Attach 8. Plans Section C8_0 Sign Layout 2Feb2026.pdf

PDF 25 MB Posted

Attached to
Pactola Loop B Campground Reconstruction Project
Solicitation number
1240LT26Q0010
Issued by

About this file

This file is a sign layout plan document for the Pactola Loop B Campground Reconstruction Project. The document titled "Attach 8. Plans Section C8_0 Sign Layout 2Feb2026.pdf" appears to be a technical drawing or planning attachment that specifies the location and layout of signage throughout the campground reconstruction area. The notation "Not Shown on Map 52 BASE" indicates this particular sign layout plan is not depicted on the base map referenced in the project documentation.

This attachment serves as a supplementary technical specification document for the RFQ solicitation 1240LT26Q0010, issued by the USDA Forest Service for the campground reconstruction project. Quotes are due by 9:00 a.m. Central Time on March 10, 2026, and should be submitted to Contract Specialist Janice King (janice.king@usda.gov) and Contracting Officer Lucas Dahlman (lucas.dahlman@usda.gov). Bidders are required to review all attachments including this sign layout plan to fully understand the project scope, which involves reconstructing Loop B with 36 total camping spurs, relocating the host site, constructing a new 20-stall trailhead parking area, and upgrading water and wastewater infrastructure.

View the file

Other files

File Type Posted
Final Summary of Changes _A0004_Pactola Loop B.pdf PDF
Attach 4. Updated Pactola Loop B Specifications_02March2026.pdf PDF
Final_SUMMARY OF CHANGES_A0003_Pactola Loop B Reconstruction Project.pdf PDF
Final_SUMMARY OF CHANGES_A0002_Pactola Loop B Reconstruction Project.pdf PDF
Attach 4. Updated Pactola Loop B Specifications_ 23Feb2026.pdf PDF
Attach 16. Well Log _1977 Pactola CG.pdf PDF
A0001_SUMMARY OF CHANGES_Pactola Loop B Reconstruction Project.pdf PDF
Attach 4. Pactola Loop B Specifications 16Jan2025.pdf PDF
Attach 6. Plans Section C1_C5 Site Plans 2Feb2026.pdf PDF
Attach 10. Plans Section C8_2 Sign Details 2Feb2026.pdf PDF
Attach 14. Site Map Pactola Loop B.pdf PDF
Attach 15. Wage Determination SD20260001_01.30.2026.pdf PDF
Attach 2. Statement of Work PACTOLA LOOP B_ 8Dec25.pdf PDF
Attach 7. Plans Section C6_C7 Details 2Feb2026.pdf PDF
Attach 9. Plans Section C8_1 Sign Layout 2Feb2026.pdf PDF
Attach 11. Plans Section A_S_M Structures Mechanical 2Feb2026.pdf PDF
Attach 5. Plans Section G Title Sheet 2Feb2026.pdf PDF
Attach 12. Plans Section E Electrical 2Feb2026.pdf PDF
Attach 1. Solicitation_Terms and Agreement_Pactola Loop B_01.30.2026.pdf PDF
Attach 3. Schedule of Items_Pactola Loop B 16Jan2026.xlsx XLSX spreadsheet
Attach 13. Combined Plans_Drawings _Reduced 2Feb2026.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Not Shown on Map

BASE

File details come from the government source that posted it. Updated .