This notice solicits bids for the construction of the Consolidated Space Operations Facility and entry control facility at Schriever Air Force Base in Colorado. The project will consist of constructing a two-story Consolidated Space Operations Facility with reinforced concrete foundation, steel structure, and low slope membrane roof. An additional one-story entry control facility will also be constructed. The facilities must be designed as permanent structures and comply with DoD standards for antiterrorism, force protection, and cybersecurity. Bids are open to both large and small businesses. The selected contractor must commence work within 10 days of receiving notice to proceed and complete the project within 1400 calendar days. Performance and payment bonds will be required. The specifications, drawings, and instructions to offerors are provided in the attached documents. The soliciting agency is the Department of the Army Corps of Engineers Engineering District Omaha.

View the file

Other files

File Type Posted
Am-0012_W9128F20R0002.pdf PDF
Am-0011_W9128F20R0002.pdf PDF
Am-0010_W9128F20R0002.pdf PDF
Am-0009_W9128F20R0002.pdf PDF
Am-0009_W9128F20R0002_Drawings-Reissued.pdf PDF
Am-0008_W9128F20R0002_Drawings_(Reissued).pdf PDF
Am-0008_W9128F20R0002.pdf PDF
CSOF Part 1_Modeling Files_90 Percent Corrected Download Instructions.pdf PDF
Am-0007_W9128F20R0002.pdf PDF
Modeling Files - 90 Percent Corrected Disclaimer.pdf PDF
Am-0004_W9128F20R0002.pdf PDF
CSOF Part 9_Modeling Files_90 Percent Corrected.zip ZIP file
CSOF Part 2_Modeling Files_90 Percent Corrected.zip ZIP file
ECP_Modeling Files_90 Percent Corrected.zip ZIP file
CSOF Part 10_Modeling Files_90 Percent Corrected.zip ZIP file
Am-0005_W9128F20R0002.pdf PDF
Am-0006_W9128F20R0002.pdf PDF
CSOF Part 1_Modeling Files_90 Percent Corrected.pdf PDF
CSOF Part 7_Modeling Files_90 Percent Corrected.zip ZIP file
CSOF Part 3_Modeling Files_90 Percent Corrected.zip ZIP file
CSOF Part 6_Modeling Files_90 Percent Corrected.zip ZIP file
CSOF Part 5_Modeling Files_90 Percent Corrected.zip ZIP file
CSOF Part 8_Modeling Files_90 Percent Corrected.zip ZIP file
CSOF Part 4_Modeling Files_90 Percent Corrected.zip ZIP file
Am-0002_W9128F20R0002_Drawings-(Revised).pdf PDF
W9128F20R0002_Am0002_Final_Div00_Specs_Drawings.pdf PDF
CSOF Virtual Site Visit_Attendee POCs_01Apr2021.pdf PDF
W9128F20R0002_Am0001_Final.pdf PDF
CSOF_DRAWINGS_Volume 1_LS-Civil-Landscape.pdf PDF
90-Percent-Corrected_V3-SPECS_W9128F20R0002_ECP.pdf PDF
CSOF_DRAWINGS_Volume 8_Comm-Security.pdf PDF
ECP_DRAWINGS.pdf PDF
CSOF_DRAWINGS_Volume 4_Interiors.pdf PDF
Div00_W9128F20R0002.pdf PDF
90-Percent-Corrected_V1-SPECS_W9128F20R0002_CSOF-General.pdf PDF
90-Percent-Corrected_V2-SPECS_W9128F20R0002_CSOF.pdf PDF
CSOF_DRAWINGS_Volume 7_Electrical.pdf PDF
CSOF_DRAWINGS_Volume 6_Process-Mechanical.pdf PDF
CSOF Site Photo Package compressed.pdf PDF
CSOF_DRAWINGS_Volume 3_Architectural.pdf PDF
CSOF_DRAWINGS_Volume 5_Fire-Plumbing.pdf PDF
CSOF_DRAWINGS_Volume 2_Structural.pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

