OR FS ERFO 2020(1)-14(1), Walla Walla South – Umatilla Repairs 2020, Phase 1 and WA ERFO FS UMATL614 2020-1(1), Walla Walla North – Umatilla Repairs 2020, Phase 1
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- 69056724B000006
- Agency
-
Federal Highway Administration
Department of Transportation
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- Oregon, United States
- Points of contact
-
- Contracts G. Office wfl.contracts@dot.gov (360) 619-7520
Notice details come from SAM.gov. Updated .
About this opportunity
The Federal Highway Administration (FHWA) is seeking a contractor to perform comprehensive road and bridge repair work in the Umatilla National Forest, spanning both Oregon and Washington, under two related Emergency Relief for Federally Owned (ERFO) projects designated as OR FS ERFO 2020(1)-14(1) and WA ERFO FS UMATL614 2020-1(1). The solicitation, numbered 69056724B000006, requires extensive repairs to Forest Service Roads damaged by flooding in 2020, including roadway reconstruction, erosion control, culvert replacement, and stream bank stabilization. Key contract requirements include installing new aquatic organism passage structures, road surface reconditioning, aggregate surfacing, and implementing comprehensive erosion and sediment control measures. The evaluation will be based on bid pricing, with bids ranging from $4,069,990 to $14,877,505, and the Engineer's Estimate set at $7,496,000. Potential bidders had multiple opportunities to ask questions, with the final Q&A document dated January 10, 2025, and the bid opening extended to January 14, 2025.
The contract is designated as a total small business set-aside, targeting contractors in the Highway, Street, and Bridge Construction NAICS category (237310). Seven contractors submitted bids, with Nelson Construction submitting the lowest bid at $4,069,990. The project involves multiple repair sites across Umatilla, Union, and Columbia counties in Oregon and Washington, focusing on Forest Service Roads 3200, 3738, 4712, and 4713. Work will include detailed tasks such as mobilization, construction surveys, quality control, culvert installations (24-inch to 144-inch pipes), roadway excavation, aggregate surface reconditioning, timber pile installation, and various mitigation measures including log barriers, root wads, and bank stabilization. The place of performance is primarily within the Umatilla National Forest, with work expected to be completed in summer 2025. Specific project elements include repairing multiple bridge structures, replacing failed culverts, and reconstructing approximately 13 different road alignments across the region.
Notice text
6 versions
Update #6 · Latest ·
Project: OR FS ERFO 2020(1)-14(1), Walla Walla South - Umatilla Repairs 2020, Phase 1 & WA ERFO FS UMATL614 2020-1(1), Walla Walla North – Umatilla Repairs 2020, Phase 1
See attachments for full requirements
QA_12-23-2024 uploaded 12/23/2024
QA_12-30-2024 and Amendment A001 uploaded on 12/30/2024
QA_01-10-2025 Uploaded 01/10/2025
Bid Summary Uploaded 01/14/2025
Bid Tabulation Uploaded 01/15/2025
Update #5 ·
Project: OR FS ERFO 2020(1)-14(1), Walla Walla South - Umatilla Repairs 2020, Phase 1 & WA ERFO FS UMATL614 2020-1(1), Walla Walla North – Umatilla Repairs 2020, Phase 1
See attachments for full requirements
QA_12-23-2024 uploaded 12/23/2024
QA_12-30-2024 and Amendment A001 uploaded on 12/30/2024
QA_01-10-2025 Uploaded 01/10/2025
Bid Summary Uploaded 01/14/2025
Update #4 ·
Project: OR FS ERFO 2020(1)-14(1), Walla Walla South - Umatilla Repairs 2020, Phase 1 & WA ERFO FS UMATL614 2020-1(1), Walla Walla North – Umatilla Repairs 2020, Phase 1
See attachments for full requirements
QA_12-23-2024 uploaded 12/23/2024
QA_12-30-2024 and Amendment A001 uploaded on 12/30/2024
QA_01-10-2025 Uploaded 01/10/2025
Update #3 ·
Project: OR FS ERFO 2020(1)-14(1), Walla Walla South - Umatilla Repairs 2020, Phase 1 & WA ERFO FS UMATL614 2020-1(1), Walla Walla North – Umatilla Repairs 2020, Phase 1
See attachments for full requirements
QA_12-23-2024 uploaded 12/23/2024
QA_12-30-2024 and Amendment A001 uploaded on 12/30/2024
Update #2 ·
Project: OR FS ERFO 2020(1)-14(1), Walla Walla South - Umatilla Repairs 2020, Phase 1 & WA ERFO FS UMATL614 2020-1(1), Walla Walla North – Umatilla Repairs 2020, Phase 1
See attachments for full requirements
QA_12-23-2024 uploaded 12/23/2024
Update #1 ·
Project: OR FS ERFO 2020(1)-14(1), Walla Walla South - Umatilla Repairs 2020, Phase 1 & WA ERFO FS UMATL614 2020-1(1), Walla Walla North – Umatilla Repairs 2020, Phase 1
See attachments for full requirements
Files
Show all 27
Notice history
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| WA ERFO NPS OLYM 2022-1(3), OLYMPIC NPS ERFO REPAIRS 2022 Road 107 MP 0.3 TO 0.5 & MP 0.8 | Federal Highway Administration | No set-aside | |
| UT NP ARCH 100(2) Bridges on Delicate Arch Road | Federal Highway Administration | No set-aside | |
| Acadia National Park | Federal Highway Administration | Total Small Business | |
| Pomeroy Ranger District NZ Blowdown Cleanup | Forest Service | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity