Attach 16. Well Log _1977 Pactola CG.pdf

PDF 94 KB Posted

Attached to
Pactola Loop B Campground Reconstruction Project
Solicitation number
1240LT26Q0010
Issued by

About this file

This is a Notice of Well Construction document for a water well drilled on the south side of Pictola Lake in an unspecified county. The well owner is identified as the U.S. Forest Service, and the well was completed on July 7, 1977, for campground purposes. The well log indicates a total drill hole depth of 140 feet, with water-producing aquifers identified in the fractured rock layers. The well encounters topsoil from 0-6 feet, drift from 6-23 feet, schist and boulders from 23-29 feet, and shift broken rock from 29-49 feet. Additional layers of schist mixed with gravel, schist with small amounts of water, and schist with gravel and quartze continue through approximately 95 feet, with the remaining depth to 140 feet consisting of granite bedrock. The static water level is recorded at depths of 81, 92, 110, and 112 feet at various measurement points, with a total casing depth of 65 feet.

The pump installation section indicates a pump was installed at the well, though specific details regarding pump type, capacity, and installation date are not clearly legible in the document. A water surface measuring tube was required per Minnesota Well Construction Standards Section 46.408 of Chapter 46.4. The drilling contractor is identified as Aldine Drilling Company, though portions of the contractor information and pump installation details are difficult to read due to the document's condition. The well's flow rate upon completion is noted as 18 gallons per minute.

View the file

Other files

File Type Posted
Final Summary of Changes _A0004_Pactola Loop B.pdf PDF
Attach 4. Updated Pactola Loop B Specifications_02March2026.pdf PDF
Final_SUMMARY OF CHANGES_A0003_Pactola Loop B Reconstruction Project.pdf PDF
Final_SUMMARY OF CHANGES_A0002_Pactola Loop B Reconstruction Project.pdf PDF
Attach 4. Updated Pactola Loop B Specifications_ 23Feb2026.pdf PDF
A0001_SUMMARY OF CHANGES_Pactola Loop B Reconstruction Project.pdf PDF
Attach 4. Pactola Loop B Specifications 16Jan2025.pdf PDF
Attach 6. Plans Section C1_C5 Site Plans 2Feb2026.pdf PDF
Attach 8. Plans Section C8_0 Sign Layout 2Feb2026.pdf PDF
Attach 10. Plans Section C8_2 Sign Details 2Feb2026.pdf PDF
Attach 14. Site Map Pactola Loop B.pdf PDF
Attach 15. Wage Determination SD20260001_01.30.2026.pdf PDF
Attach 2. Statement of Work PACTOLA LOOP B_ 8Dec25.pdf PDF
Attach 7. Plans Section C6_C7 Details 2Feb2026.pdf PDF
Attach 9. Plans Section C8_1 Sign Layout 2Feb2026.pdf PDF
Attach 11. Plans Section A_S_M Structures Mechanical 2Feb2026.pdf PDF
Attach 5. Plans Section G Title Sheet 2Feb2026.pdf PDF
Attach 12. Plans Section E Electrical 2Feb2026.pdf PDF
Attach 1. Solicitation_Terms and Agreement_Pactola Loop B_01.30.2026.pdf PDF
Attach 3. Schedule of Items_Pactola Loop B 16Jan2026.xlsx XLSX spreadsheet
Attach 13. Combined Plans_Drawings _Reduced 2Feb2026.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .