About this file

This appears to be a construction plans document (PDF) associated with two related Emergency Relief for Federally Owned (ERFO) road repair projects managed by the Federal Highway Administration. The projects involve repairs to the Walla Walla-Umatilla area, split into North (Washington state) and South (Oregon) phases, identified as OR FS ERFO 2020(1)-14(1) and WA ERFO FS UMATL614 2020-1(1) respectively. Without access to the actual contents of the PDF file, I cannot provide specific details about the construction plans, engineering specifications, or technical requirements contained within the document.

View the file

Other files

Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

KIRK R LOFTSGAARDEN

Digitally signed by KIRK R LOFTSGAARDEN Date: 2024.09.25 13:59:50 -07'00'

Sheet and Description

SECTION DSECTION ESECTION FSECTION H-

PLAN & PROFILEEROSION

CONTROLDRAINAGE

TEMPORARY

TRAFFIC

CONTROL

ALLOWANCEBid Schedule

A002015101-0000MOBILIZATIONLPSMAllALL

A004015201-0000CONSTRUCTION SURVEY AND STAKINGLPSMAllALL

A006015301-0010CONTRACTOR QUALITY CONTROL AND ASSURANCELPSMAllALL

A008015401-0000CONTRACTOR TESTINGLPSMAllALL

A010015501-0000CONSTRUCTION SCHEDULELPSMAllALL

A012015702-6000SOIL EROSION CONTROL, TEMPORARY STREAM DIVERSIONLPSMAllALL

A014015705-0100SOIL EROSION CONTROL, SILT FENCELNFT11,59555512,150

A016015705-1400SOIL EROSION CONTROL, FIBER ROLLLNFT39624420

A018015802-0000WATERING FOR DUST CONTROLLPSMAllALL

A020020101-0000CLEARING AND GRUBBINGACRE1.50.11.6

A022020301-1900REMOVAL OF PIPE CULVERTEACH33

A024020401-0000ROADWAY EXCAVATIONCUYD87684960

A026020402-0000SUBEXCAVATION (FS 3738 MP 8.35)CUYD20416220

A028020403-0000UNCLASSIFIED BORROWCUYD8,5858159,400

A030025101-0400PLACED RIPRAP, METHOD A, CLASS 4CUYD15010160

A032025101-2500PLACED RIPRAP, METHOD B, CLASS 5CUYD2,9112893,200

A034025101-2600PLACED RIPRAP, METHOD B, CLASS 6CUYD7,0216797,700

A036025201-1000SPECIAL ROCK EMBANKMENT, MECHANICALLY-PLACEDCUYD1,8222782,100

A038030201-1000ROADWAY AGGREGATE, METHOD 1CUYD40931440

A040030302-1000DITCH RECONDITIONINGLNFT3,7603404,100

A042030302-5000AGGREGATE SURFACE RECONDITIONINGLNFT3,6103904,000

A044055102-2400UNTREATED TIMBER PILE, IN PLACEEACH1528160

A046060201-080024-INCH PIPE CULVERTLNFT25530

A048060201-100036-INCH PIPE CULVERTLNFT30232

A050060201-2500144-INCH PIPE CULVERTLNFT66470

A052062201-0150DUMP TRUCK, 7 CUBIC YARD MINIMUM CAPACITYHOUR170170

A054062201-0900WHEEL LOADER, 2 CUBIC YARD MINIMUM RATED CAPACITYHOUR170170

A056062201-3350HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITYHOUR170170

A058062301-0000GENERAL LABORHOUR170170

A060062501-0000TURF ESTABLISHMENT, HYDRAULIC METHODACRE1.30.21.5

A062062632-0000PLANTINGSLPSMAllALL

A064063501-0000TEMPORARY TRAFFIC CONTROLLPSMAllALL

A066064703-4000MITIGATION, LOG BARRIEREACH9010100

A068064703-5000MITIGATION, ROOT WADEACH18317200

A070064703-6000MITIGATION, FISH PASSAGE BOULDEREACH14115

A072064703-8000MITIGATION, BANK STABILIZATION (BOULDER CLUSTER)EACH52860

A074064704-1000MITIGATION, STREAMBED MATERIALCUYD1519160

MileStone: 100% Date Completed: In Progress Report Date: 08/20/24

A M E N D

Line Item No.

