CSOF_DRAWINGS_Volume 6_Process-Mechanical.pdf
PDF 40 MB Posted
- Solicitation number
- W9128F20R0002
About this file
This notice is a solicitation for the construction of the Consolidated Space Operations Facility at Schriever Air Force Base in Colorado. The project will consist of constructing a two-story facility and one-story entry control facility with reinforced concrete, steel structure, and membrane roofing. It will comply with DoD, Air Force, and base design standards, and will utilize local materials and construction techniques where cost effective. Facilities will be designed for permanent construction and comply with DoD antiterrorism and cybersecurity requirements. Offerors must be able to commence work within 10 days of notice to proceed and complete construction within 1400 calendar days, with liquidated damages for failure to meet the deadline. Performance and payment bonds will be required. The Army Corps of Engineers Engineering District Omaha is the issuing agency.
View the file
Other files
Show all 42
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
1 2 3 4 5 6 7 8 9 10
D
C
B
A
D A
T E
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
F
IL
E N
U M
B E
R
P
W F
R
O M
A H
A D
IS
T
R
IC
T C
A P
IT
A
L A
V E
N U
E
O M
A H
A N
E B
R A
S K
A
-1
-2
CSOF PACKAGE - 90% CORRECTED DESIGN
E
F
G
A F
-1
-0
F
IL
E N
A M
E
C S
O F
P
A C
K A
G E
C O
N S
O L
ID
A T
E D
S P
A C
E O
P E
R A
T
IO
N S
F A
C
IL
IT
Y
B L D
G N
O
3/10/2021 10:03:49 AM
G-010
C O
V E
R S
H E
E T
V
O L U
M E
S C
H R
IE
V
E R
A F
B C
O L O
R A
D O
M D
A L L A
B A
T T
IS
T
A
T V
O N
F E
L D
T
T V
O N
F E
L D
T
J O
L S
O N
S H
-G
L E
N -3
-C
S O
F -A
.R
V T
PROCESS, MECHANICAL
1616 CAPITAL AVENUE, #3300 OMAHA, NEBRASKA 68102
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
1 2 3 4 5 6 7 8 9 10
D
C
B
A
D A
T E
US Army Corps of Engineers ®
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
F
IL
E N
U M
B E
R
P
SOLICITATION NO.: W9128F20R0002
CONSTRUCTION CONTRACT NO.:
ISSUE DATE:
90% CORRECTED DESIGN
W F
R
O M
A H
A D
IS
T
R
IC
T C
A P
IT
A
L A
V E
N U
E
O M
A H
A N
E B
R A
S K
A
-1
-2
CSOF PACKAGE - 90% CORRECTED DESIGN
E
F
G
A F
-1
-0
F
IL
E N
A M
E
OMAHA DISTRICT
C S
C
K A
G E
C O
N S
O L
ID
A T
E D
S P
A C
E O
P E
R A
T
IO
N S
F A
C
IL
IT
Y
B L D
G N
O
3/10/2021 10:03:49 AM
G-010
C O
V E
R S
H E
E T
V
O L U
M E
S C
H R
IE
V
E R
A F
B C
O L O
R A
D O
M D
A L L A
B A
T T
IS
T
A
T V
O N
F E
L D
T
T V
O N
F E
L D
T
J O
L S
O N
S H
-G
L E
N -3
-C
S O
F -A
.R
V T
SCHRIEVER AFB, COLORADO
CONSOLIDATED SPACE OPERATIONS FACILITY
BLDG. NO. 750
03-12-2021
CSOF PACKAGE - VOLUME 6
BID OPTION 3D PERSPECTIVE
BASE BID 3D PERSPECTIVE
MECHANICAL
PLUMBINGARCHITECTURALSTRUCTURALCIVIL / LANDSCAPEFIRE PROTECTION
TELECOMMUNICATIONSELECTRICAL
DESIGNER SIGNATURE BLOCK
N
N
MECHANICAL ELECTRICAL
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
1 2 3 4 5 6 7 8 9 10
D
C
B
A
D A
T E
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
F
IL
E N
U M
B E
R
P
W F
R
O M
A H
A D
IS
T
R
IC
T C
A P
IT
A
L A
V E
N U
E
O M
A H
A N
E B
R A
S K
A
-1
-2
CSOF PACKAGE - 90% CORRECTED DESIGN
E
F
G
A F
-1
-0
F
IL
E N
A M
E
C S
C
K A
G E
C O
N S
O L
ID
A T
E D
S P
A C
E O
P E
R A
T
IO
N S
F A
C
IL
IT
Y
B L D
G N
O
3/10/2021 1:10:28 PM
G-011
C S
O F
D
R A
W
IN
G I
N D
E X
V
O L U
M E
S C
H R
IE
V
E R
A F
B C
O L O
R A
D O
M D
A L L A
B A
T T
IS
T
A
T V
O N
F E
L D
T
T V
O N
F E
L D
T
J O
L S
O N
S H
-G
L E
N -3
-C
S O
F -A
.R
V T
SHT No SHEET NAME REV DATE
M-501 MECHANICAL - PIPE SUPPORT DETAILS SHEET 1
M-502 MECHANICAL - PIPE SUPPORT DETAILS SHEET 2
M-503 MECHANICAL - PIPE SUPPORT DETAILS SHEET 3
M-504 DETAILS
M-505 DETAILS
M-506 DETAILS
M-507 DETAILS
M-508 DETAILS
M-601 MECHANICAL - EQUIPMENT SCHEDULES - SHEET 1
M-602 MECHANICAL - EQUIPMENT SCHEDULES - SHEET 2
M-603 MECAHNICAL - EQUIPMENT SCHEDULES - SHEET 3
M-604 MECAHNICAL - EQUIPMENT SCHEDULES - SHEET 4
M-605 MECHANICAL - EQUIPMENT SCHEDULES - SHEET 4
M-605A MECHANICAL - EQUIPMENT SCHEDULES - SHEET 4A
M-606 MECHANICAL - EQUIPMENT SCHEDULES - SHEET 6
M-607 MECHANICAL - EQUIPMENT SCHEDULES - SHEET 7
M-608 OUTSIDE AIR CALCULATION
M-609 MISSION CRITICAL CHILLED WATER DISTRIBUTION DIAGRAM
M-701 DDC CONTROLS - LEGEND AND ABBREVIATIONS
M-702 DDC CONTROLS - NETWORK DIAGRAM
M-703 DDC CONTROLS - AHU WITHOUT OUTSIDE AIR
M-704 DDC CONTROLS - AHU WITH OUTSIDE AIR
M-705 DOAS-1 DIAGRAM AND SEQUENCE
M-707 DDC CONTROLS - VAVS
M-708 DDC CONTROLS - CRAC UNITS
M-709 DDC CONTROLS - FCU
M-710 DDC CONTROLS - HYDROGEN DETECTION AND EXHAUST SYSTEM CONTROLS
M-711 DDC CONTROLS - SMOKE EXHAUST AND EMERGENCY SHUTDOWN
M-712 DDC CONTROLS - GENERAL EXHAUST FANS
M-713 DDC CONTROLS - SUMP PUMPS
M-714 DDC CONTROLS - DHWR PUMP & METERING
Grand total: 175
SHT No SHEET NAME REV DATE
D-731 PIPING AND INSTRUMENTATION DIAGRAM - FAN COIL UNITS - EAST CENTRAL UTILITY PLANT
D-732 PIPING AND INSTRUMENTATION DIAGRAM - FAN COIL UNITS - EAST CENTRAL UTILITY PLANT
D-733 PIPING AND INSTRUMENTATION DIAGRAM - FAN COIL UNITS - ELECTRICAL ROOMS
D-734 PIPING AND INSTRUMENTATION DIAGRAM - GENERATOR FUEL OIL SYSTEM 01
D-735 PIPING AND INSTRUMENTATION DIAGRAM - GENERATOR FUEL OIL SYSTEM 02
DP901 CHILLED WATER PIPING ISOMETRIC - CUP
DP902 CONDENSER WATER PIPING ISOMETRIC - CUP
DP903 HOT WATER PIPING ISOMETRIC - CUP
DP904 DOMESTIC COLD WATER AND MAKE-UP WATER PIPING ISOMETRIC - CUP
DP905 MISCELLANEOUS PIPING ISOMETRIC - CUP
DP906 ELECTRICAL/MECHANICAL YARD PIPING ISOMETRIC - CUP
1400 - MECHANICAL
M-001 LEGEND AND ABBREVIATIONS
MH110 OVERALL HVAC PLAN - FIRST FLOOR
MH111 FIRST FLOOR HVAC PLAN - SECTOR 1
MH112 FIRST FLOOR HVAC PLAN - SECTOR 2
MH113 FIRST FLOOR HVAC PLAN - SECTOR 3
MH114 FIRST FLOOR HVAC PLAN - SECTOR 4
MH115 FIRST FLOOR HVAC PLAN - SECTOR 5
MH116 FIRST FLOOR HVAC PLAN - SECTOR 6
MH116A FIRST FLOOR HVAC PLAN - SECTOR 6A
MH117 FIRST FLOOR HVAC PLAN - SECTOR 7
MH118 FIRST FLOOR HVAC PLAN - SECTOR 8
MH119 FIRST FLOOR HVAC PLAN - SECTOR 9
MH119A FIRST FLOOR HVAC PLAN - SECTOR 9A
MH120 OVERALL HVAC PLAN - SECOND FLOOR
MH121 SECOND FLOOR HVAC PLAN - SECTOR 1
MH122 SECOND FLOOR HVAC PLAN - SECTOR 2
MH123 SECOND FLOOR HVAC PLAN - SECTOR 3
MH124 SECOND FLOOR HVAC PLAN - SECTOR 4
MH125 SECOND FLOOR HVAC PLAN - SECTOR 5
MH126 SECOND FLOOR HVAC PLAN - SECTOR 6
MH127 SECOND FLOOR HVAC PLAN - SECTOR 7
MH128 SECOND FLOOR HVAC PLAN - SECTOR 8
MH129 SECOND FLOOR HVAC PLAN - SECTOR 9
MH130 OVERALL HVAC ROOF PLAN
MH130A OVERALL HVAC ROOF PLAN
MP100 OVERALL PIPING PLAN - FIRST FLOOR
MP111 FIRST FLOOR PIPING PLAN - SECTOR 1
MP112 FIRST FLOOR PIPING PLAN - SECTOR 2
MP113 FIRST FLOOR PIPING PLAN - SECTOR 3
MP114 FIRST FLOOR PIPING PLAN - SECTOR 4
MP115 FIRST FLOOR PIPING PLAN - SECTOR 5
MP116 FIRST FLOOR PIPING PLAN - SECTOR 6
MP116A FIRST FLOOR PIPING PLAN - SECTOR 6A
MP117 FIRST FLOOR PIPING PLAN - SECTOR 7
MP118 FIRST FLOOR PIPING PLAN - SECTOR 8
MP119 FIRST FLOOR PIPING PLAN - SECTOR 9
MP119A FIRST FLOOR PIPING PLAN - SECTOR 9A
MP120 OVERALL PIPING PLAN - SECOND FLOOR
MP121 SECOND FLOOR PIPING PLAN - SECTOR 1
MP122 SECOND FLOOR PIPING PLAN - SECTOR 2
MP123 SECOND FLOOR PIPING PLAN - SECTOR 3
MP124 SECOND FLOOR PIPING PLAN - SECTOR 4
MP125 SECOND FLOOR PIPING PLAN - SECTOR 5
MP126 SECOND FLOOR PIPING PLAN - SECTOR 6
MP127 SECOND FLOOR PIPING PLAN - SECTOR 7
MP128 SECOND FLOOR PIPING PLAN - SECTOR 8
MP129 SECOND FLOOR PIPING PLAN - SECTOR 9
MH401 HVAC AIRSIDE EQUIPMENT PLAN - CUP
MH402 HVAC VENTILATION EQUIPMENT PLAN -CUP
MH403 HVAC AIRSIDE DUCT PLAN - CUP
MH404 HVAC VENTILATION DUCT PLAN - CUP
M-405 ENLARGED MECHANICAL ROOM PLANS
M-406 ENLARGED MECHANICAL ROOM PLANS
M-407 ENLARGED MECHANICAL ROOM PLANS
M-408 ENLARGED MECHANICAL ROOM PLANS
M-409 ENLARGED MECHANICAL ROOM PLANS
M-411 ENLARGED PIPING PLAN
M-412 ENLARGED PIPING PLAN
M-413 ENLARGED PIPING PLAN
M-421 ISOMETRIC MECHANICAL ROOM PLANS
M-422 ISOMETRIC MECHANICAL ROOM PLANS
M-423 ISOMETRIC MECHANICAL ROOM PLANS
M-424 ISOMETRIC MECHANICAL ROOM PLANS
M-425 ISOMETRIC MECHANICAL ROOM PLANS
SHT No SHEET NAME REV DATE
1300 - PROCESS
DP301 PROCESS PIPING SECTIONS - CUP
DP302 PROCESS PIPING SECTIONS - CUP
DP303 PROCESS PIPING SECTIONS - CUP
DP304 PROCESS PIPING SECTIONS - CUP
DP305 PROCESS PIPING SECTIONS - CUP
DP306 PROCESS PIPING SECTIONS - CUP
DP307 PROCESS PIPING SECTIONS - ELECTRICAL/MECHANICAL YARD
DP400 OVERALL PROCESS PIPING PLAN - CUP MECHANICAL ROOMS A/B
DP401 CHILLED WATER PIPING PLAN - CUP MECHANICAL ROOM A
DP402 CHILLED WATER PIPING PLAN - CUP MECHANICAL ROOM B
DP403 CONDENSER WATER PIPING PLAN - CUP MECHANICAL ROOM A
DP404 CONDENSER WATER PIPING PLAN - CUP MECHANICAL ROOM B
DP405 HOT WATER PIPING PLAN -CUP MECHANICAL ROOM A
DP406 HOT WATER PIPING PLAN -CUP MECHANICAL ROOM B
DP407 DOMESTIC COLD WATER AND MAKE-UP WATER PIPING PLAN - CUP MECHANICAL ROOM A
DP408 DOMESTIC COLD WATER AND MAKE-UP WATER PIPING PLAN - CUP MECHANICAL ROOM B
DP409 MISCELLANEOUS PIPING PLAN - CUP MECHANICAL ROOM A
DP410 MISCELLANEOUS PIPING PLAN - CUP MECHANICAL ROOM B
DP411 FAN COIL UNIT PIPING - CUP
DP412 OVERALL PROCESS PIPING PLAN - CUP ROOF
DP413 CONDENSER WATER PIPING PLAN - CUP ROOF
DP414 MISCELLANEOUS PIPING PLAN - CUP ROOF
DP415 PROCESS PIPING PLAN - ELECTRICAL/MECHANICAL YARD
DQ401 PROCESS EQUIPMENT PLAN - CUP MECANICAL ROOM A
DQ402 PROCESS EQUIPMENT PLAN - CUP MECANICAL ROOM B
DQ403 PROCESS EQUIPMENT PLAN - CUP ROOF
DQ404 PROCESS EQUIPMENT PLAN - ELECTRICAL/MECHANICAL YARD
D-001 PIPING AND INSTRUMENTATION DIAGRAM - LEGEND SHEET 1
D-002 PIPING AND INSTRUMENTATION DIAGRAM - LEGEND SHEET 2
D-003 PIPING AND INSTRUMENTATION DIAGRAM - LEGEND SHEET 3
D-004 PIPING AND INSTRUMENTATION DIAGRAM - SEQUENCE OF OPERATIONS
D-601 PROCESS FLOW DIAGRAM - CHILLED WATER SYSTEM
D-602 PROCESS FLOW DIAGRAM - CONDENSER WATER SYSTEM
D-603 PROCESS FLOW DIAGRAM - HOT WATER SYSTEM
D-604 PROCESS FLOW DIAGRAM - SYSTEM TABLES
D-701 PIPING AND INSTRUMENTATION DIAGRAM - WATER COOLED CHILLER 01
D-701A PIPING AND INSTRUMENTATION - CHILLER CONDENSER WATER BYPASS PUMP 01
D-702 PIPING AND INSTRUMENTATION DIAGRAM - WATER COOLED CHILLER 02
D-702A PIPING AND INSTRUMENTATION - CHILLER CONDENSER WATER BYPASS PUMP 02
D-703 PIPING AND INSTRUMENTATION DIAGRAM - WATER COOLED CHILLER 03
D-703A PIPING AND INSTRUMENTATION - CHILLER CONDENSER WATER BYPASS PUMP 03
D-704 PIPING AND INSTRUMENTATION DIAGRAM - WATER COOLED CHILLER 04
D-704A PIPING AND INSTRUMENTATION - CHILLER CONDENSER WATER BYPASS PUMP 04
D-705 PIPING AND INSTRUMENTATION DIAGRAM - COOLING TOWER 01
D-706 PIPING AND INSTRUMENTATION DIAGRAM - COOLING TOWER 02
D-707 PIPING AND INSTRUMENTATION DIAGRAM - COOLING TOWER 03
D-708 PIPING AND INSTRUMENTATION DIAGRAM - COOLING TOWER 04
D-709 PIPING AND INSTRUMENTATION DIAGRAM - PRIMARY CHILLED WATER PUMPS
D-710 PIPING AND INSTRUMENTATION DIAGRAM - CONDENSER WATER PUMPS
D-711 PIPING AND INSTRUMENTATION DIAGRAM - CHILLED WATER WEST HEADER
D-712 PIPING AND INSTRUMENTATION DIAGRAM - CHILLED WATER EAST HEADER
D-713 PIPING AND INSTRUMENTATION DIAGRAM - CONDENSER WATER WEST HEADER
D-714 PIPING AND INSTRUMENTATION DIAGRAM - CONDENSER WATER EAST HEADER
D-715 PIPING AND INSTRUMENTATION DIAGRAM - FREE COOLING HEAT EXCHANGER 01
D-716 PIPING AND INSTRUMENTATION DIAGRAM - FREE COOLING HEAT EXCHANGER 02
D-717 PIPING AND INSTRUMENTATION DIAGRAM - CONDENSER WATER CHEMICAL FEED
D-718 PIPING AND INSTRUMENTATION DIAGRAM - REFRIGERANT MONITORING WEST
D-719 PIPING AND INSTRUMENTATION DIAGRAM - REFRIGERANT MONITORING EAST
D-720 PIPING AND INSTRUMENTATION DIAGRAM - VENILATION FANS
D-721 PIPING AND INSTRUMENTATION DIAGRAM - DOMESTIC COLD WATER
D-722 PIPING AND INSTRUMENTATION DIAGRAM - HOT WATER BOILER 01
D-723 PIPING AND INSTRUMENTATION DIAGRAM - HOT WATER BOILER 02
D-724 PIPING AND INSTRUMENTATION DIAGRAM - HOT WATER BOILER 03
D-725 PIPING AND INSTRUMENTATION DIAGRAM - HOT WATER BOILER 04
D-726 PIPING AND INSTRUMENTATION DIAGRAM - SECONDARY HOT WATER PUMPS
D-727 PIPING AND INSTRUMENTATION DIAGRAM - HOT WATER WEST HEADER
D-728 PIPING AND INSTRUMENTATION DIAGRAM - HOT WATER EAST HEADER
D-729 PIPING AND INSTRUMENTATION DIAGRAM - FAN COIL UNITS - WEST CENTRAL UTILITY PLANT
D-730 PIPING AND INSTRUMENTATION DIAGRAM - FAN COIL UNITS - WEST CENTRAL UTILITY PLANT
SHT No SHEET NAME REV DATE
0000 - GENERAL
G-010 COVER SHEET - VOLUME 6
G-011 CSOF - DRAWING INDEX - VOLUME 6
Grand total: 2
LEVEL 1 FF
2' - 0"
CHW-CH-01
2"ø CHWS
"ø
C
H W
S
4"ø CWS
/2
/8
/8
"1
/8
6"ø RV
10"ø CWS
10"ø CWS
10"ø CHWS
10"ø CWR
2 1/2"ø MUWT
2 1/2"ø MUWT
6"ø CHWS
6"ø CHWR
6"ø CWR
6"ø CWS
3”⌀ RV
1 1/4”⌀ RV
3/4"ø HWR
3/4"ø HWS
1 1/4"ø HWS
1 1/4"ø HWR
1"ø CHWS
1"ø CHWR
2"ø CHWR
LEVEL 1 FF
2' - 0"
CH-PMP-02
/2
/8
/8
/8
" 1
2 1/2"ø MUWT
2 1/2"ø MUWT
10"ø CWS
6"ø RV
10"ø CWS
10"ø CWR
8"ø CWR
8"ø CWS
W
R
W
S
W R
R
R
S
1"ø CF
1 1/4"ø HWS
1 1/4"ø HWR
2"ø CHWR
2"ø CHWS
HVAC-FCU-05
3/4"ø HWS
3/4"ø HWR
1"ø CHWR
1"ø CHWS
LEVEL 1 FF
2' - 0"
3"ø HWR
3"ø HWS
/8
/8
BLR-PMP-01
HW-BLR-01
4"ø HWS 4"ø HWR
G
6"⌀ EXHAUST VENT
6"⌀ COMBUSTION AIR
LEVEL 1 FF
2' - 0"
CHW-AS-01
CHW-CSF-01
10"ø CHWR
10"ø CHWR
1 1/2"ø CHWR
2"ø MUWT
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
1 2 3 4 5 6 7 8 9 10
D
C
B
A
D A
T E
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
F
IL
E N
U M
B E
R
P
4 5 6
KEY PLAN
PLAN NORTH
W F
R
O M
A H
A D
IS
T
R
IC
T
C
A P
IT
A
L A
V E
N U
E
O M
A H
A N
E B
R A
S K
A
-1
-2
CSOF PACKAGE - 90% CORRECTED DESIGN
E
F
G
8 9
A F
-1
-0
F
IL
E N
A M
E
C S
C
K A
G E
C O
N S
O L
ID
A T
E D
S P
A C
E O
P E
R A
T
IO
N S
F A
C
IL
IT
Y
B L D
G N
O
C F
E U
E R
S T
E
IN
3/9/2021 11:48:52 AM
DP301
P R
O C
E S
S P
IP
IN
G S
E C
T
IO
N S
C
U P
S C
H R
IE
V
E R
A F
B C
O L O
R A
D O
C F
E U
E R
S T
E
IN
R T
U R
N E
R
J B
O V
E N
K A
M P
3/8" = 1'-0"1
TYPICAL CHILLER SECTION
3/8" = 1'-0"2
TYPICAL CHLLER BYPASS PUMP SECTION
3/8" = 1'-0"3
TYPICAL BOILER SECTION
3/8" = 1'-0"4
TYPICAL CHILLED WATER AIR SEPARATOR SECTION
GENERAL SHEET NOTES
1. PIPING SUSPENDED FROM THE BUILDING STRUCTURE ABOVE SHALL BE
ISOLATED USING MASON INDUSTRIES, MODEL 30N OR PC30N
SPRING/NEOPRENE HANGERS, OR EQUAL. SPRING/NEOPRENE HANGERS
SHALL HAVE 1" NOMINAL STATIC DEFLECTION.
2. PROVIDE AND INSTALL PIPING HANGERS AND SUPPORTS PER THE
HANGER NOTES, TABLES, AND DETAILS ON DRAWINGS M-501, M-502, AND
M-503. PROVIDE AND INSTALL PIPING HANGERS AND SUPPORTS AS
NECESSARY AND REQUIRED TO PROPERLY SUPPORT, GUIDE AND
ACCOMMODATE ANY MOVEMENT OF THE PIPING SYSTEMS IN THE
BUILDING MECHANICAL ROOM, AND CONNECT TO THE EQUIPMENT PER
THE MANUFACTURERS INSTALLATION REQUIREMENTS.
3. ALL PIPING PENETRATIONS THROUGH THE BUILDINGS BELOW GRADE
EXTERIOR WALLS AND FLOORS SHALL BE PRE-FORMED DURING WALL
CONSTRUCTION USING STEEL PIPE SLEEVE WITH WATER STOP/ANCHOR
PLATE. PROVIDE AND INSTALL MECHANICAL LINK-SEAL BETWEEN PIPING
AND STEEL WALL SLEEVE. SIZE AND INSTALL PIPE SLEEVE AND LINK-
SEAL ACCORDING TO THE MANUFACTURER'S INSTALLATION
REQUIREMENTS.
4. SEE STRUCTURAL DRAWINGS FOR CONCRETE EQUIPMENT PAD DETAILS
AND REQUIREMENTS.
5. CONTRACTOR SHALL FIELD ROUTE ALL PIPING 2" AND SMALLER.
ROUTING SHOWN IS FOR REFERENCE ONLY.
HW-CSF-01
HW-AS-01
4"ø HWS
4"ø HWR
1 1/2"ø MUWT
LEVEL 1 FF
2' - 0"
/4
/2
/4
/2
/8
2 1/2"ø MUWT2 1/2"ø MUWT
4"ø CWS
4"ø CWS
4"ø CWS 4"ø CWS
1 1/2"ø MUWT
3"ø NG
4"ø HWS
4"ø HWR
10"ø CWR 10"ø CWS
6"ø RV
10"ø CWS
10"ø CHWR
10"ø CHWS
10"ø CHWR
W
R
W
R
S
S
S
S
HW-PMP-02 CHW-PMP-02 CW-PMP-02
NOTE 5
NOTE 5 NOTE 5
2"⌀ CHWR
2"⌀ CHWS
1 1/4"⌀ HWS
1 1/4"⌀ HWR
LEVEL 1 FF
2' - 0"
I J
"3
" 6
/4
/8
3"ø DCW3"ø MUWT
2"ø MUWT
1 1/2"ø MUWT
1 1/4"ø DCW
1 1/2"ø DCW
2"ø DCW
1"ø DCW
D
W
S
S
S
S
/4
"ø
D
C W
/4
"ø
D
C W
3/4"ø DCWHVAC-FCU-02
HVAC-FCU-01
CW-SPR-01CW-SPR-02CF-TNK-03 CF-TNK-01/02
6"ø RV
2"ø CHWR2"ø CHWS
1"ø CHWR1"ø CHWS
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
1 2 3 4 5 6 7 8 9 10
D
C
B
A
D A
T E
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
F
IL
E N
U M
B E
R
P
4 5 6
KEY PLAN
PLAN NORTH
W F
R
O M
A H
A D
IS
T
R
IC
T
C
A P
IT
A
L A
V E
N U
E
O M
A H
A N
E B
R A
S K
A
-1
-2
CSOF PACKAGE - 90% CORRECTED DESIGN
E
F
G
8 9
A F
-1
-0
F
IL
E N
A M
E
C S
C
K A
G E
C O
N S
O L
ID
A T
E D
S P
A C
E O
P E
R A
T
IO
N S
F A
C
IL
IT
Y
B L D
G N
O
C F
E U
E R
S T
E
IN
3/9/2021 11:49:00 AM
DP302
P R
O C
E S
S P
IP
IN
G S
E C
T
IO
N S
C
U P
S C
H R
IE
V
E R
A F
B C
O L O
R A
D O
C F
E U
E R
S T
E
IN
R T
U R
N E
R
J B
O V
E N
K A
M P
3/8" = 1'-0"1
TYPICAL HOT WATER AIR SEPERATOR SECTION
3/8" = 1'-0"2
TYPICAL PUMP SECTION
3/8" = 1'-0"3
MECHANICAL ROOM A WEST WALL SECTION
GENERAL SHEET NOTES
1. PIPING SUSPENDED FROM THE BUILDING STRUCTURE ABOVE SHALL BE
ISOLATED USING MASON INDUSTRIES, MODEL 30N OR PC30N
SPRING/NEOPRENE HANGERS, OR EQUAL. SPRING/NEOPRENE HANGERS
SHALL HAVE 1" NOMINAL STATIC DEFLECTION.
2. PROVIDE AND INSTALL PIPING HANGERS AND SUPPORTS PER THE
HANGER NOTES, TABLES, AND DETAILS ON DRAWINGS M-501, M-502, AND
M-503. PROVIDE AND INSTALL PIPING HANGERS AND SUPPORTS AS
NECESSARY AND REQUIRED TO PROPERLY SUPPORT, GUIDE AND
ACCOMMODATE ANY MOVEMENT OF THE PIPING SYSTEMS IN THE
BUILDING MECHANICAL ROOM, AND CONNECT TO THE EQUIPMENT PER
THE MANUFACTURERS INSTALLATION REQUIREMENTS.
3. ALL PIPING PENETRATIONS THROUGH THE BUILDINGS BELOW GRADE
EXTERIOR WALLS AND FLOORS SHALL BE PRE-FORMED DURING WALL
CONSTRUCTION USING STEEL PIPE SLEEVE WITH WATER STOP/ANCHOR
PLATE. PROVIDE AND INSTALL MECHANICAL LINK-SEAL BETWEEN PIPING
AND STEEL WALL SLEEVE. SIZE AND INSTALL PIPE SLEEVE AND LINK-
SEAL ACCORDING TO THE MANUFACTURER'S INSTALLATION
REQUIREMENTS.
4. SEE STRUCTURAL DRAWINGS FOR CONCRETE EQUIPMENT PAD DETAILS
AND REQUIREMENTS.
/1
/1
" 1
HW-ET-01CHW-ET-01 CHW-HX-01
DW-SS-01
DW-EEWS-01
4"ø HWR
10"ø CHWR
8"ø CWS
8"ø CWR
W
R
/2
"ø
D
C W
/2
"ø
D
C W
HVAC-FCU-08 HVAC-FCU-06 HVAC-FCU-04 HVAC-FCU-02
3"ø HWS 4"ø CHWS
4"ø CHWR 3"ø HWS
1 1/4"ø DCW
1 1/2"ø HWS1 1/2"ø CHWR
10”⌀ CHWS (BEHIND)
8"ø CHWR
2"ø CHWR 2"ø CHWS
/4
"ø
D
C W
3"ø HWR
LEVEL 1 FF
2' - 0"
/1
/1
"1
CHW-HX-02 CHW-ET-02HW-ET-02
DW-SS-02
8"ø CWR 8"ø CHWR
8"ø CHWR8"ø CWS
4"ø HWS
/2
"ø
D
C W
/2
"ø
D
C W
/4
"ø
D
C W
HVAC-FCU-16 HVAC-FCU-14 HVAC-FCU-12 HVAC-FCU-10
10"ø CHWS 4"ø HWS
4"ø HWR
3"ø HWS 3"ø HWS
1 1/2"ø HWS 1 1/2"ø CHWR
1 1/2"ø MUWT1 1/4"ø HWS 3"ø HWS
3"ø HWR
4"ø CHWS
4"ø CHWS
2"ø CHWS 2"ø CHWR
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
1 2 3 4 5 6 7 8 9 10
D
C
B
A
D A
T E
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
F
IL
E N
U M
B E
R
P
4 5 6
KEY PLAN
PLAN NORTH
W F
R
O M
A H
A D
IS
T
R
IC
T C
A P
IT
A
L A
V E
N U
E
O M
A H
A N
E B
R A
S K
A
-1
-2
CSOF PACKAGE - 90% CORRECTED DESIGN
E
F
G
8 9
A F
-1
-0
F
IL
E N
A M
E
C S
C
K A
G E
C O
N S
O L
ID
A T
E D
S P
A C
E O
P E
R A
T
IO
N S
F A
C
IL
IT
Y
B L D
G N
O
C F
E U
E R
S T
E
IN
3/9/2021 11:49:09 AM
DP303
P R
O C
E S
S P
IP
IN
G S
E C
T
IO
N S
C
U P
S C
H R
IE
V
E R
A F
B C
O L O
R A
D O
C F
E U
E R
S T
E
IN
R T
U R
N E
R
J B
O V
E N
K A
M P
3/8" = 1'-0"1
CUP MECHANICAL ROOM A SOUTH WALL SECTION
3/8" = 1'-0"2
CUP MECHANICAL ROOM B SOUTH WALL SECTION
GENERAL SHEET NOTES
1. PIPING SUSPENDED FROM THE BUILDING STRUCTURE ABOVE SHALL BE
ISOLATED USING MASON INDUSTRIES, MODEL 30N OR PC30N
SPRING/NEOPRENE HANGERS, OR EQUAL. SPRING/NEOPRENE HANGERS
SHALL HAVE 1" NOMINAL STATIC DEFLECTION.
2. PROVIDE AND INSTALL PIPING HANGERS AND SUPPORTS PER THE
HANGER NOTES, TABLES, AND DETAILS ON DRAWINGS M-501, M-502, AND
M-503. PROVIDE AND INSTALL PIPING HANGERS AND SUPPORTS AS
NECESSARY AND REQUIRED TO PROPERLY SUPPORT, GUIDE AND
ACCOMMODATE ANY MOVEMENT OF THE PIPING SYSTEMS IN THE
BUILDING MECHANICAL ROOM, AND CONNECT TO THE EQUIPMENT PER
THE MANUFACTURERS INSTALLATION REQUIREMENTS.
3. ALL PIPING PENETRATIONS THROUGH THE BUILDINGS BELOW GRADE
EXTERIOR WALLS AND FLOORS SHALL BE PRE-FORMED DURING WALL
CONSTRUCTION USING STEEL PIPE SLEEVE WITH WATER STOP/ANCHOR
PLATE. PROVIDE AND INSTALL MECHANICAL LINK-SEAL BETWEEN PIPING
AND STEEL WALL SLEEVE. SIZE AND INSTALL PIPE SLEEVE AND LINK-
SEAL ACCORDING TO THE MANUFACTURER'S INSTALLATION
REQUIREMENTS.
4. SEE STRUCTURAL DRAWINGS FOR CONCRETE EQUIPMENT PAD DETAILS
AND REQUIREMENTS.
5. CONTRACTOR SHALL FIELD ROUTE ALL PIPING 2" AND SMALLER.
ROUTING SHOWN IS FOR REFERENCE ONLY.
TO SINK INSTANTANEOUS
ELECTRIC WATER HEATER
TO SINK
INSTANTANEOUS
ELECTRIC
WATER HEATER
"2
CUP ROOF
10"ø CWS
10"ø CWR
6"⌀ EXHAUST VENT
6"⌀ EXHAUST VENT
6"⌀ COMBUSTION AIR
6"⌀ COMBUSTION AIR
8"⌀ CWR
J
8"ø CWR 8"ø CWR
10"ø CWS
8"ø CWR
8"ø CWR 2"ø BLD 3"ø OF 2"ø BLD3"ø OF
(BEHIND) (BEHIND)
CW-CT-02CW-CT-01
CUP ROOF
/8
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
1 2 3 4 5 6 7 8 9 10
D
C
B
A
D A
T E
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
F
IL
E N
U M
B E
R
P
4 5 6
KEY PLAN
PLAN NORTH
W F
R
O M
A H
A D
IS
T
R
IC
T C
A P
IT
A
L A
V E
N U
E
O M
A H
A N
E B
R A
S K
A
-1
-2
CSOF PACKAGE - 90% CORRECTED DESIGN
E
F
G
8 9
A F
-1
-0
F
IL
E N
A M
E
C S
C
K A
G E
C O
N S
O L
ID
A T
E D
S P
A C
E O
P E
R A
T
IO
N S
F A
C
IL
IT
Y
B L D
G N
O
C F
E U
E R
S T
E
IN
3/9/2021 11:49:16 AM
DP304
P R
O C
E S
S P
IP
IN
G S
E C
T
IO
N S
C
U P
S C
H R
IE
V
E R
A F
B C
O L O
R A
D O
C F
E U
E R
S T
E
IN
R T
U R
N E
R
J B
O V
E N
K A
M P
3/8" = 1'-0"1
CUP ROOF SECTION 1
3/8" = 1'-0"2
CUP ROOF SECTION 2
GENERAL SHEET NOTES CONT.
4. CONTRACTOR SHALL FIELD ROUTE ALL PIPING 2" AND SMALLER.
ROUTING SHOWN IS FOR REFERENCE ONLY.
GENERAL SHEET NOTES
1. PIPING SHALL BE SUPPORTED FROM THE COOLING TOWER STRUCTURAL
STEEL FRAMING ON THE ROOF. COORDINATE THE LOCATION OF STEEL
PIPE SUPPORT STANCHIONS AND HANGER ASSEMBLIES WITH THE
COOLING TOWER WALKWAY GRADING AND PLATFORMS. AFTER
FABRICATION, ASSEMBLY AND INSTALLATION OF STEEL PIPE SUPPORTS,
SCRAPE AND BRUSH ASSEMBLY FREE OF SCALE, DIRT, AND LOOSE
MATERIAL, AND WIPE CLEAN WITH SOLVENT MOISTENED CLOTH. USING
BRUSH OR ROLLER COAT ENTIRE SUPPORT SURFACE WITH PRIME AND
FINISH COATS OF RUST PREVENTIVE PAINT.
2. PROVIDE AND INSTALL PIPING HANGERS AND SUPPORTS PER THE
HANGER NOTES, TABLES, AND DETAILS ON DRAWINGS M-501, M-502, AND
M-503. PROVIDE AND INSTALL PIPING HANGERS AND SUPPORTS AS
NECESSARY AND REQUIRED TO PROPERLY SUPPORT, GUIDE AND
ACCOMMODATE ANY MOVEMENT OF THE PIPING SYSTEMS IN THE
BUILDING MECHANICAL ROOM AND ON THE BUILDING ROOF, AND
CONNECT TO THE EQUIPMENT PER THE MANUFACTURERS INSTALLATION
REQUIREMENTS.
3. ALL PIPING PENETRATIONS THROUGH THE BUILDING ROOF STRUCTURE
SHALL BE FLASHED AND SEALED WATERTIGHT. REFERENCE
ARCHITECTURAL DRAWINGS FOR REQUIREMENTS AND DETAILS.
J
8"ø CWR 8"ø CWR
10"ø CWS
8"ø CWR 8"ø CWR 3"ø OF
2"ø BLD
3"ø OF
2"ø BLD
CW-CT-04 CW-CT-03
" 2
CUP ROOF
/8
CUP ROOF
10"ø CWS
10"ø CWR
8"⌀ CWR
6"⌀ COMBUSTION AIR
6"⌀ EXHAUST VENT
6"⌀ EXHAUST VENT
6"⌀ COMBUSTION AIR
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
1 2 3 4 5 6 7 8 9 10
D
C
B
A
D A
T E
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
F
IL
E N
U M
B E
R
P
4 5 6
KEY PLAN
PLAN NORTH
W F
R
O M
A H
A D
IS
T
R
IC
T
C
A P
IT
A
L A
V E
N U
E
O M
A H
A N
E B
R A
S K
A
-1
-2
CSOF PACKAGE - 90% CORRECTED DESIGN
E
F
G
8 9
A F
-1
-0
F
IL
E N
A M
E
C S
C
K A
G E
C O
N S
O L
ID
A T
E D
S P
A C
E O
P E
R A
T
IO
N S
F A
C
IL
IT
Y
B L D
G N
O
C F
E U
E R
S T
E
IN
3/9/2021 11:49:24 AM
DP305
P R
O C
E S
S P
IP
IN
G S
E C
T
IO
N S
C
U P
S C
H R
IE
V
E R
A F
B C
O L O
R A
D O
C F
E U
E R
S T
E
IN
R T
U R
N E
R
J B
O V
E N
K A
M P
3/8" = 1'-0"1
CUP ROOF SECTION 3
3/8" = 1'-0"2
CUP ROOF SECTION 4
GENERAL SHEET NOTES
1. PIPING SHALL BE SUPPORTED FROM THE COOLING TOWER STRUCTURAL
STEEL FRAMING ON THE ROOF. COORDINATE THE LOCATION OF STEEL
PIPE SUPPORT STANCHIONS AND HANGER ASSEMBLIES WITH THE
COOLING TOWER WALKWAY GRADING AND PLATFORMS. AFTER
FABRICATION, ASSEMBLY AND INSTALLATION OF STEEL PIPE SUPPORTS,
SCRAPE AND BRUSH ASSEMBLY FREE OF SCALE, DIRT, AND LOOSE
MATERIAL, AND WIPE CLEAN WITH SOLVENT MOISTENED CLOTH. USING
BRUSH OR ROLLER COAT ENTIRE SUPPORT SURFACE WITH PRIME AND
FINISH COATS OF RUST PREVENTIVE PAINT.
2. PROVIDE AND INSTALL PIPING HANGERS AND SUPPORTS PER THE
HANGER NOTES, TABLES, AND DETAILS ON DRAWINGS M-501, M-502, AND
M-503. PROVIDE AND INSTALL PIPING HANGERS AND SUPPORTS AS
NECESSARY AND REQUIRED TO PROPERLY SUPPORT, GUIDE AND
ACCOMMODATE ANY MOVEMENT OF THE PIPING SYSTEMS IN THE
BUILDING MECHANICAL ROOM AND ON THE BUILDING ROOF, AND
CONNECT TO THE EQUIPMENT PER THE MANUFACTURERS INSTALLATION
REQUIREMENTS.
3. ALL PIPING PENETRATIONS THROUGH THE BUILDING ROOF STRUCTURE
SHALL BE FLASHED AND SEALED WATERTIGHT. REFERENCE
ARCHITECTURAL DRAWINGS FOR REQUIREMENTS AND DETAILS.
4. CONTRACTOR SHALL FIELD ROUTE ALL PIPING 2" AND SMALLER.
"2
/8
CW-CT-01 CW-CT-03
R
R
6"ø EL 8"ø CWR
10"ø CWS 10"ø CWS
8"ø CWR
4"ø CWS
4"ø CWS
4"ø CWS
4"ø CWS
1 1/2"ø MUWT 1 1/2"ø MUWT 2"ø BLD 3"ø OF
CUP ROOF
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
1 2 3 4 5 6 7 8 9 10
D
C
B
A
D A
T E
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
F
IL
E N
U M
B E
R
P
4 5 6
KEY PLAN
PLAN NORTH
W F
R
O M
A H
A D
IS
T
R
IC
T
C
A P
IT
A
L A
V E
N U
E
O M
A H
A N
E B
R A
S K
A
-1
-2
CSOF PACKAGE - 90% CORRECTED DESIGN
E
F
G
8 9
A F
-1
-0
F
IL
E N
A M
E
C S
C
K A
G E
C O
N S
O L
ID
A T
E D
S P
A C
E O
P E
R A
T
IO
N S
F A
C
IL
IT
Y
B L D
G N
O
C F
E U
E R
S T
E
IN
3/9/2021 11:49:31 AM
DP306
P R
O C
E S
S P
IP
IN
G S
E C
T
IO
N S
C
U P
S C
H R
IE
V
E R
A F
B C
O L O
R A
D O
C F
E U
E R
S T
E
IN
R T
U R
N E
R
J B
O V
E N
K A
M P
3/8" = 1'-0"1
CUP ROOF SECTION 5
GENERAL SHEET NOTES
1. PIPING SHALL BE SUPPORTED FROM THE COOLING TOWER STRUCTURAL
STEEL FRAMING ON THE ROOF. COORDINATE THE LOCATION OF STEEL
PIPE SUPPORT STANCHIONS AND HANGER ASSEMBLIES WITH THE
COOLING TOWER WALKWAY GRADING AND PLATFORMS. AFTER
FABRICATION, ASSEMBLY AND INSTALLATION OF STEEL PIPE SUPPORTS,
SCRAPE AND BRUSH ASSEMBLY FREE OF SCALE, DIRT, AND LOOSE
MATERIAL, AND WIPE CLEAN WITH SOLVENT MOISTENED CLOTH. USING
BRUSH OR ROLLER COAT ENTIRE SUPPORT SURFACE WITH PRIME AND
FINISH COATS OF RUST PREVENTIVE PAINT.
2. PROVIDE AND INSTALL PIPING HANGERS AND SUPPORTS PER THE
HANGER NOTES, TABLES, AND DETAILS ON DRAWINGS M-501, M-502, AND
M-503. PROVIDE AND INSTALL PIPING HANGERS AND SUPPORTS AS
NECESSARY AND REQUIRED TO PROPERLY SUPPORT, GUIDE AND
ACCOMMODATE ANY MOVEMENT OF THE PIPING SYSTEMS IN THE
BUILDING MECHANICAL ROOM AND ON THE BUILDING ROOF, AND
CONNECT TO THE EQUIPMENT PER THE MANUFACTURERS INSTALLATION
REQUIREMENTS.
3. ALL PIPING PENETRATIONS THROUGH THE BUILDING ROOF STRUCTURE
SHALL BE FLASHED AND SEALED WATERTIGHT. REFERENCE
ARCHITECTURAL DRAWINGS FOR REQUIREMENTS AND DETAILS.
TOC - FO TANK FOUNDATION
1' - 3"
FO-TNK-01 FO-TNK-02
FO-PMP-04
2"ø FOR 2"ø FOR
3"ø FOS2"ø FOS
2"ø FOS
2"ø FOR
2"⌀ FOR
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
1 2 3 4 5 6 7 8 9 10
D
C
B
A
D A
T E
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
F
IL
E N
U M
B E
R
P
4 5 6
KEY PLAN
PLAN NORTH
W F
R
O M
A H
A D
IS
T
R
IC
T
C
A P
IT
A
L A
V E
N U
E
O M
A H
A N
E B
R A
S K
A
-1
-2
CSOF PACKAGE - 90% CORRECTED DESIGN
E
F
G
8 9
A F
-1
-0
F
IL
E N
A M
E
C S
C
K A
G E
C O
N S
O L
ID
A T
E D
S P
A C
E O
P E
R A
T
IO
N S
F A
C
IL
IT
Y
B L D
G N
O
C F
E U
E R
S T
E
IN
3/9/2021 11:49:37 AM
DP307
P R
O C
E S
S P
IP
IN
G S
E C
T
IO
N S
E L E
C T
R
IC
A L /M
E C
H A
N
IC
A L Y
A R
D
S C
H R
IE
V
E R
A F
B C
O L O
R A
D O
C F
E U
E R
S T
E
IN
R T
U R
N E
R
J B
O V
E N
K A
M P
3/8" = 1'-0"1
FUEL OIL TANK SECTION
GENERAL SHEET NOTES
1. FUEL OIL PIPING SHALL BE SUPPORTED FROM THE RETAINING WALL AND
THE CONCRETE FOUNDATIONS OF THE FUEL OIL STORAGE TANKS AND
THE DIESEL ENGINE GENERATORS. REFERENCE STRUCTURAL
DRAWINGS FOR PIPE SUPPORT ASSEMBLY DETAILS FOR ATTACHMENT
TO THE RETAINING WALL AND THE CONCRETE FOUNDATIONS.
