or-ef2020-1-14-1_plans pdf.pdf
PDF 30 MB Posted
- Solicitation number
- 69056724B000006
About this file
This appears to be a construction plans document (PDF) associated with two related Emergency Relief for Federally Owned (ERFO) road repair projects managed by the Federal Highway Administration. The projects involve repairs to the Walla Walla-Umatilla area, split into North (Washington state) and South (Oregon) phases, identified as OR FS ERFO 2020(1)-14(1) and WA ERFO FS UMATL614 2020-1(1) respectively. Without access to the actual contents of the PDF file, I cannot provide specific details about the construction plans, engineering specifications, or technical requirements contained within the document.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
KIRK R LOFTSGAARDEN
Digitally signed by KIRK R LOFTSGAARDEN Date: 2024.09.25 13:59:50 -07'00'
Sheet and Description
SECTION DSECTION ESECTION FSECTION H-
PLAN & PROFILEEROSION
CONTROLDRAINAGE
TEMPORARY
TRAFFIC
CONTROL
ALLOWANCEBid Schedule
A002015101-0000MOBILIZATIONLPSMAllALL
A004015201-0000CONSTRUCTION SURVEY AND STAKINGLPSMAllALL
A006015301-0010CONTRACTOR QUALITY CONTROL AND ASSURANCELPSMAllALL
A008015401-0000CONTRACTOR TESTINGLPSMAllALL
A010015501-0000CONSTRUCTION SCHEDULELPSMAllALL
A012015702-6000SOIL EROSION CONTROL, TEMPORARY STREAM DIVERSIONLPSMAllALL
A014015705-0100SOIL EROSION CONTROL, SILT FENCELNFT11,59555512,150
A016015705-1400SOIL EROSION CONTROL, FIBER ROLLLNFT39624420
A018015802-0000WATERING FOR DUST CONTROLLPSMAllALL
A020020101-0000CLEARING AND GRUBBINGACRE1.50.11.6
A022020301-1900REMOVAL OF PIPE CULVERTEACH33
A024020401-0000ROADWAY EXCAVATIONCUYD87684960
A026020402-0000SUBEXCAVATION (FS 3738 MP 8.35)CUYD20416220
A028020403-0000UNCLASSIFIED BORROWCUYD8,5858159,400
A030025101-0400PLACED RIPRAP, METHOD A, CLASS 4CUYD15010160
A032025101-2500PLACED RIPRAP, METHOD B, CLASS 5CUYD2,9112893,200
A034025101-2600PLACED RIPRAP, METHOD B, CLASS 6CUYD7,0216797,700
A036025201-1000SPECIAL ROCK EMBANKMENT, MECHANICALLY-PLACEDCUYD1,8222782,100
A038030201-1000ROADWAY AGGREGATE, METHOD 1CUYD40931440
A040030302-1000DITCH RECONDITIONINGLNFT3,7603404,100
A042030302-5000AGGREGATE SURFACE RECONDITIONINGLNFT3,6103904,000
A044055102-2400UNTREATED TIMBER PILE, IN PLACEEACH1528160
A046060201-080024-INCH PIPE CULVERTLNFT25530
A048060201-100036-INCH PIPE CULVERTLNFT30232
A050060201-2500144-INCH PIPE CULVERTLNFT66470
A052062201-0150DUMP TRUCK, 7 CUBIC YARD MINIMUM CAPACITYHOUR170170
A054062201-0900WHEEL LOADER, 2 CUBIC YARD MINIMUM RATED CAPACITYHOUR170170
A056062201-3350HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITYHOUR170170
A058062301-0000GENERAL LABORHOUR170170
A060062501-0000TURF ESTABLISHMENT, HYDRAULIC METHODACRE1.30.21.5
A062062632-0000PLANTINGSLPSMAllALL
A064063501-0000TEMPORARY TRAFFIC CONTROLLPSMAllALL
A066064703-4000MITIGATION, LOG BARRIEREACH9010100
A068064703-5000MITIGATION, ROOT WADEACH18317200
A070064703-6000MITIGATION, FISH PASSAGE BOULDEREACH14115
A072064703-8000MITIGATION, BANK STABILIZATION (BOULDER CLUSTER)EACH52860
A074064704-1000MITIGATION, STREAMBED MATERIALCUYD1519160
MileStone: 100% Date Completed: In Progress Report Date: 08/20/24
A M E N D
Line Item No.
Pay Item Number
SUMMARY OF QUANTITIES
17-S ep-2024 9:58 AM
Remarks and/or Determination of Estimated Quantity Pay Item DescriptionUnit
Estimated Quantities c:\pw -w ork\d0502694\[or-ef2020-1-14-1_soq.xlsm ]S heet
PROJECT
B.1 OR FS ERFO 2020(1)-14(1)
WA ERFO FS UMATL614 2020-1(1)
SHEET
NUMBER
POINT
NUMBERNORTHEASTELEVATIONDESCRIPTIONPOINT
NUMBERNORTHEASTELEVATIONDESCRIPTION
MP 1.26-1.69MP 4.87
21101757552.1768792914.2382463.7925/8" ir w/fhwa alum cap21601742221.8368790919.2442756.5205/8" ir w/fhwa alum cap
21102757436.3068792586.7502467.4205/8" ir w/fhwa alum cap21602742070.4218790935.1592757.6375/8" ir w/fhwa alum cap
21103757232.8978792470.8402471.0295/8" ir w/fhwa alum cap21603741865.8248790980.3832765.5805/8" ir w/fhwa alum cap
21108755861.4638792142.8332493.6245/8" ir w/fhwa alum capMP 5.5
21109755724.4348792136.3562494.2275/8" ir w/fhwa alum cap21697740641.2488793756.8552893.2135/8" ir w/fhwa alum cap
21112755317.6708791689.5562498.6785/8" ir w/fhwa alum cap21698740513.2918793884.8152888.4245/8" ir w/fhwa alum cap
21113755046.3248791582.4742508.0035/8" ir w/fhwa alum cap21699740388.0868794051.0162888.1445/8" ir w/fhwa alum cap
FORKS1757554.7888792764.6002462.1493" alum cap21700740238.4328794201.8642894.7205/8" ir w/fhwa alum cap
MP 1.96-2.14MP 6.87
21201754717.0738790563.6472469.7815/8" ir w/fhwa alum cap21701739475.2628795565.3272925.0195/8" ir w/fhwa alum cap
21202754499.5608790452.8192477.1475/8" ir w/fhwa alum cap21702739337.7708795644.7172931.2905/8" ir w/fhwa alum cap
21206754113.4108789455.7582501.7995/8" ir w/fhwa alum cap21703739169.1448795745.1282937.4415/8" ir w/fhwa alum cap
21207753866.7538789348.8992496.7795/8" ir w/fhwa alum cap21704738966.7488795837.2652949.8245/8" ir w/fhwa alum cap
MP 2.54
21301752853.4178788685.2632550.9115/8" ir w/fhwa alum cap
21302752687.4038788729.7472552.1455/8" ir w/fhwa alum cap
21303752452.1248788838.5912560.2115/8" ir w/fhwa alum cap
21304752069.0908789030.8362588.5705/8" ir w/fhwa alum cap
21305751875.7608788903.3782603.3475/8" ir w/fhwa alum cap
MP 3.08-3.23
21401750099.5028788333.8302379.8765/8" ir w/fhwa alum cap
21402749898.3778788283.6552382.0775/8" ir w/fhwa alum cap
21403749615.8348788184.5322385.8365/8" ir w/fhwa alum cap
21404749411.3088788201.7222392.0195/8" ir w/fhwa alum cap
21405749022.0688788293.4012397.3265/8" ir w/fhwa alum cap
21406748703.2548788212.1562400.2525/8" ir w/fhwa alum cap
21407748469.6988788119.1022401.0545/8" ir w/fhwa alum cap
MP 3.53
21501747952.0938788339.1752622.2375/8" ir w/fhwa alum cap
21502747792.2898788336.3872621.9885/8" ir w/fhwa alum cap
21503747501.0028788189.0892624.1375/8" ir w/fhwa alum cap
21504747304.8598788215.2122627.4175/8" ir w/fhwa alum cap
14-A ug-2024 11:47 A
M C :\U sers\sarah.w ilson\D esktop\[O R
_FS
_ER
FO
_2020(1)-14(1)_controlsheet.xlsx]S heet
PROJECT COORDINATES
COORDINATE SYSTEM :Assumed (coordinates based of rec grade GPS scaled to OR N SPCS) VERTICAL DATUM : Assumed (based off recreation grade GPS)
