Purpose of this update on 20 August 2021 is to post Amendment 0012 for Solicitation W9128F20R0002.

Purpose of this update on 20 August 2021 is to post Amendment 0011 for Solicitation W9128F20R0002 due to wage updates.

Purpose of this update on 08 June 2021 is to post Amendment 0010 for Solicitation W9128F20R0002.

Amendment 0010 is expected to be posted by close of business 8 June with no extension due date anticipated.

Purpose of this update on 04 June 2021 is to post Amendment 0009 for Solicitation W9128F20R0002.

Purpose of this update on 27 May 2021 is to post Amendment 0008 for Solicitation W9128F20R0002.

Purpose of this update on 19 May 2021 is to post Amendment 0007 for Solicitation W9128F20R0002.

Purpose of this update on 14 May 2021 is to post all amendments since the solicitation closing date. Per the solicitation documents, this is a two-phase solicitation and those interested parties who did not submit a proposal in phase 1 will not be evaluated in phase 2. The CADD/BIM files are also being provided.

Purpose of this update on 14 April 2021 is to post Amendment 0002 for Solicitation W9128F20R0002.

Purpose of this update on 01 April 2021 is to post the list of Firms/POCs who participated in the virtual site visit.

Purpose of this update on 25 March 2021 is to post Amendment 0001 for Solicitation W9128F20R0002.

This notice is for solicitation issuance for construction of the Consolidated Space Operations Facility (CSOF) located at Schriever AFB, Colorado.

This solicitation is UNRESTRICTED AND OPEN TO BOTH LARGE AND SMALL BUSINESS PARTICIPATION.

Project Description: 

This project will consist of constructing a two-story CSOF with reinforced concrete foundation, steel structure, and a low slope membrane roof and the construct of a one-story entry control facility at the south side of the restricted area. Project will comply with all applicable DoD, Air Force, and base design standards.  In addition, local materials and construction techniques shall be used where cost effective.  Facilities will be designed as permanent construction in accordance with the DoD Unified Facilities Criteria (UFC) 1-200-01, "General Building Requirements" and UFC 1-200-02, "High Performance and Sustainable Building Requirements."  This project will comply with DoD antiterrorism/force protection requirements per UFC 4-010-01, "DoD Minimum Antiterrorism Standards for Buildings" and include cybersecurity measures per UFC 4-010-06, "Cybersecurity of Facility-Related Control Systems."

The Contractor will be required to commence work within 10 days after Notice to Proceed (NTP) and complete the work in the proposed number of calendar days (Not to Exceed 1400 calendar days) after receipt of NTP.  Clauses will be included for Liquidated Damages in case of failure to complete the work in the time allowed.  Performance and Payment Bonds will be required.

The project specifications, applicable drawings and instructions to offerors are included in the attached documents.

Update #11 ·

Purpose of this update on 20 August 2021 is to post Amendment 0011 for Solicitation W9128F20R0002 due to wage updates.

Purpose of this update on 08 June 2021 is to post Amendment 0010 for Solicitation W9128F20R0002.

Amendment 0010 is expected to be posted by close of business 8 June with no extension due date anticipated.

Purpose of this update on 04 June 2021 is to post Amendment 0009 for Solicitation W9128F20R0002.

Purpose of this update on 27 May 2021 is to post Amendment 0008 for Solicitation W9128F20R0002.

Purpose of this update on 19 May 2021 is to post Amendment 0007 for Solicitation W9128F20R0002.

Purpose of this update on 14 May 2021 is to post all amendments since the solicitation closing date. Per the solicitation documents, this is a two-phase solicitation and those interested parties who did not submit a proposal in phase 1 will not be evaluated in phase 2. The CADD/BIM files are also being provided.

Purpose of this update on 14 April 2021 is to post Amendment 0002 for Solicitation W9128F20R0002.

Purpose of this update on 01 April 2021 is to post the list of Firms/POCs who participated in the virtual site visit.

Purpose of this update on 25 March 2021 is to post Amendment 0001 for Solicitation W9128F20R0002.

This notice is for solicitation issuance for construction of the Consolidated Space Operations Facility (CSOF) located at Schriever AFB, Colorado.

This solicitation is UNRESTRICTED AND OPEN TO BOTH LARGE AND SMALL BUSINESS PARTICIPATION.

Project Description: 

This project will consist of constructing a two-story CSOF with reinforced concrete foundation, steel structure, and a low slope membrane roof and the construct of a one-story entry control facility at the south side of the restricted area. Project will comply with all applicable DoD, Air Force, and base design standards.  In addition, local materials and construction techniques shall be used where cost effective.  Facilities will be designed as permanent construction in accordance with the DoD Unified Facilities Criteria (UFC) 1-200-01, "General Building Requirements" and UFC 1-200-02, "High Performance and Sustainable Building Requirements."  This project will comply with DoD antiterrorism/force protection requirements per UFC 4-010-01, "DoD Minimum Antiterrorism Standards for Buildings" and include cybersecurity measures per UFC 4-010-06, "Cybersecurity of Facility-Related Control Systems."

The Contractor will be required to commence work within 10 days after Notice to Proceed (NTP) and complete the work in the proposed number of calendar days (Not to Exceed 1400 calendar days) after receipt of NTP.  Clauses will be included for Liquidated Damages in case of failure to complete the work in the time allowed.  Performance and Payment Bonds will be required.

The project specifications, applicable drawings and instructions to offerors are included in the attached documents.

Update #10 ·

Purpose of this update on 08 June 2021 is to post Amendment 0010 for Solicitation W9128F20R0002.

Amendment 0010 is expected to be posted by close of business 8 June with no extension due date anticipated.

Purpose of this update on 04 June 2021 is to post Amendment 0009 for Solicitation W9128F20R0002.

Purpose of this update on 27 May 2021 is to post Amendment 0008 for Solicitation W9128F20R0002.

Purpose of this update on 19 May 2021 is to post Amendment 0007 for Solicitation W9128F20R0002.

Purpose of this update on 14 May 2021 is to post all amendments since the solicitation closing date. Per the solicitation documents, this is a two-phase solicitation and those interested parties who did not submit a proposal in phase 1 will not be evaluated in phase 2. The CADD/BIM files are also being provided.

Purpose of this update on 14 April 2021 is to post Amendment 0002 for Solicitation W9128F20R0002.

Purpose of this update on 01 April 2021 is to post the list of Firms/POCs who participated in the virtual site visit.

Purpose of this update on 25 March 2021 is to post Amendment 0001 for Solicitation W9128F20R0002.

This notice is for solicitation issuance for construction of the Consolidated Space Operations Facility (CSOF) located at Schriever AFB, Colorado.

This solicitation is UNRESTRICTED AND OPEN TO BOTH LARGE AND SMALL BUSINESS PARTICIPATION.

Project Description: 

This project will consist of constructing a two-story CSOF with reinforced concrete foundation, steel structure, and a low slope membrane roof and the construct of a one-story entry control facility at the south side of the restricted area. Project will comply with all applicable DoD, Air Force, and base design standards.  In addition, local materials and construction techniques shall be used where cost effective.  Facilities will be designed as permanent construction in accordance with the DoD Unified Facilities Criteria (UFC) 1-200-01, "General Building Requirements" and UFC 1-200-02, "High Performance and Sustainable Building Requirements."  This project will comply with DoD antiterrorism/force protection requirements per UFC 4-010-01, "DoD Minimum Antiterrorism Standards for Buildings" and include cybersecurity measures per UFC 4-010-06, "Cybersecurity of Facility-Related Control Systems."

The Contractor will be required to commence work within 10 days after Notice to Proceed (NTP) and complete the work in the proposed number of calendar days (Not to Exceed 1400 calendar days) after receipt of NTP.  Clauses will be included for Liquidated Damages in case of failure to complete the work in the time allowed.  Performance and Payment Bonds will be required.

The project specifications, applicable drawings and instructions to offerors are included in the attached documents.

Update #9 ·

Amendment 0010 is expected to be posted by close of business 8 June with no extension due date anticipated.

Purpose of this update on 04 June 2021 is to post Amendment 0009 for Solicitation W9128F20R0002.

Purpose of this update on 27 May 2021 is to post Amendment 0008 for Solicitation W9128F20R0002.

Purpose of this update on 19 May 2021 is to post Amendment 0007 for Solicitation W9128F20R0002.

Purpose of this update on 14 May 2021 is to post all amendments since the solicitation closing date. Per the solicitation documents, this is a two-phase solicitation and those interested parties who did not submit a proposal in phase 1 will not be evaluated in phase 2. The CADD/BIM files are also being provided.

Purpose of this update on 14 April 2021 is to post Amendment 0002 for Solicitation W9128F20R0002.

Purpose of this update on 01 April 2021 is to post the list of Firms/POCs who participated in the virtual site visit.

Purpose of this update on 25 March 2021 is to post Amendment 0001 for Solicitation W9128F20R0002.

This notice is for solicitation issuance for construction of the Consolidated Space Operations Facility (CSOF) located at Schriever AFB, Colorado.

This solicitation is UNRESTRICTED AND OPEN TO BOTH LARGE AND SMALL BUSINESS PARTICIPATION.

Project Description: 

This project will consist of constructing a two-story CSOF with reinforced concrete foundation, steel structure, and a low slope membrane roof and the construct of a one-story entry control facility at the south side of the restricted area. Project will comply with all applicable DoD, Air Force, and base design standards.  In addition, local materials and construction techniques shall be used where cost effective.  Facilities will be designed as permanent construction in accordance with the DoD Unified Facilities Criteria (UFC) 1-200-01, "General Building Requirements" and UFC 1-200-02, "High Performance and Sustainable Building Requirements."  This project will comply with DoD antiterrorism/force protection requirements per UFC 4-010-01, "DoD Minimum Antiterrorism Standards for Buildings" and include cybersecurity measures per UFC 4-010-06, "Cybersecurity of Facility-Related Control Systems."

The Contractor will be required to commence work within 10 days after Notice to Proceed (NTP) and complete the work in the proposed number of calendar days (Not to Exceed 1400 calendar days) after receipt of NTP.  Clauses will be included for Liquidated Damages in case of failure to complete the work in the time allowed.  Performance and Payment Bonds will be required.

The project specifications, applicable drawings and instructions to offerors are included in the attached documents.

Update #8 ·

Purpose of this update on 04 June 2021 is to post Amendment 0009 for Solicitation W9128F20R0002.

Purpose of this update on 27 May 2021 is to post Amendment 0008 for Solicitation W9128F20R0002.

Purpose of this update on 19 May 2021 is to post Amendment 0007 for Solicitation W9128F20R0002.

Purpose of this update on 14 May 2021 is to post all amendments since the solicitation closing date. Per the solicitation documents, this is a two-phase solicitation and those interested parties who did not submit a proposal in phase 1 will not be evaluated in phase 2. The CADD/BIM files are also being provided.

Purpose of this update on 14 April 2021 is to post Amendment 0002 for Solicitation W9128F20R0002.

Purpose of this update on 01 April 2021 is to post the list of Firms/POCs who participated in the virtual site visit.

Purpose of this update on 25 March 2021 is to post Amendment 0001 for Solicitation W9128F20R0002.

This notice is for solicitation issuance for construction of the Consolidated Space Operations Facility (CSOF) located at Schriever AFB, Colorado.

This solicitation is UNRESTRICTED AND OPEN TO BOTH LARGE AND SMALL BUSINESS PARTICIPATION.

Project Description: 

This project will consist of constructing a two-story CSOF with reinforced concrete foundation, steel structure, and a low slope membrane roof and the construct of a one-story entry control facility at the south side of the restricted area. Project will comply with all applicable DoD, Air Force, and base design standards.  In addition, local materials and construction techniques shall be used where cost effective.  Facilities will be designed as permanent construction in accordance with the DoD Unified Facilities Criteria (UFC) 1-200-01, "General Building Requirements" and UFC 1-200-02, "High Performance and Sustainable Building Requirements."  This project will comply with DoD antiterrorism/force protection requirements per UFC 4-010-01, "DoD Minimum Antiterrorism Standards for Buildings" and include cybersecurity measures per UFC 4-010-06, "Cybersecurity of Facility-Related Control Systems."

The Contractor will be required to commence work within 10 days after Notice to Proceed (NTP) and complete the work in the proposed number of calendar days (Not to Exceed 1400 calendar days) after receipt of NTP.  Clauses will be included for Liquidated Damages in case of failure to complete the work in the time allowed.  Performance and Payment Bonds will be required.

The project specifications, applicable drawings and instructions to offerors are included in the attached documents.

Update #7 ·

Purpose of this update on 27 May 2021 is to post Amendment 0008 for Solicitation W9128F20R0002.

Purpose of this update on 19 May 2021 is to post Amendment 0007 for Solicitation W9128F20R0002.

Purpose of this update on 14 May 2021 is to post all amendments since the solicitation closing date. Per the solicitation documents, this is a two-phase solicitation and those interested parties who did not submit a proposal in phase 1 will not be evaluated in phase 2. The CADD/BIM files are also being provided.

Purpose of this update on 14 April 2021 is to post Amendment 0002 for Solicitation W9128F20R0002.

Purpose of this update on 01 April 2021 is to post the list of Firms/POCs who participated in the virtual site visit.

Purpose of this update on 25 March 2021 is to post Amendment 0001 for Solicitation W9128F20R0002.

This notice is for solicitation issuance for construction of the Consolidated Space Operations Facility (CSOF) located at Schriever AFB, Colorado.

This solicitation is UNRESTRICTED AND OPEN TO BOTH LARGE AND SMALL BUSINESS PARTICIPATION.

Project Description: 

This project will consist of constructing a two-story CSOF with reinforced concrete foundation, steel structure, and a low slope membrane roof and the construct of a one-story entry control facility at the south side of the restricted area. Project will comply with all applicable DoD, Air Force, and base design standards.  In addition, local materials and construction techniques shall be used where cost effective.  Facilities will be designed as permanent construction in accordance with the DoD Unified Facilities Criteria (UFC) 1-200-01, "General Building Requirements" and UFC 1-200-02, "High Performance and Sustainable Building Requirements."  This project will comply with DoD antiterrorism/force protection requirements per UFC 4-010-01, "DoD Minimum Antiterrorism Standards for Buildings" and include cybersecurity measures per UFC 4-010-06, "Cybersecurity of Facility-Related Control Systems."

The Contractor will be required to commence work within 10 days after Notice to Proceed (NTP) and complete the work in the proposed number of calendar days (Not to Exceed 1400 calendar days) after receipt of NTP.  Clauses will be included for Liquidated Damages in case of failure to complete the work in the time allowed.  Performance and Payment Bonds will be required.

The project specifications, applicable drawings and instructions to offerors are included in the attached documents.

Update #6 ·

Purpose of this update on 19 May 2021 is to post Amendment 0007 for Solicitation W9128F20R0002.

Purpose of this update on 14 May 2021 is to post all amendments since the solicitation closing date. Per the solicitation documents, this is a two-phase solicitation and those interested parties who did not submit a proposal in phase 1 will not be evaluated in phase 2. The CADD/BIM files are also being provided.

Purpose of this update on 14 April 2021 is to post Amendment 0002 for Solicitation W9128F20R0002.

Purpose of this update on 01 April 2021 is to post the list of Firms/POCs who participated in the virtual site visit.

Purpose of this update on 25 March 2021 is to post Amendment 0001 for Solicitation W9128F20R0002.

This notice is for solicitation issuance for construction of the Consolidated Space Operations Facility (CSOF) located at Schriever AFB, Colorado.

This solicitation is UNRESTRICTED AND OPEN TO BOTH LARGE AND SMALL BUSINESS PARTICIPATION.

Project Description: 

This project will consist of constructing a two-story CSOF with reinforced concrete foundation, steel structure, and a low slope membrane roof and the construct of a one-story entry control facility at the south side of the restricted area. Project will comply with all applicable DoD, Air Force, and base design standards.  In addition, local materials and construction techniques shall be used where cost effective.  Facilities will be designed as permanent construction in accordance with the DoD Unified Facilities Criteria (UFC) 1-200-01, "General Building Requirements" and UFC 1-200-02, "High Performance and Sustainable Building Requirements."  This project will comply with DoD antiterrorism/force protection requirements per UFC 4-010-01, "DoD Minimum Antiterrorism Standards for Buildings" and include cybersecurity measures per UFC 4-010-06, "Cybersecurity of Facility-Related Control Systems."

The Contractor will be required to commence work within 10 days after Notice to Proceed (NTP) and complete the work in the proposed number of calendar days (Not to Exceed 1400 calendar days) after receipt of NTP.  Clauses will be included for Liquidated Damages in case of failure to complete the work in the time allowed.  Performance and Payment Bonds will be required.

The project specifications, applicable drawings and instructions to offerors are included in the attached documents.

Update #5 ·

Purpose of this update on 14 May 2021 is to post all amendments since the solicitation closing date. Per the solicitation documents, this is a two-phase solicitation and those interested parties who did not submit a proposal in phase 1 will not be evaluated in phase 2. The CAD/BIM files are also being provided.

Purpose of this update on 14 April 2021 is to post Amendment 0002 for Solicitation W9128F20R0002.

Purpose of this update on 01 April 2021 is to post the list of Firms/POCs who participated in the virtual site visit.

Purpose of this update on 25 March 2021 is to post Amendment 0001 for Solicitation W9128F20R0002.

This notice is for solicitation issuance for construction of the Consolidated Space Operations Facility (CSOF) located at Schriever AFB, Colorado.

This solicitation is UNRESTRICTED AND OPEN TO BOTH LARGE AND SMALL BUSINESS PARTICIPATION.

Project Description: 

This project will consist of constructing a two-story CSOF with reinforced concrete foundation, steel structure, and a low slope membrane roof and the construct of a one-story entry control facility at the south side of the restricted area. Project will comply with all applicable DoD, Air Force, and base design standards.  In addition, local materials and construction techniques shall be used where cost effective.  Facilities will be designed as permanent construction in accordance with the DoD Unified Facilities Criteria (UFC) 1-200-01, "General Building Requirements" and UFC 1-200-02, "High Performance and Sustainable Building Requirements."  This project will comply with DoD antiterrorism/force protection requirements per UFC 4-010-01, "DoD Minimum Antiterrorism Standards for Buildings" and include cybersecurity measures per UFC 4-010-06, "Cybersecurity of Facility-Related Control Systems."

The Contractor will be required to commence work within 10 days after Notice to Proceed (NTP) and complete the work in the proposed number of calendar days (Not to Exceed 1400 calendar days) after receipt of NTP.  Clauses will be included for Liquidated Damages in case of failure to complete the work in the time allowed.  Performance and Payment Bonds will be required.

The project specifications, applicable drawings and instructions to offerors are included in the attached documents.

Update #4 ·

Purpose of this update on 14 April 2021 is to post Amendment 0002 for Solicitation W9128F20R0002.

Purpose of this update on 01 April 2021 is to post the list of Firms/POCs who participated in the virtual site visit.

Purpose of this update on 25 March 2021 is to post Amendment 0001 for Solicitation W9128F20R0002.

This notice is for solicitation issuance for construction of the Consolidated Space Operations Facility (CSOF) located at Schriever AFB, Colorado.

This solicitation is UNRESTRICTED AND OPEN TO BOTH LARGE AND SMALL BUSINESS PARTICIPATION.

Project Description: 

This project will consist of constructing a two-story CSOF with reinforced concrete foundation, steel structure, and a low slope membrane roof and the construct of a one-story entry control facility at the south side of the restricted area. Project will comply with all applicable DoD, Air Force, and base design standards.  In addition, local materials and construction techniques shall be used where cost effective.  Facilities will be designed as permanent construction in accordance with the DoD Unified Facilities Criteria (UFC) 1-200-01, "General Building Requirements" and UFC 1-200-02, "High Performance and Sustainable Building Requirements."  This project will comply with DoD antiterrorism/force protection requirements per UFC 4-010-01, "DoD Minimum Antiterrorism Standards for Buildings" and include cybersecurity measures per UFC 4-010-06, "Cybersecurity of Facility-Related Control Systems."

The Contractor will be required to commence work within 10 days after Notice to Proceed (NTP) and complete the work in the proposed number of calendar days (Not to Exceed 1400 calendar days) after receipt of NTP.  Clauses will be included for Liquidated Damages in case of failure to complete the work in the time allowed.  Performance and Payment Bonds will be required.

The project specifications, applicable drawings and instructions to offerors are included in the attached documents.

Update #3 ·

Purpose of this update on 01 April 2021 is to post the list of Firms/POCs who participated in the virtual site visit.

Purpose of this update on 25 March 2021 is to post Amendment 0001 for Solicitation W9128F20R0002.

This notice is for solicitation issuance for construction of the Consolidated Space Operations Facility (CSOF) located at Schriever AFB, Colorado.

This solicitation is UNRESTRICTED AND OPEN TO BOTH LARGE AND SMALL BUSINESS PARTICIPATION.

Project Description: 

This project will consist of constructing a two-story CSOF with reinforced concrete foundation, steel structure, and a low slope membrane roof and the construct of a one-story entry control facility at the south side of the restricted area. Project will comply with all applicable DoD, Air Force, and base design standards.  In addition, local materials and construction techniques shall be used where cost effective.  Facilities will be designed as permanent construction in accordance with the DoD Unified Facilities Criteria (UFC) 1-200-01, "General Building Requirements" and UFC 1-200-02, "High Performance and Sustainable Building Requirements."  This project will comply with DoD antiterrorism/force protection requirements per UFC 4-010-01, "DoD Minimum Antiterrorism Standards for Buildings" and include cybersecurity measures per UFC 4-010-06, "Cybersecurity of Facility-Related Control Systems."

The Contractor will be required to commence work within 10 days after Notice to Proceed (NTP) and complete the work in the proposed number of calendar days (Not to Exceed 1400 calendar days) after receipt of NTP.  Clauses will be included for Liquidated Damages in case of failure to complete the work in the time allowed.  Performance and Payment Bonds will be required.

The project specifications, applicable drawings and instructions to offerors are included in the attached documents.

Update #2 ·

Purpose of this update on 25 March 2021 is to post Amendment 0001 for Solicitation W9128F20R0002.

This notice is for solicitation issuance for construction of the Consolidated Space Operations Facility (CSOF) located at Schriever AFB, Colorado.

This solicitation is UNRESTRICTED AND OPEN TO BOTH LARGE AND SMALL BUSINESS PARTICIPATION.

Project Description: 

This project will consist of constructing a two-story CSOF with reinforced concrete foundation, steel structure, and a low slope membrane roof and the construct of a one-story entry control facility at the south side of the restricted area. Project will comply with all applicable DoD, Air Force, and base design standards.  In addition, local materials and construction techniques shall be used where cost effective.  Facilities will be designed as permanent construction in accordance with the DoD Unified Facilities Criteria (UFC) 1-200-01, "General Building Requirements" and UFC 1-200-02, "High Performance and Sustainable Building Requirements."  This project will comply with DoD antiterrorism/force protection requirements per UFC 4-010-01, "DoD Minimum Antiterrorism Standards for Buildings" and include cybersecurity measures per UFC 4-010-06, "Cybersecurity of Facility-Related Control Systems."

The Contractor will be required to commence work within 10 days after Notice to Proceed (NTP) and complete the work in the proposed number of calendar days (Not to Exceed 1400 calendar days) after receipt of NTP.  Clauses will be included for Liquidated Damages in case of failure to complete the work in the time allowed.  Performance and Payment Bonds will be required.

The project specifications, applicable drawings and instructions to offerors are included in the attached documents.

Update #1 ·

This notice is for solicitation issuance for construction of the Consolidated Space Operations Facility (CSOF) located at Schriever AFB, Colorado.

This solicitation is UNRESTRICTED AND OPEN TO BOTH LARGE AND SMALL BUSINESS PARTICIPATION.

Project Description: 

This project will consist of constructing a two-story CSOF with reinforced concrete foundation, steel structure, and a low slope membrane roof and the construct of a one-story entry control facility at the south side of the restricted area. Project will comply with all applicable DoD, Air Force, and base design standards.  In addition, local materials and construction techniques shall be used where cost effective.  Facilities will be designed as permanent construction in accordance with the DoD Unified Facilities Criteria (UFC) 1-200-01, "General Building Requirements" and UFC 1-200-02, "High Performance and Sustainable Building Requirements."  This project will comply with DoD antiterrorism/force protection requirements per UFC 4-010-01, "DoD Minimum Antiterrorism Standards for Buildings" and include cybersecurity measures per UFC 4-010-06, "Cybersecurity of Facility-Related Control Systems."

The Contractor will be required to commence work within 10 days after Notice to Proceed (NTP) and complete the work in the proposed number of calendar days (Not to Exceed 1400 calendar days) after receipt of NTP.  Clauses will be included for Liquidated Damages in case of failure to complete the work in the time allowed.  Performance and Payment Bonds will be required.

The project specifications, applicable drawings and instructions to offerors are included in the attached documents.

Files

File Type Posted
Am-0012_W9128F20R0002.pdf PDF
Am-0011_W9128F20R0002.pdf PDF
Am-0010_W9128F20R0002.pdf PDF
Am-0009_W9128F20R0002.pdf PDF
Am-0009_W9128F20R0002_Drawings-Reissued.pdf PDF
Am-0008_W9128F20R0002.pdf PDF
Am-0008_W9128F20R0002_Drawings_(Reissued).pdf PDF
Modeling Files - 90 Percent Corrected Disclaimer.pdf PDF
Am-0007_W9128F20R0002.pdf PDF
CSOF Part 1_Modeling Files_90 Percent Corrected Download Instructions.pdf PDF
CSOF Part 1_Modeling Files_90 Percent Corrected.pdf PDF
CSOF Part 3_Modeling Files_90 Percent Corrected.zip ZIP file
CSOF Part 5_Modeling Files_90 Percent Corrected.zip ZIP file
CSOF Part 6_Modeling Files_90 Percent Corrected.zip ZIP file
CSOF Part 7_Modeling Files_90 Percent Corrected.zip ZIP file
CSOF Part 10_Modeling Files_90 Percent Corrected.zip ZIP file
Am-0006_W9128F20R0002.pdf PDF
Am-0005_W9128F20R0002.pdf PDF
CSOF Part 9_Modeling Files_90 Percent Corrected.zip ZIP file
Am-0004_W9128F20R0002.pdf PDF
Am-0003_W9128F20R0002.pdf PDF
CSOF Part 2_Modeling Files_90 Percent Corrected.zip ZIP file
CSOF Part 4_Modeling Files_90 Percent Corrected.zip ZIP file
CSOF Part 8_Modeling Files_90 Percent Corrected.zip ZIP file
ECP_Modeling Files_90 Percent Corrected.zip ZIP file
Am-0002_W9128F20R0002_Drawings-(Revised).pdf PDF
W9128F20R0002_Am0002_Final_Div00_Specs_Drawings.pdf PDF
CSOF Virtual Site Visit_Attendee POCs_01Apr2021.pdf PDF
W9128F20R0002_Am0001_Final.pdf PDF
90-Percent-Corrected_V1-SPECS_W9128F20R0002_CSOF-General.pdf PDF
CSOF_DRAWINGS_Volume 1_LS-Civil-Landscape.pdf PDF
CSOF_DRAWINGS_Volume 4_Interiors.pdf PDF
CSOF_DRAWINGS_Volume 7_Electrical.pdf PDF
ECP_DRAWINGS.pdf PDF
CSOF Site Photo Package compressed.pdf PDF
CSOF_DRAWINGS_Volume 2_Structural.pdf PDF
CSOF_DRAWINGS_Volume 3_Architectural.pdf PDF
CSOF_DRAWINGS_Volume 5_Fire-Plumbing.pdf PDF
CSOF_DRAWINGS_Volume 6_Process-Mechanical.pdf PDF
Div00_W9128F20R0002.pdf PDF
90-Percent-Corrected_V2-SPECS_W9128F20R0002_CSOF.pdf PDF
90-Percent-Corrected_V3-SPECS_W9128F20R0002_ECP.pdf PDF
CSOF_DRAWINGS_Volume 8_Comm-Security.pdf PDF
Show all 43

Notice history

Notice Type Posted
This notice Latest solicitation Solicitation
Consolidated Space Operations Facility, Schriever AFB, Colorado Original Pre-Solicitation

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors