Am-0008_W9128F20R0002.pdf

PDF 641 KB Posted

Attached to
Consolidated Space Operations Facility, Schriever AFB, Colorado
Solicitation number
W9128F20R0002
Issued by

About this file

This solicitation package is for the construction of a Consolidated Space Operations Facility and entry control facility at Schriever Air Force Base in Colorado. The project includes constructing a two-story CSOF with reinforced concrete foundation, steel structure, and low slope membrane roof. The one-story entry control facility will be built at the south side of the restricted area. Facilities must comply with DoD, Air Force, and base design standards and utilize local materials where cost effective. Construction will adhere to DoD antiterrorism and cybersecurity requirements. Offerors must commence work within 10 days of notice to proceed and complete the project within 1400 calendar days, with liquidated damages for delays. Performance and payment bonds are required. The Army Corps of Engineers District Omaha is the contracting agency.

View the file

Other files

File Type Posted
Am-0012_W9128F20R0002.pdf PDF
Am-0011_W9128F20R0002.pdf PDF
Am-0010_W9128F20R0002.pdf PDF
Am-0009_W9128F20R0002.pdf PDF
Am-0009_W9128F20R0002_Drawings-Reissued.pdf PDF
Am-0008_W9128F20R0002_Drawings_(Reissued).pdf PDF
CSOF Part 1_Modeling Files_90 Percent Corrected Download Instructions.pdf PDF
Am-0007_W9128F20R0002.pdf PDF
Modeling Files - 90 Percent Corrected Disclaimer.pdf PDF
Am-0004_W9128F20R0002.pdf PDF
CSOF Part 9_Modeling Files_90 Percent Corrected.zip ZIP file
CSOF Part 2_Modeling Files_90 Percent Corrected.zip ZIP file
ECP_Modeling Files_90 Percent Corrected.zip ZIP file
CSOF Part 10_Modeling Files_90 Percent Corrected.zip ZIP file
Am-0005_W9128F20R0002.pdf PDF
Am-0006_W9128F20R0002.pdf PDF
CSOF Part 1_Modeling Files_90 Percent Corrected.pdf PDF
CSOF Part 7_Modeling Files_90 Percent Corrected.zip ZIP file
CSOF Part 3_Modeling Files_90 Percent Corrected.zip ZIP file
CSOF Part 6_Modeling Files_90 Percent Corrected.zip ZIP file
Am-0003_W9128F20R0002.pdf PDF
CSOF Part 5_Modeling Files_90 Percent Corrected.zip ZIP file
CSOF Part 8_Modeling Files_90 Percent Corrected.zip ZIP file
CSOF Part 4_Modeling Files_90 Percent Corrected.zip ZIP file
Am-0002_W9128F20R0002_Drawings-(Revised).pdf PDF
W9128F20R0002_Am0002_Final_Div00_Specs_Drawings.pdf PDF
CSOF Virtual Site Visit_Attendee POCs_01Apr2021.pdf PDF
W9128F20R0002_Am0001_Final.pdf PDF
CSOF_DRAWINGS_Volume 1_LS-Civil-Landscape.pdf PDF
90-Percent-Corrected_V3-SPECS_W9128F20R0002_ECP.pdf PDF
CSOF_DRAWINGS_Volume 8_Comm-Security.pdf PDF
ECP_DRAWINGS.pdf PDF
CSOF_DRAWINGS_Volume 4_Interiors.pdf PDF
Div00_W9128F20R0002.pdf PDF
90-Percent-Corrected_V1-SPECS_W9128F20R0002_CSOF-General.pdf PDF
90-Percent-Corrected_V2-SPECS_W9128F20R0002_CSOF.pdf PDF
CSOF_DRAWINGS_Volume 7_Electrical.pdf PDF
CSOF_DRAWINGS_Volume 6_Process-Mechanical.pdf PDF
CSOF Site Photo Package compressed.pdf PDF
CSOF_DRAWINGS_Volume 3_Architectural.pdf PDF
CSOF_DRAWINGS_Volume 5_Fire-Plumbing.pdf PDF
CSOF_DRAWINGS_Volume 2_Structural.pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

W9128F

CONSOLIDATED SPACE OPERATIONS FACILITY, PNGLEN203001 (FY20), SCHRIEVER AFB, COLORADO

See attached documentation for content of the amendment revisions to solicitation

Date for receipt of Volume II proposals is 10 JUN 2021 at 1400 hours

Government Point of Contact: Melissa Harlon, Contract Specialist, Melissa.R.Harlon@usace.army.mil

U.S.ARMY CORPS OF ENGINEERS, OMAHA DIST

Attn: CONTRACTING DIVISION (CENWO-CT-M)

1616 CAPITOL AVENUE

OMAHA, NE 68102-4901

See Item 6

W9128F20R0002

27 May 21

23-Mar-2021

27 May 21

Am #0008 - 1

Am #0008 - 2 (Continuation SF 30)

27 MAY 2021

Solicitation No. W9128F 20 R 0002

Date of Issue: 23 MAR 2021 Date of Receiving Volume II Proposals: 10 JUN 2021

SUBJECT: Amendment No. 0008 to Request for Proposal Solicitation Package for Construction of CONSOLIDATED SPACE OPERATIONS FACILITY.

TO: Prospective Offerors and Others Concerned

1. The specifications and drawings for subject project are hereby modified as follows (revise all specification indices, attachment lists, and drawing indices accordingly).

a. Specifications. (Descriptive Changes.) NONE

b. Specifications (New and/or Revised and Reissued). Delete and substitute or add specification sections as noted below. The substituted sections are revised and reissued with this amendment. For convenience, on the revised specification pages, changes have been identified with highlighting unless section is noted as new or completely reissued; all portions of the revised specification pages apply regardless of whether changes are shown with highlighting.

VOLUME 2 SPECIFICATIONS – CSOF:

Pages or Sections Deleted Pages or Sections Substituted or Added 03 30 00 03 30 00 08 11 13 08 11 13 08 34 73 08 34 73 09 29 00 09 29 00 10 28 13 10 28 13 12 61 13 12 61 13 23 07 00 23 07 00 23 64 26 23 64 26 33 52 10 33 52 10

VOLUME 3 SPECIFICATIONS – ECP:

Pages or Sections Deleted Pages or Sections Substituted or Added 08 11 13 08 11 13 08 41 13 08 41 13

c. Drawings (Reissued). The following drawings are revised with latest revision date as shown in the drawing border and reissued with this amendment.

CSOF PACKAGE - VOLUME 1 OF 8 – LIFE SAFETY, CIVIL, LANDSCAPE:

(1) Sheet CD104, SITE DEMOLITION PLAN – SHEET 4

(2) Sheet CG104, CIVIL GRADING PLAN – SHEET 4

(3) Sheet CS104, CIVIL SITE PLAN – SHEET 4

(4) Sheet CU104, CIVIL UTILITY PLAN – SHEET 4

Am #0008 - 3

CSOF PACKAGE – VOLUME 3 of 8 – ARCHITECTURAL:

(1) Sheet A-100A, 1ST FLOOR IUC - COMPOSITE PLAN - BID OPTION

(2) Sheet A-111, 1ST FLOOR - SECTOR 1 PLAN

(3) Sheet A-112, 1ST FLOOR - SECTOR 2 PLAN

(4) Sheet A-113, 1ST FLOOR - SECTOR 3 PLAN

(5) Sheet A-114, 1ST FLOOR - SECTOR 4 PLAN

(6) Sheet A-115, 1ST FLOOR - SECTOR 5 PLAN

(7) Sheet A-116, 1ST FLOOR - SECTOR 6 PLAN - BASE BID

(8) Sheet A-116A, 1ST FLOOR - SECTOR 6 PLAN - BID OPTION

(9) Sheet A-117, 1ST FLOOR - SECTOR 7 PLAN

(10) Sheet A-118, 1ST FLOOR - SECTOR 8 PLAN

(11) Sheet A-119, 1ST FLOOR - SECTOR 9 PLAN - BASE BID

(12) Sheet A-119A, 1ST FLOOR - SECTOR 9 PLAN - BID OPTION

(13) Sheet A-121, 2ND FLOOR - SECTOR 1 PLAN

(14) Sheet A-122, 2ND FLOOR - SECTOR 2 PLAN

(15) Sheet A-123, 2ND FLOOR - SECTOR 3 PLAN

(16) Sheet A-124, 2ND FLOOR - SECTOR 4 PLAN

(17) Sheet A-125, 2ND FLOOR - SECTOR 5 PLAN

(18) Sheet A-126, 2ND FLOOR - SECTOR 6 PLAN - BASE BID

(19) Sheet A-126A, 2ND FLOOR - SECTOR 6 PLAN - BID OPTION

(20) Sheet A-127, 2ND FLOOR - SECTOR 7 PLAN

(21) Sheet A-128, 2ND FLOOR - SECTOR 8 PLAN

(22) Sheet A-129, 2ND FLOOR - SECTOR 9 PLAN - BASE BID

(23) Sheet A-129A, 2ND FLOOR - SECTOR 9 PLAN - BID OPTION

(24) Sheet A-204, ENLARGED BUILDING ELEVATIONS

(25) Sheet A-313A, WALL SECTIONS & PANEL ELEVATIONS

(26) Sheet A-400, ENLARGED RESTROOM PLANS

(27) Sheet A-401, ENLARGED RESTROOM PLANS

(28) Sheet A-402, ENLARGED RESTROOM PLANS

(29) Sheet A-403A, ENLARGED RESTROOM PLAN - BID OPTION

(30) Sheet A-413, STAIR DETAILS AND ENLARGED STAIR PLANS- STAIR 2

(31) Sheet A-450, INTERIOR ELEVATIONS

(32) Sheet A-451, INTERIOR ELEVATIONS

(33) Sheet A-452, INTERIOR ELEVATIONS

(34) Sheet A-453, INTERIOR ELEVATIONS

(35) Sheet A-454, INTERIOR ELEVATIONS

(36) Sheet A-455, INTERIOR ELEVATIONS

(37) Sheet A-456, INTERIOR ELEVATIONS

Am #0008 - 4

(38) Sheet A-457, INTERIOR ELEVATIONS

(39) Sheet A-501, INTERIOR PARTITION TYPES

(40) Sheet A-602, 2ND FLOOR - DOOR SCHEDULE

(41) Sheet A-711, 1ST FLOOR - SECTOR 1 REFLECTED CEILING PLAN

(42) Sheet A-712, 1ST FLOOR - SECTOR 2 REFLECTED CEILING PLAN

(43) Sheet A-713, 1ST FLOOR - SECTOR 3 REFLECTED CEILING PLAN

(44) Sheet A-714, 1ST FLOOR - SECTOR 4 REFLECTED CEILING PLAN

(45) Sheet A-715, 1ST FLOOR - SECTOR 5 REFLECTED CEILING PLAN

(46) Sheet A-716, 1ST FLOOR - SECTOR 6 REFLECTED CEILING PLAN

(47) Sheet A-716A, 1ST FLOOR - SECTOR 6 REFLECTED CEILING PLAN -BID OPTION

(48) Sheet A-717, 1ST FLOOR - SECTOR 7 REFLECTED CEILING PLAN

(49) Sheet A-718, 1ST FLOOR - SECTOR 8 REFLECTED CEILING PLAN

(50) Sheet A-719, 1ST FLOOR - SECTOR 9 REFLECTED CEILING PLAN

(51) Sheet A-719A, 1ST FLOOR - SECTOR 9 REFLECTED CEILING PLAN -BID OPTION

(52) Sheet A-721, 2ND FLOOR - SECTOR 1 REFLECTED CEILING PLAN

(53) Sheet A-722, 2ND FLOOR - SECTOR 2 REFLECTED CEILING PLAN

(54) Sheet A-723, 2ND FLOOR - SECTOR 3 REFLECTED CEILING PLAN

(55) Sheet A-724, 2ND FLOOR - SECTOR 4 REFLECTED CEILING PLAN

(56) Sheet A-725, 2ND FLOOR - SECTOR 5 REFLECTED CEILING PLAN

(57) Sheet A-726, 2ND FLOOR - SECTOR 6 REFLECTED CEILING PLAN

(58) Sheet A-726A, 2ND FLOOR - SECTOR 6 REFLECTED CEILING PLAN - BID

OPTION

(59) Sheet A-727, 2ND FLOOR - SECTOR 7 REFLECTED CEILING PLAN

(60) Sheet A-728, 2ND FLOOR - SECTOR 8 REFLECTED CEILING PLAN

(61) Sheet A-729, 2ND FLOOR - SECTOR 9 REFLECTED CEILING PLAN

(62) Sheet A-729A, 2ND FLOOR - SECTOR 9 REFLECTED CEILING PLAN - BID

OPTION

(63) Sheet A-730, ENLARGED REFLECTED CEILING PLANS

(64) Sheet A-737, CEILING DETAILS

CSOF PACKAGE – VOLUME 4 of 8 – INTERIOR DESIGN:

(1) Sheet IN600, ROOM FINISH SCHEDULE

(2) Sheet IN601, ROOM FINISH SCHEDULE

(3) Sheet IN604, MATERIALS & FINISHES LEGEND

(4) Sheet I-502, INTERIOR ELEVATIONS & DETAILS

(5) Sheet IG311, 1ST FLOOR - SECTOR 1 SIGNAGE PLAN

(6) Sheet IG312, 1ST FLOOR - SECTOR 2 SIGNAGE PLAN

(7) Sheet IG313, 1ST FLOOR - SECTOR 3 SIGNAGE PLAN

(8) Sheet IG314, 1ST FLOOR - SECTOR 4 SIGNAGE PLAN

Am #0008 - 5

(9) Sheet IG315, 1ST FLOOR - SECTOR 5 SIGNAGE PLAN

(10) Sheet IG316, 1ST FLOOR - SECTOR 6 SIGNAGE PLAN - BASE BID

(11) Sheet IG316A, 1ST FLOOR - SECTOR 6 SIGNAGE PLAN - BID OPTION

(12) Sheet IG317, 1ST FLOOR - SECTOR 7 SIGNAGE PLAN

(13) Sheet IG318, 1ST FLOOR - SECTOR 8 SIGNAGE PLAN

(14) Sheet IG319, 1ST FLOOR - SECTOR 9 SIGNAGE PLAN - BASE BID

(15) Sheet IG319A, 1ST FLOOR - SECTOR 9 SIGNAGE PLAN - BID OPTION

(16) Sheet IG321, 2ND FLOOR - SECTOR 1 SIGNAGE PLAN

(17) Sheet IG322, 2ND FLOOR - SECTOR 2 SIGNAGE PLAN

(18) Sheet IG323, 2ND FLOOR - SECTOR 3 SIGNAGE PLAN

(19) Sheet IG324, 2ND FLOOR - SECTOR 4 SIGNAGE PLAN

(20) Sheet IG325, 2ND FLOOR - SECTOR 5 SIGNAGE PLAN

(21) Sheet IG326, 2ND FLOOR - SECTOR 6 SIGNAGE PLAN - BASE BID

(22) Sheet IG326A, 2ND FLOOR - SECTOR 6 SIGNAGE PLAN - BID OPTION

(23) Sheet IG327, 2ND FLOOR - SECTOR 7 SIGNAGE PLAN

(24) Sheet IG328, 2ND FLOOR - SECTOR 8 SIGNAGE PLAN

(25) Sheet IG329, 2ND FLOOR - SECTOR 9 SIGNAGE PLAN - BASE BID

(26) Sheet IG329A, 2ND FLOOR - SECTOR 9 SIGNAGE PLAN - BID OPTION

CSOF PACKAGE – VOLUME 5 of 8 – FIRE PROTECTION, PLUMBING:

(1) Sheet FX121, 2ND FLOOR - SECTOR 1, 2, 3, 4, 5, & 6 FIRE SUPPRESSION

PLAN

(2) Sheet FX122, 2ND FLOOR – SECTOR 7, 8 & 9 FIRE SUPPRESSION PLAN

(3) Sheet P-100, OVERALL SANITARY AND VENT – UNDERGROUND

(4) Sheet P-100A, OVERALL SANITARY AND VENT - UNDERGROUND - BID OPTION

(5) Sheet P-101, SANITARY AND VENT - UNDERGROUND - SECTOR 1

(6) Sheet P-102, SANITARY AND VENT - UNDERGROUND - SECTOR 2

(7) Sheet P-103, SANITARY AND VENT - UNDERGROUND - SECTOR 3

(8) Sheet P-104, SANITARY AND VENT - UNDERGROUND - SECTOR 4

(9) Sheet P-105, SANITARY AND VENT - UNDERGROUND - SECTOR 5

(10) Sheet P-106, SANITARY AND VENT - UNDERGROUND - SECTOR 6

(11) Sheet P-106A, SANITARY AND VENT - UNDERGROUND - SECTOR 6 - BID OPTION

(12) Sheet P-107, SANITARY AND VENT - UNDERGROUND - SECTOR 7

(13) Sheet P-108, SANITARY AND VENT - UNDERGROUND - SECTOR 8

(14) Sheet P-109, SANITARY AND VENT - UNDERGROUND - SECTOR 9

(15) Sheet P-109A, SANITARY AND VENT - UNDERGROUND - SECTOR 9 - BID OPTION

(16) Sheet P-110, OVERALL SANITARY AND VENT - FIRST FLOOR

(17) Sheet P-110A, OVERALL SANITARY AND VENT - FIRST FLOOR - BID OPTION

Am #0008 - 6

(18) Sheet P-111, SANITARY AND VENT - FIRST FLOOR - SECTOR 1

(19) Sheet P-112, SANITARY AND VENT - FIRST FLOOR - SECTOR 2

(20) Sheet P-113, SANITARY AND VENT - FIRST FLOOR - SECTOR 3

(21) Sheet P-114, SANITARY AND VENT - FIRST FLOOR - SECTOR 4

(22) Sheet P-115, SANITARY AND VENT - FIRST FLOOR - SECTOR 5

(23) Sheet P-116, SANITARY AND VENT - FIRST FLOOR - SECTOR 6

(24) Sheet P-116A, SANITARY AND VENT - FIRST FLOOR - SECTOR 6 - BID OPTION

(25) Sheet P-117, SANITARY AND VENT - FIRST FLOOR - SECTOR 7

(26) Sheet P-118, SANITARY AND VENT - FIRST FLOOR - SECTOR 8

(27) Sheet P-119, SANITARY AND VENT - FIRST FLOOR - SECTOR 9

(28) Sheet P-119A, SANITARY AND VENT - FIRST FLOOR - SECTOR 9 - BID OPTION

(29) Sheet P-120, OVERALL SANITARY AND VENT - SECOND FLOOR

(30) Sheet P-120A, OVERALL SANITARY AND VENT - SECOND FLOOR - BID OPTION

(31) Sheet P-121, SANITARY AND VENT - SECOND FLOOR - SECTOR 1

(32) Sheet P-122, SANITARY AND VENT - SECOND FLOOR - SECTOR 2

(33) Sheet P-123, SANITARY AND VENT - SECOND FLOOR - SECTOR 3

(34) Sheet P-124, SANITARY AND VENT - SECOND FLOOR - SECTOR 4

(35) Sheet P-125, SANITARY AND VENT - SECOND FLOOR - SECTOR 5

(36) Sheet P-126, SANITARY AND VENT - SECOND FLOOR - SECTOR 6

(37) Sheet P-126A, SANITARY AND VENT - SECOND FLOOR - SECTOR 6 - BID

OPTION

(38) Sheet P-127, SANITARY AND VENT - SECOND FLOOR - SECTOR 7

(39) Sheet P-128, SANITARY AND VENT - SECOND FLOOR - SECTOR 8

(40) Sheet P-129, SANITARY AND VENT - SECOND FLOOR - SECTOR 9

(41) Sheet P-129A, SANITARY AND VENT - SECOND FLOOR - SECTOR 9 - BID

OPTION

(42) Sheet P-210, OVERALL DOMESTIC WATER - FIRST FLOOR

(43) Sheet P-210A, OVERALL DOMESTIC WATER - FIRST FLOOR - BID OPTION

(44) Sheet P-211, DOMESTIC WATER - FIRST FLOOR - SECTOR 1

(45) Sheet P-212, DOMESTIC WATER - FIRST FLOOR - SECTOR 2

(46) Sheet P-213, DOMESTIC WATER - FIRST FLOOR - SECTOR 3

(47) Sheet P-214, DOMESTIC WATER - FIRST FLOOR - SECTOR 4

(48) Sheet P-215, DOMESTIC WATER - FIRST FLOOR - SECTOR 5

(49) Sheet P-216, DOMESTIC WATER - FIRST FLOOR - SECTOR 6

(50) Sheet P-216A, DOMESTIC WATER - FIRST FLOOR - SECTOR 6 - BID OPTION

(51) Sheet P-217, DOMESTIC WATER - FIRST FLOOR - SECTOR 7

(52) Sheet P-218, DOMESTIC WATER - FIRST FLOOR - SECTOR 8

(53) Sheet P-219, DOMESTIC WATER - FIRST FLOOR - SECTOR 9

(54) Sheet P-219A, DOMESITIC WATER PIPING - SECTOR 9 - BID OPTION

Am #0008 - 7

(55) Sheet P-220, OVERALL DOMESTIC WATER - SECOND FLOOR

(56) Sheet P-220A, OVERALL DOMESTIC WATER - SECOND FLOOR - BID OPTION

(57) Sheet P-221, DOMESTIC WATER - SECOND FLOOR - SECTOR 1

(58) Sheet P-222, DOMESTIC WATER - SECOND FLOOR - SECTOR 2

(59) Sheet P-223, DOMESTIC WATER - SECOND FLOOR - SECTOR 3

(60) Sheet P-224, DOMESTIC WATER - SECOND FLOOR - SECTOR 4

(61) Sheet P-225, DOMESTIC WATER - SECOND FLOOR - SECTOR 5

(62) Sheet P-226, DOMESTIC WATER - SECOND FLOOR - SECTOR 6

(63) Sheet P-226A, DOMESTIC WATER - SECOND FLOOR - SECTOR 6 - BID OPTION

(64) Sheet P-227, DOMESTIC WATER - SECOND FLOOR - SECTOR 7

(65) Sheet P-228, DOMESTIC WATER - SECOND FLOOR - SECTOR 8

(66) Sheet P-229, DOMESTIC WATER - SECOND FLOOR - SECTOR 9

(67) Sheet P-229A, DOMESTIC WATER - SECOND FLOOR - SECTOR 9 - BID OPTION

(68) Sheet P-401, ENLARGED DOMESTIC WATER PLANS

(69) Sheet P-402, ENLARGED DOMESTIC WATER PLANS

(70) Sheet P-403, ENLARGED DOMESTIC WATER PLANS

(71) Sheet P-404A, ENLARGED DOMESTIC WATER PLANS - BID OPTION

(72) Sheet P-505, PLUMBING DETAILS

(73) Sheet P-601, PLUMBING SCHEDULES

CSOF PACKAGE – VOLUME 6 of 8 – PROCESS MECHANICAL:

(1) Sheet M-501, MECHANICAL - PIPE SUPPORT DETAILS SHEET 1

CSOF PACKAGE – VOLUME 7 of 8 – ELECTRICAL:

(1) Sheet ES100, CSOF ELECTRICAL SITE PLAN – SHEET 1

(2) Sheet EP402, ENLARGED POWER PLANS LEVEL 2

(3) Sheet EL115, LIGHTING PLAN LEVEL 1 – SECTOR 5

(4) Sheet EL118, LIGHTING PLAN LEVEL 1 – SECTOR 8

(5) Sheet EL127, LIGHTING PLAN LEVEL 2 – SECTOR 7

(6) Sheet EL129, LIGHTING PLAN LEVEL 2 – SECTOR 9

(7) Sheet EL129A, LIGHTING PLAN LEVEL 2 – SECTOR 9A

ECP PACKAGE:

(1) Sheet CD111-E, SITE DEMOLITION PLAN – SHEET 1

(2) Sheet CG111-E, SITE GRADING PLAN

(3) Sheet CS111-E, CIVIL SITE PLAN

(4) Sheet CU111-E, SITE UTILITY PLAN

Am #0008 - 8

2. This amendment is a part of the proposing papers and its receipt shall be acknowledged. All other conditions and requirements of the request for proposal remain unchanged.

3. Electronic Proposals. Provide proposals via the instructions provided in Section 00 22 00 of the Request for Proposal.

4. Offers will be received until 2:00 p.m., local time at place of receiving proposals, 10 JUN 2021.

Attachments:

Specifications listed in 1.b., above Drawings listed in 1.c., above (under separate cover)

U.S. Army Corps of Engineers, Omaha District 1616 Capitol Avenue Omaha, Nebraska 68102 4901

27 MAY 2021

nep/2160

Consolidated Space Operations Facility - Schriever AFB, CO SH50

SECTION TABLE OF CONTENTS

DIVISION 03 - CONCRETE

SECTION 03 30 00

CAST-IN-PLACE CONCRETE

02/19

PART 1 GENERAL

1.1 REFERENCES

1.2 DEFINITIONS

1.3 SUSTAINABILITY REQUIREMENTS

1.4 SUBMITTALS

1.5 MODIFICATION OF REFERENCES

1.6 DELIVERY, STORAGE, AND HANDLING

1.6.1 Reinforcement

1.7 QUALITY ASSURANCE

1.7.1 Design Data

1.7.1.1 Formwork Calculations

1.7.1.2 Concrete Mix Design

1.7.2 Shop Drawings

1.7.2.1 Formwork

1.7.2.2 Reinforcing Steel

1.7.3 Control Submittals

1.7.3.1 Concrete Curing Plan

1.7.3.2 Pumping Concrete

1.7.3.3 Silica Fume Manufacturer's Representative

1.7.3.4 VOC Content for form release agents, curing compounds, and concrete penetrating sealers

1.7.3.5 Safety Data Sheets

1.7.4 Test Reports

1.7.4.1 Fly Ash and Pozzolan

1.7.4.2 Slag Cement

1.7.4.3 Aggregates

1.7.5 Field Samples

1.7.5.1 Slab Finish Sample

1.7.5.2 Surface Finish Samples

1.7.6 Quality Control Plan

1.7.7 Quality Control Personnel Certification

1.7.7.1 Quality Manager Qualifications

1.7.7.2 Field Testing Technician and Testing Agency

1.7.8 Laboratory Qualifications for Concrete Qualification Testing

1.7.9 Laboratory Accreditation

1.8 ENVIRONMENTAL REQUIREMENTS

1.8.1 Submittals for Environmental Performance

1.9 QUALIFICATIONS FOR WELDING WORK

PART 2 PRODUCTS

2.1 PRODUCT SUSTAINABILITY CRITERIA

2.1.1 Recycled Content for Cement

2.1.2 Bio-based Materials

2.1.3 Reduce Volatile Organic Compounds (VOC) (LOW-EMITTING

SECTION 03 30 00 Page 1Am #0008

MATERIALS) for Products

2.2 FORMWORK MATERIALS

2.2.1 Wood Forms

2.2.1.1 Concrete Form Plywood (Standard Rough)

2.2.1.2 Overlaid Concrete Form Plywood (Standard Smooth)

2.2.2 Plastic Forms

2.2.3 Carton Forms

2.2.4 Steel Forms

2.3 FORMWORK ACCESSORIES

2.3.1 Form Ties

2.3.2 Waterstops

2.3.2.1 PVC Waterstop

2.3.2.2 Rubber Waterstop

2.3.2.3 Thermoplastic Elastomeric Rubber Waterstop

2.3.2.4 Hydrophilic Waterstop

2.3.3 Biodegradable Form Release Agent

2.3.4 Chamfer Materials

2.3.5 Construction and movement joints

2.3.6 Perimeter Insulation

2.3.7 Other Embedded items

2.4 CONCRETE MATERIALS

2.4.1 Cementitious Materials

2.4.1.1 Recycled Content of Cementitious Materials

2.4.1.2 Portland Cement

2.4.1.3 Blended Cements

2.4.1.4 Fly Ash

2.4.1.5 Slag cement

2.4.1.6 Silica Fume

2.4.1.7 Other Supplementary Cementitious Materials

2.4.2 Water

2.4.3 Aggregate

2.4.3.1 Normal-Weight Aggregate

2.4.3.2 Recycled Aggregate Materials

2.4.4 Admixtures

2.5 MISCELLANEOUS MATERIALS

2.5.1 Concrete Curing Materials

2.5.2 Nonshrink Grout

2.5.3 Floor Finish Materials

2.5.3.1 Liquid Chemical Floor Hardeners and Sealers

2.5.4 Expansion/Contraction Joint Filler

2.5.5 Joint Sealants

2.5.5.1 Horizontal Surfaces, 3 Percent Slope, Maximum

2.5.5.2 Preformed Polychloroprene Elastomeric Type

2.5.5.3 Lubricant for Preformed Compression Seals

2.5.6 Vapor Retarder

2.6 CONCRETE MIX DESIGN

2.6.1 Properties and Requirements

2.6.2 Durability

2.6.2.1 Alkali-Aggregate Reaction

2.6.2.2 Freezing and Thawing Resistance

2.6.2.3 Concrete Temperature

2.6.3 Trial Mixtures

2.6.4 Ready-Mix Concrete

2.7 REINFORCEMENT

2.7.1 Reinforcing Bars

2.7.1.1 Headed Reinforcing Bars

2.7.1.2 Bar Mats

2.7.1.3 Headed Shear Stud Reinforcement

2.7.2 Mechanical Reinforcing Bar Connectors

SECTION 03 30 00 Page 2Am #0008

2.7.3 Wire

2.7.4 Welded wire reinforcement

2.7.5 Reinforcing Bar Supports

2.7.6 Reinforcing Fibers

2.7.7 Dowels for Load Transfer in Floors

2.7.8 Welding

PART 3 EXECUTION

3.1 EXAMINATION

3.2 PREPARATION

3.2.1 General

3.2.2 Subgrade Under Foundations and Footings

3.2.3 Subgrade Under Slabs on Ground

3.2.4 Edge Forms and Screed Strips for Slabs

3.2.5 Reinforcement and Other Embedded Items

3.3 FORMS

3.3.1 Coating

3.3.2 Reshoring

3.3.3 Reuse

3.3.4 Forms for Standard Rough Form Finish

3.3.5 Forms for Standard Smooth Form Finish

3.3.6 Form Ties

3.3.7 Tolerances for Form Construction

3.3.8 Removal of Forms and Supports

3.3.9 Strength of Concrete Required for Removal of Formwork

3.4 WATERSTOP INSTALLATION AND SPLICES

3.4.1 PVC Waterstop

3.4.2 Rubber Waterstop

3.4.3 Thermoplastic Elastomeric Rubber Waterstop

3.4.4 Hydrophilic Waterstop

3.5 PLACING REINFORCEMENT AND MISCELLANEOUS MATERIALS

3.5.1 General

3.5.2 Vapor Retarder

3.5.3 Perimeter Insulation

3.5.4 Reinforcement Supports

3.5.5 Splicing

3.5.6 Future Bonding

3.5.7 Setting Miscellaneous Material

3.5.8 Fabrication

3.5.9 Placing Reinforcement

3.5.10 Spacing of Reinforcing Bars

3.5.11 Concrete Protection for Reinforcement

3.5.12 Welding

3.6 BATCHING, MEASURING, MIXING, AND TRANSPORTING CONCRETE

3.6.1 Measuring

3.6.2 Mixing

3.6.3 Transporting

3.7 PLACING CONCRETE

3.7.1 Footing Placement

3.7.2 Pumping

3.7.3 Cold Weather

3.7.4 Hot Weather

3.7.5 Bonding

3.8 WASTE MANAGEMENT

3.8.1 Mixing Equipment

3.8.2 Hardened, Cured Waste Concrete

3.8.3 Reinforcing Steel

3.8.4 Other Waste

SECTION 03 30 00 Page 3Am #0008

3.9 SURFACE FINISHES EXCEPT FLOOR, SLAB, AND PAVEMENT FINISHES

3.9.1 Defects

3.9.2 Not Against Forms (Top of Walls)

3.9.3 Formed Surfaces

3.9.3.1 Tolerances

3.9.3.2 As-Cast Rough Form

3.9.3.3 Standard Smooth Finish

3.10 FLOOR, SLAB, AND PAVEMENT FINISHES AND MISCELLANEOUS CONSTRUCTION

3.10.1 Finish

3.10.1.1 Scratched

3.10.1.2 Floated

3.10.1.3 Concrete Containing Silica Fume

3.10.1.4 Steel Troweled

3.10.1.5 Broomed

3.10.1.6 Pavement

3.10.1.7 Chemical-Hardener Treatment

3.10.2 Flat Floor Finishes

3.10.2.1 Measurement of Floor Tolerances

3.10.2.2 Remedies for Out of Tolerance Work

3.10.3 Concrete Walks

3.10.4 Pits and Trenches

3.10.5 Curbs and Gutters

3.10.6 Splash Blocks

3.11 JOINTS

3.11.1 Construction Joints

3.11.1.1 Maximum Allowable Construction Joint Spacing

3.11.1.2 Construction Joints for Constructability Purposes

3.11.2 Isolation Joints in Slabs on Ground

3.11.3 Contraction Joints in Slabs on Ground

3.11.4 Sealing Joints in Slabs on Ground

3.12 CURING AND PROTECTION

3.12.1 Requirements for Type III, High-Early-Strength Portland Cement

3.12.2 Curing Periods

3.12.3 Curing Formed Surfaces

3.12.4 Curing Unformed Surfaces

3.12.5 Temperature of Concrete During Curing

3.12.6 Protection from Mechanical Injury

3.12.7 Protection After Curing

3.13 FIELD QUALITY CONTROL

3.13.1 Sampling

3.13.2 Testing

3.13.2.1 Slump Tests

3.13.2.2 Temperature Tests

3.13.2.3 Compressive Strength Tests

3.13.2.4 Air Content

3.13.2.5 Unit Weight of Structural Concrete

3.13.2.6 Chloride Ion Concentration

3.13.2.7 Strength of Concrete Structure

3.13.2.8 Non-Conforming Materials

3.13.2.9 Testing Concrete Structure for Strength

3.14 REPAIR, REHABILITATION AND REMOVAL

3.14.1 Crack Repair

3.14.2 Repair of Weak Surfaces

3.14.3 Failure of Quality Assurance Test Results

-- End of Section Table of Contents --

SECTION 03 30 00 Page 4Am #0008

SECTION 03 30 00

CAST-IN-PLACE CONCRETE

02/19

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN CONCRETE INSTITUTE (ACI)

ACI 117 (2010; Errata 2011) Specifications for Tolerances for Concrete Construction and Materials and Commentary

ACI 121R (2008) Guide for Concrete Construction Quality Systems in Conformance with ISO

ACI 301 (2016) Specifications for Structural Concrete

ACI 302.1R (2015) Guide for Concrete Floor and Slab Construction

ACI 304.2R (2017) Guide to Placing Concrete by Pumping Methods

ACI 304R (2000; R 2009) Guide for Measuring, Mixing, Transporting, and Placing Concrete

ACI 305.1 (2014) Specification for Hot Weather Concreting

ACI 305R (2010) Guide to Hot Weather Concreting

ACI 306.1 (1990; R 2002) Standard Specification for Cold Weather Concreting

ACI 306R (2016) Guide to Cold Weather Concreting

ACI 308.1 (2011) Specification for Curing Concrete

ACI 347R (2014; Errata 1 2017) Guide to Formwork for Concrete

ACI SP-15 (2011) Field Reference Manual: Standard Specifications for Structural Concrete ACI 301-05 with Selected ACI References

ACI SP-2 (2007; Abstract: 10th Edition) ACI Manual of Concrete Inspection

SECTION 03 30 00 Page 5Am #0008

AMERICAN HARDBOARD ASSOCIATION (AHA)

AHA A135.4 (1995; R 2004) Basic Hardboard

AMERICAN WELDING SOCIETY (AWS)

AWS D1.4/D1.4M (2011) Structural Welding Code - Reinforcing Steel

ASTM INTERNATIONAL (ASTM)

ASTM A1022/A1022M (2016b) Standard Specification for Deformed and Plain Stainless Steel Wire and Welded Wire for Concrete Reinforcement

ASTM A1044/A1044M (2016a) Standard Specification for Steel Stud Assemblies for Shear Reinforcement of Concrete

ASTM A1064/A1064M (2017) Standard Specification for Carbon-Steel Wire and Welded Wire Reinforcement, Plain and Deformed, for Concrete

ASTM A184/A184M (2017) Standard Specification for Welded Deformed Steel Bar Mats for Concrete Reinforcement

ASTM A36/A36M (2014) Standard Specification for Carbon Structural Steel

ASTM A615/A615M (2016) Standard Specification for Deformed and Plain Carbon-Steel Bars for Concrete Reinforcement

ASTM A706/A706M (2016) Standard Specification for Low-Alloy Steel Deformed and Plain Bars for Concrete Reinforcement

ASTM A934/A934M (2016) Standard Specification for Epoxy-Coated Prefabricated Steel Reinforcing Bars

ASTM A970/A970M (2018) Standard Specification for Headed Steel Bars for Concrete Reinforcement

ASTM C1017/C1017M (2013; E 2015) Standard Specification for Chemical Admixtures for Use in Producing Flowing Concrete

ASTM C1074 (2011) Standard Practice for Estimating Concrete Strength by the Maturity Method

ASTM C1077 (2017) Standard Practice for Agencies Testing Concrete and Concrete Aggregates for Use in Construction and Criteria for Testing Agency Evaluation

ASTM C1107/C1107M (2017) Standard Specification for Packaged

SECTION 03 30 00 Page 6Am #0008

Dry, Hydraulic-Cement Grout (Nonshrink)

ASTM C1157/C1157M (2017) Standard Performance Specification for Hydraulic Cement

ASTM C1218/C1218M (2017) Standard Test Method for Water-Soluble Chloride in Mortar and Concrete

ASTM C1240 (2014) Standard Specification for Silica Fume Used in Cementitious Mixtures

ASTM C1260 (2014) Standard Test Method for Potential Alkali Reactivity of Aggregates (Mortar-Bar Method)

ASTM C1293 (2008; R 2015) Standard Test Method for Determination of Length Change of Concrete Due to Alkali-Silica Reaction

ASTM C138/C138M (2017a) Standard Test Method for Density (Unit Weight), Yield, and Air Content (Gravimetric) of Concrete

ASTM C143/C143M (2015) Standard Test Method for Slump of Hydraulic-Cement Concrete

ASTM C150/C150M (2018) Standard Specification for Portland Cement

ASTM C1567 (2013) Standard Test Method for Potential Alkali-Silica Reactivity of Combinations of Cementitious Materials and Aggregate (Accelerated Mortar-Bar Method)

ASTM C1602/C1602M (2018) Standard Specification for Mixing Water Used in Production of Hydraulic Cement Concrete

ASTM C172/C172M (2017) Standard Practice for Sampling Freshly Mixed Concrete

ASTM C173/C173M (2016) Standard Test Method for Air Content of Freshly Mixed Concrete by the Volumetric Method

ASTM C1778 (2016) Standard Guide for Reducing the Risk of Deleterious Alkali-Aggregate Reaction in Concrete

ASTM C231/C231M (2017a) Standard Test Method for Air Content of Freshly Mixed Concrete by the Pressure Method

ASTM C260/C260M (2010a; R 2016) Standard Specification for Air-Entraining Admixtures for Concrete

ASTM C31/C31M (2019) Standard Practice for Making and Curing Concrete Test Specimens in the Field

SECTION 03 30 00 Page 7Am #0008

ASTM C311/C311M (2018) Standard Test Methods for Sampling and Testing Fly Ash or Natural Pozzolans for Use in Portland-Cement Concrete

ASTM C33/C33M (2018) Standard Specification for Concrete Aggregates

ASTM C330/C330M (2017a) Standard Specification for Lightweight Aggregates for Structural Concrete

ASTM C39/C39M (2018) Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens

ASTM C42/C42M (2018a) Standard Test Method for Obtaining and Testing Drilled Cores and Sawed Beams of Concrete

ASTM C494/C494M (2017) Standard Specification for Chemical Admixtures for Concrete

ASTM C552 (2017; E 2018) Standard Specification for Cellular Glass Thermal Insulation

ASTM C567/C567M (2014) Determining Density of Structural Lightweight Concrete

ASTM C578 (2018) Standard Specification for Rigid, Cellular Polystyrene Thermal Insulation

ASTM C591 (2015) Standard Specification for Unfaced Preformed Rigid Cellular Polyisocyanurate Thermal Insulation

ASTM C595/C595M (2018) Standard Specification for Blended Hydraulic Cements

ASTM C618 (2019) Standard Specification for Coal Fly Ash and Raw or Calcined Natural Pozzolan for Use in Concrete

ASTM C78/C78M (2018) Standard Test Method for Flexural Strength of Concrete (Using Simple Beam with Third-Point Loading)

ASTM C803/C803M (2018) Standard Test Method for Penetration Resistance of Hardened Concrete

ASTM C873/C873M (2015) Standard Test Method for Compressive Strength of Concrete Cylinders Cast in Place in Cylindrical Molds

ASTM C900 (2015) Standard Test Method for Pullout Strength of Hardened Concrete

ASTM C920 (2018) Standard Specification for Elastomeric Joint Sealants

SECTION 03 30 00 Page 8Am #0008

ASTM C94/C94M (2018) Standard Specification for Ready-Mixed Concrete

ASTM C989/C989M (2018a) Standard Specification for Slag Cement for Use in Concrete and Mortars

ASTM D1751 (2004; E 2013; R 2013) Standard Specification for Preformed Expansion Joint Filler for Concrete Paving and Structural Construction (Nonextruding and Resilient Bituminous Types)

ASTM D1752 (2018) Standard Specification for Preformed Sponge Rubber, Cork and Recycled PVC Expansion Joint Fillers for Concrete Paving and Structural Construction

ASTM D2628 (1991; R 2016) Standard Specification for Preformed Polychloroprene Elastomeric Joint Seals for Concrete Pavements

ASTM D2835 (1989; R 2017) Standard Specification for Lubricant for Installation of Preformed Compression Seals in Concrete Pavements

ASTM D3042 (2017) Standard Test Method for Insoluble Residue in Carbonate Aggregates

ASTM D412 (2016) Standard Test Methods for Vulcanized Rubber and Thermoplastic Elastomers - Tension

ASTM D471 (2016a) Standard Test Method for Rubber Property - Effect of Liquids

ASTM D5759 (2012) Characterization of Coal Fly Ash and Clean Coal Combustion Fly Ash for Potential Uses

ASTM D6690 (2015) Standard Specification for Joint and Crack Sealants, Hot Applied, for Concrete and Asphalt Pavements

ASTM E1155 (2014) Standard Test Method for Determining Floor Flatness and Floor Levelness Numbers

ASTM E1643 (2018a) Standard Practice for Selection, Design, Installation, and Inspection of Water Vapor Retarders Used in Contact with Earth or Granular Fill Under Concrete Slabs

ASTM E1745 (2017) Standard Specification for Water Vapor Retarders Used in Contact with Soil or Granular Fill under Concrete Slabs

ASTM E329 (2018) Standard Specification for Agencies Engaged in Construction Inspection, SECTION 03 30 00 Page 9Am #0008

Testing, or Special Inspection

ASTM E96/E96M (2016) Standard Test Methods for Water Vapor Transmission of Materials

CONCRETE REINFORCING STEEL INSTITUTE (CRSI)

CRSI 10MSP (2009; 28th Ed; Errata) Manual of Standard Practice

CRSI RB4.1 (2016) Supports for Reinforcement Used in Concrete

NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY (NIST)

NIST PS 1 (2009) DOC Voluntary Product Standard PS 1-07, Structural Plywood

U.S. ARMY CORPS OF ENGINEERS (USACE)

COE CRD-C 513 (1974) Corps of Engineers Specifications for Rubber Waterstops

COE CRD-C 572 (1974) Corps of Engineers Specifications for Polyvinylchloride Waterstops

1.2 DEFINITIONS

a. "Cementitious material" as used herein must include all portland cement, pozzolan, fly ash, slag cement, and silica fume.

b. "Exposed to public view" means situated so that it can be seen from eye level from a public location after completion of the building. A public location is accessible to persons not responsible for operation or maintenance of the building.

c. "Chemical admixtures" are materials in the form of powder or fluids that are added to the concrete to give it certain characteristics not obtainable with plain concrete mixes.

d. "Supplementary cementing materials" (SCM) include coal fly ash, silica fume, slag cement, natural or calcined pozzolans, and ultra-fine coal ash when used in such proportions to replace the portland cement that result in improvement to sustainability and durability and reduced cost.

e. "Design strength" (f'c) is the specified compressive strength of concrete at time(s) specified in this section to meet structural design criteria.

f. "Mass Concrete" is any concrete system that approaches a maximum temperature of 158 degrees F within the first 72 hours of placement.

[*Am8]<Deleted Text>[**Am8]

g. "Mixture proportioning" is the process of designing concrete mixture proportions to enable it to meet the strength, service life and constructability requirements of the project while minimizing the initial and life-cycle cost.

SECTION 03 30 00 Page 10Am #0008

[*Am8]<Deleted Text>[**Am8]

h. "Mixture proportions" are the masses or volumes of individual ingredients used to make a unit measure (cubic meter or cubic yard) of concrete.

i. "Pozzolan" is a siliceous or siliceous and aluminous material, which in itself possesses little or no cementitious value but will, in finely divided form and in the presence of moisture, chemically react with calcium hydroxide at ordinary temperatures to form compounds possessing cementitious properties.

j. "Workability (or consistence)" is the ability of a fresh (plastic) concrete mix to fill the form/mould properly with the desired work (vibration) and without reducing the concrete's quality. Workability depends on water content, chemical admixtures, aggregate (shape and size distribution), cementitious content and age (level of hydration).

1.3 SUSTAINABILITY REQUIREMENTS

Materials in this technical specification may contribute towards contract compliance with sustainability requirements. See Section 01 33 29 SUSTAINABILITY REPORTING for project requirements.

1.4 SUBMITTALS

Government approval is required for submittals with a "G" designation ubmittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Concrete Curing Plan

Quality Control Plan

Quality Control Personnel Certification

Quality Control Organizational Chart

Laboratory Accreditation

Form Removal Schedule

Maturity Method Data

SD-02 Shop Drawings

Formwork

Reinforcing Steel; G, AE

SD-03 Product Data

Joint Sealants

Joint Filler

Formwork Materials

SECTION 03 30 00 Page 11Am #0008

Recycled Aggregate Materials

Cementitious Materials

Vapor Retarder

Concrete Curing Materials

Reinforcement

Liquid Chemical Floor Hardeners and Sealers

Admixtures

Reinforcing Fibers

Mechanical Reinforcing Bar Connectors

Waterstops

Biodegradable Form Release Agent

Pumping Concrete

Floor Finishing Plan

Nonshrink Grout

Recycled Content of Cementitious Materials

SD-04 Samples

Slab Finish Sample

Surface Finish Samples

SD-05 Design Data

Concrete Mix Design; G, AE

Formwork Calculations

SD-06 Test Reports

Concrete Mix Design; G, AE

Fly Ash

Pozzolan

Slag Cement

Aggregates

Tolerance Report

Compressive Strength Tests; G

SECTION 03 30 00 Page 12Am #0008

Unit Weight of Structural Concrete

Chloride Ion Concentration

Air Content

Slump Tests

Water

SD-07 Certificates

Reinforcing Bars

Welder Qualifications

Silica Fume Manufacturer's Representative

VOC Content for Form Release Agents, Curing Compounds, and Concrete Penetrating Sealers

Safety Data Sheets

VOC Content for Composite Wood Products

Indoor Air Quality for Concrete Curing Materials

Indoor Air Quality for Sealants

Indoor Air Quality for Concrete Penetrating Sealers

Indoor Air Quality for Liquid Chemical Floor Hardeners

Forest Stewardship Council (FSC) Certification

Field Testing Technician and Testing Agency

SD-08 Manufacturer's Instructions

Liquid Chemical Floor Hardeners and Sealers

Joint Sealants

Curing Compound

1.5 MODIFICATION OF REFERENCES

Accomplish work in accordance with ACI publications except as modified herein. Consider the advisory or recommended provisions to be mandatory.

Interpret reference to the "Building Official," the "Structural Engineer," and the "Architect/Engineer" to mean the Contracting Officer.

1.6 DELIVERY, STORAGE, AND HANDLING

Follow ACI 301, ACI 304R and ASTM A934/A934M requirements and recommendations. Do not deliver concrete until vapor retarder, forms, reinforcement, embedded items, and chamfer strips are in place and ready for concrete placement. Do not store concrete curing compounds or sealers with materials that have a high capacity to adsorb volatile organic

SECTION 03 30 00 Page 13Am #0008 compound (VOC) emissions. Do not store concrete curing compounds or sealers in occupied spaces.

1.6.1 Reinforcement

Store reinforcement of different sizes and shapes in separate piles or racks raised above the ground to avoid excessive rusting. Protect from contaminants such as grease, oil, and dirt. Ensure bar sizes can be accurately identified after bundles are broken and tags removed.

1.7 QUALITY ASSURANCE

1.7.1 Design Data

1.7.1.1 Formwork Calculations

ACI 347R. Include design calculations indicating arrangement of forms, sizes and grades of supports (lumber), panels, and related components.

Furnish drawings and calculations of shoring and re-shoring methods proposed for floor and roof slabs, spandrel beams, and other horizontal concrete members. Calculations must indicate concrete pressure with both live and dead loads, along with material types.

1.7.1.2 Concrete Mix Design

Sixty days minimum prior to concrete placement, submit a mix design for each strength and type of concrete. Submit a complete list of materials including type; brand ource and amount of cement, supplementary cementitious materials, fibers, and admixtures; and applicable reference specifications. Submit mill test and all other test for cement, supplementary cementitious materials, aggregates, and admixtures. Provide documentation of maximum nominal aggregate size, gradation analysis, percentage retained and passing sieve, and a graph of percentage retained verses sieve size. Provide mix proportion data using at least three different water-cementitious material ratios for each type of mixture, which produce a range of strength encompassing those required for each type of concrete required. If source material changes, resubmit mix proportion data using revised source material. Provide only materials that have been proven by trial mix studies to meet the requirements of this specification, unless otherwise approved in writing by the Contracting Officer. Indicate clearly in the submittal where each mix design is used when more than one mix design is submitted. Resubmit data on concrete components if the qualities or source of components changes.

For previously approved concrete mix designs used within the past twelve months, the previous mix design may be re-submitted without further trial batch testing if accompanied by material test data conducted within the last six months. Obtain mix design approval from the contracting officer prior to concrete placement.

1.7.2 Shop Drawings

1.7.2.1 Formwork

Drawings showing details of formwork including, but not limited to;

joints, supports, studding and shoring, and sequence of form and shoring removal. Indicate placement schedule, construction, location and method of forming control joints. Include locations of inserts, conduit, sleeves and other embedded items. Reproductions of contract drawings are unacceptable. Submit form removal schedule indicating element and minimum

SECTION 03 30 00 Page 14Am #0008 length of time for form removal.

Design, fabricate, erect, support, brace, and maintain formwork so that it is able to support, without failure, all vertical and lateral loads that may reasonably be anticipated to be applied to the formwork.

1.7.2.2 Reinforcing Steel

Indicate bending diagrams, assembly diagrams, splicing and laps of bars, shapes, dimensions, and details of bar reinforcing, accessories, and concrete cover. Do not scale dimensions from structural drawings to determine lengths of reinforcing bars. Reproductions of contract drawings are unacceptable.

1.7.3 Control Submittals

1.7.3.1 Concrete Curing Plan

Submit proposed materials, methods, and duration for curing concrete elements in accordance with ACI 308.1.

1.7.3.2 Pumping Concrete

Submit proposed materials and methods for pumping concrete. Submittal must include mix designs, pumping equipment including type of pump and size and material for pipe, and maximum length and height concrete is to be pumped.

1.7.3.3 Silica Fume Manufacturer's Representative

The manufacturer's representative must be present at mix plant to ensure proper mix, including high range water reducer, and batching methods during the first 3 days of concrete mix preparation and placement. After which the manufacturer's representative must designate a representative at the concrete producer's plant to ensure the concrete mix procedures meet the silica fume manufacturer's recommendations.

1.7.3.4 VOC Content for form release agents, curing compounds, and concrete penetrating sealers

Submit certification for the form release agent, curing compounds, and concrete penetrating sealers that indicate the VOC content of each product.

1.7.3.5 Safety Data Sheets

Submit Safety Data Sheets (SDS) for all materials that are regulated for hazardous health effects. SDS must be readily accessible during each work shift to employees when they are at the construction site.

1.7.4 Test Reports

1.7.4.1 Fly Ash and Pozzolan

Submit test results in accordance with ASTM C618 for fly ash and pozzolan. Submit test results performed within 6 months of submittal date.

1.7.4.2 Slag Cement

Submit test results in accordance with ASTM C989/C989M for slag cement.

SECTION 03 30 00 Page 15Am #0008

Submit test results performed within 6 months of submittal date.

1.7.4.3 Aggregates

Submit test results in accordance with ASTM C33/C33M, or ASTM C330/C330M for lightweight aggregate, and ASTM C1293 or ASTM C1567 as required in the paragraph titled ALKALI-AGGREGATE REACTION.

1.7.5 Field Samples

1.7.5.1 Slab Finish Sample

Install minimum of 10 foot by 10 foot slab. Slab finish sample must not be part of the final project. Finish as required by specification.

Silica fume manufacturer's representative must attend and advise.

1.7.5.2 Surface Finish Samples

Provide a minimum of three sample concrete panels for each finish for each mix design, 3 feet by 3 feet, 3 inches thick. Use the approved concrete mix design(s). Provide sample panels on-site at locations directed. Once approved, each set of panels must be representative of each of the finishes specified and of the workmanship and finish(es) required. Do not remove or destroy samples until directed by the Contracting Officer.

1.7.6 Quality Control Plan

Develop and submit for approval a concrete quality control program in accordance with the guidelines of ACI 121R and as specified herein. The plan must include approved laboratories. Provide direct oversight for the concrete qualification program inclusive of associated sampling and testing. All quality control reports must be provided to the Contracting Officer, Quality Manager and Concrete Supplier. Maintain a copy of ACI SP-15 and CRSI 10MSP at project site.

1.7.7 Quality Control Personnel Certification

The Contractor must submit for approval the responsibilities of the various quality control personnel, including the names and qualifications of the individuals in those positions and a quality control organizational chart defining the quality control hierarchy and the responsibility of the various positions. Quality control personnel must be employed by the Contractor.

Submit American Concrete Institute certification for the following:

a. CQC personnel responsible for inspection of concrete operations.

b. Lead Foreman or Journeyman of the Concrete Placing, Finishing, and Curing Crews.

c. Field Testing Technicians: ACI Concrete Field Testing Technician, Grade I.

1.7.7.1 Quality Manager Qualifications

The quality manager must hold a current license as a professional engineer in a U.S. state or territory with experience on at least five similar projects. Evidence of extraordinary proven experience may be considered

SECTION 03 30 00 Page 16Am #0008 by the Contracting Officer as sufficient to act as the Quality Manager.

1.7.7.2 Field Testing Technician and Testing Agency

Submit data on qualifications of proposed testing agency and technicians for approval by the Contracting Officer prior to performing testing on concrete.

a. Work on concrete under this contract must be performed by an ACI Concrete Field Testing Technician Grade 1 qualified in accordance with ACI SP-2 or equivalent. Equivalent certification programs must include requirements for written and performance examinations as stipulated in ACI SP-2.

b. Testing agencies that perform testing services on reinforcing steel must meet the requirements of ASTM E329.

c. Testing agencies that perform testing services on concrete materials must meet the requirements of ASTM C1077.

1.7.8 Laboratory Qualifications for Concrete Qualification Testing

The concrete testing laboratory must have the necessary equipment and experience to accomplish required testing. The laboratory must meet the requirements of ASTM C1077 and be Cement and Concrete Reference Laboratory (CCRL) inspected.

1.7.9 Laboratory Accreditation

Laboratory and testing facilities must be provided by and at the expense of the Contractor. The laboratories performing the tests must be accredited in accordance with ASTM C1077, including ASTM C78/C78M and ASTM C1260. The accreditation must be current and must include the required test methods, as specified. Furthermore, the testing must comply with the following requirements:

a. Aggregate Testing and Mix Proportioning: Aggregate testing and mixture proportioning studies must be performed by an accredited laboratory and under the direction of a registered professional engineer in a U.S. state or territory competent in concrete materials who is competent in concrete materials and must sign all reports and designs.

b. Acceptance Testing: Furnish all materials, labor, and facilities required for molding, curing, testing, and protecting test specimens at the site and in the laboratory. Furnish and maintain boxes or other facilities suitable for storing and curing the specimens at the site while in the mold within the temperature range stipulated by

ASTM C31/C31M.

c. Contractor Quality Control: All sampling and testing must be performed by an approved, onsite, independent, accredited laboratory.

1.8 ENVIRONMENTAL REQUIREMENTS

Provide space ventilation according to material manufacturer recommendations, at a minimum, during and following installation of concrete curing compound and sealer. Maintain one of the following ventilation conditions during the curing period or for 72 hours after installation:

SECTION 03 30 00 Page 17Am #0008

a. Supply 100 percent outside air 24 hours a day.

b. Supply airflow at a rate of 6 air changes per hour, when outside temperatures are between 55 degrees F and 84 degrees F and humidity is between 30 percent and 60 percent.

c. Supply airflow at a rate of 1.5 air changes per hour, when outside air conditions are not within the range stipulated above.

1.8.1 Submittals for Environmental Performance

a. Provide data indication the percentage of post-industrial pozzolan (fly ash, slag cement) cement substitution as a percentage of the full product composite by weight.

b. Provide data indicating the percentage of post-industrial and post-consumer recycled content aggregate.

c. Provide product data indicating the percentage of post-consumer recycled steel content in each type of steel reinforcement as a percentage of the full product composite by weight.

d. Provide product data stating the location where all products were manufactured

e. For projects using FSC certified formwork, provide Forest Stewardship Council (FSC) Certification chain-of-custody documentation for all certified wood products.

f. For projects using reusable formwork, provide data showing how formwork is reused.

g. Provide SDS product information data showing that form release agents meet any environmental performance goals such as using vegetable and soy based products.

h. Provide SDS product information data showing that concrete adhesives meet any environmental performance goals including low emitting, low volatile organic compound products.

1.9 QUALIFICATIONS FOR WELDING WORK

Welding procedures must be in accordance with AWS D1.4/D1.4M.

Verify that Welder qualifications are in accordance with AWS D1.4/D1.4M for welding of reinforcement or under an equivalent qualification test approved in advance. Welders are permitted to do only the type of welding for which each is specifically qualified.

PART 2 PRODUCTS

2.1 PRODUCT SUSTAINABILITY CRITERIA

For products in this section, where applicable and to extent allowed by performance criteria, provide and document the following:

SECTION 03 30 00 Page 18Am #0008

2.1.1 Recycled Content for Cement

Recycled content is identified for some products in this section; provide documentation in accordance with Section 01 33 29 SUSTAINABILITY REPORTING paragraph RECYCLED CONTENT. Other products listed in this section may be available with recycled content; identify those products that meet project requirements for recycled content and provide documentation in accordance with Section 01 33 29 SUSTAINABILITY REPORTING paragraph RECYCLED CONTENT.

2.1.2 Bio-based Materials

Bio-based material is identified for some products in this section;

provide documentation in accordance with Section 01 33 29 SUSTAINABILITY REPORTING paragraph BIO-BASED PRODUCTS. Other bio-based products listed in this section may be available; identify those products that meet project requirements for bio-based materials and provide documentation in accordance with Section 01 33 29 SUSTAINABILITY REPORTING paragraph

BIO-BASED PRODUCTS.

2.1.3 Reduce Volatile Organic Compounds (VOC) (LOW-EMITTING MATERIALS) for Products

Reduced VOC content is identified for some products in this section;

provide documentation in accordance with Section 01 33 29 SUSTAINABILITY REPORTING paragraph REDUCE VOLATILE ORGANIC COMPOUNDS (VOC) (LOW-EMITTING MATERIALS).