2. PROVIDE AND INSTALL PIPING HANGERS AND SUPPORTS PER THE
HANGER NOTES, TABLES, AND DETAILS ON DRAWINGS M-501, M-502, AND
M-503. PROVIDE AND INSTALL PIPING HANGERS AND SUPPORTS AS
NECESSARY AND REQUIRED TO PROPERLY SUPPORT, GUIDE AND
ACCOMMODATE ANY MOVEMENT OF THE PIPING SYSTEMS IN THE
ELECTRICAL YARD AND CONNECT TO THE EQUIPMENT PER THE
MANUFACTURERS INSTALLATION REQUIREMENTS.
3. FUEL OIL STORAGE TANKS EACH SHALL BE 15,000 GALLON CAPACITY,
DOUBLE-WALL ABOVEGROUND HORIZONTAL STORAGE TANK. FUEL OIL
STORAGE TANKS, PIPING, FITTINGS, PUMPS, AND ACCESSORIES SHALL
BE ELECTRIC HEAT TRACED AND INSULATED AND ALUMINUM JACKETED
FOR FREEZE PROTECTION.
4. SEE STRUCTURAL DRAWINGS FOR CONCRETE EQUIPMENT PAD DETAILS
AND REQUIREMENTS.
1 2 3
I
J
3.2
MECHANICAL ROOM A MECHANICAL ROOM B
ELECTRICAL ROOM A
ELECTRICAL ROOM B
BATTERY ROOM
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
1 2 3 4 5 6 7 8 9 10
D
C
B
A
D A
T E
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
F
IL
E N
U M
B E
R
P
4 5 6
KEY PLAN
PLAN NORTH
W F
R
O M
A H
A D
IS
T
R
IC
T
C
A P
IT
A
L A
V E
N U
E
O M
A H
A N
E B
R A
S K
A
-1
-2
CSOF PACKAGE - 90% CORRECTED DESIGN
E
F
G
8 9
A F
-1
-0
F
IL
E N
A M
E
C S
C
K A
G E
C O
N S
O L
ID
A T
E D
S P
A C
E O
P E
R A
T
IO
N S
F A
C
IL
IT
Y
B L D
G N
O
C F
E U
E R
S T
E
IN
3/9/2021 11:49:47 AM
DP400
O V
E R
A L L P
R O
C E
S S
P
IP
IN
G
P L A
N
C U
P
M E
C H
A N
IC
A
L R
O O
M S
A /B
S C
H R
IE
V
E R
A F
B C
O L O
R A
D O
C F
E U
E R
S T
E
IN
R T
U R
N E
R
J B
O V
E N
K A
M P
1/4" = 1'-0"1
OVERALL PROCESS PIPING PLAN - CUP MECHANICAL ROOMS A/B
1 2
J
CHW-CH-01 CHW-CH-02
C H
W -P
M P
-0
C H
W -P
M P
-0
CHW-AS-01
CHW-HX-01
CHW-ET-01
/1
/1
2' - 4 3/4" 1' - 11 1/2" 3' - 8 11/16" 2' - 4 1/8"
17' - 1 3/16" 10' - 0"
1' - 11 1/2" 1' - 6" 15' - 5 1/2"
1' - 11 1/2"MOTOR OPERATED
3-WAY FLOW
CONTROL VALVE
W
R
W
S
/2
W
R
W
S
W
S
W
R
10"ø CHWR
10"ø CHWS 10"ø CHWS
10"ø CHWR
10"ø CHWR
4"ø CHWR
4"ø CHWS
10"ø CHWR
10"ø CHWS
1"ø CF
1"ø CF
M A
T C
H L
IN
E
D P
CHW-CSF-01
(BELOW)
2"ø CHWR
NOTE 5
MECHANICAL ROOM A
MINIMUM FLOW BYPASS
4' - 5" 3' - 3 5/8"
2"ø CHWS
NOTE 5
DP302
DP301
DP301
DP302
DP301
DP301
DP302
DP303
/4
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
1 2 3 4 5 6 7 8 9 10
D
C
B
A
D A
T E
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
F
IL
E N
U M
B E
R
P
4 5 6
KEY PLAN
PLAN NORTH
W F
R
O M
A H
A D
IS
T
R
IC
T C
A P
IT
A
L A
V E
N U
E
O M
A H
A N
E B
R A
S K
A
-1
-2
CSOF PACKAGE - 90% CORRECTED DESIGN
E
F
G
8 9
A F
-1
-0
F
IL
E N
A M
E
C S
C
K A
G E
C O
N S
O L
ID
A T
E D
S P
A C
E O
P E
R A
T
IO
N S
F A
C
IL
IT
Y
B L D
G N
O
C F
E U
E R
S T
E
IN
3/9/2021 11:49:56 AM
DP401
C H
IL
L E
D W
A T
E R
P
IP
IN
G
P L A
N
C U
P M
E C
H A
N
IC
A L
R O
O M
A
S C
H R
IE
V
E R
A F
B C
O L O
R A
D O
C F
E U
E R
S T
E
IN
R T
U R
N E
R
J B
O V
E N
K A
M P
GENERAL SHEET NOTES
1. PIPING SUSPENDED FROM THE BUILDING STRUCTURE ABOVE SHALL BE
ISOLATED USING MASON INDUSTRIES, MODEL 30N OR PC30N
SPRING/NEOPRENE HANGERS, OR EQUAL. SPRING/NEOPRENE HANGERS
SHALL HAVE 1" NOMINAL STATIC DEFLECTION.
2. PROVIDE AND INSTALL PIPING HANGERS AND SUPPORTS PER THE
HANGER NOTES, TABLES, AND DETAILS ON DRAWINGS M-501, M-502 AND
M-503. PROVIDE AND INSTALL PIPING HANGERS AND SUPPORTS AS
NECESSARY AND REQUIRED TO PROPERLY SUPPORT, GUIDE AND
ACCOMMODATE ANY MOVEMENT OF THE PIPING SYSTEMS IN THE
BUILDING MECHANICAL ROOM, AND CONNECT TO THE EQUIPMENT PER
THE MANUFACTURERS INSTALLATION REQUIREMENTS.
3. ALL PIPING PENETRATIONS THROUGH THE BUILDINGS BELOW GRADE
EXTERIOR WALLS AND FLOORS SHALL BE PRE-FORMED DURING WALL
CONSTRUCTION USING STEEL PIPE SLEEVE WITH WATER STOP/ANCHOR
PLATE. PROVIDE AND INSTALL MECHANICAL LINK-SEAL BETWEEN PIPING
AND STEEL WALL SLEEVE. SIZE AND INSTALL PIPE SLEEVE AND LINK-
SEAL ACCORDING TO THE MANUFACTURER'S INSTALLATION
REQUIREMENTS.
4. CONTRACTOR SHALL FIELD ROUTE ALL PIPING 2" AND SMALLER.
ROUTING SHOWN IS FOR REFERENCE ONLY.
5. SEE DRAWING DP411 FOR CONTINUATION OF PIPING TO FAN COIL UNITS.
3/8" = 1'-0"1
CHILLED WATER PIPING PLAN - CUP MECHANICAL ROOM A
0 1' 2' 4' 6'
2 3
J
3.2
CHW-CH-03 CHW-CH-04
C H
W -P
M P
-0
C H
W -P
M P
-0
CHW-AS-02
CHW-HX-02
CHW-ET-02
M A
T C
H L
IN
E
D P
CHW-CSF-02
(BELOW)
10"ø CHWS
10"ø CHWR
10"ø CHWR
MOTOR OPERATED
3-WAY FLOW
CONTROL VALVE
MECHANICAL ROOM B
4"ø CHWR
4"ø CHWS
1 1/4"ø CHWR
NOTE 5
NOTE 5
2' - 10" 4' - 5 1/4" 11' - 9 15/16" 8' - 6 7/8" 1' - 6" 2' - 0"
ELECTRICAL ROOM A
ELECTRICAL ROOM B
BATTERY ROOM
W
R
1"ø CF
6"ø CHWS
W
R
W
S
W
R
W
S
8"ø CHWR
MINIMUM FLOW BYPASS
NOTE 5
DP303
7"
/4
W
R
W
S
1' - 1" 5' - 10 3/8"
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
1 2 3 4 5 6 7 8 9 10
D
C
B
A
D A
T E
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
F
IL
E N
U M
B E
R
P
4 5 6
KEY PLAN
PLAN NORTH
W F
R
O M
A H
A D
IS
T
R
IC
T C
A P
IT
A
L A
V E
N U
E
O M
A H
A N
E B
R A
S K
A
-1
-2
CSOF PACKAGE - 90% CORRECTED DESIGN
E
F
G
8 9
A F
-1
-0
F
IL
E N
A M
E
C S
C
K A
G E
C O
N S
O L
ID
A T
E D
S P
A C
E O
P E
R A
T
IO
N S
F A
C
IL
IT
Y
B L D
G N
O
C F
E U
E R
S T
E
IN
3/9/2021 11:50:03 AM
DP402
C H
IL
L E
D W
A T
E R
P
IP
IN
G
P L A
N
C U
P M
E C
H A
N
IC
A L
R O
O M
B
S C
H R
IE
V
E R
A F
B C
O L O
R A
D O
C F
E U
E R
S T
E
IN
R T
U R
N E
R
J B
O V
E N
K A
M P
3/8" = 1'-0"1
CHILLED WATER PIPING PLAN - CUP MECHANICAL ROOM B
0 1' 2' 4' 6'
GENERAL SHEET NOTES
1. PIPING SUSPENDED FROM THE BUILDING STRUCTURE ABOVE SHALL BE
ISOLATED USING MASON INDUSTRIES, MODEL 30N OR PC30N
SPRING/NEOPRENE HANGERS, OR EQUAL. SPRING/NEOPRENE HANGERS
SHALL HAVE 1" NOMINAL STATIC DEFLECTION.
2. PROVIDE AND INSTALL PIPING HANGERS AND SUPPORTS PER THE
HANGER NOTES, TABLES, AND DETAILS ON DRAWINGS M-501, M-502 AND
M-503. PROVIDE AND INSTALL PIPING HANGERS AND SUPPORTS AS
NECESSARY AND REQUIRED TO PROPERLY SUPPORT, GUIDE AND
ACCOMMODATE ANY MOVEMENT OF THE PIPING SYSTEMS IN THE
BUILDING MECHANICAL ROOM, AND CONNECT TO THE EQUIPMENT PER
THE MANUFACTURERS INSTALLATION REQUIREMENTS.
3. ALL PIPING PENETRATIONS THROUGH THE BUILDINGS BELOW GRADE
EXTERIOR WALLS AND FLOORS SHALL BE PRE-FORMED DURING WALL
CONSTRUCTION USING STEEL PIPE SLEEVE WITH WATER STOP/ANCHOR
PLATE. PROVIDE AND INSTALL MECHANICAL LINK-SEAL BETWEEN PIPING
AND STEEL WALL SLEEVE. SIZE AND INSTALL PIPE SLEEVE AND LINK-
SEAL ACCORDING TO THE MANUFACTURER'S INSTALLATION
REQUIREMENTS.
4. CONTRACTOR SHALL FIELD ROUTE ALL PIPING 2" AND SMALLER.
ROUTING SHOWN IS FOR REFERENCE ONLY.