Pay Item Number

SUMMARY OF QUANTITIES

17-S ep-2024 9:58 AM

Remarks and/or Determination of Estimated Quantity Pay Item DescriptionUnit

Estimated Quantities c:\pw -w ork\d0502694\[or-ef2020-1-14-1_soq.xlsm ]S heet

PROJECT

B.1 OR FS ERFO 2020(1)-14(1)

WA ERFO FS UMATL614 2020-1(1)

SHEET

NUMBER

POINT

NUMBERNORTHEASTELEVATIONDESCRIPTIONPOINT

NUMBERNORTHEASTELEVATIONDESCRIPTION

MP 1.26-1.69MP 4.87

21101757552.1768792914.2382463.7925/8" ir w/fhwa alum cap21601742221.8368790919.2442756.5205/8" ir w/fhwa alum cap

21102757436.3068792586.7502467.4205/8" ir w/fhwa alum cap21602742070.4218790935.1592757.6375/8" ir w/fhwa alum cap

21103757232.8978792470.8402471.0295/8" ir w/fhwa alum cap21603741865.8248790980.3832765.5805/8" ir w/fhwa alum cap

21108755861.4638792142.8332493.6245/8" ir w/fhwa alum capMP 5.5

21109755724.4348792136.3562494.2275/8" ir w/fhwa alum cap21697740641.2488793756.8552893.2135/8" ir w/fhwa alum cap

21112755317.6708791689.5562498.6785/8" ir w/fhwa alum cap21698740513.2918793884.8152888.4245/8" ir w/fhwa alum cap

21113755046.3248791582.4742508.0035/8" ir w/fhwa alum cap21699740388.0868794051.0162888.1445/8" ir w/fhwa alum cap

FORKS1757554.7888792764.6002462.1493" alum cap21700740238.4328794201.8642894.7205/8" ir w/fhwa alum cap

MP 1.96-2.14MP 6.87

21201754717.0738790563.6472469.7815/8" ir w/fhwa alum cap21701739475.2628795565.3272925.0195/8" ir w/fhwa alum cap

21202754499.5608790452.8192477.1475/8" ir w/fhwa alum cap21702739337.7708795644.7172931.2905/8" ir w/fhwa alum cap

21206754113.4108789455.7582501.7995/8" ir w/fhwa alum cap21703739169.1448795745.1282937.4415/8" ir w/fhwa alum cap

21207753866.7538789348.8992496.7795/8" ir w/fhwa alum cap21704738966.7488795837.2652949.8245/8" ir w/fhwa alum cap

MP 2.54

21301752853.4178788685.2632550.9115/8" ir w/fhwa alum cap

21302752687.4038788729.7472552.1455/8" ir w/fhwa alum cap

21303752452.1248788838.5912560.2115/8" ir w/fhwa alum cap

21304752069.0908789030.8362588.5705/8" ir w/fhwa alum cap

21305751875.7608788903.3782603.3475/8" ir w/fhwa alum cap

MP 3.08-3.23

21401750099.5028788333.8302379.8765/8" ir w/fhwa alum cap

21402749898.3778788283.6552382.0775/8" ir w/fhwa alum cap

21403749615.8348788184.5322385.8365/8" ir w/fhwa alum cap

21404749411.3088788201.7222392.0195/8" ir w/fhwa alum cap

21405749022.0688788293.4012397.3265/8" ir w/fhwa alum cap

21406748703.2548788212.1562400.2525/8" ir w/fhwa alum cap

21407748469.6988788119.1022401.0545/8" ir w/fhwa alum cap

MP 3.53

21501747952.0938788339.1752622.2375/8" ir w/fhwa alum cap

21502747792.2898788336.3872621.9885/8" ir w/fhwa alum cap

21503747501.0028788189.0892624.1375/8" ir w/fhwa alum cap

21504747304.8598788215.2122627.4175/8" ir w/fhwa alum cap

14-A ug-2024 11:47 A

M C :\U sers\sarah.w ilson\D esktop\[O R

_FS

_ER

FO

_2020(1)-14(1)_controlsheet.xlsx]S heet

PROJECT COORDINATES

COORDINATE SYSTEM :Assumed (coordinates based of rec grade GPS scaled to OR N SPCS) VERTICAL DATUM : Assumed (based off recreation grade GPS)

PROJECT : Walla Walla South-Umatilla Repairs 2020, Phase 1 Walla Walla North-Umatilla Repairs 2020, Phase 1 DATE OF FIELD WORK : September/October 2021

PROJECT UNITS : International foot

PROJECT COORDINATES

PROJECT

D.1 OR FS ERFO 2020(1)-14(1)

WA ERFO FS UMATL614 2020-1(1)

SHEET

NUMBER

SURVEY CONTROL

10.4 x 16 20301 -1900

25101 -0400

25101 -2500

25101 -2600

55102 -2400

60201 -0800

60201 -1000

60201 -2500

62635 -2000

64703 -4000

64703 -5000

64703 -6000

64703 -8000

64704 -1000

Station

ES

TIM

A

TED

M A X

IM

U M

C O

V

ER

S

TR

U C

TU

R A

L EX

C A V A

TIO

N

R

EM

O V A L O

F PIPE C

U

LV

ER

T

PLA

C

ED

R

IPR

A P, M

ETH

O

D A

C

LA

S S

PLA

C

ED

R

IPR

A P, M

ETH

O

D B

C

LA

S S

PLA

C

ED

R

IPR

A P, M

ETH

O

D B

C

LA

S S

U N

TR

EA

TED

TIM

B

ER

PILE, IN

PLA

C E

24-IN

C H

PIPE C

U

LV

ER

T

36-IN

C H

PIPE C

U

LV

ER

T

144-IN

C

H

PIPE C

U

LV

ER

T

PLA

N

TIN

G

S

M

ITIG

A

TIO

N

, LO

G B

A R R

IER

M

ITIG

A

TIO

N , R

O O

T W A D

M

ITIG

A

TIO

N

, FIS

H

PA

S S A G

E B O

U

LD

ER

M

ITIG

A

TIO

N , B

A N

K

S

TA

B

ILIZ

A

TIO

N , B

O U

LD

ER

C

LU

S

TER

M

ITIG

A

TIO

N , S

TR

EA

M B

ED

M

A

TER

IA

L

S K

EW

A N

G

LE

A llow able Pipe M aterial

(S ee key below

B

EV

ELS

1V

:nH

B

EV

ELS

1V

:nH

REMARKS

See below for numbered notes

FEETCUYDEACHCUYDCUYDCUYDEACHLNFTLNFTLNFTEACHEACHEACHEACHEACHCUYDLtRt

200+00819102165910FS 3200-MP 1.30-1.36

201+08381253GSFS 3200-MP 1.30-1.36

300+0012881035871313FS 3200-MP 1.38-1.44

400+006261044010193FS 3200-MP 1.52-1.69

450+00578394224251124FS 3200-MP 1.52-1.69

500+00599311224091124FS 3200-MP 1.96-2.00

600+001027163536960183815FS 3200-MP 2.02-2.14

703+99281150661415119GSFS 3200-MP 2.54

800+00839102209174FS 3200-MP 3.08

900+00812102408157FS 3200-MP 3.23

1000+00707297224801124FS 3200-MP 3.53

1500+15130Field fitGSFS 4712-MP 0.87

PROJECT TOTAL163150291170211522530663748901831452151

Allowable Pipe Material

NOTE:AAluminum

1. Steel pipe culvert minimum wall thickness4. Plastic pipe is not allowed when final installation is exposed. Furnish metal end sections forASAluminized steel required by the Std. 602-1 fill height table. all plastic pipe including those specified with bevels. See Std. 602-5 for acceptable cell class.CConcrete

2. Aluminized steel pipe culvert minimum wall thickness5. See Std. 602-7 for acceptable concrete cell class.GSGalvanized steel thickness required by the Std. 602-1 fill height table (steel).6. Structural excavation quantity based on material excavated inside the vertical planes locatedPPlastic

3. Aluminum pipe culvert minimum wall thickness 18 inches outside and parallel to the limits of footings or foundations. (blank)Any appropriate material thickness required by the Std. 602-1 fill height table.x/__Any appropriate material except __

PAY ITEM NUMBER

17-S ep-2024 12:21 PM c:\pw

-w ork\d0513194\[or-ef2020-1-14-1_pln_D rainage.xlsx]Sheet

TABULATION OF DRAINAGE QUANTITIES

PROJECT

F.1 OR FS ERFO 2020(1)-14(1)

WA ERFO FS UMATL614 2020-1(1)

SHEET

NUMBER Note: The quantities shown hereon are approximate and are subject to field adjustments.

File details come from the government source that posted it. Updated .