159 olsson.com

TEL 417.890.8802

1343 SOUTH 75TH STREET

OMAHA NE 68124

744 Horizon Court, #135 Grand Junction, CO 81506 Citrine - Engineering South Dakota COA #FL269825 citrinellc.com

TEL 303.325.3460

CURB STOP (VALVES 2" AND SMALLER)

NO SCALE

A TYPICAL SINGLE UTILITY TRENCH

M5.5 NO SCALE

B TYPICAL MULTIPLE UTILITY TRENCH

M5.5 NO SCALE

D M5.5

C DAYLIGHT DRAIN DETAIL

U3.1 NO SCALE

DUMPSTER

DUMPSTER

D U

M

PSTER

W

S

O W

S

O

W

S

O W S

O

8"

M

"16

6"

"16

6"

6"

6"

6"

8"

W

M

6" 9"

6"

9"

6" 6"

9"

6"

" 15

6"

9"

6"

6"

6"

9"

9"

6"

9"

9"

9"

9"

9"

" 12 "6"

9"

9"

" 12

9"

6"

9"

9"

9"

9"

9"

6"

6"

9"

9"

9"

9"

6"

9"

6"

6"

6"

6"

9"

9"

6"

6"

"9"

9"

9"

"12

6"

6"

9"

9"

"15

9"

6"

9"

9"

9"

6"

6"

9"

9"

9"

9"

6"

9"

9"

6"

" 18

9"

9"

9"

9"

" 18

9"

6"

"12

9"

6"

9"

9"

9"

9"

6"

9"

9"

9"

9"9"

9"

9" 9"

9"12

6"

9"

9" 18

9"

6"

9"

D

.4

F.

F.

E.

E E

SD

SD

SD

.5

F.

F.

E.

T

T

W

W

W

W

W

W

W

W

W

P-UGP-UGP-UG

P-UG

P-UG

P-UG

P-UG

P-UGP-UGP-UGP-UG

P- U

G

CP

-1

CP

-2

W

S

O W

S

O

W

S

O W S

O

8"

4"

"20

" 12

"16

" 14

8"

M

8"

" 12

6"

8"

8"

6"

8"

8"

6"

8"

" 8"

" 6"

6"

6" 6"

6"

6"

8"

8"

6"

.28 F.

F.E

W

M

9"

6"

9"

6"

6"

9"

6"

6"

9"

9"

9"

9"

9"

6" 9"

6"

6"

6"

9"

6"

6"

" 24

" 21

6"

6"

9"

9"

9"

6"

6"

9"

9"

9"

6"

6"

9"

6"

9"

9"

6"

9"

6"

9"

9"

6"

9"

9"

9"

9"

6"

6"

9"

9"

6"

6"

9"

9"

9"

9"

9"

6"

9"

6"

9"

9"

9"

9"

9"

9"

9"

6"

6"

9"

6"

"15

6"

9"

6"

6"

6"

9"

6"

6"

9" 9"

9"

9"

9"

6"

9"

6"

6"

9"

9"

9"

6"

6"

9"

9"

9"

9"

9"

9"

"15

9"

9"

9"

9"

9"

9"

9"

9"

6"

.2

F.

F.

E.

D

.4

F.

F.

E.

E E

SD

SD

W

W

W W

S

O W

S

O

W

S

O W S

O

M

W

M

D

E E

SD

SD

T

W

W

W

P-UG

P-UG

P-UG

P-UG

P-UG

P-UG

P-UG

P-UGP-UGP-UGP-UG

P-

U G

P-U G

P-UG

P-UG

P-

UG

P- U

G

P-

UG

P- U

G

P-

UG

P-UG

P-UG

T

" 15

H3 HYDRANT

N: 648625.37

E: 1134790.98

EL: 4644

H3 HYDRANT

N: 648680.59

E: 1134854.96

EL: 4642

DRAIN

N: 648647.35

E: 1134791.60

EL: 4642

DRAIN

N: 648680.40

E: 1134825.76

EL: 4640

N: 648610.89 E: 1134867.36

EL: 4645

N: 648688.19 E: 1134924.44

EL: 4644

#1 H

O

ST

/V O

LU

N

TE

ER

S

IT

E

#3

HO

ST

/V O

LU

NT

EE

R

SI

TE

W

W

W

W

W

W

W

W

W

WW

W

W

W

W

W

W

W

W W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

#25

#26

#27 #28

#24

#31 #30

#29

#32

#33

#23

#21

#22

#44

#20

#19

#18

#17

#16

#15

#14

#13

#12

#10

#9

#8

#7

#6

#5

#4

#3

#39

#41

#40

#42

#43

#35

#3

HO

ST

/V

OL

UN

TE

ER

S

IT

E

#3

HO

ST

/V

OL

UN

TE

ER

S

IT

E

#3

HO

ST

/V

OL

UN

TE

ER

S

IT

E

#2 H

O

ST

/V O

LU

N

TE

ER

S

IT

E

DATENO. REVISION / ISSUE

UNITED STATES

DEPARTMENT OF AGRICULTURE

FOREST SERVICE

MECHANICAL/PLUMBING

BID OPTION

SITE PLAN

R2

ROCKY MOUNTAIN REGION

PACTOLA

CAMPGROUND

LOOP B

RECONSTRUCTION

BLACK HILLS

NATIONAL FOREST

MYSTIC RANGER DISTRICT

JR

SR

05.28.2025

M6.0 42 52

550 East St. Louis Street Springfield, MO 65806 Olsson - Engineering South Dakota COA #C-159 olsson.com

TEL 417.890.8802

1343 SOUTH 75TH STREET

OMAHA NE 68124

744 Horizon Court, #135 Grand Junction, CO 81506 Citrine - Engineering South Dakota COA #FL269825 citrinellc.com

TEL 303.325.3460

SCALE IN FEET

40' 80'20'0'

GENERAL NOTES:

1. REF SPECIFICATION 331116 WATER DISTRIBUTION FOR PIPING SYSTEM CONSTRUCTION AND

MATERIALS.

A. HDPE PIPE AND FITTINGS U/G POTABLE WATER.

B. PVC PIPE AND FITTINGS PUMP HOUSE WATER AND DISINFECTION FEED SYSTEM

C. GALVANIZED CARBON STEEL - HYDRANT A/G PIPING.

2. REF SPECIFICATION 331219 WATER HYDRANTS.

3. REF SPECIFICATION 223000 PLUMBING EQUIPMENT.

4. REF SPECIFICATION 332600 DISINFECTION FEED SYSTEM.

5. WATER LINE LOCATIONS TO BE STAKED IN FIELD BY THE CONTRACTOR AND APPROVED BY

CONTRACTING OFFICER.

6. COORDINATE WITH CONTRACTING OFFICER FOR MINOR SHIFTS IN WATER LINE ROUTING TO AVOID

MAJOR VEGETATION OR EXISTING SITE CONDITIONS.

7. ALL DRAIN TO DAYLIGHT LATERALS TO BE STAKED IN FIELD BY CONTRACTOR AND APPROVED BY

CONTRACTING OFFICER.

8. WATER/SEWER - 10 FT SEPARATION REQUIRED BETWEEN WATER AND SEWER LINES AND

HOOK-UPS.

OPTION 1

PACTOLA MECHANICAL BID OPTIONS

OPTION # DESCRIPTION

1 ADDITIONAL HOST/VOLUNTEER

SITE IMPROVEMENTS

OPTIONS LISTED ABOVE SHALL BE COORDINATED WITH ALL OTHER DISCIPLINE

SHEETS. REFERENCE DWG. C7.0, S6.0, AND E7.0.

R

B

B

R

Part 8_PACTOLA CAMPGROUND_A & S.pdf
Sheets and Views
S0.1-S0.1
S1.1-S1.1
S1.1-S6.0
S2.0-S2.0
Part 9_PACTOLA CAMPGROUND_MD & M1.pdf
Part 10_PACTOLA CAMPGROUND_M5.pdf
Part 11_PACTOLA CAMPGROUND_M6.pdf

File details come from the government source that posted it. Updated .