CSOF_DRAWINGS_Volume 7_Electrical.pdf
PDF 60 MB Posted
- Solicitation number
- W9128F20R0002
About this file
This notice solicits bids for the construction of the Consolidated Space Operations Facility at Schriever Air Force Base in Colorado. The project will consist of constructing a two-story facility and one-story entry control facility using reinforced concrete, steel structure, and a low slope membrane roof. Facilities must comply with DoD, Air Force, and base design standards as well as Unified Facilities Criteria for building requirements, antiterrorism standards, and cybersecurity of control systems. The contractor must commence work within 10 days of receiving the notice to proceed and complete the project within 1400 calendar days, with liquidated damages for failure to meet the deadline. Performance and payment bonds are required. The Army Corps of Engineers Engineering District Omaha is the contracting agency.
View the file
Other files
Show all 42
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .