Maintenance Dredging of Fire Island Inlet and Shores Westerly to Jones Inlet Beach Erosion Control and Navigation Project

Closed Solicitation Posted

Solicitation number
W912DS24B0003
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
New York, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The U.S. Army Corps of Engineers (USACE), New York District, is seeking bids for the Maintenance Dredging of Fire Island Inlet and Shores Westerly to Jones Inlet Beach Erosion Control and Navigation Project. The work involves dredging approximately 700,000 to 1,000,000 cubic yards of sand from the Fire Island Inlet Federal Navigation channel and deposition basin, and placing the dredged sand as nourishment along the designated Gilgo Beach shoreline. The contractor must commence work within 5 calendar days of the notice to proceed and complete the basic work within 97 calendar days, maintaining a minimum production rate of 13,500 cubic yards per day. Bids are due by May 23, 2024, and the government plans to award the contract in May 2024 with a notice to proceed in the first week of October 2024.

This is an unrestricted procurement, with no set-aside designations. The estimated cost range for the overall project is $15,000,000 to $50,000,000. Liquidated damages of $2,390 per calendar day will be assessed for delays. The project location is in New York, NY, USA.

Notice text

The New York District of the U.S. Army Corps of Engineers (USACE) proposes to perform maintenance 
dredging and beach nourishment of Fire Island Inlet and Shores Westerly to Jones Inlet Beach 
Erosion Control and Navigation Project, New York.  The work consists of dredging the Fire Island 
Inlet Federal Navigation channel and deposition basin with subsequent placement of the dredged sand 
as nourishment along the designated feeder beach (Gilgo Beach, Suffolk County, New York).

The proposed dredging and beach nourishment work would involve dredging and placement of 
approximately 700,000 to 1,000,000 CY of sand at Gilgo Beach, subject to available funding. The 
project is scheduled to be dredged to a depth of 14 feet plus 2 feet allowable over-depth.

The purpose of the proposed work is to alleviate the effects of shoaling and maintain the project 
dimensions, thereby providing safe and economical use of the Fire Island Inlet waterway by 
commercial and recreational boating interests while providing beneficial use of the dredged sand. 
Between maintenance operations, the bypassed sand placed at the feeder beach would be carried by 
littoral drift to feed down drift beaches. The maintenance operation would thus serve to place sand 
trapped in the channel back into the normal littoral movement that naturally replenishes the 
western beaches, while maintaining a safe channel for navigation.

The proposed work can be accomplished by large pipeline dredge and must meet US Coast Guard 
criteria for an “ocean going vessel”.

The Contractor will be required to commence work within five (5) calendar days after the date of 
receipt by him of the notice to proceed, and to prosecute said work diligently and to complete the 
basic work ready for use not later than ninety-seven (97) calendar days after the receipt by him of 
the notice to proceed (NTP). The contractor is required to
maintain an integrated production of at least 13,500 cubic yards per calendar day.

The work is estimated to cost between $15,000,000 and $50,000,000.  Plans and specifications for 
the subject project would be available in March 2024, with bid opening in April 2024. It is the 
intention of the government to award in May and NTP in first week of October 2024.

Liquidated Damages of $2,390.00 per calendar day of delay will be assessed to the contractor until 
all work under the contract is accepted as complete.

This is an unrestricted Procurement.

Files

File Type Posted
Bid Abstract W912DS-24-B-0003.pdf PDF
Amendment 0015.pdf PDF
Amendment 0014.pdf PDF
Amendment 0013.pdf PDF
Amendment-0012.pdf PDF
Amendment 11_c - Tobay Beach WQC - F-2021-0073 CCR - NYSDOS Approval.pdf PDF
Amendment 11_d - Revised Section 00 01 15 List of Drawings 5-7-24.pdf PDF
Amendment 11_b - Tobay Beach Drawings for 2024 Beach Fill from Fire Island.pdf PDF
Amendment 11_h - NYSDEC Permit - Town of Oyster Bay Tobay Beach.pdf PDF
Amendment 0011.pdf PDF
Amendment 11_g - DA Permit - Town of Oyster Bay Tobay Beach.pdf PDF
Amendment 11_e - Revised Section 01 11 00 Summary of Work 5-7-24.pdf PDF
Amendment 11_f - Revised Section 31 24 00_00 18 Beach Fill Placement 5-7-24.pdf PDF
Amendment 0010.pdf PDF
Amendment 0009.pdf PDF
Amendment 0008.pdf PDF
Amendment 0007.pdf PDF
Amendment 0006.pdf PDF
Amendment 0005.pdf PDF
Amnedment 0004.pdf PDF
Amendment 0003_c1 - 5367-3 med-mllw-ELEVATION.pdf PDF
Amendment 0003_c2 - 5367-60 sort-mllw-ELEVATION.pdf PDF
Amendment 0003_h - 00 90 04 WENTWORTH SCALE.pdf PDF
Amendment 0003_f - Revised Section 31 24 00_00 18 Beach Fill Placement.pdf PDF
Amendment 0003_d - Revised Section 00 01 15 List of Drawings.pdf PDF
Amendment 0003_i - Utility Permit 1980-00225_11453_13160.pdf PDF
Amendment 0003_g - 00 90 03 Composite Grain Size Distribution Curves.pdf PDF
Amendment 0003_e - Revised Section 01 11 00 Summary of Work.pdf PDF
Amendment 0003_m - Map 3 - 15771 Fire Island Inlet.pdf PDF
Amendment 0003_k - Map 1- Project_15771 Fire Island Inlet.pdf PDF
Amendment 0003_j - Utility Permit 1990-01009_16305_12907.pdf PDF
Amendment 0003.pdf PDF
Amendment 0003_l - Map 2 - 015995 Fire Island Inlet Contract 1.pdf PDF
Amendment 0003_n - Revised 01 50 00 Temporary Construction Facilities and Controls.pdf PDF
Amendment 0003_a - Revised Bid Schedule.pdf PDF
Amendment 0003_b - W912DS24B0003 FIIJI24 Revised Plans.pdf PDF
Amendment 0003_c3 - 5406-30sort-ele.pdf PDF
Amendment 0002 -a.pdf PDF
Amendment 0002_c2 - 5367-60 sort-mllw-ELEVATION.pdf PDF
Amendment 0002_b -W912DS24B0003 FIIJI24 Revised Plans.pdf PDF
Amendment 0002_e - Revised Section 01 11 00 Summary of Work.pdf PDF
Amendment 0002_l - Map 2 - 015995 Fire Island Inlet Contract 1.pdf PDF
Amendment 0002_h - 00 90 04 WENTWORTH SCALE.pdf PDF
Amendment 0002_i - Utility Permit 1980-00225_11453_13160.pdf PDF
Amendment 0002_c1 - 5367-3 med-mllw-ELEVATION.pdf PDF
Amendment 0002_k - Map 1- Project_15771 Fire Island Inlet.pdf PDF
Amendment 0002_c3 - 5406-30sort-ele.pdf PDF
Amendment 0002_d - Revised Section 00 01 15 List of Drawings.pdf PDF
Amendment 0002_f - Revised Section 31 24 00_00 18 Beach Fill Placement.pdf PDF
Amendment 0002_g - 00 90 03 Composite Grain Size Distribution Curves.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

Notice history

Notice Type Posted
This notice Latest solicitation Solicitation
Fire Island Inlet and Shores Westerly to Jones Inlet Beach Erosion Control and Navigation Project Original Pre-Solicitation

Similar open opportunities

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors