Final_SUMMARY OF CHANGES_A0002_Pactola Loop B Reconstruction Project.pdf

PDF 211 KB Posted

Attached to
Pactola Loop B Campground Reconstruction Project
Solicitation number
1240LT26Q0010
Issued by

About this file

This is a Questions and Answers amendment (Amendment One/A0002) to a federal construction solicitation for the Pactola Loop B Reconstruction Project located in Black Hills National Forest, Pennington County, South Dakota. The solicitation number is 1240LT26Q0010, issued by the USDA Forest Service on February 3, 2026. Quotes are due March 10, 2026, at 9:00 a.m. Central Time (10:00 a.m. Mountain Time), submitted via email to Lucas Dahlman (Contracting Officer) and Janice King (Contract Specialist) with the subject line "Pactola Loop B Quote – 1240LT26Q0010." This is a Combined Synopsis procurement, and the SF1442 Form is no longer required.

The amendment addresses 17 contractor questions spanning technical, logistical, and contractual matters. Key clarifications include: CAD design files in DWG format will be provided to the successful bidder upon request and are proprietary; four 2000-gallon precast concrete sewer vaults will be installed at sites 80, 82, 83, and 84 (with two additional vaults at sites 56 and 57 if Option Bid Item #1 is exercised); South Dakota imposes a 2% excise tax on construction project gross receipts with no countywide sales tax in Pennington County; no geotechnical investigation was completed and groundwater is not anticipated within typical excavation depths; rock excavation is not anticipated with only shallow excavations required; design quantity variations less than 15% will not receive adjustment; Red Flag warnings will not result in work stoppages or compensation; Black Hills Energy serves electrical utilities at the site; and waterline burial depth requirements are specified in Specification Section 331116, Part 3, 3.1.J. The government indicated it may not respond to questions received after this amendment due to time constraints.

View the file

Other files

File Type Posted
Final Summary of Changes _A0004_Pactola Loop B.pdf PDF
Attach 4. Updated Pactola Loop B Specifications_02March2026.pdf PDF
Final_SUMMARY OF CHANGES_A0003_Pactola Loop B Reconstruction Project.pdf PDF
Attach 4. Updated Pactola Loop B Specifications_ 23Feb2026.pdf PDF
Attach 16. Well Log _1977 Pactola CG.pdf PDF
A0001_SUMMARY OF CHANGES_Pactola Loop B Reconstruction Project.pdf PDF
Attach 4. Pactola Loop B Specifications 16Jan2025.pdf PDF
Attach 6. Plans Section C1_C5 Site Plans 2Feb2026.pdf PDF
Attach 8. Plans Section C8_0 Sign Layout 2Feb2026.pdf PDF
Attach 10. Plans Section C8_2 Sign Details 2Feb2026.pdf PDF
Attach 14. Site Map Pactola Loop B.pdf PDF
Attach 15. Wage Determination SD20260001_01.30.2026.pdf PDF
Attach 5. Plans Section G Title Sheet 2Feb2026.pdf PDF
Attach 12. Plans Section E Electrical 2Feb2026.pdf PDF
Attach 1. Solicitation_Terms and Agreement_Pactola Loop B_01.30.2026.pdf PDF
Attach 3. Schedule of Items_Pactola Loop B 16Jan2026.xlsx XLSX spreadsheet
Attach 13. Combined Plans_Drawings _Reduced 2Feb2026.pdf PDF
Attach 2. Statement of Work PACTOLA LOOP B_ 8Dec25.pdf PDF
Attach 7. Plans Section C6_C7 Details 2Feb2026.pdf PDF
Attach 9. Plans Section C8_1 Sign Layout 2Feb2026.pdf PDF
Attach 11. Plans Section A_S_M Structures Mechanical 2Feb2026.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUMMARY OF CHANGES

AMEMDMENT ONE (A0002)

PROJECT: PACTOLA LOOP B RECONSTRUCTION PROJECT

BLACK HILLS NATIONAL FOREST – PENNINGTON COUNTY, SOUTH DAKOTA

The purpose of Amendment Two (A0002) is as follows:

1) To provide answers to additional contractor's questions.

2) All other terms and conditions remain the same.

SOLICITATION #: 1240LT26Q0010

The due date for quotes remains as March 10, 2026, at 9:00 a.m. Central Time (10:00 a.m.

Mountain Time).

All responses shall be sent via email to the following:

Lucas Dahlman, Contracting Officer, at lucas.dahlman@usda.gov and Janice King, Contract Specialist, at janice.king@usda.gov. In the subject line of the email of your quote, include the following: Pactola Loop B Quote – 1240LT26Q0010.

Due to time constraints and passage of the expiration due date for questions, the

Government may not respond to questions received after the issuance of this amendment.

Questions:

(The Government’s answers are in red font following each question.)

1) Would the government be able to provide the CAD electronic design files in .DWG format?

The successful bidder upon request will be provided with the CAD electronic files in

DWG format. Files shared are all proprietary and shall not be used outside of this contract.

2) When will the solicitation come out for this project?

The Solicitation was issued for this project on February 3, 2026, on the www.Sam.gov website. You may search the website for the solicitation by the project’s name, Pactola

Loop B Reconstruction Project, or by the Solicitation Number, 1240LT26Q0010. This is a Combined Synopsis and the SF1442 Form is no longer required. Refer to Attachment

1, the Solicitation, for the submission requirements. In addition, please read all of the supporting attachments.

mailto:lucas.dahlman@usda.gov mailto:janice.king@usda.gov http://www.sam.gov/

3) Question/clarification regarding Attach 13. Combined Plans_Drawings _Reduced

2Feb2026 file. The majority of the drawings are 42 x 30, excluding 2, C1.1 & C7.0, they are 17 x 11. Are these correct?

Plan Drawing sheets C1.1 and C7.0 have been edited since the time of A/E plan acceptance. The information on plan drawing sheets C1.1 and C7.0 is accurate. One set of 42 x 30 plan drawings will be provided to the successful bidder.

4) Please confirm the presence of only 4 - 2000-gallon precast tanks planned for installation in host sites 34, 36, 37 and 38 following details A, B, C and D on Sheet M5.0.

4 – 2000 gallon precast concrete sewer vaults as detailed on plan drawings sheet M5.0 are to be installed at the following sites as referenced on plan drawings sheet C8.0.

Site 80 Volunteer Site

Site 82 Volunteer Site

Site 83 Volunteer Site

Site 84 Host Site

Note: Option Bid Item #1, if exercised, includes 2 – 2000 gallon precast concrete sewer vaults as detailed on plan drawings sheet M5.0 to be installed at the following sites as referenced on plan drawings sheet C8.0.

Site 56 Host Site

Site 57 Host Site

5) Please clarify the sales and excise taxes for this project (applicable percentages / applied to what amounts etc).

South Dakota excise tax imposed on the gross receipts for construction projects is at a rate of 2% and Pennington County does not levy a countywide sales tax. Please refer to the South Dakota Department of Revenue for more details.

6) Does Construction Industry have all the latest information and documents for this project?

The latest, most accurate information is contained within the solicitation.

7) I asked earlier about the electronic design files and Amendment 1 said they will be provided for construction. I wasn’t clear that I was looking for them now for bid preparation. Is that possible?

The www.Sam.gov website does not support the upload of DWG type files (i.e.

AutoCAD file types). Should contractors want these files, they must send an email to

Janice King at janice.king@usda.gov. Requests should be made prior to the quote due date.

http://www.sam.gov/ mailto:janice.king@usda.gov

8) Geotechnical Report / Groundwater Conditions - Please provide the geotechnical report, if available, including subsurface exploration data, groundwater elevations, and pavement design criteria. The specifications reference dewatering procedures; however, no groundwater information or anticipated subsurface conditions were identified in the bid documents. In the absence of a geotechnical report or defined groundwater elevations, contractor will have to assume groundwater is not anticipated within typical excavation depths. Confirmation is requested.

A geotechnical investigation was not completed. Groundwater is not anticipated with typical excavation depths.

9) Pavement Section – Bid Option Areas - Please confirm the required pavement structural section for all bid option areas, including: ◦ Aggregate base thickness ◦ Asphalt thickness ◦ Compaction requirements (percent of maximum density and test method) ◦

Required testing frequency.

Aggregate Base – See plan drawings sheet 12 of 52, C4.0

- See Specifications Section 321123, Part 3, 3.3

Asphalt – See Specifications Section 010250, Part 3, 3.3.B Option Item No. 2 – Asphalt

Surfacing. See Amended Specifications Section 321217, Part 3, 3.4

10) Existing Well Capacity and Condition - Please provide existing well logs, pump test data, historical production records, and confirmation that the existing well capacity is adequate to serve the expanded Loop B demand (36 sites). If capacity is found to be insufficient during construction, please confirm that corrective measures (including well upgrades or replacement) will be treated as a change to the contract. Contractor cannot assume performance of an existing system without documented verification.

See Attachment 16: Well Log. Improvements to Loop B will result in a maximum increase of 3 hydrants to the existing 15 hydrant system.

11) Water System Disinfection, Testing, and Sampling Requirements - Please confirm the specific disinfection standards (AWWA reference), sampling protocol, laboratory requirements, number of required passing samples, and testing agency requirements.

Additionally, please confirm responsibility for all testing, laboratory fees, and retesting costs should samples fail due to existing system conditions or source water quality.

See Amended Specifications Section 331116, Part 3, 3.16

12) Stump and Root Removal Requirements - Please clarify the required depth and extent of stump and root removal within the clearing and grubbing limits, including:

• Required removal depth below finished grade:

See Specifications Section 311100, Part 3, 3.2.A

• Required removal depth below aggregate, pavement, and structural areas:

See Specifications Section 311100, Part 3, 3.2.A

• Whether full root ball extraction is required:

Full root ball extraction is not required. See Specifications Section 311100, Part 3, 3.2.A

• Whether stump grinding is acceptable in non-structural areas:

Stump grinding is acceptable.

• Backfill material and compaction requirements following stump removal:

See Specifications Section 312250, Part 3, 3.15

13) Rock Excavation – Definition and Payment - Please provide the contractual definition of rock excavation, including criteria for classification (rippable vs. non-rippable, size threshold, blasting requirements, etc.). Please clarify the method of measurement and payment if rock is encountered during trenching, roadway widening, or site grading. In the absence of a defined pay item, contractors will have to assume rock excavation is not anticipated within typical excavation depths.

See Specifications Section 312250, Part 1, 1.2.D.

See Specifications Section 312317, Part 1, 1.6.E

Rock is not anticipated with this contract. Only shallow excavations are required.

14) Designed Quantity Variations (<15%) - Please confirm the procedure for adjustment if actual field quantities vary from Designed Quantities by less than 15 percent, including whether unit prices will apply to overruns or underruns.

See Specifications Section 010250, Part 2, 2.1.C.1

For increases or decreases in quantity less than 15 percent, no adjustment will be made.

Design quantities will be paid.

15) Electrical Utility Provider and Upgrade Costs - Please identify the serving electrical utility provider and confirm whether any service upgrades, transformer upgrades, meter modifications, or coordination costs are included in this contract or will be provided by the Owner.

Pactola Loop B Campground – Black Hills Energy, (888) 890-5554

See Amended Specification Section 262210, Part 1, 1.2.D.1

16) Red Flag Warning Work Restrictions - The specifications reference compliance with

Red Flag warnings. Please confirm whether work stoppages or operational limitations resulting from Red Flag warnings will qualify for time extensions and/or compensation if such restrictions materially impact critical path activities.

See Specifications Section 010150, Part 1, 1.12

Red Flag warnings will not result in work stoppages or operational limitations.

17) Waterline Burial Depth / Frost Protection - Please confirm the required burial depth for water distribution piping and hydrants based on frost depth at approximately 4,650 ft elevation.

See Specification Section 331116, Part 3, 3.1.J

File details come from the government source that posted it. Updated .