Consolidated Space Operations Facility, Schriever AFB, Colorado
Solicitation number
W9128F20R0002
Issued by

About this file

This document contains a federal solicitation for the construction of the Consolidated Space Operations Facility at Schriever Air Force Base in Colorado. The solicitation is unrestricted and open to both large and small businesses. The project will consist of constructing a two-story facility and one-story entry control facility in compliance with DoD, Air Force, and base design standards. Facilities must meet DoD requirements for antiterrorism, force protection, and cybersecurity. The contractor will be required to commence work within 10 days of notice to proceed and complete the project within 1400 calendar days, with liquidated damages for failure to meet the deadline. Performance and payment bonds will be required. The Army Corps of Engineers Engineering District Omaha is the contracting agency.

View the file

Other files

File Type Posted
Am-0012_W9128F20R0002.pdf PDF
Am-0011_W9128F20R0002.pdf PDF
Am-0010_W9128F20R0002.pdf PDF
Am-0009_W9128F20R0002.pdf PDF
Am-0009_W9128F20R0002_Drawings-Reissued.pdf PDF
Am-0008_W9128F20R0002_Drawings_(Reissued).pdf PDF
Am-0008_W9128F20R0002.pdf PDF
CSOF Part 1_Modeling Files_90 Percent Corrected Download Instructions.pdf PDF
Am-0007_W9128F20R0002.pdf PDF
Modeling Files - 90 Percent Corrected Disclaimer.pdf PDF
Am-0004_W9128F20R0002.pdf PDF
CSOF Part 9_Modeling Files_90 Percent Corrected.zip ZIP file
CSOF Part 2_Modeling Files_90 Percent Corrected.zip ZIP file
ECP_Modeling Files_90 Percent Corrected.zip ZIP file
CSOF Part 10_Modeling Files_90 Percent Corrected.zip ZIP file
Am-0005_W9128F20R0002.pdf PDF
Am-0006_W9128F20R0002.pdf PDF
CSOF Part 1_Modeling Files_90 Percent Corrected.pdf PDF
CSOF Part 7_Modeling Files_90 Percent Corrected.zip ZIP file
CSOF Part 3_Modeling Files_90 Percent Corrected.zip ZIP file
CSOF Part 6_Modeling Files_90 Percent Corrected.zip ZIP file
Am-0003_W9128F20R0002.pdf PDF
CSOF Part 5_Modeling Files_90 Percent Corrected.zip ZIP file
CSOF Part 8_Modeling Files_90 Percent Corrected.zip ZIP file
CSOF Part 4_Modeling Files_90 Percent Corrected.zip ZIP file
Am-0002_W9128F20R0002_Drawings-(Revised).pdf PDF
W9128F20R0002_Am0002_Final_Div00_Specs_Drawings.pdf PDF
CSOF Virtual Site Visit_Attendee POCs_01Apr2021.pdf PDF
W9128F20R0002_Am0001_Final.pdf PDF
CSOF_DRAWINGS_Volume 1_LS-Civil-Landscape.pdf PDF
90-Percent-Corrected_V3-SPECS_W9128F20R0002_ECP.pdf PDF
CSOF_DRAWINGS_Volume 8_Comm-Security.pdf PDF
ECP_DRAWINGS.pdf PDF
CSOF_DRAWINGS_Volume 4_Interiors.pdf PDF
Div00_W9128F20R0002.pdf PDF
90-Percent-Corrected_V1-SPECS_W9128F20R0002_CSOF-General.pdf PDF
90-Percent-Corrected_V2-SPECS_W9128F20R0002_CSOF.pdf PDF
CSOF_DRAWINGS_Volume 7_Electrical.pdf PDF
CSOF_DRAWINGS_Volume 6_Process-Mechanical.pdf PDF
CSOF_DRAWINGS_Volume 3_Architectural.pdf PDF
CSOF_DRAWINGS_Volume 5_Fire-Plumbing.pdf PDF
CSOF_DRAWINGS_Volume 2_Structural.pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SF SF SF SF SF

SF

SF

SF

SF

SF

SFSFSFSFSFSF

SF

SF

SF

SF

SF

SF SF SF

SF

SF

SF

SFSFSF

SFSFSFSF

SF

SF

SF

SF

SF

SFSFSFSF

SFSF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+2 0.

L3

C1

L3

C

L3

L1

X X X X X X X X X X X X

X X

X X

X

X

X

X

X

X

X

X

XXXXXXXXXXXX X X X X X X X X X X X X

XXXX

1. EROSION AND SEDIMENT CONTROL SHOWN ON THIS

DRAWING IS CONCEPTUAL AND SUBJECT TO CHANGE

BASED ON FINAL PERMITTING REQUIREMENTS AND

DIRECTION FROM SAFB. CONTRACTOR TO CONFIRM

FINAL EROSION AND SEDIMENT CONTROL PERMITTING

REQUIREMENTS PRIOR TO BEGINNING CONSTRUCTION.

2. REFER TO COLORADO DEPARTMENT OF

TRANSPORTATION TEMPORARY EROSION CONTROL

STANDARD PLAN NO. M-208-1 DETAILS SHOWN ON GC501

AND GC502.

3. INSTALL SILT FENCE. SEE NOTE 2.

4. INSTALL VEHICLE TRACKING PAD. SEE NOTE 2.

5. INSTALL CONCRETE WASHOUT STRUCTURE. SEE NOTE 2.

6. INSTALL EROSION LOG CULVERT INLET PROTECTION.

SEE NOTE 2.

7. INSTALL STORM DRAIN INLET PROTECTION. SEE NOTE 2.

8. INSTALL EROSION LOG AT TOE OF SLOPE. SEE NOTE 2.

NOTES:

SH

-G

LE

N

-3

1- G

C

1.

D

W G

GC101-E

ER

O

SI

O

N

AN

D

SE

D

IM

EN

T

C O

N

TR

O L

PL

AN

SAFB RESTRICTED

AREA BOUNDARY

4TEMPORARY

CONSTRUCTION

BYPASS ROAD

PROPOSED

CONTRACTOR

SECURE STAGING AREA

7 7

4 5

TEMPORARY FENCE 4

TEMPORARY

CONSTRUCTION

ROAD

BASIN NO. AREA (AC)

A-1 1.5570

A-2 0.8468

A-3 0.3750

A-4 1.3654

A-5 0.3758

B-1 0.2513

B-2 1.1256

B-3 0.8128

TOTAL 6.7097

BASIN NO. AREA (AC)

C-1 0.2283

C-2 0.2734

C-3 0.5314

C-4 0.3177

C-5 0.3177

C-6 0.3177

C-7 0.3177

C-8 0.3512

C-9

C-10 0.2590

TOTAL 3.2494

CSOF DRAINAGE AREAS

ECP DRAINAGE AREAS

C-2 C-1 C-9 C-10

C-3

C-4

C-5

C-6

C-7

C-8

DP-1

DP-4

DP-3

DP-2

A-1

DP-1

DP-3

DP-2

DP-4

B-1 B-3

A-4 A-5

B-2

A-2 A-3

0.3355

9 10

16 17

36 37

39 40

55 56

CSOF SITE

PHOTO

LOCATION

PLAN

UNDERGROUND

UTILIDOR

PICTURES

PHOTOS 61 - 64.

PHOTO 1.

PHOTO 2.

PHOTO 3.

PHOTO 4.

PHOTO 5.

PHOTO 6.

PHOTO 7.

PHOTO 8.

PHOTO 9.

PHOTO 10.

PHOTO 11.

PHOTO 12.

PHOTO 13.

PHOTO 14.

PHOTO 15.

PHOTO 16.

PHOTO 17.

PHOTO 18.

PHOTO 19.

PHOTO 20.

PHOTO 21.

PHOTO 22.

PHOTO 23.

PHOTO 24.

PHOTO 25.

PHOTO 26.

PHOTO 27.

PHOTO 28.

PHOTO 29.

PHOTO 30.

PHOTO 31.

PHOTO 32.

PHOTO 33.

PHOTO 34.

PHOTO 35.

PHOTO 36.

PHOTO 37.

PHOTO 38.

PHOTO 39.

PHOTO 40.

PHOTO 41.

PHOTO 42.

PHOTO 43.

PHOTO 44.

PHOTO 45.

PHOTO 46.

PHOTO 47.

PHOTO 48.

PHOTO 49.

PHOTO 50.

PHOTO 51.

PHOTO 52.

PHOTO 53.

PHOTO 54.

PHOTO 55.

PHOTO 56.

PHOTO 57.

PHOTO 58.

PHOTO 59.

PHOTO 60.

PHOTO 61.

PHOTO 62.

PHOTO 63.

PHOTO 64.

File details come from the government source that posted it. Updated .