OR FS ERFO 2020(1)-14(1), Walla Walla South – Umatilla Repairs 2020, Phase 1 and WA ERFO FS UMATL614 2020-1(1), Walla Walla North – Umatilla Repairs 2020, Phase 1
Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- 69056724B000006
- Agency
-
Federal Highway Administration
Department of Transportation
- Responses due
- Not on record
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- Oregon, United States
- Points of contact
-
- Contracts G. Office wfl.contracts@dot.gov (360) 619-7520
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of Transportation Federal Highway Administration is issuing a pre-solicitation notice for two repair projects located in the Umatilla National Forest in Oregon and Washington. The projects, OR FS ERFO 2020(1)-14(1), Walla Walla South - Umatilla Repairs 2020, Phase 1 and WA ERFO FS UMATL614 2020-1(1), Walla Walla North - Umatilla Repairs 2020, Phase 1, involve excavation, borrow, grading, aggregate surfacing, drainage, riprap, rock embankment, stream bank stabilization, and subexcavation work. Technical questions must be submitted by email, and the solicitation documents will be available during the winter of 2023-2024 on www.sam.gov.
This opportunity is set aside for small businesses and has an estimated price range of $2 million to $5 million. The project length is 0.67 miles, with a tentative completion date of Summer 2026. Prospective bidders are encouraged to view the project sites in fall 2019 due to anticipated snow conditions limiting access after December 1st.
Notice text
3 versions
Update #3 · Latest ·
Project: OR FS ERFO 2020(1)-14(1), Walla Walla South – Umatilla Repairs 2020, Phase 1 and WA ERFO FS UMATL614 2020-1(1), Walla Walla North – Umatilla Repairs 2020, Phase 1
This work consists of: excavation, borrow, grading, aggregate surfacing, drainage, riprap, rock embankment, stream bank stabilization, subexcavation.
Project Location: 28 Miles East of Pendleton, Oregon.
Project Length: 0.67 Miles
Estimated Price Range: Between $5 and $10 Million
Tentative Fixed Completion Date: Spring/Summer 2027
(Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)
See attachments for full requirements
Update 12/4/2023: QA_12-04-23.pdf posted to attachments.
Update 09/19/2024: 2024 Prelim letter and Project Description Posted.
Update #2 ·
Project: OR FS ERFO 2020(1)-14(1), Walla Walla South – Umatilla Repairs 2020, Phase 1 and WA ERFO FS UMATL614 2020-1(1), Walla Walla North – Umatilla Repairs 2020, Phase 1
This work consists of excavation, borrow, grading, aggregate surfacing, drainage, riprap, rock embankment, stream bank stabilization, subexcavation.
Project Location: 28 Miles E of Pendleton, OR.
Project Length: 0.67 MIles
Tenative Completion Date: Summer 2026
Estimated Price Range: $2 Million - $5 Million
See attachments for full requirements
Update 12/4/2023: QA_12-04-23.pdf posted to attachments.
Update #1 ·
Project: OR FS ERFO 2020(1)-14(1), Walla Walla South – Umatilla Repairs 2020, Phase 1 and WA ERFO FS UMATL614 2020-1(1), Walla Walla North – Umatilla Repairs 2020, Phase 1
This work consists of excavation, borrow, grading, aggregate surfacing, drainage, riprap, rock embankment, stream bank stabilization, subexcavation.
Project Location: 28 Miles E of Pendleton, OR.
Project Length: 0.67 MIles
Tenative Completion Date: Summer 2026
Estimated Price Range: $2 Million - $5 Million
See attachments for full requirements
Files
Notice history
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| WA ERFO NPS OLYM 2022-1(3), OLYMPIC NPS ERFO REPAIRS 2022 Road 107 MP 0.3 TO 0.5 & MP 0.8 | Federal Highway Administration | No set-aside | |
| NJ-NY ERFO FW WARI 2019-1(1) - Wallkill River National Wildlife Refuge | Federal Highway Administration | Total Small Business | |
| Pomeroy Ranger District NZ Blowdown Cleanup | Forest Service | Total Small Business | |
| Acadia National Park | Federal Highway Administration | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity