CSOF_DRAWINGS_Volume 6_Process-Mechanical.pdf

PDF 40 MB Posted

Attached to
Consolidated Space Operations Facility, Schriever AFB, Colorado
Solicitation number
W9128F20R0002
Issued by

About this file

This notice is a solicitation for the construction of the Consolidated Space Operations Facility at Schriever Air Force Base in Colorado. The project will consist of constructing a two-story facility and one-story entry control facility with reinforced concrete, steel structure, and membrane roofing. It will comply with DoD, Air Force, and base design standards, and will utilize local materials and construction techniques where cost effective. Facilities will be designed for permanent construction and comply with DoD antiterrorism and cybersecurity requirements. Offerors must be able to commence work within 10 days of notice to proceed and complete construction within 1400 calendar days, with liquidated damages for failure to meet the deadline. Performance and payment bonds will be required. The Army Corps of Engineers Engineering District Omaha is the issuing agency.

View the file

Other files

File Type Posted
Am-0012_W9128F20R0002.pdf PDF
Am-0011_W9128F20R0002.pdf PDF
Am-0010_W9128F20R0002.pdf PDF
Am-0009_W9128F20R0002.pdf PDF
Am-0009_W9128F20R0002_Drawings-Reissued.pdf PDF
Am-0008_W9128F20R0002_Drawings_(Reissued).pdf PDF
Am-0008_W9128F20R0002.pdf PDF
CSOF Part 1_Modeling Files_90 Percent Corrected Download Instructions.pdf PDF
Am-0007_W9128F20R0002.pdf PDF
Modeling Files - 90 Percent Corrected Disclaimer.pdf PDF
Am-0004_W9128F20R0002.pdf PDF
CSOF Part 9_Modeling Files_90 Percent Corrected.zip ZIP file
CSOF Part 2_Modeling Files_90 Percent Corrected.zip ZIP file
ECP_Modeling Files_90 Percent Corrected.zip ZIP file
CSOF Part 10_Modeling Files_90 Percent Corrected.zip ZIP file
Am-0005_W9128F20R0002.pdf PDF
Am-0006_W9128F20R0002.pdf PDF
CSOF Part 1_Modeling Files_90 Percent Corrected.pdf PDF
CSOF Part 7_Modeling Files_90 Percent Corrected.zip ZIP file
CSOF Part 3_Modeling Files_90 Percent Corrected.zip ZIP file
CSOF Part 6_Modeling Files_90 Percent Corrected.zip ZIP file
Am-0003_W9128F20R0002.pdf PDF
CSOF Part 5_Modeling Files_90 Percent Corrected.zip ZIP file
CSOF Part 8_Modeling Files_90 Percent Corrected.zip ZIP file
CSOF Part 4_Modeling Files_90 Percent Corrected.zip ZIP file
Am-0002_W9128F20R0002_Drawings-(Revised).pdf PDF
W9128F20R0002_Am0002_Final_Div00_Specs_Drawings.pdf PDF
CSOF Virtual Site Visit_Attendee POCs_01Apr2021.pdf PDF
W9128F20R0002_Am0001_Final.pdf PDF
CSOF_DRAWINGS_Volume 1_LS-Civil-Landscape.pdf PDF
90-Percent-Corrected_V3-SPECS_W9128F20R0002_ECP.pdf PDF
CSOF_DRAWINGS_Volume 8_Comm-Security.pdf PDF
ECP_DRAWINGS.pdf PDF
CSOF_DRAWINGS_Volume 4_Interiors.pdf PDF
Div00_W9128F20R0002.pdf PDF
90-Percent-Corrected_V1-SPECS_W9128F20R0002_CSOF-General.pdf PDF
90-Percent-Corrected_V2-SPECS_W9128F20R0002_CSOF.pdf PDF
CSOF_DRAWINGS_Volume 7_Electrical.pdf PDF
CSOF Site Photo Package compressed.pdf PDF
CSOF_DRAWINGS_Volume 3_Architectural.pdf PDF
CSOF_DRAWINGS_Volume 5_Fire-Plumbing.pdf PDF
CSOF_DRAWINGS_Volume 2_Structural.pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

1 2 3 4 5 6 7 8 9 10

D

C

B

A

D A

T E

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

F

IL

E N

U M

B E

R

P

W F

R

O M

A H

A D

IS

T

R

IC

T C

A P

IT

A

L A

V E

N U

E

O M

A H

A N

E B

R A

S K

A

-1

-2

CSOF PACKAGE - 90% CORRECTED DESIGN

E

F

G

A F

-1

-0

F

IL

E N

A M

E

C S

O F

P

A C

K A

G E

C O

N S

O L

ID

A T

E D

S P

A C

E O

P E

R A

T

IO

N S

F A

C

IL

IT

Y

B L D

G N

O

3/10/2021 10:03:49 AM

G-010

C O

V E

R S

H E

E T

V

O L U

M E

S C

H R

IE

V

E R

A F

B C

O L O

R A

D O

M D

A L L A

B A

T T

IS

T

A

T V

O N

F E

L D

T

T V

O N

F E

L D

T

J O

L S

O N

S H

-G

L E

N -3

-C

S O

F -A

.R

V T

PROCESS, MECHANICAL

1616 CAPITAL AVENUE, #3300 OMAHA, NEBRASKA 68102

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

1 2 3 4 5 6 7 8 9 10

D

C

B

A

D A

T E

US Army Corps of Engineers ®

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

F

IL

E N

U M

B E

R

P

SOLICITATION NO.: W9128F20R0002

CONSTRUCTION CONTRACT NO.:

ISSUE DATE:

90% CORRECTED DESIGN

W F

R

O M

A H

A D

IS

T

R

IC

T C

A P

IT

A

L A

V E

N U

E

O M

A H

A N

E B

R A

S K

A

-1

-2

CSOF PACKAGE - 90% CORRECTED DESIGN

E

F

G

A F

-1

-0

F

IL

E N

A M

E

OMAHA DISTRICT

C S

C

K A

G E

C O

N S

O L

ID

A T

E D

S P

A C

E O

P E

R A

T

IO

N S

F A

C

IL

IT

Y

B L D

G N

O

3/10/2021 10:03:49 AM

G-010

C O

V E

R S

H E

E T

V

O L U

M E

S C

H R

IE

V

E R

A F

B C

O L O

R A

D O

M D

A L L A

B A

T T

IS

T

A

T V

O N

F E

L D

T

T V

O N

F E

L D

T

J O

L S

O N

S H

-G

L E

N -3

-C

S O

F -A

.R

V T

SCHRIEVER AFB, COLORADO

CONSOLIDATED SPACE OPERATIONS FACILITY

BLDG. NO. 750

03-12-2021

CSOF PACKAGE - VOLUME 6

BID OPTION 3D PERSPECTIVE

BASE BID 3D PERSPECTIVE

MECHANICAL

PLUMBINGARCHITECTURALSTRUCTURALCIVIL / LANDSCAPEFIRE PROTECTION

TELECOMMUNICATIONSELECTRICAL

DESIGNER SIGNATURE BLOCK

N

N

MECHANICAL ELECTRICAL

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

1 2 3 4 5 6 7 8 9 10

D

C

B

A

D A

T E

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

F

IL

E N

U M

B E

R

P

W F

R

O M

A H

A D

IS

T

R

IC

T C

A P

IT

A

L A

V E

N U

E

O M

A H

A N

E B

R A

S K

A

-1

-2

CSOF PACKAGE - 90% CORRECTED DESIGN

E

F

G

A F

-1

-0

F

IL

E N

A M

E

C S

C

K A

G E

C O

N S

O L

ID

A T

E D

S P

A C

E O

P E

R A

T

IO

N S

F A

C

IL

IT

Y

B L D

G N

O

3/10/2021 1:10:28 PM

G-011

C S

O F

D

R A

W

IN

G I

N D

E X

V

O L U

M E

S C

H R

IE

V

E R

A F

B C

O L O

R A

D O

M D

A L L A

B A

T T

IS

T

A

T V

O N

F E

L D

T

T V

O N

F E

L D

T

J O

L S

O N

S H

-G

L E

N -3

-C

S O

F -A

.R

V T

SHT No SHEET NAME REV DATE

M-501 MECHANICAL - PIPE SUPPORT DETAILS SHEET 1

M-502 MECHANICAL - PIPE SUPPORT DETAILS SHEET 2

M-503 MECHANICAL - PIPE SUPPORT DETAILS SHEET 3

M-504 DETAILS

M-505 DETAILS

M-506 DETAILS

M-507 DETAILS

M-508 DETAILS

M-601 MECHANICAL - EQUIPMENT SCHEDULES - SHEET 1

M-602 MECHANICAL - EQUIPMENT SCHEDULES - SHEET 2

M-603 MECAHNICAL - EQUIPMENT SCHEDULES - SHEET 3

M-604 MECAHNICAL - EQUIPMENT SCHEDULES - SHEET 4

M-605 MECHANICAL - EQUIPMENT SCHEDULES - SHEET 4

M-605A MECHANICAL - EQUIPMENT SCHEDULES - SHEET 4A

M-606 MECHANICAL - EQUIPMENT SCHEDULES - SHEET 6

M-607 MECHANICAL - EQUIPMENT SCHEDULES - SHEET 7

M-608 OUTSIDE AIR CALCULATION

M-609 MISSION CRITICAL CHILLED WATER DISTRIBUTION DIAGRAM

M-701 DDC CONTROLS - LEGEND AND ABBREVIATIONS

M-702 DDC CONTROLS - NETWORK DIAGRAM

M-703 DDC CONTROLS - AHU WITHOUT OUTSIDE AIR

M-704 DDC CONTROLS - AHU WITH OUTSIDE AIR

M-705 DOAS-1 DIAGRAM AND SEQUENCE

M-707 DDC CONTROLS - VAVS

M-708 DDC CONTROLS - CRAC UNITS

M-709 DDC CONTROLS - FCU

M-710 DDC CONTROLS - HYDROGEN DETECTION AND EXHAUST SYSTEM CONTROLS

M-711 DDC CONTROLS - SMOKE EXHAUST AND EMERGENCY SHUTDOWN

M-712 DDC CONTROLS - GENERAL EXHAUST FANS

M-713 DDC CONTROLS - SUMP PUMPS

M-714 DDC CONTROLS - DHWR PUMP & METERING

Grand total: 175

SHT No SHEET NAME REV DATE

D-731 PIPING AND INSTRUMENTATION DIAGRAM - FAN COIL UNITS - EAST CENTRAL UTILITY PLANT

D-732 PIPING AND INSTRUMENTATION DIAGRAM - FAN COIL UNITS - EAST CENTRAL UTILITY PLANT

D-733 PIPING AND INSTRUMENTATION DIAGRAM - FAN COIL UNITS - ELECTRICAL ROOMS

D-734 PIPING AND INSTRUMENTATION DIAGRAM - GENERATOR FUEL OIL SYSTEM 01

D-735 PIPING AND INSTRUMENTATION DIAGRAM - GENERATOR FUEL OIL SYSTEM 02

DP901 CHILLED WATER PIPING ISOMETRIC - CUP

DP902 CONDENSER WATER PIPING ISOMETRIC - CUP

DP903 HOT WATER PIPING ISOMETRIC - CUP

DP904 DOMESTIC COLD WATER AND MAKE-UP WATER PIPING ISOMETRIC - CUP

DP905 MISCELLANEOUS PIPING ISOMETRIC - CUP

DP906 ELECTRICAL/MECHANICAL YARD PIPING ISOMETRIC - CUP

1400 - MECHANICAL

M-001 LEGEND AND ABBREVIATIONS

MH110 OVERALL HVAC PLAN - FIRST FLOOR

MH111 FIRST FLOOR HVAC PLAN - SECTOR 1

MH112 FIRST FLOOR HVAC PLAN - SECTOR 2

MH113 FIRST FLOOR HVAC PLAN - SECTOR 3

MH114 FIRST FLOOR HVAC PLAN - SECTOR 4

MH115 FIRST FLOOR HVAC PLAN - SECTOR 5

MH116 FIRST FLOOR HVAC PLAN - SECTOR 6

MH116A FIRST FLOOR HVAC PLAN - SECTOR 6A

MH117 FIRST FLOOR HVAC PLAN - SECTOR 7

MH118 FIRST FLOOR HVAC PLAN - SECTOR 8

MH119 FIRST FLOOR HVAC PLAN - SECTOR 9

MH119A FIRST FLOOR HVAC PLAN - SECTOR 9A

MH120 OVERALL HVAC PLAN - SECOND FLOOR

MH121 SECOND FLOOR HVAC PLAN - SECTOR 1

MH122 SECOND FLOOR HVAC PLAN - SECTOR 2

MH123 SECOND FLOOR HVAC PLAN - SECTOR 3

MH124 SECOND FLOOR HVAC PLAN - SECTOR 4

MH125 SECOND FLOOR HVAC PLAN - SECTOR 5

MH126 SECOND FLOOR HVAC PLAN - SECTOR 6

MH127 SECOND FLOOR HVAC PLAN - SECTOR 7

MH128 SECOND FLOOR HVAC PLAN - SECTOR 8

MH129 SECOND FLOOR HVAC PLAN - SECTOR 9

MH130 OVERALL HVAC ROOF PLAN

MH130A OVERALL HVAC ROOF PLAN

MP100 OVERALL PIPING PLAN - FIRST FLOOR

MP111 FIRST FLOOR PIPING PLAN - SECTOR 1

MP112 FIRST FLOOR PIPING PLAN - SECTOR 2

MP113 FIRST FLOOR PIPING PLAN - SECTOR 3

MP114 FIRST FLOOR PIPING PLAN - SECTOR 4

MP115 FIRST FLOOR PIPING PLAN - SECTOR 5

MP116 FIRST FLOOR PIPING PLAN - SECTOR 6

MP116A FIRST FLOOR PIPING PLAN - SECTOR 6A

MP117 FIRST FLOOR PIPING PLAN - SECTOR 7

MP118 FIRST FLOOR PIPING PLAN - SECTOR 8

MP119 FIRST FLOOR PIPING PLAN - SECTOR 9

MP119A FIRST FLOOR PIPING PLAN - SECTOR 9A

MP120 OVERALL PIPING PLAN - SECOND FLOOR

MP121 SECOND FLOOR PIPING PLAN - SECTOR 1

MP122 SECOND FLOOR PIPING PLAN - SECTOR 2

MP123 SECOND FLOOR PIPING PLAN - SECTOR 3

MP124 SECOND FLOOR PIPING PLAN - SECTOR 4

MP125 SECOND FLOOR PIPING PLAN - SECTOR 5

MP126 SECOND FLOOR PIPING PLAN - SECTOR 6

MP127 SECOND FLOOR PIPING PLAN - SECTOR 7

MP128 SECOND FLOOR PIPING PLAN - SECTOR 8

MP129 SECOND FLOOR PIPING PLAN - SECTOR 9

MH401 HVAC AIRSIDE EQUIPMENT PLAN - CUP

MH402 HVAC VENTILATION EQUIPMENT PLAN -CUP

MH403 HVAC AIRSIDE DUCT PLAN - CUP

MH404 HVAC VENTILATION DUCT PLAN - CUP

M-405 ENLARGED MECHANICAL ROOM PLANS

M-406 ENLARGED MECHANICAL ROOM PLANS

M-407 ENLARGED MECHANICAL ROOM PLANS

M-408 ENLARGED MECHANICAL ROOM PLANS

M-409 ENLARGED MECHANICAL ROOM PLANS

M-411 ENLARGED PIPING PLAN

M-412 ENLARGED PIPING PLAN

M-413 ENLARGED PIPING PLAN

M-421 ISOMETRIC MECHANICAL ROOM PLANS

M-422 ISOMETRIC MECHANICAL ROOM PLANS

M-423 ISOMETRIC MECHANICAL ROOM PLANS

M-424 ISOMETRIC MECHANICAL ROOM PLANS

M-425 ISOMETRIC MECHANICAL ROOM PLANS

SHT No SHEET NAME REV DATE

1300 - PROCESS

DP301 PROCESS PIPING SECTIONS - CUP

DP302 PROCESS PIPING SECTIONS - CUP

DP303 PROCESS PIPING SECTIONS - CUP

DP304 PROCESS PIPING SECTIONS - CUP

DP305 PROCESS PIPING SECTIONS - CUP

DP306 PROCESS PIPING SECTIONS - CUP

DP307 PROCESS PIPING SECTIONS - ELECTRICAL/MECHANICAL YARD

DP400 OVERALL PROCESS PIPING PLAN - CUP MECHANICAL ROOMS A/B

DP401 CHILLED WATER PIPING PLAN - CUP MECHANICAL ROOM A

DP402 CHILLED WATER PIPING PLAN - CUP MECHANICAL ROOM B

DP403 CONDENSER WATER PIPING PLAN - CUP MECHANICAL ROOM A

DP404 CONDENSER WATER PIPING PLAN - CUP MECHANICAL ROOM B

DP405 HOT WATER PIPING PLAN -CUP MECHANICAL ROOM A

DP406 HOT WATER PIPING PLAN -CUP MECHANICAL ROOM B

DP407 DOMESTIC COLD WATER AND MAKE-UP WATER PIPING PLAN - CUP MECHANICAL ROOM A

DP408 DOMESTIC COLD WATER AND MAKE-UP WATER PIPING PLAN - CUP MECHANICAL ROOM B

DP409 MISCELLANEOUS PIPING PLAN - CUP MECHANICAL ROOM A

DP410 MISCELLANEOUS PIPING PLAN - CUP MECHANICAL ROOM B

DP411 FAN COIL UNIT PIPING - CUP

DP412 OVERALL PROCESS PIPING PLAN - CUP ROOF

DP413 CONDENSER WATER PIPING PLAN - CUP ROOF

DP414 MISCELLANEOUS PIPING PLAN - CUP ROOF

DP415 PROCESS PIPING PLAN - ELECTRICAL/MECHANICAL YARD

DQ401 PROCESS EQUIPMENT PLAN - CUP MECANICAL ROOM A

DQ402 PROCESS EQUIPMENT PLAN - CUP MECANICAL ROOM B

DQ403 PROCESS EQUIPMENT PLAN - CUP ROOF

DQ404 PROCESS EQUIPMENT PLAN - ELECTRICAL/MECHANICAL YARD

D-001 PIPING AND INSTRUMENTATION DIAGRAM - LEGEND SHEET 1

D-002 PIPING AND INSTRUMENTATION DIAGRAM - LEGEND SHEET 2

D-003 PIPING AND INSTRUMENTATION DIAGRAM - LEGEND SHEET 3

D-004 PIPING AND INSTRUMENTATION DIAGRAM - SEQUENCE OF OPERATIONS

D-601 PROCESS FLOW DIAGRAM - CHILLED WATER SYSTEM

D-602 PROCESS FLOW DIAGRAM - CONDENSER WATER SYSTEM

D-603 PROCESS FLOW DIAGRAM - HOT WATER SYSTEM

D-604 PROCESS FLOW DIAGRAM - SYSTEM TABLES

D-701 PIPING AND INSTRUMENTATION DIAGRAM - WATER COOLED CHILLER 01

D-701A PIPING AND INSTRUMENTATION - CHILLER CONDENSER WATER BYPASS PUMP 01

D-702 PIPING AND INSTRUMENTATION DIAGRAM - WATER COOLED CHILLER 02

D-702A PIPING AND INSTRUMENTATION - CHILLER CONDENSER WATER BYPASS PUMP 02

D-703 PIPING AND INSTRUMENTATION DIAGRAM - WATER COOLED CHILLER 03

D-703A PIPING AND INSTRUMENTATION - CHILLER CONDENSER WATER BYPASS PUMP 03

D-704 PIPING AND INSTRUMENTATION DIAGRAM - WATER COOLED CHILLER 04

D-704A PIPING AND INSTRUMENTATION - CHILLER CONDENSER WATER BYPASS PUMP 04

D-705 PIPING AND INSTRUMENTATION DIAGRAM - COOLING TOWER 01

D-706 PIPING AND INSTRUMENTATION DIAGRAM - COOLING TOWER 02

D-707 PIPING AND INSTRUMENTATION DIAGRAM - COOLING TOWER 03

D-708 PIPING AND INSTRUMENTATION DIAGRAM - COOLING TOWER 04

D-709 PIPING AND INSTRUMENTATION DIAGRAM - PRIMARY CHILLED WATER PUMPS

D-710 PIPING AND INSTRUMENTATION DIAGRAM - CONDENSER WATER PUMPS

D-711 PIPING AND INSTRUMENTATION DIAGRAM - CHILLED WATER WEST HEADER

D-712 PIPING AND INSTRUMENTATION DIAGRAM - CHILLED WATER EAST HEADER

D-713 PIPING AND INSTRUMENTATION DIAGRAM - CONDENSER WATER WEST HEADER

D-714 PIPING AND INSTRUMENTATION DIAGRAM - CONDENSER WATER EAST HEADER

D-715 PIPING AND INSTRUMENTATION DIAGRAM - FREE COOLING HEAT EXCHANGER 01

D-716 PIPING AND INSTRUMENTATION DIAGRAM - FREE COOLING HEAT EXCHANGER 02

D-717 PIPING AND INSTRUMENTATION DIAGRAM - CONDENSER WATER CHEMICAL FEED

D-718 PIPING AND INSTRUMENTATION DIAGRAM - REFRIGERANT MONITORING WEST

D-719 PIPING AND INSTRUMENTATION DIAGRAM - REFRIGERANT MONITORING EAST

D-720 PIPING AND INSTRUMENTATION DIAGRAM - VENILATION FANS

D-721 PIPING AND INSTRUMENTATION DIAGRAM - DOMESTIC COLD WATER

D-722 PIPING AND INSTRUMENTATION DIAGRAM - HOT WATER BOILER 01

D-723 PIPING AND INSTRUMENTATION DIAGRAM - HOT WATER BOILER 02

D-724 PIPING AND INSTRUMENTATION DIAGRAM - HOT WATER BOILER 03

D-725 PIPING AND INSTRUMENTATION DIAGRAM - HOT WATER BOILER 04

D-726 PIPING AND INSTRUMENTATION DIAGRAM - SECONDARY HOT WATER PUMPS

D-727 PIPING AND INSTRUMENTATION DIAGRAM - HOT WATER WEST HEADER

D-728 PIPING AND INSTRUMENTATION DIAGRAM - HOT WATER EAST HEADER

D-729 PIPING AND INSTRUMENTATION DIAGRAM - FAN COIL UNITS - WEST CENTRAL UTILITY PLANT

D-730 PIPING AND INSTRUMENTATION DIAGRAM - FAN COIL UNITS - WEST CENTRAL UTILITY PLANT

SHT No SHEET NAME REV DATE

0000 - GENERAL

G-010 COVER SHEET - VOLUME 6

G-011 CSOF - DRAWING INDEX - VOLUME 6

Grand total: 2

LEVEL 1 FF

2' - 0"

CHW-CH-01

2"ø CHWS

"ø

C

H W

S

4"ø CWS

/2

/8

/8

"1

/8

6"ø RV

10"ø CWS

10"ø CWS

10"ø CHWS

10"ø CWR

2 1/2"ø MUWT

2 1/2"ø MUWT

6"ø CHWS

6"ø CHWR

6"ø CWR

6"ø CWS

3”⌀ RV

1 1/4”⌀ RV

3/4"ø HWR

3/4"ø HWS

1 1/4"ø HWS

1 1/4"ø HWR

1"ø CHWS

1"ø CHWR

2"ø CHWR

LEVEL 1 FF

2' - 0"

CH-PMP-02

/2

/8

/8

/8

" 1

2 1/2"ø MUWT

2 1/2"ø MUWT

10"ø CWS

6"ø RV

10"ø CWS

10"ø CWR

8"ø CWR

8"ø CWS

W

R

W

S

W R

R

R

S

1"ø CF

1 1/4"ø HWS

1 1/4"ø HWR

2"ø CHWR

2"ø CHWS

HVAC-FCU-05

3/4"ø HWS

3/4"ø HWR

1"ø CHWR

1"ø CHWS

LEVEL 1 FF

2' - 0"

3"ø HWR

3"ø HWS

/8

/8

BLR-PMP-01

HW-BLR-01

4"ø HWS 4"ø HWR

G

6"⌀ EXHAUST VENT

6"⌀ COMBUSTION AIR

LEVEL 1 FF

2' - 0"

CHW-AS-01

CHW-CSF-01

10"ø CHWR

10"ø CHWR

1 1/2"ø CHWR

2"ø MUWT

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

1 2 3 4 5 6 7 8 9 10

D

C

B

A

D A

T E

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

F

IL

E N

U M

B E

R

P

4 5 6

KEY PLAN

PLAN NORTH

W F

R

O M

A H

A D

IS

T

R

IC

T

C

A P

IT

A

L A

V E

N U

E

O M

A H

A N

E B

R A

S K

A

-1

-2

CSOF PACKAGE - 90% CORRECTED DESIGN

E

F

G

8 9

A F

-1

-0

F

IL

E N

A M

E

C S

C

K A

G E

C O

N S

O L

ID

A T

E D

S P

A C

E O

P E

R A

T

IO

N S

F A

C

IL

IT

Y

B L D

G N

O

C F

E U

E R

S T

E

IN

3/9/2021 11:48:52 AM

DP301

P R

O C

E S

S P

IP

IN

G S

E C

T

IO

N S

C

U P

S C

H R

IE

V

E R

A F

B C

O L O

R A

D O

C F

E U

E R

S T

E

IN

R T

U R

N E

R

J B

O V

E N

K A

M P

3/8" = 1'-0"1

TYPICAL CHILLER SECTION

3/8" = 1'-0"2

TYPICAL CHLLER BYPASS PUMP SECTION

3/8" = 1'-0"3

TYPICAL BOILER SECTION

3/8" = 1'-0"4

TYPICAL CHILLED WATER AIR SEPARATOR SECTION

GENERAL SHEET NOTES

1. PIPING SUSPENDED FROM THE BUILDING STRUCTURE ABOVE SHALL BE

ISOLATED USING MASON INDUSTRIES, MODEL 30N OR PC30N

SPRING/NEOPRENE HANGERS, OR EQUAL. SPRING/NEOPRENE HANGERS

SHALL HAVE 1" NOMINAL STATIC DEFLECTION.

2. PROVIDE AND INSTALL PIPING HANGERS AND SUPPORTS PER THE

HANGER NOTES, TABLES, AND DETAILS ON DRAWINGS M-501, M-502, AND

M-503. PROVIDE AND INSTALL PIPING HANGERS AND SUPPORTS AS

NECESSARY AND REQUIRED TO PROPERLY SUPPORT, GUIDE AND

ACCOMMODATE ANY MOVEMENT OF THE PIPING SYSTEMS IN THE

BUILDING MECHANICAL ROOM, AND CONNECT TO THE EQUIPMENT PER

THE MANUFACTURERS INSTALLATION REQUIREMENTS.

3. ALL PIPING PENETRATIONS THROUGH THE BUILDINGS BELOW GRADE

EXTERIOR WALLS AND FLOORS SHALL BE PRE-FORMED DURING WALL

CONSTRUCTION USING STEEL PIPE SLEEVE WITH WATER STOP/ANCHOR

PLATE. PROVIDE AND INSTALL MECHANICAL LINK-SEAL BETWEEN PIPING

AND STEEL WALL SLEEVE. SIZE AND INSTALL PIPE SLEEVE AND LINK-

SEAL ACCORDING TO THE MANUFACTURER'S INSTALLATION

REQUIREMENTS.

4. SEE STRUCTURAL DRAWINGS FOR CONCRETE EQUIPMENT PAD DETAILS

AND REQUIREMENTS.

5. CONTRACTOR SHALL FIELD ROUTE ALL PIPING 2" AND SMALLER.

ROUTING SHOWN IS FOR REFERENCE ONLY.

HW-CSF-01

HW-AS-01

4"ø HWS

4"ø HWR

1 1/2"ø MUWT

LEVEL 1 FF

2' - 0"

/4

/2

/4

/2

/8

2 1/2"ø MUWT2 1/2"ø MUWT

4"ø CWS

4"ø CWS

4"ø CWS 4"ø CWS

1 1/2"ø MUWT

3"ø NG

4"ø HWS

4"ø HWR

10"ø CWR 10"ø CWS

6"ø RV

10"ø CWS

10"ø CHWR

10"ø CHWS

10"ø CHWR

W

R

W

R

S

S

S

S

HW-PMP-02 CHW-PMP-02 CW-PMP-02

NOTE 5

NOTE 5 NOTE 5

2"⌀ CHWR

2"⌀ CHWS

1 1/4"⌀ HWS

1 1/4"⌀ HWR

LEVEL 1 FF

2' - 0"

I J

"3

" 6

/4

/8

3"ø DCW3"ø MUWT

2"ø MUWT

1 1/2"ø MUWT

1 1/4"ø DCW

1 1/2"ø DCW

2"ø DCW

1"ø DCW

D

W

S

S

S

S

/4

"ø

D

C W

/4

"ø

D

C W

3/4"ø DCWHVAC-FCU-02

HVAC-FCU-01

CW-SPR-01CW-SPR-02CF-TNK-03 CF-TNK-01/02

6"ø RV

2"ø CHWR2"ø CHWS

1"ø CHWR1"ø CHWS

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

1 2 3 4 5 6 7 8 9 10

D

C

B

A

D A

T E

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

F

IL

E N

U M

B E

R

P

4 5 6

KEY PLAN

PLAN NORTH

W F

R

O M

A H

A D

IS

T

R

IC

T

C

A P

IT

A

L A

V E

N U

E

O M

A H

A N

E B

R A

S K

A

-1

-2

CSOF PACKAGE - 90% CORRECTED DESIGN

E

F

G

8 9

A F

-1

-0

F

IL

E N

A M

E

C S

C

K A

G E

C O

N S

O L

ID

A T

E D

S P

A C

E O

P E

R A

T

IO

N S

F A

C

IL

IT

Y

B L D

G N

O

C F

E U

E R

S T

E

IN

3/9/2021 11:49:00 AM

DP302

P R

O C

E S

S P

IP

IN

G S

E C

T

IO

N S

C

U P

S C

H R

IE

V

E R

A F

B C

O L O

R A

D O

C F

E U

E R

S T

E

IN

R T

U R

N E

R

J B

O V

E N

K A

M P

3/8" = 1'-0"1

TYPICAL HOT WATER AIR SEPERATOR SECTION

3/8" = 1'-0"2

TYPICAL PUMP SECTION

3/8" = 1'-0"3

MECHANICAL ROOM A WEST WALL SECTION

GENERAL SHEET NOTES

1. PIPING SUSPENDED FROM THE BUILDING STRUCTURE ABOVE SHALL BE

ISOLATED USING MASON INDUSTRIES, MODEL 30N OR PC30N

SPRING/NEOPRENE HANGERS, OR EQUAL. SPRING/NEOPRENE HANGERS

SHALL HAVE 1" NOMINAL STATIC DEFLECTION.

2. PROVIDE AND INSTALL PIPING HANGERS AND SUPPORTS PER THE

HANGER NOTES, TABLES, AND DETAILS ON DRAWINGS M-501, M-502, AND

M-503. PROVIDE AND INSTALL PIPING HANGERS AND SUPPORTS AS

NECESSARY AND REQUIRED TO PROPERLY SUPPORT, GUIDE AND

ACCOMMODATE ANY MOVEMENT OF THE PIPING SYSTEMS IN THE

BUILDING MECHANICAL ROOM, AND CONNECT TO THE EQUIPMENT PER

THE MANUFACTURERS INSTALLATION REQUIREMENTS.

3. ALL PIPING PENETRATIONS THROUGH THE BUILDINGS BELOW GRADE

EXTERIOR WALLS AND FLOORS SHALL BE PRE-FORMED DURING WALL

CONSTRUCTION USING STEEL PIPE SLEEVE WITH WATER STOP/ANCHOR

PLATE. PROVIDE AND INSTALL MECHANICAL LINK-SEAL BETWEEN PIPING

AND STEEL WALL SLEEVE. SIZE AND INSTALL PIPE SLEEVE AND LINK-

SEAL ACCORDING TO THE MANUFACTURER'S INSTALLATION

REQUIREMENTS.

4. SEE STRUCTURAL DRAWINGS FOR CONCRETE EQUIPMENT PAD DETAILS

AND REQUIREMENTS.

/1

/1

" 1

HW-ET-01CHW-ET-01 CHW-HX-01

DW-SS-01

DW-EEWS-01

4"ø HWR

10"ø CHWR

8"ø CWS

8"ø CWR

W

R

/2

"ø

D

C W

/2

"ø

D

C W

HVAC-FCU-08 HVAC-FCU-06 HVAC-FCU-04 HVAC-FCU-02

3"ø HWS 4"ø CHWS

4"ø CHWR 3"ø HWS

1 1/4"ø DCW

1 1/2"ø HWS1 1/2"ø CHWR

10”⌀ CHWS (BEHIND)

8"ø CHWR

2"ø CHWR 2"ø CHWS

/4

"ø

D

C W

3"ø HWR

LEVEL 1 FF

2' - 0"

/1

/1

"1

CHW-HX-02 CHW-ET-02HW-ET-02

DW-SS-02

8"ø CWR 8"ø CHWR

8"ø CHWR8"ø CWS

4"ø HWS

/2

"ø

D

C W

/2

"ø

D

C W

/4

"ø

D

C W

HVAC-FCU-16 HVAC-FCU-14 HVAC-FCU-12 HVAC-FCU-10

10"ø CHWS 4"ø HWS

4"ø HWR

3"ø HWS 3"ø HWS

1 1/2"ø HWS 1 1/2"ø CHWR

1 1/2"ø MUWT1 1/4"ø HWS 3"ø HWS

3"ø HWR

4"ø CHWS

4"ø CHWS

2"ø CHWS 2"ø CHWR

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

1 2 3 4 5 6 7 8 9 10

D

C

B

A

D A

T E

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

F

IL

E N

U M

B E

R

P

4 5 6

KEY PLAN

PLAN NORTH

W F

R

O M

A H

A D

IS

T

R

IC

T C

A P

IT

A

L A

V E

N U

E

O M

A H

A N

E B

R A

S K

A

-1

-2

CSOF PACKAGE - 90% CORRECTED DESIGN

E

F

G

8 9

A F

-1

-0

F

IL

E N

A M

E

C S

C

K A

G E

C O

N S

O L

ID

A T

E D

S P

A C

E O

P E

R A

T

IO

N S

F A

C

IL

IT

Y

B L D

G N

O

C F

E U

E R

S T

E

IN

3/9/2021 11:49:09 AM

DP303

P R

O C

E S

S P

IP

IN

G S

E C

T

IO

N S

C

U P

S C

H R

IE

V

E R

A F

B C

O L O

R A

D O

C F

E U

E R

S T

E

IN

R T

U R

N E

R

J B

O V

E N

K A

M P

3/8" = 1'-0"1

CUP MECHANICAL ROOM A SOUTH WALL SECTION

3/8" = 1'-0"2

CUP MECHANICAL ROOM B SOUTH WALL SECTION

GENERAL SHEET NOTES

1. PIPING SUSPENDED FROM THE BUILDING STRUCTURE ABOVE SHALL BE

ISOLATED USING MASON INDUSTRIES, MODEL 30N OR PC30N

SPRING/NEOPRENE HANGERS, OR EQUAL. SPRING/NEOPRENE HANGERS

SHALL HAVE 1" NOMINAL STATIC DEFLECTION.

2. PROVIDE AND INSTALL PIPING HANGERS AND SUPPORTS PER THE

HANGER NOTES, TABLES, AND DETAILS ON DRAWINGS M-501, M-502, AND

M-503. PROVIDE AND INSTALL PIPING HANGERS AND SUPPORTS AS

NECESSARY AND REQUIRED TO PROPERLY SUPPORT, GUIDE AND

ACCOMMODATE ANY MOVEMENT OF THE PIPING SYSTEMS IN THE

BUILDING MECHANICAL ROOM, AND CONNECT TO THE EQUIPMENT PER

THE MANUFACTURERS INSTALLATION REQUIREMENTS.

3. ALL PIPING PENETRATIONS THROUGH THE BUILDINGS BELOW GRADE

EXTERIOR WALLS AND FLOORS SHALL BE PRE-FORMED DURING WALL

CONSTRUCTION USING STEEL PIPE SLEEVE WITH WATER STOP/ANCHOR

PLATE. PROVIDE AND INSTALL MECHANICAL LINK-SEAL BETWEEN PIPING

AND STEEL WALL SLEEVE. SIZE AND INSTALL PIPE SLEEVE AND LINK-

SEAL ACCORDING TO THE MANUFACTURER'S INSTALLATION

REQUIREMENTS.

4. SEE STRUCTURAL DRAWINGS FOR CONCRETE EQUIPMENT PAD DETAILS

AND REQUIREMENTS.

5. CONTRACTOR SHALL FIELD ROUTE ALL PIPING 2" AND SMALLER.

ROUTING SHOWN IS FOR REFERENCE ONLY.

TO SINK INSTANTANEOUS

ELECTRIC WATER HEATER

TO SINK

INSTANTANEOUS

ELECTRIC

WATER HEATER

"2

CUP ROOF

10"ø CWS

10"ø CWR

6"⌀ EXHAUST VENT

6"⌀ EXHAUST VENT

6"⌀ COMBUSTION AIR

6"⌀ COMBUSTION AIR

8"⌀ CWR

J

8"ø CWR 8"ø CWR

10"ø CWS

8"ø CWR

8"ø CWR 2"ø BLD 3"ø OF 2"ø BLD3"ø OF

(BEHIND) (BEHIND)

CW-CT-02CW-CT-01

CUP ROOF

/8

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

1 2 3 4 5 6 7 8 9 10

D

C

B

A

D A

T E

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

F

IL

E N

U M

B E

R

P

4 5 6

KEY PLAN

PLAN NORTH

W F

R

O M

A H

A D

IS

T

R

IC

T C

A P

IT

A

L A

V E

N U

E

O M

A H

A N

E B

R A

S K

A

-1

-2

CSOF PACKAGE - 90% CORRECTED DESIGN

E

F

G

8 9

A F

-1

-0

F

IL

E N

A M

E

C S

C

K A

G E

C O

N S

O L

ID

A T

E D

S P

A C

E O

P E

R A

T

IO

N S

F A

C

IL

IT

Y

B L D

G N

O

C F

E U

E R

S T

E

IN

3/9/2021 11:49:16 AM

DP304

P R

O C

E S

S P

IP

IN

G S

E C

T

IO

N S

C

U P

S C

H R

IE

V

E R

A F

B C

O L O

R A

D O

C F

E U

E R

S T

E

IN

R T

U R

N E

R

J B

O V

E N

K A

M P

3/8" = 1'-0"1

CUP ROOF SECTION 1

3/8" = 1'-0"2

CUP ROOF SECTION 2

GENERAL SHEET NOTES CONT.

4. CONTRACTOR SHALL FIELD ROUTE ALL PIPING 2" AND SMALLER.

ROUTING SHOWN IS FOR REFERENCE ONLY.

GENERAL SHEET NOTES

1. PIPING SHALL BE SUPPORTED FROM THE COOLING TOWER STRUCTURAL

STEEL FRAMING ON THE ROOF. COORDINATE THE LOCATION OF STEEL

PIPE SUPPORT STANCHIONS AND HANGER ASSEMBLIES WITH THE

COOLING TOWER WALKWAY GRADING AND PLATFORMS. AFTER

FABRICATION, ASSEMBLY AND INSTALLATION OF STEEL PIPE SUPPORTS,

SCRAPE AND BRUSH ASSEMBLY FREE OF SCALE, DIRT, AND LOOSE

MATERIAL, AND WIPE CLEAN WITH SOLVENT MOISTENED CLOTH. USING

BRUSH OR ROLLER COAT ENTIRE SUPPORT SURFACE WITH PRIME AND

FINISH COATS OF RUST PREVENTIVE PAINT.

2. PROVIDE AND INSTALL PIPING HANGERS AND SUPPORTS PER THE

HANGER NOTES, TABLES, AND DETAILS ON DRAWINGS M-501, M-502, AND

M-503. PROVIDE AND INSTALL PIPING HANGERS AND SUPPORTS AS

NECESSARY AND REQUIRED TO PROPERLY SUPPORT, GUIDE AND

ACCOMMODATE ANY MOVEMENT OF THE PIPING SYSTEMS IN THE

BUILDING MECHANICAL ROOM AND ON THE BUILDING ROOF, AND

CONNECT TO THE EQUIPMENT PER THE MANUFACTURERS INSTALLATION

REQUIREMENTS.

3. ALL PIPING PENETRATIONS THROUGH THE BUILDING ROOF STRUCTURE

SHALL BE FLASHED AND SEALED WATERTIGHT. REFERENCE

ARCHITECTURAL DRAWINGS FOR REQUIREMENTS AND DETAILS.

J

8"ø CWR 8"ø CWR

10"ø CWS

8"ø CWR 8"ø CWR 3"ø OF

2"ø BLD

3"ø OF

2"ø BLD

CW-CT-04 CW-CT-03

" 2

CUP ROOF

/8

CUP ROOF

10"ø CWS

10"ø CWR

8"⌀ CWR

6"⌀ COMBUSTION AIR

6"⌀ EXHAUST VENT

6"⌀ EXHAUST VENT

6"⌀ COMBUSTION AIR

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

1 2 3 4 5 6 7 8 9 10

D

C

B

A

D A

T E

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

F

IL

E N

U M

B E

R

P

4 5 6

KEY PLAN

PLAN NORTH

W F

R

O M

A H

A D

IS

T

R

IC

T

C

A P

IT

A

L A

V E

N U

E

O M

A H

A N

E B

R A

S K

A

-1

-2

CSOF PACKAGE - 90% CORRECTED DESIGN

E

F

G

8 9

A F

-1

-0

F

IL

E N

A M

E

C S

C

K A

G E

C O

N S

O L

ID

A T

E D

S P

A C

E O

P E

R A

T

IO

N S

F A

C

IL

IT

Y

B L D

G N

O

C F

E U

E R

S T

E

IN

3/9/2021 11:49:24 AM

DP305

P R

O C

E S

S P

IP

IN

G S

E C

T

IO

N S

C

U P

S C

H R

IE

V

E R

A F

B C

O L O

R A

D O

C F

E U

E R

S T

E

IN

R T

U R

N E

R

J B

O V

E N

K A

M P

3/8" = 1'-0"1

CUP ROOF SECTION 3

3/8" = 1'-0"2

CUP ROOF SECTION 4

GENERAL SHEET NOTES

1. PIPING SHALL BE SUPPORTED FROM THE COOLING TOWER STRUCTURAL

STEEL FRAMING ON THE ROOF. COORDINATE THE LOCATION OF STEEL

PIPE SUPPORT STANCHIONS AND HANGER ASSEMBLIES WITH THE

COOLING TOWER WALKWAY GRADING AND PLATFORMS. AFTER

FABRICATION, ASSEMBLY AND INSTALLATION OF STEEL PIPE SUPPORTS,

SCRAPE AND BRUSH ASSEMBLY FREE OF SCALE, DIRT, AND LOOSE

MATERIAL, AND WIPE CLEAN WITH SOLVENT MOISTENED CLOTH. USING

BRUSH OR ROLLER COAT ENTIRE SUPPORT SURFACE WITH PRIME AND

FINISH COATS OF RUST PREVENTIVE PAINT.

2. PROVIDE AND INSTALL PIPING HANGERS AND SUPPORTS PER THE

HANGER NOTES, TABLES, AND DETAILS ON DRAWINGS M-501, M-502, AND

M-503. PROVIDE AND INSTALL PIPING HANGERS AND SUPPORTS AS

NECESSARY AND REQUIRED TO PROPERLY SUPPORT, GUIDE AND

ACCOMMODATE ANY MOVEMENT OF THE PIPING SYSTEMS IN THE

BUILDING MECHANICAL ROOM AND ON THE BUILDING ROOF, AND

CONNECT TO THE EQUIPMENT PER THE MANUFACTURERS INSTALLATION

REQUIREMENTS.

3. ALL PIPING PENETRATIONS THROUGH THE BUILDING ROOF STRUCTURE

SHALL BE FLASHED AND SEALED WATERTIGHT. REFERENCE

ARCHITECTURAL DRAWINGS FOR REQUIREMENTS AND DETAILS.

4. CONTRACTOR SHALL FIELD ROUTE ALL PIPING 2" AND SMALLER.

"2

/8

CW-CT-01 CW-CT-03

R

R

6"ø EL 8"ø CWR

10"ø CWS 10"ø CWS

8"ø CWR

4"ø CWS

4"ø CWS

4"ø CWS

4"ø CWS

1 1/2"ø MUWT 1 1/2"ø MUWT 2"ø BLD 3"ø OF

CUP ROOF

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

1 2 3 4 5 6 7 8 9 10

D

C

B

A

D A

T E

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

F

IL

E N

U M

B E

R

P

4 5 6

KEY PLAN

PLAN NORTH

W F

R

O M

A H

A D

IS

T

R

IC

T

C

A P

IT

A

L A

V E

N U

E

O M

A H

A N

E B

R A

S K

A

-1

-2

CSOF PACKAGE - 90% CORRECTED DESIGN

E

F

G

8 9

A F

-1

-0

F

IL

E N

A M

E

C S

C

K A

G E

C O

N S

O L

ID

A T

E D

S P

A C

E O

P E

R A

T

IO

N S

F A

C

IL

IT

Y

B L D

G N

O

C F

E U

E R

S T

E

IN

3/9/2021 11:49:31 AM

DP306

P R

O C

E S

S P

IP

IN

G S

E C

T

IO

N S

C

U P

S C

H R

IE

V

E R

A F

B C

O L O

R A

D O

C F

E U

E R

S T

E

IN

R T

U R

N E

R

J B

O V

E N

K A

M P

3/8" = 1'-0"1

CUP ROOF SECTION 5

GENERAL SHEET NOTES

1. PIPING SHALL BE SUPPORTED FROM THE COOLING TOWER STRUCTURAL

STEEL FRAMING ON THE ROOF. COORDINATE THE LOCATION OF STEEL

PIPE SUPPORT STANCHIONS AND HANGER ASSEMBLIES WITH THE

COOLING TOWER WALKWAY GRADING AND PLATFORMS. AFTER

FABRICATION, ASSEMBLY AND INSTALLATION OF STEEL PIPE SUPPORTS,

SCRAPE AND BRUSH ASSEMBLY FREE OF SCALE, DIRT, AND LOOSE

MATERIAL, AND WIPE CLEAN WITH SOLVENT MOISTENED CLOTH. USING

BRUSH OR ROLLER COAT ENTIRE SUPPORT SURFACE WITH PRIME AND

FINISH COATS OF RUST PREVENTIVE PAINT.

2. PROVIDE AND INSTALL PIPING HANGERS AND SUPPORTS PER THE

HANGER NOTES, TABLES, AND DETAILS ON DRAWINGS M-501, M-502, AND

M-503. PROVIDE AND INSTALL PIPING HANGERS AND SUPPORTS AS

NECESSARY AND REQUIRED TO PROPERLY SUPPORT, GUIDE AND

ACCOMMODATE ANY MOVEMENT OF THE PIPING SYSTEMS IN THE

BUILDING MECHANICAL ROOM AND ON THE BUILDING ROOF, AND

CONNECT TO THE EQUIPMENT PER THE MANUFACTURERS INSTALLATION

REQUIREMENTS.

3. ALL PIPING PENETRATIONS THROUGH THE BUILDING ROOF STRUCTURE

SHALL BE FLASHED AND SEALED WATERTIGHT. REFERENCE

ARCHITECTURAL DRAWINGS FOR REQUIREMENTS AND DETAILS.

TOC - FO TANK FOUNDATION

1' - 3"

FO-TNK-01 FO-TNK-02

FO-PMP-04

2"ø FOR 2"ø FOR

3"ø FOS2"ø FOS

2"ø FOS

2"ø FOR

2"⌀ FOR

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

1 2 3 4 5 6 7 8 9 10

D

C

B

A

D A

T E

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

F

IL

E N

U M

B E

R

P

4 5 6

KEY PLAN

PLAN NORTH

W F

R

O M

A H

A D

IS

T

R

IC

T

C

A P

IT

A

L A

V E

N U

E

O M

A H

A N

E B

R A

S K

A

-1

-2

CSOF PACKAGE - 90% CORRECTED DESIGN

E

F

G

8 9

A F

-1

-0

F

IL

E N

A M

E

C S

C

K A

G E

C O

N S

O L

ID

A T

E D

S P

A C

E O

P E

R A

T

IO

N S

F A

C

IL

IT

Y

B L D

G N

O

C F

E U

E R

S T

E

IN

3/9/2021 11:49:37 AM

DP307

P R

O C

E S

S P

IP

IN

G S

E C

T

IO

N S

E L E

C T

R

IC

A L /M

E C

H A

N

IC

A L Y

A R

D

S C

H R

IE

V

E R

A F

B C

O L O

R A

D O

C F

E U

E R

S T

E

IN

R T

U R

N E

R

J B

O V

E N

K A

M P

3/8" = 1'-0"1

FUEL OIL TANK SECTION

GENERAL SHEET NOTES

1. FUEL OIL PIPING SHALL BE SUPPORTED FROM THE RETAINING WALL AND

THE CONCRETE FOUNDATIONS OF THE FUEL OIL STORAGE TANKS AND

THE DIESEL ENGINE GENERATORS. REFERENCE STRUCTURAL

DRAWINGS FOR PIPE SUPPORT ASSEMBLY DETAILS FOR ATTACHMENT

TO THE RETAINING WALL AND THE CONCRETE FOUNDATIONS.

2. PROVIDE AND INSTALL PIPING HANGERS AND SUPPORTS PER THE

HANGER NOTES, TABLES, AND DETAILS ON DRAWINGS M-501, M-502, AND

M-503. PROVIDE AND INSTALL PIPING HANGERS AND SUPPORTS AS

NECESSARY AND REQUIRED TO PROPERLY SUPPORT, GUIDE AND

ACCOMMODATE ANY MOVEMENT OF THE PIPING SYSTEMS IN THE

ELECTRICAL YARD AND CONNECT TO THE EQUIPMENT PER THE

MANUFACTURERS INSTALLATION REQUIREMENTS.

3. FUEL OIL STORAGE TANKS EACH SHALL BE 15,000 GALLON CAPACITY,

DOUBLE-WALL ABOVEGROUND HORIZONTAL STORAGE TANK. FUEL OIL

STORAGE TANKS, PIPING, FITTINGS, PUMPS, AND ACCESSORIES SHALL

BE ELECTRIC HEAT TRACED AND INSULATED AND ALUMINUM JACKETED

FOR FREEZE PROTECTION.

4. SEE STRUCTURAL DRAWINGS FOR CONCRETE EQUIPMENT PAD DETAILS

AND REQUIREMENTS.

1 2 3

I

J

3.2

MECHANICAL ROOM A MECHANICAL ROOM B

ELECTRICAL ROOM A

ELECTRICAL ROOM B

BATTERY ROOM

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

1 2 3 4 5 6 7 8 9 10

D

C

B

A

D A

T E

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

F

IL

E N

U M

B E

R

P

4 5 6

KEY PLAN

PLAN NORTH

W F

R

O M

A H

A D

IS

T

R

IC

T

C

A P

IT

A

L A

V E

N U

E

O M

A H

A N

E B

R A

S K

A

-1

-2

CSOF PACKAGE - 90% CORRECTED DESIGN

E

F

G

8 9

A F

-1

-0

F

IL

E N

A M

E

C S

C

K A

G E

C O

N S

O L

ID

A T

E D

S P

A C

E O

P E

R A

T

IO

N S

F A

C

IL

IT

Y

B L D

G N

O

C F

E U

E R

S T

E

IN

3/9/2021 11:49:47 AM

DP400

O V

E R

A L L P

R O

C E

S S

P

IP

IN

G

P L A

N

C U

P

M E

C H

A N

IC

A

L R

O O

M S

A /B

S C

H R

IE

V

E R

A F

B C

O L O

R A

D O

C F

E U

E R

S T

E

IN

R T

U R

N E

R

J B

O V

E N

K A

M P

1/4" = 1'-0"1

OVERALL PROCESS PIPING PLAN - CUP MECHANICAL ROOMS A/B

1 2

J

CHW-CH-01 CHW-CH-02

C H

W -P

M P

-0

C H

W -P

M P

-0

CHW-AS-01

CHW-HX-01

CHW-ET-01

/1

/1

2' - 4 3/4" 1' - 11 1/2" 3' - 8 11/16" 2' - 4 1/8"

17' - 1 3/16" 10' - 0"

1' - 11 1/2" 1' - 6" 15' - 5 1/2"

1' - 11 1/2"MOTOR OPERATED

3-WAY FLOW

CONTROL VALVE

W

R

W

S

/2

W

R

W

S

W

S

W

R

10"ø CHWR

10"ø CHWS 10"ø CHWS

10"ø CHWR

10"ø CHWR

4"ø CHWR

4"ø CHWS

10"ø CHWR

10"ø CHWS

1"ø CF

1"ø CF

M A

T C

H L

IN

E

D P

CHW-CSF-01

(BELOW)

2"ø CHWR

NOTE 5

MECHANICAL ROOM A

MINIMUM FLOW BYPASS

4' - 5" 3' - 3 5/8"

2"ø CHWS

NOTE 5

DP302

DP301

DP301

DP302

DP301

DP301

DP302

DP303

/4

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

1 2 3 4 5 6 7 8 9 10

D

C

B

A

D A

T E

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

F

IL

E N

U M

B E

R

P

4 5 6

KEY PLAN

PLAN NORTH

W F

R

O M

A H

A D

IS

T

R

IC

T C

A P

IT

A

L A

V E

N U

E

O M

A H

A N

E B

R A

S K

A

-1

-2

CSOF PACKAGE - 90% CORRECTED DESIGN

E

F

G

8 9

A F

-1

-0

F

IL

E N

A M

E

C S

C

K A

G E

C O

N S

O L

ID

A T

E D

S P

A C

E O

P E

R A

T

IO

N S

F A

C

IL

IT

Y

B L D

G N

O

C F

E U

E R

S T

E

IN

3/9/2021 11:49:56 AM

DP401

C H

IL

L E

D W

A T

E R

P

IP

IN

G

P L A

N

C U

P M

E C

H A

N

IC

A L

R O

O M

A

S C

H R

IE

V

E R

A F

B C

O L O

R A

D O

C F

E U

E R

S T

E

IN

R T

U R

N E

R

J B

O V

E N

K A

M P

GENERAL SHEET NOTES

1. PIPING SUSPENDED FROM THE BUILDING STRUCTURE ABOVE SHALL BE

ISOLATED USING MASON INDUSTRIES, MODEL 30N OR PC30N

SPRING/NEOPRENE HANGERS, OR EQUAL. SPRING/NEOPRENE HANGERS

SHALL HAVE 1" NOMINAL STATIC DEFLECTION.

2. PROVIDE AND INSTALL PIPING HANGERS AND SUPPORTS PER THE

HANGER NOTES, TABLES, AND DETAILS ON DRAWINGS M-501, M-502 AND

M-503. PROVIDE AND INSTALL PIPING HANGERS AND SUPPORTS AS

NECESSARY AND REQUIRED TO PROPERLY SUPPORT, GUIDE AND

ACCOMMODATE ANY MOVEMENT OF THE PIPING SYSTEMS IN THE

BUILDING MECHANICAL ROOM, AND CONNECT TO THE EQUIPMENT PER

THE MANUFACTURERS INSTALLATION REQUIREMENTS.

3. ALL PIPING PENETRATIONS THROUGH THE BUILDINGS BELOW GRADE

EXTERIOR WALLS AND FLOORS SHALL BE PRE-FORMED DURING WALL

CONSTRUCTION USING STEEL PIPE SLEEVE WITH WATER STOP/ANCHOR

PLATE. PROVIDE AND INSTALL MECHANICAL LINK-SEAL BETWEEN PIPING

AND STEEL WALL SLEEVE. SIZE AND INSTALL PIPE SLEEVE AND LINK-

SEAL ACCORDING TO THE MANUFACTURER'S INSTALLATION

REQUIREMENTS.

4. CONTRACTOR SHALL FIELD ROUTE ALL PIPING 2" AND SMALLER.

ROUTING SHOWN IS FOR REFERENCE ONLY.

5. SEE DRAWING DP411 FOR CONTINUATION OF PIPING TO FAN COIL UNITS.

3/8" = 1'-0"1

CHILLED WATER PIPING PLAN - CUP MECHANICAL ROOM A

0 1' 2' 4' 6'

2 3

J

3.2

CHW-CH-03 CHW-CH-04

C H

W -P

M P

-0

C H

W -P

M P

-0

CHW-AS-02

CHW-HX-02

CHW-ET-02

M A

T C

H L

IN

E

D P

CHW-CSF-02

(BELOW)

10"ø CHWS

10"ø CHWR

10"ø CHWR

MOTOR OPERATED

3-WAY FLOW

CONTROL VALVE

MECHANICAL ROOM B

4"ø CHWR

4"ø CHWS

1 1/4"ø CHWR

NOTE 5

NOTE 5

2' - 10" 4' - 5 1/4" 11' - 9 15/16" 8' - 6 7/8" 1' - 6" 2' - 0"

ELECTRICAL ROOM A

ELECTRICAL ROOM B

BATTERY ROOM

W

R

1"ø CF

6"ø CHWS

W

R

W

S

W

R

W

S

8"ø CHWR

MINIMUM FLOW BYPASS

NOTE 5

DP303

7"

/4

W

R

W

S

1' - 1" 5' - 10 3/8"

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

1 2 3 4 5 6 7 8 9 10

D

C

B

A

D A

T E

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

F

IL

E N

U M

B E

R

P

4 5 6

KEY PLAN

PLAN NORTH

W F

R

O M

A H

A D

IS

T

R

IC

T C

A P

IT

A

L A

V E

N U

E

O M

A H

A N

E B

R A

S K

A

-1

-2

CSOF PACKAGE - 90% CORRECTED DESIGN

E

F

G

8 9

A F

-1

-0

F

IL

E N

A M

E

C S

C

K A

G E

C O

N S

O L

ID

A T

E D

S P

A C

E O

P E

R A

T

IO

N S

F A

C

IL

IT

Y

B L D

G N

O

C F

E U

E R

S T

E

IN

3/9/2021 11:50:03 AM

DP402

C H

IL

L E

D W

A T

E R

P

IP

IN

G

P L A

N

C U

P M

E C

H A

N

IC

A L

R O

O M

B

S C

H R

IE

V

E R

A F

B C

O L O

R A

D O

C F

E U

E R

S T

E

IN

R T

U R

N E

R

J B

O V

E N

K A

M P

3/8" = 1'-0"1

CHILLED WATER PIPING PLAN - CUP MECHANICAL ROOM B

0 1' 2' 4' 6'

GENERAL SHEET NOTES

1. PIPING SUSPENDED FROM THE BUILDING STRUCTURE ABOVE SHALL BE

ISOLATED USING MASON INDUSTRIES, MODEL 30N OR PC30N

SPRING/NEOPRENE HANGERS, OR EQUAL. SPRING/NEOPRENE HANGERS

SHALL HAVE 1" NOMINAL STATIC DEFLECTION.

2. PROVIDE AND INSTALL PIPING HANGERS AND SUPPORTS PER THE

HANGER NOTES, TABLES, AND DETAILS ON DRAWINGS M-501, M-502 AND

M-503. PROVIDE AND INSTALL PIPING HANGERS AND SUPPORTS AS

NECESSARY AND REQUIRED TO PROPERLY SUPPORT, GUIDE AND

ACCOMMODATE ANY MOVEMENT OF THE PIPING SYSTEMS IN THE

BUILDING MECHANICAL ROOM, AND CONNECT TO THE EQUIPMENT PER

THE MANUFACTURERS INSTALLATION REQUIREMENTS.

3. ALL PIPING PENETRATIONS THROUGH THE BUILDINGS BELOW GRADE

EXTERIOR WALLS AND FLOORS SHALL BE PRE-FORMED DURING WALL

CONSTRUCTION USING STEEL PIPE SLEEVE WITH WATER STOP/ANCHOR

PLATE. PROVIDE AND INSTALL MECHANICAL LINK-SEAL BETWEEN PIPING

AND STEEL WALL SLEEVE. SIZE AND INSTALL PIPE SLEEVE AND LINK-

SEAL ACCORDING TO THE MANUFACTURER'S INSTALLATION

REQUIREMENTS.

4. CONTRACTOR SHALL FIELD ROUTE ALL PIPING 2" AND SMALLER.

ROUTING SHOWN IS FOR REFERENCE ONLY.

5. SEE DRAWING DP411 FOR CONTINUATION OF PIPING TO FAN COIL UNITS.

6. PIPING IS BELOW GRADE AND EXTENDS 5'-0" OUTSIDE OF BUILDING.

REFERENCE CIVIL DRAWING CU101 FOR CONTINUATION.

NOTE 6

J

C H

W -C

H -0

C H

W -C

H -0

2 C W

-P M

P -0

C W

-P M

P -0

CHW-HX-01

CW-SPR-01

CW-SPR-02

C H

-P M

P -0

C H

-P M

P -0

/4

/4

/8

/1

/1

5' - 6 1/4" 11' - 6 3/4" 10' - 0"

5' - 6 1/4" 1' - 2"

S

R

4"ø CWS

4"ø CWS

4"ø CWS

4"ø CWS

10"ø CWR

10"ø CWS

10"ø CWS

R

R

R

S

S

M A

T C

H L

IN

E

D P

/2

/4

/8

/1

/1

MECHANICAL ROOM A

MINIMUM

FLOW BYPASS

DP302

DP301

DP301

DP302

DP301

DP301

DP302

DP303

/4

8"ø CWS

8"ø CWS

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

1 2 3 4 5 6 7 8 9 10

D

C

B

A

D A

T E

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

F

IL

E N

U M

B E

R

P

4 5 6

KEY PLAN

PLAN NORTH

W F

R

O M

A H

A D

IS

T

R

IC

T

C

A P

IT

A

L A

V E

N U

E

O M

A H

A N

E B

R A

S K

A

-1

-2

CSOF PACKAGE - 90% CORRECTED DESIGN

E

F

G

8 9

A F

-1

-0

F

IL

E N

A M

E

C S

C

K A

G E

C O

N S

O L

ID

A T

E D

S P

A C

E O

P E

R A

T

IO

N S

F A

C

IL

IT

Y

B L D

G N

O

C F

E U

E R

S T

E

IN

3/9/2021 11:50:11 AM

DP403

C O

N D

E N

S E

R W

A T

E R

P

IP

IN

G

P L A

N

C U

P

M E

C H

A N

IC

A

L R

O O

M A

S C

H R

IE

V

E R

A F

B C

O L O

R A

D O

C F

E U

E R

S T

E

IN

R T

U R

N E

R

J B

O V

E N

K A

M P

3/8" = 1'-0"1

CONDENSER WATER PIPING PLAN - CUP MECHANICAL ROOM A

0 1' 2' 4' 6'

GENERAL SHEET NOTES

1. PIPING SUSPENDED FROM THE BUILDING STRUCTURE ABOVE SHALL BE

ISOLATED USING MASON INDUSTRIES, MODEL 30N OR PC30N

SPRING/NEOPRENE HANGERS, OR EQUAL. SPRING/NEOPRENE HANGERS

SHALL HAVE 1" NOMINAL STATIC DEFLECTION.

2. PROVIDE AND INSTALL PIPING HANGERS AND SUPPORTS PER THE

HANGER NOTES, TABLES, AND DETAILS ON DRAWINGS M-501, M-502 AND

M-503. PROVIDE AND INSTALL PIPING HANGERS AND SUPPORTS AS

NECESSARY AND REQUIRED TO PROPERLY SUPPORT, GUIDE AND

ACCOMMODATE ANY MOVEMENT OF THE PIPING SYSTEMS IN THE

BUILDING MECHANICAL ROOM, AND CONNECT TO THE EQUIPMENT PER

THE MANUFACTURERS INSTALLATION REQUIREMENTS.

3. ALL PIPING PENETRATIONS THROUGH THE BUILDINGS BELOW GRADE

EXTERIOR WALLS AND FLOORS SHALL BE PRE-FORMED DURING WALL

CONSTRUCTION USING STEEL PIPE SLEEVE WITH WATER STOP/ANCHOR

PLATE. PROVIDE AND INSTALL MECHANICAL LINK-SEAL BETWEEN PIPING

AND STEEL WALL SLEEVE. SIZE AND INSTALL PIPE SLEEVE AND LINK-

SEAL ACCORDING TO THE MANUFACTURER'S INSTALLATION

REQUIREMENTS.

J

3.2

C H

W -C

H -0

C H

W -C

H -0

4C W

-P M

P -0

C W

-P M

P -0

CHW-HX-02

C H

-P M

P -0

C H

-P M

P -0

M A

T C

H L

IN

E

D P

2' - 10" 16' - 3 3/16" 9' - 11 1/4" 1' - 5" 3' - 8 5/8"

1' - 9 1/4" 5' - 9 15/16"

/2

/4

/8

/1

/1

/8

R

S

S

S

4"ø CWS

4"ø CWS

R

R

R

MINIMUM FLOW BYPASS

10"ø CWS

10"ø CWS

10"ø CWR

S

8"ø CWR

MECHANICAL ROOM B

ELECTRICAL ROOM A

ELECTRICAL ROOM B

BATTERY ROOM

DP303

/4

8"ø CWS 8"ø CWS

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

1 2 3 4 5 6 7 8 9 10

D

C

B

A

D A

T E

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

F

IL

E N

U M

B E

R

P

4 5 6

KEY PLAN

PLAN NORTH

W F

R

O M

A H

A D

IS

T

R

IC

T

C

A P

IT

A

L A

V E

N U

E

O M

A H

A N

E B

R A

S K

A

-1

-2

CSOF PACKAGE - 90% CORRECTED DESIGN

E

F

G

8 9

A F

-1

-0

F

IL

E N

A M

E

C S

C

K A

G E

C O

N S

O L

ID

A T

E D

S P

A C

E O

P E

R A

T

IO

N S

F A

C

IL

IT

Y

B L D

G N

O

C F

E U

E R

S T

E

IN

3/9/2021 11:50:19 AM

DP404

C O

N D

E N

S E

R W

A T

E R

P

IP

IN

G

P L A

N

C U

P

M E

C H

A N

IC

A

L R

O O

M B

S C

H R

IE

V

E R

A F

B C

O L O

R A

D O

C F

E U

E R

S T

E

IN

R T

U R

N E

R

J B

O V

E N

K A

M P

3/8" = 1'-0"1

CONDENSER WATER PIPING PLAN - CUP MECHANICAL ROOM B

0 1' 2' 4' 6'

GENERAL SHEET NOTES

1. PIPING SUSPENDED FROM THE BUILDING STRUCTURE ABOVE SHALL BE

ISOLATED USING MASON INDUSTRIES, MODEL 30N OR PC30N

SPRING/NEOPRENE HANGERS, OR EQUAL. SPRING/NEOPRENE HANGERS

SHALL HAVE 1" NOMINAL STATIC DEFLECTION.

2. PROVIDE AND INSTALL PIPING HANGERS AND SUPPORTS PER THE

HANGER NOTES, TABLES, AND DETAILS ON DRAWINGS M-501, M-502 AND

M-503. PROVIDE AND INSTALL PIPING HANGERS AND SUPPORTS AS

NECESSARY AND REQUIRED TO PROPERLY SUPPORT, GUIDE AND

ACCOMMODATE ANY MOVEMENT OF THE PIPING SYSTEMS IN THE

BUILDING MECHANICAL ROOM, AND CONNECT TO THE EQUIPMENT PER

THE MANUFACTURERS INSTALLATION REQUIREMENTS.

3. ALL PIPING PENETRATIONS THROUGH THE BUILDINGS BELOW GRADE

EXTERIOR WALLS AND FLOORS SHALL BE PRE-FORMED DURING WALL

CONSTRUCTION USING STEEL PIPE SLEEVE WITH WATER STOP/ANCHOR

PLATE. PROVIDE AND INSTALL MECHANICAL LINK-SEAL BETWEEN PIPING

AND STEEL WALL SLEEVE. SIZE AND INSTALL PIPE SLEEVE AND LINK-

SEAL ACCORDING TO THE MANUFACTURER'S INSTALLATION

REQUIREMENTS.

J

MECHANICAL ROOM A

M A

T C

H L

IN

E

D P

HW-BLR-01

HW-BLR-02

HW-ET-01

H W

-P M

P -0

H W

-P M

P -0

HW-AS-01

6' - 5 1/2" 1' - 10 1/2" 1' - 0" 12' - 11 1/2"

/4

/2

BLR-PMP-01

BLR-PMP-02

NEUTRAL

BRIDGE

HW-CSF-01

(BELOW)

4' - 5" 3' - 3 5/8"

1 1/4"ø HWR

1 1/4"ø HWS

NOTE 5

NOTE 5

R

S

S

R

S

3"ø HWS

3"ø HWS

4"ø HWR

4"ø HWS

4"ø HWS

4"ø HWS

3"ø HWS

3"ø HWR

1"ø CF

3"ø HWR

3"ø HWR

3"ø HWR

3"ø HWR

3"ø HWS

3"ø HWS

DP302

DP301

DP301

DP302

DP301

DP301

DP302

DP303

/4

/4

/2

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

1 2 3 4 5 6 7 8 9 10

D

C

B

A

D A

T E

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

F

IL

E N

U M

B E

R

P

4 5 6

KEY PLAN

PLAN NORTH

W F

R

O M

A H

A D

IS

T

R

IC

T C

A P

IT

A

L A

V E

N U

E

O M

A H

A N

E B

R A

S K

A

-1

-2

CSOF PACKAGE - 90% CORRECTED DESIGN

E

F

G

8 9

A F

-1

-0

F

IL

E N

A M

E

C S

C

K A

G E

C O

N S

O L

ID

A T

E D

S P

A C

E O

P E

R A

T

IO

N S

F A

C

IL

IT

Y

B L D

G N

O

C F

E U

E R

S T

E

IN

3/9/2021 11:50:27 AM

DP405

H O

T W

A T

E R

P

IP

IN

G

P L A

N

C U

P M

E C

H A

N

IC

A L

R O

O M

A

S C

H R

IE

V

E R

A F

B C

O L O

R A

D O

C F

E U

E R

S T

E

IN

R T

U R

N E

R

J B

O V

E N

K A

M P

GENERAL SHEET NOTES

1. PIPING SUSPENDED FROM THE BUILDING STRUCTURE ABOVE SHALL BE

ISOLATED USING MASON INDUSTRIES, MODEL 30N OR PC30N

SPRING/NEOPRENE HANGERS, OR EQUAL. SPRING/NEOPRENE HANGERS

SHALL HAVE 1" NOMINAL STATIC DEFLECTION.

2. PROVIDE AND INSTALL PIPING HANGERS AND SUPPORTS PER THE

HANGER NOTES, TABLES, AND DETAILS ON DRAWINGS M-501, M-502 AND

M-503. PROVIDE AND INSTALL PIPING HANGERS AND SUPPORTS AS

NECESSARY AND REQUIRED TO PROPERLY SUPPORT, GUIDE AND

ACCOMMODATE ANY MOVEMENT OF THE PIPING SYSTEMS IN THE

BUILDING MECHANICAL ROOM, AND CONNECT TO THE EQUIPMENT PER

THE MANUFACTURERS INSTALLATION REQUIREMENTS.

3. ALL PIPING PENETRATIONS THROUGH THE BUILDING BELOW GRADE

EXTERIOR WALLS AND FLOORS SHALL BE PRE-FORMED DURING WALL

CONSTRUCTION USING STEEL PIPE SLEEVE WITH WATER STOP/ANCHOR

PLATE. PROVIDE AND INSTALL MECHANICAL LINK-SEAL BETWEEN PIPING

AND STEEL WALL SLEEVE. SIZE AND INSTALL PIPE SLEEVE AND LINK-

SEAL ACCORDING TO THE MANUFACTURER'S INSTALLATION

REQUIREMENTS.

4. CONTRACTOR SHALL FIELD ROUTE ALL PIPING 2" AND SMALLER.

ROUTING SHOWN IS FOR REFERENCE ONLY.

5. SEE DRAWING PP401 FOR CONTINUATION OF PIPING TO FAN COIL UNITS.

GENERAL SHEET NOTES

1. PIPING SUSPENDED FROM THE BUILDING STRUCTURE ABOVE SHALL BE

ISOLATED USING MASON INDUSTRIES, MODEL 30N OR PC30N

SPRING/NEOPRENE HANGERS, OR EQUAL. SPRING/NEOPRENE HANGERS

SHALL HAVE 1" NOMINAL STATIC DEFLECTION.

2. PROVIDE AND INSTALL PIPING HANGERS AND SUPPORTS PER THE

HANGER NOTES, TABLES, AND DETAILS ON DRAWINGS M-501, M-502 AND

M-503. PROVIDE AND INSTALL PIPING HANGERS AND SUPPORTS AS

NECESSARY AND REQUIRED TO PROPERLY SUPPORT, GUIDE AND

ACCOMMODATE ANY MOVEMENT OF THE PIPING SYSTEMS IN THE

BUILDING MECHANICAL ROOM, AND CONNECT TO THE EQUIPMENT PER

THE MANUFACTURERS INSTALLATION REQUIREMENTS.

3. ALL PIPING PENETRATIONS THROUGH THE BUILDINGS BELOW GRADE

EXTERIOR WALLS AND FLOORS SHALL BE PRE-FORMED DURING WALL

CONSTRUCTION USING STEEL PIPE SLEEVE WITH WATER STOP/ANCHOR

PLATE. PROVIDE AND INSTALL MECHANICAL LINK-SEAL BETWEEN PIPING

AND STEEL WALL SLEEVE. SIZE AND INSTALL PIPE SLEEVE AND LINK-

SEAL ACCORDING TO THE MANUFACTURER'S INSTALLATION

REQUIREMENTS.

4. CONTRACTOR SHALL FIELD ROUTE ALL PIPING 2" AND SMALLER.

ROUTING SHOWN IS FOR REFERENCE ONLY.

5. SEE DRAWING DP411 FOR CONTINUATION OF PIPING TO FAN COIL UNITS.

3/8" = 1'-0"1

HOT WATER PIPING PLAN - CUP MECHANICAL ROOM A

J

3.2

MECHANICAL ROOM B

ELECTRICAL ROOM A

ELECTRICAL ROOM B

BATTERY ROOM

M A

T C

H L

IN

E

D P

D P

/4

/4

3' - 0" 4' - 5 1/4" 7' - 1" 6' - 5 1/2" 5' - 2 1/4"

1' - 0 1/16"

H W

-P M

P -0

H W

-P M

P -0

R

S

S

R

S

R

S

3"ø HWS

3"ø HWS

4"ø HWR

4"ø HWS

4"ø HWS

4"ø HWS

3"ø HWS

3"ø HWR

4"ø HWR

4"ø HWS

3"ø HWS

3"ø HWS3"ø HWR

3"ø HWR

3"ø HWR

3"ø HWR

BLR-PMP-03

BLR-PMP-04

HW-BLR-04

HW-BLR-03

HW-ET-02

HW-AS-02

1"ø CF

7" 5' - 10 3/8"

NEUTRAL

BRIDGE

HW-CSF-02

(BELOW)

1 1/4"ø HWR

1 1/4"ø HWS

NOTE 5

NOTE 5

DP303

1' - 0" 1' - 6"

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

1 2 3 4 5 6 7 8 9 10

D

C

B

A

D A

T E

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

F

IL

E N

U M

B E

R

P

4 5 6

KEY PLAN

PLAN NORTH

W F

R

O M

A H

A D

IS

T

R

IC

T C

A P

IT

A

L A

V E

N U

E

O M

A H

A N

E B

R A

S K

A

-1

-2

CSOF PACKAGE - 90% CORRECTED DESIGN

E

F

G

8 9

A F

-1

-0

F

IL

E N

A M

E

C S

C

K A

G E

C O

N S

O L

ID

A T

E D

S P

A C

E O

P E

R A

T

IO

N S

F A

C

IL

IT

Y

B L D

G N

O

C F

E U

E R

S T

E

IN

3/9/2021 11:50:34 AM

DP406

H O

T W

A T

E R

P

IP

IN

G

P L A

N

C U

P M

E C

H A

N

IC

A L

R O

O M

B

S C

H R

IE

V

E R

A F

B C

O L O

R A

D O

C F

E U

E R

S T

E

IN

R T

U R

N E

R

J B

O V

E N

K A

M P

GENERAL SHEET NOTESGENERAL SHEET NOTES

1. PIPING SUSPENDED FROM THE BUILDING STRUCTURE ABOVE SHALL BE

ISOLATED USING MASON INDUSTRIES, MODEL 30N OR PC30N

SPRING/NEOPRENE HANGERS, OR EQUAL. SPRING/NEOPRENE HANGERS

SHALL HAVE 1" NOMINAL STATIC DEFLECTION.

2. PROVIDE AND INSTALL PIPING HANGERS AND SUPPORTS PER THE

HANGER NOTES, TABLES, AND DETAILS ON DRAWINGS M-501, M-502 AND

M-503. PROVIDE AND INSTALL PIPING HANGERS AND SUPPORTS AS

NECESSARY AND REQUIRED TO PROPERLY SUPPORT, GUIDE AND

ACCOMMODATE ANY MOVEMENT OF THE PIPING SYSTEMS IN THE

BUILDING MECHANICAL ROOM, AND CONNECT TO THE EQUIPMENT PER

THE MANUFACTURERS INSTALLATION REQUIREMENTS.

3. ALL PIPING PENETRATIONS THROUGH THE BUILDINGS BELOW GRADE

EXTERIOR WALLS AND FLOORS SHALL BE PRE-FORMED DURING WALL

CONSTRUCTION USING STEEL PIPE SLEEVE WITH WATER STOP/ANCHOR

PLATE. PROVIDE AND INSTALL MECHANICAL LINK-SEAL BETWEEN PIPING

AND STEEL WALL SLEEVE. SIZE AND INSTALL PIPE SLEEVE AND LINK-

SEAL ACCORDING TO THE MANUFACTURER'S INSTALLATION

REQUIREMENTS.

4. CONTRACTOR SHALL FIELD ROUTE ALL PIPING 2" AND SMALLER.

ROUTING SHOWN IS FOR REFERENCE ONLY.

5. SEE DRAWING DP411 FOR CONTINUATION OF PIPING TO FAN COIL UNITS.

6. PIPING IS BELOW GRADE AND EXTENDS 5'-0" OUTSIDE OF BUILDING.

REFERENCE CIVIL DRAWING CU101 FOR CONTINUATION.

3/8" = 1'-0"1

HOT WATER PIPING PLAN - CUP MECHANICAL ROOM B

NOTE 6

J

MECHANICAL ROOM A

CHW-AS-01

HW-AS-01

DW-EEWS-01

DW-SS-01

HOSE BIBB

HOSE BIBB

2 1/2"ø MUWT

2 1/2"ø MUWT

2"ø MUWT

1 1/2"ø MUWT

1 1/4"ø DCW

3/4"ø DCW

3/4"ø DCW

W

/4

"ø

D

C W

M

U W

T

W

T

W

T

/4

W

AUTOMATIC

AIR VENT

AUTOMATIC

AIR VENT

M A

T C

H L

IN

E

D P

W

/8

6"

/1

3' - 5 1/4"

DP302

DP301

DP301

DP302

DP301

DP301

DP302

DP303

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

1 2 3 4 5 6 7 8 9 10

D

C

B

A

D A

T E

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

F

IL

E N

U M

B E

R

P

4 5 6

KEY PLAN

PLAN NORTH

W F

R

O M

A H

A D

IS

T

R

IC

T

C

A P

IT

A

L A

V E

N U

E

O M

A H

A N

E B

R A

S K

A

-1

-2

CSOF PACKAGE - 90% CORRECTED DESIGN

E

F

G

8 9

A F

-1

-0

F

IL

E N

A M

E

C S

C

K A

G E

C O

N S

O L

ID

A T

E D

S P

A C

E O

P E

R A

T

IO

N S

F A

C

IL

IT

Y

B L D

G N

O

C F

E U

E R

S T

E

IN

3/9/2021 11:50:42 AM

DP407

D O

M E

S T

IC

C

O L D

W A

T E

R A

N D

M A

K E

-U P

W A

T E

R

P

IP

IN

G

P L A

N

C U

P M

E C

H A

N

IC

A L R

O O

M A

S C

H R

IE

V

E R

A F

B C

O L O

R A

D O

C F

E U

E R

S T

E

IN

R T

U R

N E

R

J B

O V

E N

K A

M P

GENERAL SHEET NOTES

1. PIPING SUSPENDED FROM THE BUILDING STRUCTURE ABOVE SHALL BE

ISOLATED USING MASON INDUSTRIES, MODEL 30N OR PC30N

SPRING/NEOPRENE HANGERS, OR EQUAL. SPRING/NEOPRENE HANGERS

SHALL HAVE 1" NOMINAL STATIC DEFLECTION.

2. PROVIDE AND INSTALL PIPING HANGERS AND SUPPORTS PER THE

HANGER NOTES, TABLES, AND DETAILS ON DRAWINGS M-501, M-502 AND

M-503. PROVIDE AND INSTALL PIPING HANGERS AND SUPPORTS AS

NECESSARY AND REQUIRED TO PROPERLY SUPPORT, GUIDE AND

ACCOMMODATE ANY MOVEMENT OF THE PIPING SYSTEMS IN THE

BUILDING MECHANICAL ROOM, AND CONNECT TO THE EQUIPMENT PER

THE MANUFACTURERS INSTALLATION REQUIREMENTS.

3. ALL PIPING PENETRATIONS THROUGH THE BUILDINGS BELOW GRADE

EXTERIOR WALLS AND FLOORS SHALL BE PRE-FORMED DURING WALL

CONSTRUCTION USING STEEL PIPE SLEEVE WITH WATER STOP/ANCHOR

PLATE. PROVIDE AND INSTALL MECHANICAL LINK-SEAL BETWEEN PIPING

AND STEEL WALL SLEEVE. SIZE AND INSTALL PIPE SLEEVE AND LINK-

SEAL ACCORDING TO THE MANUFACTURER'S INSTALLATION

REQUIREMENTS.

4. CONTRACTOR SHALL FIELD ROUTE ALL PIPING 2" AND SMALLER.

ROUTING SHOWN IS FOR REFERENCE ONLY.

5. PIPING IS BELOW GRADE AND EXTENDS 5'-0" OUTSIDE OF BUILDING.

REFERENCE CIVIL DRAWING CU102 FOR CONTINUATION.

3/8" = 1'-0"1

DOMESTIC COLD WATER AND MAKE-UP WATER PIPING PLAN - CUP

MECHANICAL ROOM A

0 1' 2' 4' 6'

NOTE 5

4"⌀ DCW

J

3.2

MECHANICAL ROOM B

ELECTRICAL ROOM A

ELECTRICAL ROOM B

BATTERY ROOM

HW-AS-02

CHW-AS-02

DW-SS-02

HOSE BIBB

HOSE BIBB

1 1/4"ø DCW

3/4"ø DCW

1 1/2"ø MUWT

2"ø MUWT

2 1/2"ø MUWT

3/4"ø DCW

AUTOMATIC

AIR VENT

AUTOMATIC

AIR VENT

M A

T C

H L

IN

E

D P

3' - 5 1/4"

/8

DP303

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

1 2 3 4 5 6 7 8 9 10

D

C

B

A

D A

T E

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

F

IL

E N

U M

B E

R

P

4 5 6

KEY PLAN

PLAN NORTH

W F

R

O M

A H

A D

IS

T

R

IC

T

C

A P

IT

A

L A

V E

N U

E

O M

A H

A N

E B

R A

S K

A

-1

-2

CSOF PACKAGE - 90% CORRECTED DESIGN

E

F

G

8 9

A F

-1

-0

F

IL

E N

A M

E

C S

C

K A

G E

C O

N S

O L

ID

A T

E D

S P

A C

E O

P E

R A

T

IO

N S

F A

C

IL

IT

Y

B L D

G N

O

C F

E U

E R

S T

E

IN

3/9/2021 11:50:50 AM

DP408

D O

M E

S T

IC

C

O L D

W A

T E

R A

N D

M A

K E

-U P

W A

T E

R

P

IP

IN

G

P L A

N

C U

P M

E C

H A

N

IC

A L R

O O

M B

S C

H R

IE

V

E R

A F

B C

O L O

R A

D O

C F

E U

E R

S T

E

IN

R T

U R

N E

R

J B

O V

E N

K A

M P

GENERAL SHEET NOTES

1. PIPING SUSPENDED FROM THE BUILDING STRUCTURE ABOVE SHALL BE

ISOLATED USING MASON INDUSTRIES, MODEL 30N OR PC30N

SPRING/NEOPRENE HANGERS, OR EQUAL. SPRING/NEOPRENE HANGERS

SHALL HAVE 1" NOMINAL STATIC DEFLECTION.

2. PROVIDE AND INSTALL PIPING HANGERS AND SUPPORTS PER THE

HANGER NOTES, TABLES, AND DETAILS ON DRAWINGS M-501, M-502 AND

M-503. PROVIDE AND INSTALL PIPING HANGERS AND SUPPORTS AS

NECESSARY AND REQUIRED TO PROPERLY SUPPORT, GUIDE AND

ACCOMMODATE ANY MOVEMENT OF THE PIPING SYSTEMS IN THE

BUILDING MECHANICAL ROOM, AND CONNECT TO THE EQUIPMENT PER

THE MANUFACTURERS INSTALLATION REQUIREMENTS.

3. ALL PIPING PENETRATIONS THROUGH THE BUILDINGS BELOW GRADE

EXTERIOR WALLS AND FLOORS SHALL BE PRE-FORMED DURING WALL

CONSTRUCTION USING STEEL PIPE SLEEVE WITH WATER STOP/ANCHOR

PLATE. PROVIDE AND INSTALL MECHANICAL LINK-SEAL BETWEEN PIPING

AND STEEL WALL SLEEVE. SIZE AND INSTALL PIPE SLEEVE AND LINK-

SEAL ACCORDING TO THE MANUFACTURER'S INSTALLATION

REQUIREMENTS.

4. CONTRACTOR SHALL FIELD ROUTE ALL PIPING 2" AND SMALLER.

ROUTING SHOWN IS FOR REFERENCE ONLY.

3/8" = 1'-0"1

DOMESTIC COLD WATER AND MAKE-UP WATER PIPING PLAN - CUP

MECHANICAL ROOM B

J

MECHANICAL ROOM A

M A

T C

H L

IN

E

D P

CHW-CH-01 CHW-CH-02

HW-BLR-02

HW-BLR-01

6"⌀ EXHAUST VENT

6"⌀ COMBUSTION AIR

6"⌀ COMBUSTION AIR

6"⌀ EXHAUST VENT

2' - 10" 3' - 2"

/8

/8

/8

/1

/1

NATURAL GAS

METERING

STATION

4' - 3" 9' - 5" 10' - 0 1/4"

3"ø NG

2"ø NG

2"ø NG

6"ø RV

1 1/4"ø RV

1 1/4"ø RV

1 1/4"ø RV

1 1/4"ø RV

1 1/4"ø RV

1 1/4"ø RV

1 1/4"ø RV

1 1/4"ø RV

1 1/4"ø RV

1 1/4"ø RV

DP302

DP301

DP301

DP302

DP301

DP301

DP302

DP303

/1

/1

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

1 2 3 4 5 6 7 8 9 10

D

C

B

A

D A

T E

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

F

IL

E N

U M

B E

R

P

4 5 6

KEY PLAN

PLAN NORTH

W F

R

O M

A H

A D

IS

T

R

IC

T

C

A P

IT

A

L A

V E

N U

E

O M

A H

A N

E B

R A

S K

A

-1

-2

CSOF PACKAGE - 90% CORRECTED DESIGN

E

F

G

8 9

A F

-1

-0

F

IL

E N

A M

E

C S

C

K A

G E

C O

N S

O L

ID

A T

E D

S P

A C

E O

P E

R A

T

IO

N S

F A

C

IL

IT

Y

B L D

G N

O

C F

E U

E R

S T

E

IN

3/9/2021 11:50:57 AM

DP409

M

IS

C E

L L A

N E

O U

S P

IP

IN

G P

L A

N

C U

P

M E

C H

A N

IC

A

L R

O O

M A

S C

H R

IE

V

E R

A F

B C

O L O

R A

D O

C F

E U

E R

S T

E

IN

R T

U R

N E

R

J B

O V

E N

K A

M P

GENERAL SHEET NOTES

1. PIPING SUSPENDED FROM THE BUILDING STRUCTURE ABOVE SHALL BE

ISOLATED USING MASON INDUSTRIES, MODEL 30N OR PC30N

SPRING/NEOPRENE HANGERS, OR EQUAL. SPRING/NEOPRENE HANGERS

SHALL HAVE 1" NOMINAL STATIC DEFLECTION.

2. PROVIDE AND INSTALL PIPING HANGERS AND SUPPORTS PER THE

HANGER NOTES, TABLES, AND DETAILS ON DRAWINGS M-501, M-502 AND

M-503. PROVIDE AND INSTALL PIPING HANGERS AND SUPPORTS AS

NECESSARY AND REQUIRED TO PROPERLY SUPPORT, GUIDE AND

ACCOMMODATE ANY MOVEMENT OF THE PIPING SYSTEMS IN THE

BUILDING MECHANICAL ROOM, AND CONNECT TO THE EQUIPMENT PER

THE MANUFACTURERS INSTALLATION REQUIREMENTS.

3. ALL PIPING PENETRATIONS THROUGH THE BUILDINGS BELOW GRADE

EXTERIOR WALLS AND FLOORS SHALL BE PRE-FORMED DURING WALL

CONSTRUCTION USING STEEL PIPE SLEEVE WITH WATER STOP/ANCHOR

PLATE. PROVIDE AND INSTALL MECHANICAL LINK-SEAL BETWEEN PIPING

AND STEEL WALL SLEEVE. SIZE AND INSTALL PIPE SLEEVE AND LINK-

SEAL ACCORDING TO THE MANUFACTURER'S INSTALLATION

REQUIREMENTS.

4. CONTRACTOR SHALL FIELD ROUTE ALL PIPING 2" AND SMALLER.

ROUTING SHOWN IS FOR REFERENCE ONLY.

5. PIPING IS BELOW GRADE AND EXTENDS 5'-0" OUTSIDE OF BUILDING.

REFERENCE CIVIL DRAWING CU102 FOR CONTINUATION.

3/8" = 1'-0"1

MISCELLANEOUS PIPING PLAN – CUP MECHANICAL ROOM A

NOTE 5

J

3.2

MECHANICAL ROOM B

ELECTRICAL ROOM A

ELECTRICAL ROOM B

BATTERY ROOM

M A

T C

H L

IN

E

D P

CHW-CH-03 CHW-CH-04

HW-BLR-03

HW-BLR-04

6"⌀ EXHAUST VENT

6"⌀ EXHAUST VENT

6"⌀ COMBUSTION AIR

6"⌀ COMBUSTION AIR

3"ø NG

6"ø RV

2"ø NG

1 1/4"ø RV

1 1/4"ø RV

1 1/4"ø RV

1 1/4"ø RV

1 1/4"ø RV

1 1/4"ø RV

1 1/4"ø RV

1 1/4"ø RV

1 1/4"ø RV

1 1/4"ø RV

11' - 5 5/16" 9' - 11 3/4"

/1

/1

/8

/8

/8

2' - 2" 5' - 10"

DP303

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

1 2 3 4 5 6 7 8 9 10

D

C

B

A

D A

T E

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

F

IL

E N

U M

B E

R

P

4 5 6

KEY PLAN

PLAN NORTH

W F

R

O M

A H

A D

IS

T

R

IC

T

C

A P

IT

A

L A

V E

N U

E

O M

A H

A N

E B

R A

S K

A

-1

-2

CSOF PACKAGE - 90% CORRECTED DESIGN

E

F

G

8 9

A F

-1

-0

F

IL

E N

A M

E

C S

C

K A

G E

C O

N S

O L

ID

A T

E D

S P

A C

E O

P E

R A

T

IO

N S

F A

C

IL

IT

Y

B L D

G N

O

C F

E U

E R

S T

E

IN

3/9/2021 11:51:05 AM

DP410

M

IS

C E

L L A

N E

O U

S P

IP

IN

G P

L A

N

C U

P

M E

C H

A N

IC

A

L R

O O

M B

S C

H R

IE

V

E R

A F

B C

O L O

R A

D O

C F

E U

E R

S T

E

IN

R T

U R

N E

R

J B

O V

E N

K A

M P

GENERAL SHEET NOTES

1. PIPING SUSPENDED FROM THE BUILDING STRUCTURE ABOVE SHALL BE

ISOLATED USING MASON INDUSTRIES, MODEL 30N OR PC30N

SPRING/NEOPRENE HANGERS, OR EQUAL. SPRING/NEOPRENE HANGERS

SHALL HAVE 1" NOMINAL STATIC DEFLECTION.

2. PROVIDE AND INSTALL PIPING HANGERS AND SUPPORTS PER THE

HANGER NOTES, TABLES, AND DETAILS ON DRAWINGS M-501, M-502 AND

M-503. PROVIDE AND INSTALL PIPING HANGERS AND SUPPORTS AS

NECESSARY AND REQUIRED TO PROPERLY SUPPORT, GUIDE AND

ACCOMMODATE ANY MOVEMENT OF THE PIPING SYSTEMS IN THE

BUILDING MECHANICAL ROOM, AND CONNECT TO THE EQUIPMENT PER

THE MANUFACTURERS INSTALLATION REQUIREMENTS.

3. ALL PIPING PENETRATIONS THROUGH THE BUILDINGS BELOW GRADE

EXTERIOR WALLS AND FLOORS SHALL BE PRE-FORMED DURING WALL

CONSTRUCTION USING STEEL PIPE SLEEVE WITH WATER STOP/ANCHOR

PLATE. PROVIDE AND INSTALL MECHANICAL LINK-SEAL BETWEEN PIPING

AND STEEL WALL SLEEVE. SIZE AND INSTALL PIPE SLEEVE AND LINK-

SEAL ACCORDING TO THE MANUFACTURER'S INSTALLATION

REQUIREMENTS.

4. CONTRACTOR SHALL FIELD ROUTE ALL PIPING 2" AND SMALLER.

ROUTING SHOWN IS FOR REFERENCE ONLY.

3/8" = 1'-0"1

MISCELLANEOUS PIPING PLAN – CUP MECHANICAL ROOM B

J

3.2

HVAC-FCU-02 HVAC-FCU-04 HVAC-FCU-06 HVAC-FCU-08 HVAC-FCU-10 HVAC-FCU-12 HVAC-FCU-14 HVAC-FCU-16

HVAC-FCU-01 HVAC-FCU-03 HVAC-FCU-05 HVAC-FCU-07 HVAC-FCU-09 HVAC-FCU-11 HVAC-FCU-13 HVAC-FCU-15

H V

A C

-F C

U -1

H

V A

C -F

This is the start of the file's text. The full file is on GovTribe.