Amendment 11_c - Tobay Beach WQC - F-2021-0073 CCR - NYSDOS Approval.pdf

PDF 196 KB Posted

Attached to
Maintenance Dredging of Fire Island Inlet and Shores Westerly to Jones Inlet Beach Erosion Control and Navigation Project
Solicitation number
W912DS24B0003
Issued by

About this file

This document is a letter from the New York State Department of State that provides concurrence with the consistency certification for a beach nourishment project at Tobay Beach in Nassau County, New York. The project involves placing approximately 217,000 cubic yards of sand dredged from the Fire Island Inlet to create a berm along 2 miles of Tobay Beach. The letter states this concurrence does not obviate the need for the applicant to obtain all other required permits and approvals.

The related federal contract opportunity is for maintenance dredging of the Fire Island Inlet federal navigation channel and placement of the dredged sand as beach nourishment along Gilgo Beach in Suffolk County, New York. The proposed work involves dredging and placing approximately 700,000 to 1,000,000 cubic yards of sand, to be accomplished by a large pipeline dredge. The work is estimated to cost between $15,000,000 and $50,000,000. Plans and specifications will be available in March 2024, with a bid opening in April 2024 and contract award in May 2024. The contractor will be required to commence work within 5 calendar days of the notice to proceed and complete the work within 97 calendar days, maintaining a minimum production rate of 13,500 cubic yards per day.

View the file

Other files

File Type Posted
Bid Abstract W912DS-24-B-0003.pdf PDF
Amendment 0015.pdf PDF
Amendment 0014.pdf PDF
Amendment 0013.pdf PDF
Amendment-0012.pdf PDF
Amendment 0011.pdf PDF
Amendment 11_f - Revised Section 31 24 00_00 18 Beach Fill Placement 5-7-24.pdf PDF
Amendment 11_d - Revised Section 00 01 15 List of Drawings 5-7-24.pdf PDF
Amendment 11_h - NYSDEC Permit - Town of Oyster Bay Tobay Beach.pdf PDF
Amendment 11_e - Revised Section 01 11 00 Summary of Work 5-7-24.pdf PDF
Amendment 11_g - DA Permit - Town of Oyster Bay Tobay Beach.pdf PDF
Amendment 11_b - Tobay Beach Drawings for 2024 Beach Fill from Fire Island.pdf PDF
Amendment 0010.pdf PDF
Amendment 0009.pdf PDF
Amendment 0008.pdf PDF
Amendment 0007.pdf PDF
Amendment 0006.pdf PDF
Amendment 0005.pdf PDF
Amnedment 0004.pdf PDF
Amendment 0003_m - Map 3 - 15771 Fire Island Inlet.pdf PDF
Amendment 0003_b - W912DS24B0003 FIIJI24 Revised Plans.pdf PDF
Amendment 0003_f - Revised Section 31 24 00_00 18 Beach Fill Placement.pdf PDF
Amendment 0003_g - 00 90 03 Composite Grain Size Distribution Curves.pdf PDF
Amendment 0003_n - Revised 01 50 00 Temporary Construction Facilities and Controls.pdf PDF
Amendment 0003_c2 - 5367-60 sort-mllw-ELEVATION.pdf PDF
Amendment 0003_d - Revised Section 00 01 15 List of Drawings.pdf PDF
Amendment 0003_c3 - 5406-30sort-ele.pdf PDF
Amendment 0003.pdf PDF
Amendment 0003_i - Utility Permit 1980-00225_11453_13160.pdf PDF
Amendment 0003_h - 00 90 04 WENTWORTH SCALE.pdf PDF
Amendment 0003_a - Revised Bid Schedule.pdf PDF
Amendment 0003_e - Revised Section 01 11 00 Summary of Work.pdf PDF
Amendment 0003_j - Utility Permit 1990-01009_16305_12907.pdf PDF
Amendment 0003_c1 - 5367-3 med-mllw-ELEVATION.pdf PDF
Amendment 0003_k - Map 1- Project_15771 Fire Island Inlet.pdf PDF
Amendment 0003_l - Map 2 - 015995 Fire Island Inlet Contract 1.pdf PDF
Amendment 0002_b -W912DS24B0003 FIIJI24 Revised Plans.pdf PDF
Amendment 0002_c2 - 5367-60 sort-mllw-ELEVATION.pdf PDF
Amendment 0002_m - Map 3 - 15771 Fire Island Inlet.pdf PDF
Amendment 0002_f - Revised Section 31 24 00_00 18 Beach Fill Placement.pdf PDF
Amendment 0002_l - Map 2 - 015995 Fire Island Inlet Contract 1.pdf PDF
Amendment 0002_c3 - 5406-30sort-ele.pdf PDF
Amendment 0002_j - Utility Permit 1990-01009_16305_12907.pdf PDF
Amendment 0002_g - 00 90 03 Composite Grain Size Distribution Curves.pdf PDF
Amendment 0002_h - 00 90 04 WENTWORTH SCALE.pdf PDF
Amendment 0002_k - Map 1- Project_15771 Fire Island Inlet.pdf PDF
Amendment 0002_c1 - 5367-3 med-mllw-ELEVATION.pdf PDF
Amendment 0002_n - Revised 01 50 00 Temporary Construction Facilities and Controls.pdf PDF
Amendment 0002_d - Revised Section 00 01 15 List of Drawings.pdf PDF
Amendment 0002_i - Utility Permit 1980-00225_11453_13160.pdf PDF
Show 40 more

Latest 50 of 56 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATE OF NEW YORK

DEPARTMENT OF STATE

O N E C O M M E R C E P L A Z A 99 W A S H I N G T O N A V E N U E

ALBANY, NY 12231-0001

WWW.DOS.NY.GOV

ANDREW M. CUOMO

GOVERNOR

R O S S A N A R O S A D O

SECRETARY OF STATE

May 19, 2021

Robert de Bruin, PE de Bruin Engineering, PC 1400 Old Country Road, Suite 106 Westbury, NY 11590

Re: F-2021-0073 U.S. Army Corps of Engineers/ New York District Permit Application-Tobay Beach Nourishment NYS DEC Region 1 Application #1-2824-02056 Beach renourishment of 2 miles of Tobay Beach by placing sand from the Fire Island Inlet dredging to create a berm at elevation 8.4 (NAVD 88). Approx.

217,000 cubic yards of sand will be placed with approx. 28,000CY placed below Mean High Water and the remaining to be above MHW.

Tobay Center, Ocean Facility, Town of Oyster Bay, Nassau County, Atlantic Ocean Concurrence with Consistency Certification

Dear Robert de Bruin:

The Department of State has completed its review of your consistency certification regarding the consistency of the above-referenced activity with the New York Coastal Management Program.

Pursuant to 15 CFR § 930.62, and based upon the project information submitted, the Department of State concurs with your consistency certification for this activity. This concurrence is without prejudice to and does not obviate the need to obtain all other applicable licenses, permits, or other forms of authorization or approval that may be required pursuant to existing State statutes.

Sincerely, Gregory L. Capobianco Office of Planning, Development and Community Infrastructure

GLC/MM/HW

cc: COE/ New York District – Ronald Pinzon (Tobay Beach Nourishment) DEC Region 1 – Elyssa Scott (1-2824-02056/00025-28) Applicant – Richard Lenz, PE (Town of Oyster Bay) http://www.dos.ny.gov/

File details come from the government source that posted it. Updated .