PROJECT : Walla Walla South-Umatilla Repairs 2020, Phase 1 Walla Walla North-Umatilla Repairs 2020, Phase 1 DATE OF FIELD WORK : September/October 2021
PROJECT UNITS : International foot
PROJECT COORDINATES
PROJECT
D.1 OR FS ERFO 2020(1)-14(1)
WA ERFO FS UMATL614 2020-1(1)
SHEET
NUMBER
SURVEY CONTROL
10.4 x 16 20301 -1900
25101 -0400
25101 -2500
25101 -2600
55102 -2400
60201 -0800
60201 -1000
60201 -2500
62635 -2000
64703 -4000
64703 -5000
64703 -6000
64703 -8000
64704 -1000
Station
ES
TIM
A
TED
M A X
IM
U M
C O
V
ER
S
TR
U C
TU
R A
L EX
C A V A
TIO
N
R
EM
O V A L O
F PIPE C
U
LV
ER
T
PLA
C
ED
R
IPR
A P, M
ETH
O
D A
C
LA
S S
PLA
C
ED
R
IPR
A P, M
ETH
O
D B
C
LA
S S
PLA
C
ED
R
IPR
A P, M
ETH
O
D B
C
LA
S S
U N
TR
EA
TED
TIM
B
ER
PILE, IN
PLA
C E
24-IN
C H
PIPE C
U
LV
ER
T
36-IN
C H
PIPE C
U
LV
ER
T
144-IN
C
H
PIPE C
U
LV
ER
T
PLA
N
TIN
G
S
M
ITIG
A
TIO
N
, LO
G B
A R R
IER
M
ITIG
A
TIO
N , R
O O
T W A D
M
ITIG
A
TIO
N
, FIS
H
PA
S S A G
E B O
U
LD
ER
M
ITIG
A
TIO
N , B
A N
K
S
TA
B
ILIZ
A
TIO
N , B
O U
LD
ER
C
LU
S
TER
M
ITIG
A
TIO
N , S
TR
EA
M B
ED
M
A
TER
IA
L
S K
EW
A N
G
LE
A llow able Pipe M aterial
(S ee key below
B
EV
ELS
1V
:nH
B
EV
ELS
1V
:nH
REMARKS
See below for numbered notes
FEETCUYDEACHCUYDCUYDCUYDEACHLNFTLNFTLNFTEACHEACHEACHEACHEACHCUYDLtRt
200+00819102165910FS 3200-MP 1.30-1.36
201+08381253GSFS 3200-MP 1.30-1.36
300+0012881035871313FS 3200-MP 1.38-1.44
400+006261044010193FS 3200-MP 1.52-1.69
450+00578394224251124FS 3200-MP 1.52-1.69
500+00599311224091124FS 3200-MP 1.96-2.00
600+001027163536960183815FS 3200-MP 2.02-2.14
703+99281150661415119GSFS 3200-MP 2.54
800+00839102209174FS 3200-MP 3.08
900+00812102408157FS 3200-MP 3.23
1000+00707297224801124FS 3200-MP 3.53
1500+15130Field fitGSFS 4712-MP 0.87
PROJECT TOTAL163150291170211522530663748901831452151
Allowable Pipe Material
NOTE:AAluminum
1. Steel pipe culvert minimum wall thickness4. Plastic pipe is not allowed when final installation is exposed. Furnish metal end sections forASAluminized steel required by the Std. 602-1 fill height table. all plastic pipe including those specified with bevels. See Std. 602-5 for acceptable cell class.CConcrete
2. Aluminized steel pipe culvert minimum wall thickness5. See Std. 602-7 for acceptable concrete cell class.GSGalvanized steel thickness required by the Std. 602-1 fill height table (steel).6. Structural excavation quantity based on material excavated inside the vertical planes locatedPPlastic
3. Aluminum pipe culvert minimum wall thickness 18 inches outside and parallel to the limits of footings or foundations. (blank)Any appropriate material thickness required by the Std. 602-1 fill height table.x/__Any appropriate material except __
PAY ITEM NUMBER
17-S ep-2024 12:21 PM c:\pw
-w ork\d0513194\[or-ef2020-1-14-1_pln_D rainage.xlsx]Sheet
TABULATION OF DRAINAGE QUANTITIES
PROJECT
F.1 OR FS ERFO 2020(1)-14(1)
WA ERFO FS UMATL614 2020-1(1)
SHEET
NUMBER Note: The quantities shown hereon are approximate and are subject to field adjustments.