5. SEE DRAWING DP411 FOR CONTINUATION OF PIPING TO FAN COIL UNITS.
6. PIPING IS BELOW GRADE AND EXTENDS 5'-0" OUTSIDE OF BUILDING.
REFERENCE CIVIL DRAWING CU101 FOR CONTINUATION.
NOTE 6
J
C H
W -C
H -0
C H
W -C
H -0
2 C W
-P M
P -0
C W
-P M
P -0
CHW-HX-01
CW-SPR-01
CW-SPR-02
C H
-P M
P -0
C H
-P M
P -0
/4
/4
/8
/1
/1
5' - 6 1/4" 11' - 6 3/4" 10' - 0"
5' - 6 1/4" 1' - 2"
S
R
4"ø CWS
4"ø CWS
4"ø CWS
4"ø CWS
10"ø CWR
10"ø CWS
10"ø CWS
R
R
R
S
S
M A
T C
H L
IN
E
D P
/2
/4
/8
/1
/1
MECHANICAL ROOM A
MINIMUM
FLOW BYPASS
DP302
DP301
DP301
DP302
DP301
DP301
DP302
DP303
/4
8"ø CWS
8"ø CWS
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
1 2 3 4 5 6 7 8 9 10
D
C
B
A
D A
T E
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
F
IL
E N
U M
B E
R
P
4 5 6
KEY PLAN
PLAN NORTH
W F
R
O M
A H
A D
IS
T
R
IC
T
C
A P
IT
A
L A
V E
N U
E
O M
A H
A N
E B
R A
S K
A
-1
-2
CSOF PACKAGE - 90% CORRECTED DESIGN
E
F
G
8 9
A F
-1
-0
F
IL
E N
A M
E
C S
C
K A
G E
C O
N S
O L
ID
A T
E D
S P
A C
E O
P E
R A
T
IO
N S
F A
C
IL
IT
Y
B L D
G N
O
C F
E U
E R
S T
E
IN
3/9/2021 11:50:11 AM
DP403
C O
N D
E N
S E
R W
A T
E R
P
IP
IN
G
P L A
N
C U
P
M E
C H
A N
IC
A
L R
O O
M A
S C
H R
IE
V
E R
A F
B C
O L O
R A
D O
C F
E U
E R
S T
E
IN
R T
U R
N E
R
J B
O V
E N
K A
M P
3/8" = 1'-0"1
CONDENSER WATER PIPING PLAN - CUP MECHANICAL ROOM A
0 1' 2' 4' 6'
GENERAL SHEET NOTES
1. PIPING SUSPENDED FROM THE BUILDING STRUCTURE ABOVE SHALL BE
ISOLATED USING MASON INDUSTRIES, MODEL 30N OR PC30N
SPRING/NEOPRENE HANGERS, OR EQUAL. SPRING/NEOPRENE HANGERS
SHALL HAVE 1" NOMINAL STATIC DEFLECTION.
2. PROVIDE AND INSTALL PIPING HANGERS AND SUPPORTS PER THE
HANGER NOTES, TABLES, AND DETAILS ON DRAWINGS M-501, M-502 AND
M-503. PROVIDE AND INSTALL PIPING HANGERS AND SUPPORTS AS
NECESSARY AND REQUIRED TO PROPERLY SUPPORT, GUIDE AND
ACCOMMODATE ANY MOVEMENT OF THE PIPING SYSTEMS IN THE
BUILDING MECHANICAL ROOM, AND CONNECT TO THE EQUIPMENT PER
THE MANUFACTURERS INSTALLATION REQUIREMENTS.
3. ALL PIPING PENETRATIONS THROUGH THE BUILDINGS BELOW GRADE
EXTERIOR WALLS AND FLOORS SHALL BE PRE-FORMED DURING WALL
CONSTRUCTION USING STEEL PIPE SLEEVE WITH WATER STOP/ANCHOR
PLATE. PROVIDE AND INSTALL MECHANICAL LINK-SEAL BETWEEN PIPING
AND STEEL WALL SLEEVE. SIZE AND INSTALL PIPE SLEEVE AND LINK-
SEAL ACCORDING TO THE MANUFACTURER'S INSTALLATION
REQUIREMENTS.
J
3.2
C H
W -C
H -0
C H
W -C
H -0
4C W
-P M
P -0
C W
-P M
P -0
CHW-HX-02
C H
-P M
P -0
C H
-P M
P -0
M A
T C
H L
IN
E
D P
2' - 10" 16' - 3 3/16" 9' - 11 1/4" 1' - 5" 3' - 8 5/8"
1' - 9 1/4" 5' - 9 15/16"
/2
/4
/8
/1
/1
/8
R
S
S
S
4"ø CWS
4"ø CWS
R
R
R
MINIMUM FLOW BYPASS
10"ø CWS
10"ø CWS
10"ø CWR
S
8"ø CWR
MECHANICAL ROOM B
ELECTRICAL ROOM A
ELECTRICAL ROOM B
BATTERY ROOM
DP303
/4
8"ø CWS 8"ø CWS
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
1 2 3 4 5 6 7 8 9 10
D
C
B
A
D A
T E
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
F
IL
E N
U M
B E
R
P
4 5 6
KEY PLAN
PLAN NORTH
W F
R
O M
A H
A D
IS
T
R
IC
T
C
A P
IT
A
L A
V E
N U
E
O M
A H
A N
E B
R A
S K
A
-1
-2
CSOF PACKAGE - 90% CORRECTED DESIGN
E
F
G
8 9
A F
-1
-0
F
IL
E N
A M
E
C S
C
K A
G E
C O
N S
O L
ID
A T
E D
S P
A C
E O
P E
R A
T
IO
N S
F A
C
IL
IT
Y
B L D
G N
O
C F
E U
E R
S T
E
IN
3/9/2021 11:50:19 AM
DP404
C O
N D
E N
S E
R W
A T
E R
P
IP
IN
G
P L A
N
C U
P
M E
C H
A N
IC
A
L R
O O
M B
S C
H R
IE
V
E R
A F
B C
O L O
R A
D O
C F
E U
E R
S T
E
IN
R T
U R
N E
R
J B
O V
E N
K A
M P
3/8" = 1'-0"1
CONDENSER WATER PIPING PLAN - CUP MECHANICAL ROOM B
0 1' 2' 4' 6'
GENERAL SHEET NOTES
1. PIPING SUSPENDED FROM THE BUILDING STRUCTURE ABOVE SHALL BE
ISOLATED USING MASON INDUSTRIES, MODEL 30N OR PC30N
SPRING/NEOPRENE HANGERS, OR EQUAL. SPRING/NEOPRENE HANGERS
SHALL HAVE 1" NOMINAL STATIC DEFLECTION.
2. PROVIDE AND INSTALL PIPING HANGERS AND SUPPORTS PER THE
HANGER NOTES, TABLES, AND DETAILS ON DRAWINGS M-501, M-502 AND
M-503. PROVIDE AND INSTALL PIPING HANGERS AND SUPPORTS AS
NECESSARY AND REQUIRED TO PROPERLY SUPPORT, GUIDE AND
ACCOMMODATE ANY MOVEMENT OF THE PIPING SYSTEMS IN THE
BUILDING MECHANICAL ROOM, AND CONNECT TO THE EQUIPMENT PER
THE MANUFACTURERS INSTALLATION REQUIREMENTS.
3. ALL PIPING PENETRATIONS THROUGH THE BUILDINGS BELOW GRADE
EXTERIOR WALLS AND FLOORS SHALL BE PRE-FORMED DURING WALL
CONSTRUCTION USING STEEL PIPE SLEEVE WITH WATER STOP/ANCHOR
PLATE. PROVIDE AND INSTALL MECHANICAL LINK-SEAL BETWEEN PIPING
AND STEEL WALL SLEEVE. SIZE AND INSTALL PIPE SLEEVE AND LINK-
SEAL ACCORDING TO THE MANUFACTURER'S INSTALLATION
REQUIREMENTS.
J
MECHANICAL ROOM A
M A
T C
H L
IN
E
D P
HW-BLR-01
HW-BLR-02
HW-ET-01
H W
-P M
P -0
H W
-P M
P -0
HW-AS-01
6' - 5 1/2" 1' - 10 1/2" 1' - 0" 12' - 11 1/2"
/4
/2
BLR-PMP-01
BLR-PMP-02
NEUTRAL
BRIDGE
HW-CSF-01
(BELOW)
4' - 5" 3' - 3 5/8"
1 1/4"ø HWR
1 1/4"ø HWS
NOTE 5
NOTE 5
R
S
S
R
S
3"ø HWS
3"ø HWS
4"ø HWR
4"ø HWS
4"ø HWS
4"ø HWS
3"ø HWS
3"ø HWR
1"ø CF
3"ø HWR
3"ø HWR
3"ø HWR
3"ø HWR
3"ø HWS
3"ø HWS
DP302
DP301
DP301
DP302
DP301
DP301
DP302
DP303
/4
/4
/2
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
1 2 3 4 5 6 7 8 9 10
D
C
B
A
D A
T E
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
F
IL
E N
U M
B E
R
P
4 5 6
KEY PLAN
PLAN NORTH
W F
R
O M
A H
A D
IS
T
R
IC
T C
A P
IT
A
L A
V E
N U
E
O M
A H
A N
E B
R A
S K
A
-1
-2
CSOF PACKAGE - 90% CORRECTED DESIGN
E
F
G
8 9
A F
-1
-0
F
IL
E N
A M
E
C S
C
K A
G E
C O
N S
O L
ID
A T
E D
S P
A C
E O
P E
R A
T
IO
N S
F A
C
IL
IT
Y
B L D
G N
O
C F
E U
E R
S T
E
IN
3/9/2021 11:50:27 AM
DP405
H O
T W
A T
E R
P
IP
IN
G
P L A
N
C U
P M
E C
H A
N
IC
A L
R O
O M
A
S C
H R
IE
V
E R
A F
B C
O L O
R A
D O
C F
E U
E R
S T
E
IN
R T
U R
N E
R
J B
O V
E N
K A
M P
GENERAL SHEET NOTES
1. PIPING SUSPENDED FROM THE BUILDING STRUCTURE ABOVE SHALL BE
ISOLATED USING MASON INDUSTRIES, MODEL 30N OR PC30N
SPRING/NEOPRENE HANGERS, OR EQUAL. SPRING/NEOPRENE HANGERS
SHALL HAVE 1" NOMINAL STATIC DEFLECTION.
2. PROVIDE AND INSTALL PIPING HANGERS AND SUPPORTS PER THE
HANGER NOTES, TABLES, AND DETAILS ON DRAWINGS M-501, M-502 AND
M-503. PROVIDE AND INSTALL PIPING HANGERS AND SUPPORTS AS
NECESSARY AND REQUIRED TO PROPERLY SUPPORT, GUIDE AND
ACCOMMODATE ANY MOVEMENT OF THE PIPING SYSTEMS IN THE
BUILDING MECHANICAL ROOM, AND CONNECT TO THE EQUIPMENT PER
THE MANUFACTURERS INSTALLATION REQUIREMENTS.
3. ALL PIPING PENETRATIONS THROUGH THE BUILDING BELOW GRADE
EXTERIOR WALLS AND FLOORS SHALL BE PRE-FORMED DURING WALL
CONSTRUCTION USING STEEL PIPE SLEEVE WITH WATER STOP/ANCHOR
PLATE. PROVIDE AND INSTALL MECHANICAL LINK-SEAL BETWEEN PIPING
AND STEEL WALL SLEEVE. SIZE AND INSTALL PIPE SLEEVE AND LINK-
SEAL ACCORDING TO THE MANUFACTURER'S INSTALLATION
REQUIREMENTS.
4. CONTRACTOR SHALL FIELD ROUTE ALL PIPING 2" AND SMALLER.
ROUTING SHOWN IS FOR REFERENCE ONLY.
5. SEE DRAWING PP401 FOR CONTINUATION OF PIPING TO FAN COIL UNITS.
GENERAL SHEET NOTES
1. PIPING SUSPENDED FROM THE BUILDING STRUCTURE ABOVE SHALL BE
ISOLATED USING MASON INDUSTRIES, MODEL 30N OR PC30N
SPRING/NEOPRENE HANGERS, OR EQUAL. SPRING/NEOPRENE HANGERS
SHALL HAVE 1" NOMINAL STATIC DEFLECTION.
2. PROVIDE AND INSTALL PIPING HANGERS AND SUPPORTS PER THE
HANGER NOTES, TABLES, AND DETAILS ON DRAWINGS M-501, M-502 AND
M-503. PROVIDE AND INSTALL PIPING HANGERS AND SUPPORTS AS
NECESSARY AND REQUIRED TO PROPERLY SUPPORT, GUIDE AND
ACCOMMODATE ANY MOVEMENT OF THE PIPING SYSTEMS IN THE
BUILDING MECHANICAL ROOM, AND CONNECT TO THE EQUIPMENT PER
THE MANUFACTURERS INSTALLATION REQUIREMENTS.
3. ALL PIPING PENETRATIONS THROUGH THE BUILDINGS BELOW GRADE
EXTERIOR WALLS AND FLOORS SHALL BE PRE-FORMED DURING WALL
CONSTRUCTION USING STEEL PIPE SLEEVE WITH WATER STOP/ANCHOR
PLATE. PROVIDE AND INSTALL MECHANICAL LINK-SEAL BETWEEN PIPING
AND STEEL WALL SLEEVE. SIZE AND INSTALL PIPE SLEEVE AND LINK-
SEAL ACCORDING TO THE MANUFACTURER'S INSTALLATION
REQUIREMENTS.
4. CONTRACTOR SHALL FIELD ROUTE ALL PIPING 2" AND SMALLER.
ROUTING SHOWN IS FOR REFERENCE ONLY.
5. SEE DRAWING DP411 FOR CONTINUATION OF PIPING TO FAN COIL UNITS.
3/8" = 1'-0"1
HOT WATER PIPING PLAN - CUP MECHANICAL ROOM A
J
3.2
MECHANICAL ROOM B
ELECTRICAL ROOM A
ELECTRICAL ROOM B
BATTERY ROOM
M A
T C
H L
IN
E
D P
D P
/4
/4
3' - 0" 4' - 5 1/4" 7' - 1" 6' - 5 1/2" 5' - 2 1/4"
1' - 0 1/16"
H W
-P M
P -0
H W
-P M
P -0
R
S
S
R
S
R
S
3"ø HWS
3"ø HWS
4"ø HWR
4"ø HWS
4"ø HWS
4"ø HWS
3"ø HWS
3"ø HWR
4"ø HWR
4"ø HWS
3"ø HWS
3"ø HWS3"ø HWR
3"ø HWR
3"ø HWR
3"ø HWR
BLR-PMP-03
BLR-PMP-04
HW-BLR-04
HW-BLR-03
HW-ET-02
HW-AS-02
1"ø CF
7" 5' - 10 3/8"
NEUTRAL
BRIDGE
HW-CSF-02
(BELOW)
1 1/4"ø HWR
1 1/4"ø HWS
NOTE 5
NOTE 5
DP303
1' - 0" 1' - 6"
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
1 2 3 4 5 6 7 8 9 10
D
C
B
A
D A
T E
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
F
IL
E N
U M
B E
R
P
4 5 6
KEY PLAN
PLAN NORTH
W F
R
O M
A H
A D
IS
T
R
IC
T C
A P
IT
A
L A
V E
N U
E
O M
A H
A N
E B
R A
S K
A
-1
-2
CSOF PACKAGE - 90% CORRECTED DESIGN
E
F
G
8 9
A F
-1
-0
F
IL
E N
A M
E
C S
C
K A
G E
C O
N S
O L
ID
A T
E D
S P
A C
E O
P E
R A
T
IO
N S
F A
C
IL
IT
Y
B L D
G N
O
C F
E U
E R
S T
E
IN
3/9/2021 11:50:34 AM
DP406
H O
T W
A T
E R
P
IP
IN
G
P L A
N
C U
P M
E C
H A
N
IC
A L
R O
O M
B
S C
H R
IE
V
E R
A F
B C
O L O
R A
D O
C F
E U
E R
S T
E
IN
R T
U R
N E
R
J B
O V
E N
K A
M P
GENERAL SHEET NOTESGENERAL SHEET NOTES
1. PIPING SUSPENDED FROM THE BUILDING STRUCTURE ABOVE SHALL BE
ISOLATED USING MASON INDUSTRIES, MODEL 30N OR PC30N
SPRING/NEOPRENE HANGERS, OR EQUAL. SPRING/NEOPRENE HANGERS
SHALL HAVE 1" NOMINAL STATIC DEFLECTION.
2. PROVIDE AND INSTALL PIPING HANGERS AND SUPPORTS PER THE
HANGER NOTES, TABLES, AND DETAILS ON DRAWINGS M-501, M-502 AND
M-503. PROVIDE AND INSTALL PIPING HANGERS AND SUPPORTS AS
NECESSARY AND REQUIRED TO PROPERLY SUPPORT, GUIDE AND
ACCOMMODATE ANY MOVEMENT OF THE PIPING SYSTEMS IN THE
BUILDING MECHANICAL ROOM, AND CONNECT TO THE EQUIPMENT PER
THE MANUFACTURERS INSTALLATION REQUIREMENTS.
3. ALL PIPING PENETRATIONS THROUGH THE BUILDINGS BELOW GRADE
EXTERIOR WALLS AND FLOORS SHALL BE PRE-FORMED DURING WALL
CONSTRUCTION USING STEEL PIPE SLEEVE WITH WATER STOP/ANCHOR
PLATE. PROVIDE AND INSTALL MECHANICAL LINK-SEAL BETWEEN PIPING
AND STEEL WALL SLEEVE. SIZE AND INSTALL PIPE SLEEVE AND LINK-
SEAL ACCORDING TO THE MANUFACTURER'S INSTALLATION
REQUIREMENTS.
4. CONTRACTOR SHALL FIELD ROUTE ALL PIPING 2" AND SMALLER.
ROUTING SHOWN IS FOR REFERENCE ONLY.
5. SEE DRAWING DP411 FOR CONTINUATION OF PIPING TO FAN COIL UNITS.
6. PIPING IS BELOW GRADE AND EXTENDS 5'-0" OUTSIDE OF BUILDING.
REFERENCE CIVIL DRAWING CU101 FOR CONTINUATION.
3/8" = 1'-0"1
HOT WATER PIPING PLAN - CUP MECHANICAL ROOM B
NOTE 6
J
MECHANICAL ROOM A
CHW-AS-01
HW-AS-01
DW-EEWS-01
DW-SS-01
HOSE BIBB
HOSE BIBB
2 1/2"ø MUWT
2 1/2"ø MUWT
2"ø MUWT
1 1/2"ø MUWT
1 1/4"ø DCW
3/4"ø DCW
3/4"ø DCW
W
/4
"ø
D
C W
M
U W
T
W
T
W
T
/4
W
AUTOMATIC
AIR VENT
AUTOMATIC
AIR VENT
M A
T C
H L
IN
E
D P
W
/8
6"
/1
3' - 5 1/4"
DP302
DP301
DP301
DP302
DP301
DP301
DP302
DP303
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
1 2 3 4 5 6 7 8 9 10
D
C
B
A
D A
T E
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
F
IL
E N
U M
B E
R
P
4 5 6
KEY PLAN
PLAN NORTH
W F
R
O M
A H
A D
IS
T
R
IC
T
C
A P
IT
A
L A
V E
N U
E
O M
A H
A N
E B
R A
S K
A
-1
-2
CSOF PACKAGE - 90% CORRECTED DESIGN
E
F
G
8 9
A F
-1
-0
F
IL
E N
A M
E
C S
C
K A
G E
C O
N S
O L
ID
A T
E D
S P
A C
E O
P E
R A
T
IO
N S
F A
C
IL
IT
Y
B L D
G N
O
C F
E U
E R
S T
E
IN
3/9/2021 11:50:42 AM
DP407
D O
M E
S T
IC
C
O L D
W A
T E
R A
N D
M A
K E
-U P
W A
T E
R
P
IP
IN
G
P L A
N
C U
P M
E C
H A
N
IC
A L R
O O
M A
S C
H R
IE
V
E R
A F
B C
O L O
R A
D O
C F
E U
E R
S T
E
IN
R T
U R
N E
R
J B
O V
E N
K A
M P
GENERAL SHEET NOTES
1. PIPING SUSPENDED FROM THE BUILDING STRUCTURE ABOVE SHALL BE
ISOLATED USING MASON INDUSTRIES, MODEL 30N OR PC30N
SPRING/NEOPRENE HANGERS, OR EQUAL. SPRING/NEOPRENE HANGERS
SHALL HAVE 1" NOMINAL STATIC DEFLECTION.
2. PROVIDE AND INSTALL PIPING HANGERS AND SUPPORTS PER THE
HANGER NOTES, TABLES, AND DETAILS ON DRAWINGS M-501, M-502 AND
M-503. PROVIDE AND INSTALL PIPING HANGERS AND SUPPORTS AS
NECESSARY AND REQUIRED TO PROPERLY SUPPORT, GUIDE AND
ACCOMMODATE ANY MOVEMENT OF THE PIPING SYSTEMS IN THE
BUILDING MECHANICAL ROOM, AND CONNECT TO THE EQUIPMENT PER
THE MANUFACTURERS INSTALLATION REQUIREMENTS.
3. ALL PIPING PENETRATIONS THROUGH THE BUILDINGS BELOW GRADE
EXTERIOR WALLS AND FLOORS SHALL BE PRE-FORMED DURING WALL
CONSTRUCTION USING STEEL PIPE SLEEVE WITH WATER STOP/ANCHOR
PLATE. PROVIDE AND INSTALL MECHANICAL LINK-SEAL BETWEEN PIPING
AND STEEL WALL SLEEVE. SIZE AND INSTALL PIPE SLEEVE AND LINK-
SEAL ACCORDING TO THE MANUFACTURER'S INSTALLATION
REQUIREMENTS.
4. CONTRACTOR SHALL FIELD ROUTE ALL PIPING 2" AND SMALLER.
ROUTING SHOWN IS FOR REFERENCE ONLY.
5. PIPING IS BELOW GRADE AND EXTENDS 5'-0" OUTSIDE OF BUILDING.
REFERENCE CIVIL DRAWING CU102 FOR CONTINUATION.
3/8" = 1'-0"1
DOMESTIC COLD WATER AND MAKE-UP WATER PIPING PLAN - CUP
MECHANICAL ROOM A
0 1' 2' 4' 6'
NOTE 5
4"⌀ DCW
J
3.2
MECHANICAL ROOM B
ELECTRICAL ROOM A
ELECTRICAL ROOM B
BATTERY ROOM
HW-AS-02
CHW-AS-02
DW-SS-02
HOSE BIBB
HOSE BIBB
1 1/4"ø DCW
3/4"ø DCW
1 1/2"ø MUWT
2"ø MUWT
2 1/2"ø MUWT
3/4"ø DCW
AUTOMATIC
AIR VENT
AUTOMATIC
AIR VENT
M A
T C
H L
IN
E
D P
3' - 5 1/4"
/8
DP303
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
1 2 3 4 5 6 7 8 9 10
D
C
B
A
D A
T E
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
F
IL
E N
U M
B E
R
P
4 5 6
KEY PLAN
PLAN NORTH
W F
R
O M
A H
A D
IS
T
R
IC
T
C
A P
IT
A
L A
V E
N U
E
O M
A H
A N
E B
R A
S K
A
-1
-2
CSOF PACKAGE - 90% CORRECTED DESIGN
E
F
G
8 9
A F
-1
-0
F
IL
E N
A M
E
C S
C
K A
G E
C O
N S
O L
ID
A T
E D
S P
A C
E O
P E
R A
T
IO
N S
F A
C
IL
IT
Y
B L D
G N
O
C F
E U
E R
S T
E
IN
3/9/2021 11:50:50 AM
DP408
D O
M E
S T
IC
C
O L D
W A
T E
R A
N D
M A
K E
-U P
W A
T E
R
P
IP
IN
G
P L A
N
C U
P M
E C
H A
N
IC
A L R
O O
M B
S C
H R
IE
V
E R
A F
B C
O L O
R A
D O
C F
E U
E R
S T
E
IN
R T
U R
N E
R
J B
O V
E N
K A
M P
GENERAL SHEET NOTES
1. PIPING SUSPENDED FROM THE BUILDING STRUCTURE ABOVE SHALL BE
ISOLATED USING MASON INDUSTRIES, MODEL 30N OR PC30N
SPRING/NEOPRENE HANGERS, OR EQUAL. SPRING/NEOPRENE HANGERS
SHALL HAVE 1" NOMINAL STATIC DEFLECTION.
2. PROVIDE AND INSTALL PIPING HANGERS AND SUPPORTS PER THE
HANGER NOTES, TABLES, AND DETAILS ON DRAWINGS M-501, M-502 AND
M-503. PROVIDE AND INSTALL PIPING HANGERS AND SUPPORTS AS
NECESSARY AND REQUIRED TO PROPERLY SUPPORT, GUIDE AND
ACCOMMODATE ANY MOVEMENT OF THE PIPING SYSTEMS IN THE
BUILDING MECHANICAL ROOM, AND CONNECT TO THE EQUIPMENT PER
THE MANUFACTURERS INSTALLATION REQUIREMENTS.
3. ALL PIPING PENETRATIONS THROUGH THE BUILDINGS BELOW GRADE
EXTERIOR WALLS AND FLOORS SHALL BE PRE-FORMED DURING WALL
CONSTRUCTION USING STEEL PIPE SLEEVE WITH WATER STOP/ANCHOR
PLATE. PROVIDE AND INSTALL MECHANICAL LINK-SEAL BETWEEN PIPING
AND STEEL WALL SLEEVE. SIZE AND INSTALL PIPE SLEEVE AND LINK-
SEAL ACCORDING TO THE MANUFACTURER'S INSTALLATION
REQUIREMENTS.
4. CONTRACTOR SHALL FIELD ROUTE ALL PIPING 2" AND SMALLER.
ROUTING SHOWN IS FOR REFERENCE ONLY.
3/8" = 1'-0"1
DOMESTIC COLD WATER AND MAKE-UP WATER PIPING PLAN - CUP
MECHANICAL ROOM B
J
MECHANICAL ROOM A
M A
T C
H L
IN
E
D P
CHW-CH-01 CHW-CH-02
HW-BLR-02
HW-BLR-01
6"⌀ EXHAUST VENT
6"⌀ COMBUSTION AIR
6"⌀ COMBUSTION AIR
6"⌀ EXHAUST VENT
2' - 10" 3' - 2"
/8
/8
/8
/1
/1
NATURAL GAS
METERING
STATION
4' - 3" 9' - 5" 10' - 0 1/4"
3"ø NG
2"ø NG
2"ø NG
6"ø RV
1 1/4"ø RV
1 1/4"ø RV
1 1/4"ø RV
1 1/4"ø RV
1 1/4"ø RV
1 1/4"ø RV
1 1/4"ø RV
1 1/4"ø RV
1 1/4"ø RV
1 1/4"ø RV
DP302
DP301
DP301
DP302
DP301
DP301
DP302
DP303
/1
/1
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
1 2 3 4 5 6 7 8 9 10
D
C
B
A
D A
T E
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
F
IL
E N
U M
B E
R
P
4 5 6
KEY PLAN
PLAN NORTH
W F
R
O M
A H
A D
IS
T
R
IC
T
C
A P
IT
A
L A
V E
N U
E
O M
A H
A N
E B
R A
S K
A
-1
-2
CSOF PACKAGE - 90% CORRECTED DESIGN
E
F
G
8 9
A F
-1
-0
F
IL
E N
A M
E
C S
C
K A
G E
C O
N S
O L
ID
A T
E D
S P
A C
E O
P E
R A
T
IO
N S
F A
C
IL
IT
Y
B L D
G N
O
C F
E U
E R
S T
E
IN
3/9/2021 11:50:57 AM
DP409
M
IS
C E
L L A
N E
O U
S P
IP
IN
G P
L A
N
C U
P
M E
C H
A N
IC
A
L R
O O
M A
S C
H R
IE
V
E R
A F
B C
O L O
R A
D O
C F
E U
E R
S T
E
IN
R T
U R
N E
R
J B
O V
E N
K A
M P
GENERAL SHEET NOTES
1. PIPING SUSPENDED FROM THE BUILDING STRUCTURE ABOVE SHALL BE
ISOLATED USING MASON INDUSTRIES, MODEL 30N OR PC30N
SPRING/NEOPRENE HANGERS, OR EQUAL. SPRING/NEOPRENE HANGERS
SHALL HAVE 1" NOMINAL STATIC DEFLECTION.
2. PROVIDE AND INSTALL PIPING HANGERS AND SUPPORTS PER THE
HANGER NOTES, TABLES, AND DETAILS ON DRAWINGS M-501, M-502 AND
M-503. PROVIDE AND INSTALL PIPING HANGERS AND SUPPORTS AS
NECESSARY AND REQUIRED TO PROPERLY SUPPORT, GUIDE AND
ACCOMMODATE ANY MOVEMENT OF THE PIPING SYSTEMS IN THE
BUILDING MECHANICAL ROOM, AND CONNECT TO THE EQUIPMENT PER
THE MANUFACTURERS INSTALLATION REQUIREMENTS.
3. ALL PIPING PENETRATIONS THROUGH THE BUILDINGS BELOW GRADE
EXTERIOR WALLS AND FLOORS SHALL BE PRE-FORMED DURING WALL
CONSTRUCTION USING STEEL PIPE SLEEVE WITH WATER STOP/ANCHOR
PLATE. PROVIDE AND INSTALL MECHANICAL LINK-SEAL BETWEEN PIPING
AND STEEL WALL SLEEVE. SIZE AND INSTALL PIPE SLEEVE AND LINK-
SEAL ACCORDING TO THE MANUFACTURER'S INSTALLATION
REQUIREMENTS.
4. CONTRACTOR SHALL FIELD ROUTE ALL PIPING 2" AND SMALLER.
ROUTING SHOWN IS FOR REFERENCE ONLY.
5. PIPING IS BELOW GRADE AND EXTENDS 5'-0" OUTSIDE OF BUILDING.
REFERENCE CIVIL DRAWING CU102 FOR CONTINUATION.
3/8" = 1'-0"1
MISCELLANEOUS PIPING PLAN – CUP MECHANICAL ROOM A
NOTE 5
J
3.2
MECHANICAL ROOM B
ELECTRICAL ROOM A
ELECTRICAL ROOM B
BATTERY ROOM
M A
T C
H L
IN
E
D P
CHW-CH-03 CHW-CH-04
HW-BLR-03
HW-BLR-04
6"⌀ EXHAUST VENT
6"⌀ EXHAUST VENT
6"⌀ COMBUSTION AIR
6"⌀ COMBUSTION AIR
3"ø NG
6"ø RV
2"ø NG
1 1/4"ø RV
1 1/4"ø RV
1 1/4"ø RV
1 1/4"ø RV
1 1/4"ø RV
1 1/4"ø RV
1 1/4"ø RV
1 1/4"ø RV
1 1/4"ø RV
1 1/4"ø RV
11' - 5 5/16" 9' - 11 3/4"
/1
/1
/8
/8
/8
2' - 2" 5' - 10"
DP303
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
1 2 3 4 5 6 7 8 9 10
D
C
B
A
D A
T E
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
F
IL
E N
U M
B E
R
P
4 5 6
KEY PLAN
PLAN NORTH
W F
R
O M
A H
A D
IS
T
R
IC
T
C
A P
IT
A
L A
V E
N U
E
O M
A H
A N
E B
R A
S K
A
-1
-2
CSOF PACKAGE - 90% CORRECTED DESIGN
E
F
G
8 9
A F
-1
-0
F
IL
E N
A M
E
C S
C
K A
G E
C O
N S
O L
ID
A T
E D
S P
A C
E O
P E
R A
T
IO
N S
F A
C
IL
IT
Y
B L D
G N
O
C F
E U
E R
S T
E
IN
3/9/2021 11:51:05 AM
DP410
M
IS
C E
L L A
N E
O U
S P
IP
IN
G P
L A
N
C U
P
M E
C H
A N
IC
A
L R
O O
M B
S C
H R
IE
V
E R
A F
B C
O L O
R A
D O
C F
E U
E R
S T
E
IN
R T
U R
N E
R
J B
O V
E N
K A
M P
GENERAL SHEET NOTES
1. PIPING SUSPENDED FROM THE BUILDING STRUCTURE ABOVE SHALL BE
ISOLATED USING MASON INDUSTRIES, MODEL 30N OR PC30N
SPRING/NEOPRENE HANGERS, OR EQUAL. SPRING/NEOPRENE HANGERS
SHALL HAVE 1" NOMINAL STATIC DEFLECTION.
2. PROVIDE AND INSTALL PIPING HANGERS AND SUPPORTS PER THE
HANGER NOTES, TABLES, AND DETAILS ON DRAWINGS M-501, M-502 AND
M-503. PROVIDE AND INSTALL PIPING HANGERS AND SUPPORTS AS
NECESSARY AND REQUIRED TO PROPERLY SUPPORT, GUIDE AND
ACCOMMODATE ANY MOVEMENT OF THE PIPING SYSTEMS IN THE
BUILDING MECHANICAL ROOM, AND CONNECT TO THE EQUIPMENT PER
THE MANUFACTURERS INSTALLATION REQUIREMENTS.
3. ALL PIPING PENETRATIONS THROUGH THE BUILDINGS BELOW GRADE
EXTERIOR WALLS AND FLOORS SHALL BE PRE-FORMED DURING WALL
CONSTRUCTION USING STEEL PIPE SLEEVE WITH WATER STOP/ANCHOR
PLATE. PROVIDE AND INSTALL MECHANICAL LINK-SEAL BETWEEN PIPING
AND STEEL WALL SLEEVE. SIZE AND INSTALL PIPE SLEEVE AND LINK-
SEAL ACCORDING TO THE MANUFACTURER'S INSTALLATION
REQUIREMENTS.
4. CONTRACTOR SHALL FIELD ROUTE ALL PIPING 2" AND SMALLER.
ROUTING SHOWN IS FOR REFERENCE ONLY.
3/8" = 1'-0"1
MISCELLANEOUS PIPING PLAN – CUP MECHANICAL ROOM B
J
3.2
HVAC-FCU-02 HVAC-FCU-04 HVAC-FCU-06 HVAC-FCU-08 HVAC-FCU-10 HVAC-FCU-12 HVAC-FCU-14 HVAC-FCU-16
HVAC-FCU-01 HVAC-FCU-03 HVAC-FCU-05 HVAC-FCU-07 HVAC-FCU-09 HVAC-FCU-11 HVAC-FCU-13 HVAC-FCU-15
H V
A C
-F C
U -1
H
V A
C -F
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .