Attach 13. Combined Plans_Drawings _Reduced 2Feb2026.pdf

PDF 50 MB Posted

Attached to
Pactola Loop B Campground Reconstruction Project
Solicitation number
1240LT26Q0010
Issued by

About this file

This file is a combined plans and drawings document for the Pactola Loop B Campground Reconstruction Project. The document provides technical specifications and visual representations of the proposed construction work for the U.S. Forest Service project, including detailed layouts and design standards for the campground improvements. The drawings illustrate the modifications to the Forest Service loop road (approximately 14 feet wide, to be widened to 16 feet for one-way traffic or 24 feet for two-way traffic), the construction of a new 20-space trailhead parking area for the Osprey Trail, and the reconfiguration of the existing 20 primitive camping spurs into 36 improved camping spurs as base items. The plans show the relocation of the Host Site from the center of the loop to the beginning of the loop, with the existing Host Site converted to a Volunteer Site featuring upgraded water and electric service. Additional technical details depicted in the drawings include the new precast concrete water treatment building to replace the existing pumphouse, decommissioning requirements, drainage and shaping modifications, and associated infrastructure improvements for water, wastewater, and electrical systems serving the campground.

The solicitation (1240LT26Q0010) issued by the Department of Agriculture Forest Service is requesting quotations with questions due by 9:00 a.m. Central Time on February 12, 2026, and quotes due by 9:00 a.m. Central Time on March 10, 2026. All submissions must be emailed to Contract Specialist Janice King (janice.king@usda.gov) and Contracting Officer Lucas Dahlman (lucas.dahlman@usda.gov). The project scope includes base items for the 36 camping spurs and optional items such as removal and replacement of the sewage vault with a new concrete structure.

View the file

Other files

File Type Posted
Final Summary of Changes _A0004_Pactola Loop B.pdf PDF
Attach 4. Updated Pactola Loop B Specifications_02March2026.pdf PDF
Final_SUMMARY OF CHANGES_A0003_Pactola Loop B Reconstruction Project.pdf PDF
Final_SUMMARY OF CHANGES_A0002_Pactola Loop B Reconstruction Project.pdf PDF
Attach 4. Updated Pactola Loop B Specifications_ 23Feb2026.pdf PDF
Attach 16. Well Log _1977 Pactola CG.pdf PDF
A0001_SUMMARY OF CHANGES_Pactola Loop B Reconstruction Project.pdf PDF
Attach 4. Pactola Loop B Specifications 16Jan2025.pdf PDF
Attach 6. Plans Section C1_C5 Site Plans 2Feb2026.pdf PDF
Attach 8. Plans Section C8_0 Sign Layout 2Feb2026.pdf PDF
Attach 10. Plans Section C8_2 Sign Details 2Feb2026.pdf PDF
Attach 14. Site Map Pactola Loop B.pdf PDF
Attach 15. Wage Determination SD20260001_01.30.2026.pdf PDF
Attach 1. Solicitation_Terms and Agreement_Pactola Loop B_01.30.2026.pdf PDF
Attach 3. Schedule of Items_Pactola Loop B 16Jan2026.xlsx XLSX spreadsheet
Attach 5. Plans Section G Title Sheet 2Feb2026.pdf PDF
Attach 12. Plans Section E Electrical 2Feb2026.pdf PDF
Attach 2. Statement of Work PACTOLA LOOP B_ 8Dec25.pdf PDF
Attach 7. Plans Section C6_C7 Details 2Feb2026.pdf PDF
Attach 9. Plans Section C8_1 Sign Layout 2Feb2026.pdf PDF
Attach 11. Plans Section A_S_M Structures Mechanical 2Feb2026.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .