This is a bid tabulation document for the Walla Walla South Umatilla Repairs 2020, Phase 1 project (Solicitation No. 69056724B000006), opened on January 14, 2025 in Vancouver, Washington. The project covers work in Oregon and Washington across Umatilla, Union, and Columbia counties.

Seven contractors submitted bids ranging from $4,069,990 to $14,877,505, with Moreno and Nelson Construction Corp submitting the lowest bid. The work includes mobilization, construction survey and staking, quality control, testing, erosion control, stream diversion, culvert installation (24-inch, 36-inch, and 144-inch pipes), roadway excavation, aggregate surface reconditioning, timber pile installation, dump truck services, wheel loader operations, hydraulic excavator work, turf establishment, plantings, traffic control, and various mitigation measures including log barriers, root wads, fish passage boulders, and bank stabilization. The Engineer's Estimate for the project was $7,496,000. All bid items are measured in various units including lump sum, linear feet, cubic yards, acres, and hours, with detailed unit pricing provided for each contractor.

View the file

Other files

Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2025-01-15T13:28:29-0800

MARINO CHEA

File details come from the government source that posted it. Updated .