Attach 3. Schedule of Items_Pactola Loop B 16Jan2026.xlsx
XLSX spreadsheet 14 KB Posted
- Attached to
- Pactola Loop B Campground Reconstruction Project
- Solicitation number
- 1240LT26Q0010
- Issued by
-
Department of Agriculture Forest Service
About this file
This is a Schedule of Items document outlining the work breakdown structure and cost estimates for the Pactola Loop B Campground Reconstruction Project under USDA Forest Service Solicitation 1240LT26Q0010. The schedule specifies 18 base line items and 3 optional items with estimated quantities but placeholder unit costs of $0.00, indicating that pricing will be provided by contractors in their quotations. The base period of performance runs from April 1, 2026, through May 20, 2027.
The base items encompass comprehensive campground reconstruction work including general mobilization and site requirements, demolition of existing asphalt (10,375 square yards), buildings, water systems, and amenities, site preparation and utilities installation, construction of new infrastructure (pumphouse building, water system, electrical systems), development of 4 host/volunteer sites and their wastewater connections, construction of 1 new toilet building, parking and trailhead improvements (including a new 20-stall Osprey Trailhead parking area and overflow parking), installation of 2 gates, signage, and expansion of the campground with new road and 36 camping spurs total. The optional items include improvements to 2 additional host/volunteer sites, asphalt surfacing for 9,065 square yards, and access development to the overflow parking area. Contractors must submit questions by February 12, 2026, and quotations by March 10, 2026, both by 9:00 a.m. Central Time to the Contract Specialist and Contracting Officer.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| GAOA Pactola Campground Loop B Reconstruction |
| SCHEDULE OF ITEMS |
| Period of Performance Base Items: 04/01/2026 – 5/20/2027 | ||||||
| ITEM | ||||||
| NUMBER | DESCRIPTION | PAY UNIT | EST QTY | UNIT COST | TOTAL | |
| 0001 | General Requirements/Mobilization | LS | 1 | $0.00 | ||
| 0002 | Asphalt Removal | SY | 10375 | $0.00 | ||
| 0003 | General Demolition, Camp Sites, Furnishings and Amenities | LS | 1 | $0.00 | ||
| 0004 | Pumphouse Building Demolition | EACH | 1 | $0.00 | ||
| 0005 | Water System Demolition | LS | 1 | $0.00 | ||
| 0006 | Existing Campground Road Improvements | LS | 1 | $0.00 | ||
| 0007 | Site Work for Camp Sites | LS | 1 | $0.00 | ||
| 0008 | New Pumphouse Building | LS | 1 | $0.00 | ||
| 0009 | Water System | LS | 1 | $0.00 | ||
| 0010 | Host /Volunteer Site Construction | EACH | 4 | $0.00 | ||
| 0011 | Host/Volunteer Site Wastewater Connections and Tanks | LS | 1 | $0.00 | ||
| 0012 | Electrical | LS | 1 | $0.00 | ||
| 0013 | New Toilet Buildings | EACH | 1 | $0.00 | ||
| 0014 | Osprey Trailhead Parking | LS | 1 | $0.00 | ||
| 0015 | Overflow Parking | LS | 1 | $0.00 | ||
| 0016 | Gates | EACH | 2 | $0.00 | ||
| 0017 | Signage | LS | 1 | $0.00 | ||
| 0018 | Campground Expansion Road and Sites | LS | 1 | $0.00 | ||
| TOTAL BASE COST | $0.00 |
| Period of Performance Option Items: 04/01/2026 – 5/20/2027 | ||||||
| ITEM | ||||||
| NUMBER | DESCRIPTION | PAY UNIT | EST QTY | UNIT COST | TOTAL | |
| 0001 | Additional Host/Volunteer Sites Improvements | EACH | 2 | $0.00 | ||
| 0002 | Asphalt Surfacing | SY | 9065 | $0.00 | ||
| 0003 | Access to Overflow Parking Area | LS | 1 | $0.00 | ||
| TOTAL OPTION COST | $0.00 |
Name of Contractor: Base plus Optional Items Total $0.00
File details come from the government source that posted it. Updated .