W9128F

CONSOLIDATED SPACE OPERATIONS FACILITY, PNGLEN203001 (FY20), SCHRIEVER AFB, COLORADO

See attached documentation for content of the amendment revisions to solicitation

Date for receipt of proposals is 21 APR 2021 at 1200 hours

Government Point of Contact: Melissa Harlon, Contract Specialist, Melissa.R.Harlon@usace.army.mil

U.S.ARMY CORPS OF ENGINEERS, OMAHA DIST

Attn: CONTRACTING DIVISION (CENWO-CT-M)

1616 CAPITOL AVENUE

OMAHA, NE 68102-4901

See Item 6

W9128F20R0002

04/23/2021

23-Mar-2021

04/23/2021

Am #0003 - 1

Am #0003 - 2 (Continuation SF 30)

23 APR 2021

Solicitation No. W9128F 20 R 0002

Date of Issue: 23 MAR 2021 Date of Receiving Proposals: 21 APR 2021

Note: This amendment is to provide revisions to Technical Specifications and Drawings and to reopen bidder inquiry. No Volume II proposals are requested at this time.

SUBJECT: Amendment No. 0003 to Request for Proposal Solicitation Package for Construction of CONSOLIDATED SPACE OPERATIONS FACILITY.

TO: Prospective Offerors and Others Concerned

1. The specifications and drawings for subject project are hereby modified as follows (revise all specification indices, attachment lists, and drawing indices accordingly).

a. Specifications. (Descriptive Changes.)

DIVISION 00 SPECIFICATIONS:

(1) Section 00 21 00, Page 15, paragraph 1.3.1 “BIDDER INQUIRY” delete the first sentence and substitute the following:

“The Bidder Inquiry in Projnet is now reopened. Bidder Inquiry is set up as “CSOF Bidder Inquiry II” with new key as listed below. Technical inquiries and questions relating to technical requirements, proposal procedures or bonds are to be submitted via Bidder Inquiry in ProjNet at:

https://www.projnet.org/projnet/ No Later Than ten (10) calendar days before due date of proposals, in order that they may be given consideration or actions taken prior to receipt of offers. Proposal due date for Volume II proposals will be included in a future amendment.”

(2) Section 00 21 00, Page 15, paragraph 1.3.1 “BIDDER INQUIRY” delete bidder inquiry key and substitute the following:

“3RIES6-V3A39T”.

VOLUME 2 SPECIFCIATIONS – CSOF:

(1) SECTION 25 05 11.02, Page 4, PART 1 “GENERAL”, second paragraph, delete the second sentence and substitute the following:

“STIGs and SRGs are available online at the DoD CYBER EXCHANGE Public website located at https://public.cyber.mil/stigs.”

(2) SECTION 25 05 11.05, Page 4, PART 1 “GENERAL”, second paragraph, delete the second sentence and substitute the following:

(3) SECTION 26 20 00, Page 40, Paragraph 3.1.4 “Conduit Installation”, add the following to the end of the paragraph:

“Provide conduit labeling every 10 ft for exposed conduit runs within building envelope or utilidor. Conduit to be labeled to match existing site conduit for

Am #0003 - 3 voltage and hazard level. Coordinate with Contracting Officer for examples of existing site labeling.”

(4) SECTION 26 32 15.00 10, page 26, paragraph 2.13 “EMISSIONS”, revise the last sentence to incorporate the following: Replace “Tier IV” with “Tier II”.

VOLUME 3 SPECIFCIATIONS – ECP:

(1) SECTION 25 05 11.02, Page 4, PART 1 “GENERAL”, second paragraph, delete the second sentence and substitute the following:

b. Specifications (New and/or Revised and Reissued). Delete and substitute or add specification sections as noted below. The substituted sections are revised and reissued with this amendment. For convenience, on the revised specification pages, changes have been identified with highlighting unless section is noted as new or completely reissued; all portions of the revised specification pages apply regardless of whether changes are shown with highlighting.

VOLUME 2 SPEFICATIONS – CSOF:

Pages or Sections Deleted Pages or Sections Substituted or Added 09 65 00 09 65 00 23 09 00 23 09 00 25 05 11.00 25 05 11.00 25 05 11.01 25 05 11.01 25 05 11.04 25 05 11.04 25 05 11.06 25 05 11.06

VOLUME 3 SPECIFICATIONS – ECP:

Pages or Sections Deleted Pages or Sections Substituted or Added 25 05 11.04 25 05 11.04

c. Drawings (Reissued). The following drawings are revised with latest revision date as shown in the drawing border and reissued with this amendment.

CSOF PACKAGE - VOLUME 4 OF 8 – INTERIOR DESIGN:

(1) Sheet G-007, CSOF – DRAWING INDEX – VOLUME 4

(2) Sheet I-169A, 2ND FLOOR SECTOR 9A FLOOR PATTERN PLAN - BID OPTION

(3) Sheet IF211, 1ST FLOOR SECTOR 1 FURNITURE PLAN

(4) Sheet IF212, 1ST FLOOR SECTOR 2 FURNITURE PLAN

(5) Sheet IF213, 1ST FLOOR SECTOR 3 FURNITURE PLAN

(6) Sheet IF214, 1ST FLOOR SECTOR 4 FURNITURE PLAN

(7) Sheet IF215, 1ST FLOOR SECTOR 5 FURNITURE PLAN

(8) Sheet IF216, 1ST FLOOR SECTOR 6 FURNITURE PLAN - BASE BID

(9) Sheet IF216A,1ST FLOOR SECTOR 6 FURNITURE PLAN - BID OPTION

(10) Sheet IF217, 1ST FLOOR SECTOR 7 FURNITURE PLAN

Am #0003 - 4

(11) Sheet IF218, 1ST FLOOR SECTOR 8 FURNITURE PLAN

(12) Sheet IF219, 1ST FLOOR SECTOR 9 FURNITURE PLAN - BASE BID

(13) Sheet IF219A,1ST FLOOR SECTOR 9 FURNITURE PLAN - BID OPTION

(14) Sheet IF221, 2ND FLOOR SECTOR 1 FURNITURE PLAN

(15) Sheet IF222, 2ND FLOOR SECTOR 2 FURNITURE PLAN

(16) Sheet IF223, 2ND FLOOR SECTOR 3 FURNITURE PLAN

(17) Sheet IF224, 2ND FLOOR SECTOR 4 FURNITURE PLAN

(18) Sheet IF225, 2ND FLOOR SECTOR 5 FURNITURE PLAN

(19) Sheet IF226, 2ND FLOOR SECTOR 6 FURNITURE PLAN - BASE BID

(20) Sheet IF226A,2ND FLOOR SECTOR 6 FURNITURE PLAN - BID OPTION

(21) Sheet IF227, 2ND FLOOR SECTOR 7 FURNITURE PLAN

(22) Sheet IF228, 2ND FLOOR SECTOR 8 FURNITURE PLAN

(23) Sheet IF229, 2ND FLOOR SECTOR 9 FURNITURE PLAN - BASE BID

(24) Sheet IF229A, 2ND FLOOR SECTOR 9 FURNITURE PLAN - BID OPTION

(25) Sheet IN604, MATERIALS & FINISH LEGEND

CSOF PACKAGE - VOLUME 5 OF 8 – FIRE PROTECTION, PLUMBING:

(1) Sheet P-101, SANITARY AND VENT – UNDERGROUND – SECTOR 1

(2) Sheet P-106, SANITARY AND VENT – UNDERGROUND – SECTOR 6

(3) Sheet P-106A, SANITARY AND VENT – UNDERGROUND – SECTOR 6 – BID OPTION

(4) Sheet P-111, SANITARY AND VENT – FIRST FLOOR – SECTOR 1

(5) Sheet P-504, PLUMBING DETAILS

(6) Sheet P-602, PLUMBING SCHEDULES

CSOF PACKAGE - VOLUME 6 OF 8 – PROCESS MECHANICAL:

(1) Sheet G-011, CSOF - DRAWING INDEX - VOLUME 6

(2) Sheet M-713, DDC CONTROLS - SUMP PUMPS

CSOF PACKAGE - VOLUME 7 OF 8 – ELECTRICAL:

(1) Sheet ES100, CSOF ELECTRICAL SITE PLAN – SHEET 1

(2) Sheet ES101, CSOF ELECTRICAL SITE PLAN – SHEET 2

(3) Sheet ES102, CSOF ELECTRICAL SITE PLAN – SHEET 3

(4) Sheet ES504, SITE ELECTRICAL DETAILS

(5) Sheet EG504, GROUNDING DETAILS

(6) Sheet E-602, MEDIUM-VOLTAGE ONE-LINE DIAGRAM

(7) Sheet E-673, MEDIUM-VOLTAGE SWITCHGEAR RELAY DIAGRAM

Am #0003 - 5

ECP PACKAGE:

(1) Sheet A-100, FLOOR PLAN AND REFLECTED CEILING PLAN

(2) Sheet A-200-E, EXTERIOR ELEVATIONS

(3) Sheet A-201-E, EXTERIOR ELEVATIONS

(4) Sheet A-300-E, BUILDING SECTIONS

2. This amendment is a part of the proposing papers and its receipt shall be acknowledged. All other conditions and requirements of the request for proposal remain unchanged.

3. Electronic Proposals. Provide proposals via the instructions provided in Section 00 22 00 of the Request for Proposal.

4. Offers will be received until 12:00 p.m., local time at place of receiving proposals, 21 APR 2021.

Attachments:

Specifications listed in 1.b., above Drawings listed in 1.c., above

U.S. Army Corps of Engineers, Omaha District 1616 Capitol Avenue Omaha, Nebraska 68102 4901

23 APR 2021

nep/2160

This page was intentionally left blank for duplex printing.

Consolidated Space Operations Facility - Schriever AFB, CO SH50

SECTION TABLE OF CONTENTS

DIVISION 09 - FINISHES

SECTION 09 65 00

RESILIENT FLOORING

08/10

PART 1 GENERAL

1.1 REFERENCES

1.2 SUSTAINABILITY REQUIREMENTS

1.3 SUBMITTALS

1.4 CERTIFICATES

1.4.1 Indoor Air Quality

1.4.1.1 Floor Covering Materials

1.4.1.2 Adhesives, Caulking and Sealants

1.5 DELIVERY, STORAGE, AND HANDLING

1.6 ENVIRONMENTAL REQUIREMENTS

1.7 SCHEDULING

1.8 WARRANTY

1.9 EXTRA MATERIALS

PART 2 PRODUCTS

2.1 RUBBER TILE

2.2 LUXURY VINYL TILE [*Am-3]<deleted text>[**Am-3]

2.2.1 [*Am-3] LVT-1

2.2.2 LVT-2

2.3 WALL BASE

2.4 STAIR TREADS, RISERS

2.5 MOULDING

2.6 ADHESIVES

2.7 SURFACE PREPARATION MATERIALS

2.8 POLISH/FINISH

2.9 CAULKING AND SEALANTS

2.10 MANUFACTURER'S COLOR, PATTERN AND TEXTURE

2.11 FIRE RESISTANCE TESTING REQUIREMENTS

PART 3 EXECUTION

3.1 EXAMINATION

3.2 SURFACE PREPARATION

3.3 MOISTURE, ALKALINITY AND BOND TESTS

3.4 GENERAL INSTALLATION

3.5 PLACING LUXURY VINYL TILES

3.6 PLACING RUBBER TILE

3.7 PLACING MOULDING

3.8 PLACING WALL BASE

3.9 PLACING STAIR TREADS, RISERS

3.10 CLEANING

3.11 PROTECTION

-- End of Section Table of Contents --

SECTION 09 65 00 Page 1Am #0003

[*Am-3]<deleted text>[**Am-3] [*Am-3] LVT-1

SECTION 09 65 00 Page 2Am #0003

SECTION 09 65 00

RESILIENT FLOORING

08/10

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM D4078 (2002; R 2015) Water Emulsion Floor Polish

ASTM E648 (2017a) Standard Test Method for Critical Radiant Flux of Floor-Covering Systems Using a Radiant Heat Energy Source

ASTM F1344 (2015) Rubber Floor Tile

ASTM F1482 (2015) Installation and Preparation of Panel Type Underlayments to Receive Resilient Flooring

ASTM F1700 (2018a) Standard Specification for Solid Vinyl Floor Tile

ASTM F1861 (2016) Standard Specification for Resilient Wall Base

ASTM F1869 (2016) Standard Test Method for Measuring Moisture Vapor Emission Rate of Concrete Subfloor Using Anhydrous Calcium Chloride

ASTM F2169 (2015; E 2016) Standard Specification for Resilient Stair Treads

ASTM F2170 (2018) Standard Test Method for Determining Relative Humidity in Concrete Floor Slabs Using in situ Probes

ASTM F710 (2017) Standard Practice for Preparing Concrete Floors to Receive Resilient Flooring

CALIFORNIA DEPARTMENT OF PUBLIC HEALTH (CDPH)

CDPH SECTION 01350 (2010; Version 1.1) Standard Method for the Testing and Evaluation of Volatile Organic Chemical Emissions from Indoor Sources using Environmental Chambers

SECTION 09 65 00 Page 3Am #0003

GREEN SEAL (GS)

GS-36 (2013) Adhesives for Commercial Use

SCIENTIFIC CERTIFICATION SYSTEMS (SCS)

SCS SCS Global Services (SCS) Indoor Advantage

SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT (SCAQMD)

SCAQMD Rule 1168 (2017) Adhesive and Sealant Applications

UNDERWRITERS LABORATORIES (UL)

UL 2818 (2013) GREENGUARD Certification Program For Chemical Emissions For Building Materials, Finishes And Furnishings

1.2 SUSTAINABILITY REQUIREMENTS

Materials in this technical specification may contribute towards contract compliance with sustainability requirements. See Section 01 33 29 SUSTAINABILITY REPORTING for project requirements.

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation ubmittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-02 Shop Drawings

Resilient Flooring and Accessories; G

SD-03 Product Data

Resilient Flooring and Accessories; G

Adhesives

Luxury Vinyl Tile

Recycled content for Luxury Vinyl Tile

Wall Base

Stair Treads, Risers

SD-04 Samples

Resilient Flooring and Accessories; G

SD-06 Test Reports

Moisture, Alkalinity and Bond Tests; G

SD-07 Certificates

SECTION 09 65 00 Page 4Am #0003

Indoor Air Quality for Rubber Tile

Indoor Air Quality for Luxury Vinyl Tile

Indoor Air Quality for Wall Base

Indoor Air Quality for Adhesives

SD-08 Manufacturer's Instructions

Surface Preparation; G

Installation; G

SD-10 Operation and Maintenance Data

Resilient Flooring and Accessories; G

1.4 CERTIFICATES

1.4.1 Indoor Air Quality

Submit required indoor air quality certifications and validations in one submittal package.

1.4.1.1 Floor Covering Materials

Provide Rubber Tile, Luxury, Vinyl Tile, and wall base products certified to meet indoor air quality requirements by FLOORSCORE, UL 2818 (Greenguard) Gold, SCS Global Services Indoor Advantage Gold or provide certification by other third-party programs. Provide current product certification documentation from certification body.

1.4.1.2 Adhesives, Caulking and Sealants

Provide products certified to meet indoor air quality requirements by UL 2818 (Greenguard) Gold, SCS Global Services Indoor Advantage Gold or provide certification or validation by other third-party programs that products meet the requirements of this Section. Provide current product certification documentation from certification body. When product does not have certification, provide validation that product meets the indoor air quality product requirements cited herein.

1.5 DELIVERY, STORAGE, AND HANDLING

Deliver materials to the building site in original unopened containers bearing the manufacturer's name, style name, pattern color name and number, production run, project identification, and handling instructions. Store materials in a clean, dry, secure, and well-ventilated area free from strong contaminant sources and residues with ambient air temperature maintained above 68 degrees F and below 85 degrees F, stacked according to manufacturer's recommendations. Remove resilient flooring products from packaging to allow ventilation prior to installation. Protect materials from the direct flow of heat from hot-air registers, radiators and other heating fixtures and appliances. Observe ventilation and safety procedures specified in the MSDS. Do not store near materials that may offgas or emit harmful fumes, such as kerosene heaters, fresh paint, or adhesives.

SECTION 09 65 00 Page 5Am #0003

1.6 ENVIRONMENTAL REQUIREMENTS

Maintain areas to receive resilient flooring at a temperature above 68 degrees F and below 85 degrees F for 3 days before application, during application and 2 days after application, unless otherwise directed by the flooring manufacturer for the flooring being installed. Maintain a minimum temperature of 55 degrees F thereafter. Provide adequate ventilation to remove moisture from area and to comply with regulations limiting concentrations of hazardous vapors.

1.7 SCHEDULING

Schedule resilient flooring application after the completion of other work which would damage the finished surface of the flooring.

1.8 WARRANTY

Provide manufacturer's standard performance guarantees or warranties that extend beyond a one year period.

1.9 EXTRA MATERIALS

Provide extra flooring material of each color and pattern at the rate of 5 tiles for each 1000 tiles installed. Provide extra wall base material composed of 20 linear feet of each type, color and pattern. Package all extra materials in original properly marked containers bearing the manufacturer's name, brand name, pattern color name and number, production run, and handling instructions. Provide extra materials from the same lot as those installed. Leave extra stock at the site in location assigned by Contracting Officer.

PART 2 PRODUCTS

2.1 RUBBER TILE

Conform to ASTM F1344 Class 1 homogeneous, Type A (solid color), 24 inch square. Provide stud profile. Provide 0.125 inch overall thickness.

Provide certification of indoor air quality for Rubber Tile.

2.2 LUXURY VINYL TILE [*Am-3]<deleted text>[**Am-3]

2.2.1 [*Am-3] LVT-1

Conform to ASTM F1700 Class III with a minimum wear layer thickness 0.020 inch (20 mil) and minimum overall thickness 0.197 inch, Type B. Provide 24 inch square tile. Provide tile with a factory protective finish that enhances cleanability and durability.

2.2.2 LVT-2

Conform to ASTM F1700, Class I, Type B a wear layer thickness of 0.020 inch (20 MIL) and overall thickness of 0.197 inch (5 mm). Provide a 9-inch by 36-inch plank. Provide factory protective finish that enhances cleanability and durability.

Provide Luxury Vinyl Tile containing a minimum of 35 percent recycled content. Provide data identifying percentage of recycled content for

SECTION 09 65 00 Page 6Am #0003

[*Am-3]<deleted text>[**Am-3]

[*Am-3] LVT-1

Conform to AASTM F1700 Class III with a minimum wear layer thickness 0.020 inch (20 mil) and minimum overall thickness 0.197 inch, Type B. Provide 24 inch square tile. Provide tile with a factory protective finish that enhances cleanability and durability.

2.2.2 LVT-2

Conform to ASTM F1700, Class I, Type B a wear layer thickness of 0.020 inch (20 MIL) and overall thickness of 0.197 inch (5 mm). Provide a 9-inch by 36-inch plank. Provide factory protective finish that enhances cleanability and durability.

Provide Luxury Vinyl Tile containing a minimum of 35 percent recycled content. Provide data identifying percentage of recycled content for

Luxury Vinyl Tile.

Provide certification of indoor air quality for Luxury Vinyl Tile[**Am-3].

2.3 WALL BASE

Conform to ASTM F1861, Type TS (vulcanized thermoset rubber), Style B (coved - installed with resilient flooring). Provide 4 inch high and a minimum 1/8 inch thick wall base. Provide preformed corners in matching height, shape, and color.

Provide certification of indoor air quality for Wall Base.

2.4 STAIR TREADS, RISERS

Conform to ASTM F2169, Type TS (vulcanized thermoset rubber) or Type TP (thermoplastic rubber). Conform to ASTM F2169 for surface of treads Class 2 hammered and smooth pattern and have Group 2 strip for visually impaired of contrasting color of abrasive material. Provide square nosing.

Provide either a one piece nosing/tread/riser or a two piece nosing/tread design with a matching coved riser.

2.5 MOULDING

Provide tapered mouldings of rubber and types as recommended by flooring manufacturer for both edges and transitions of flooring materials specified. Provide vertical lip on moulding of maximum 1/4 inch. Provide bevel change in level between 1/4 and 1/2 inch with a slope no greater than 1:2.

2.6 ADHESIVES

Provide adhesives for flooring, base and accessories as recommended by the manufacturer and comply with local indoor air quality standards. Submit manufacturer's descriptive data, documentation stating physical characteristics, and mildew and germicidal characteristics.

Provide non-aerosol adhesive products used on the interior of the building (defined as inside of the weatherproofing system) that meet either emissions requirements of CDPH SECTION 01350 (limit requirements for either office or classroom spaces regardless of space type) or VOC content requirements of SCAQMD Rule 1168. Provide aerosol adhesives used on the interior of the building that meet either emissions requirements of CDPH SECTION 01350 (use the office or classroom requirements, regardless of space type) or VOC content requirements of GS-36. Provide certification or validation of indoor air quality for adhesives.

2.7 SURFACE PREPARATION MATERIALS

Provide surface preparation materials, such as panel type underlayment, lining felt, and floor crack fillers as recommended by the flooring manufacturer for the subfloor conditions. Comply with ASTM F1482 for panel type underlayment products.

2.8 POLISH/FINISH

Provide polish finish as recommended by the manufacturer and conform to ASTM D4078 for polish.

SECTION 09 65 00 Page 7Am #0003

Luxury Vinyl Tile.

Provide certification of indoor air quality for Luxury Vinyl Tile[**Am-3].

2.9 CAULKING AND SEALANTS

Provide caulking and sealants in accordance with Section 07 92 00 JOINT

SEALANTS.

2.10 MANUFACTURER'S COLOR, PATTERN AND TEXTURE

Provide color, pattern and texture for resilient flooring and accessories as indicated on the drawings. Color listed is not intended to limit the selection of equal colors from other manufacturers. Provide floor patterns as specified on the drawings. Provide flooring in any one continuous area or replacement of damaged flooring in continuous area from same production run with same shade and pattern. Submit scaled drawings indicating patterns (including location of patterns and colors) and dimensions.

Submit manufacturer's descriptive data and three samples of each indicated color and type of flooring, base, mouldings, and accessories sized a minimum 2-1/2 by 4 inch. Submit Data Package 1 in accordance with Section

01 78 23 OPERATION AND MAINTENANCE DATA.

2.11 FIRE RESISTANCE TESTING REQUIREMENTS

Provide a minimum average critical radiant flux of 0.45 watts per square centimeter for flooring in corridors and exits when tested in accordance with ASTM E648.

PART 3 EXECUTION

3.1 EXAMINATION

Examine and verify that site conditions are in agreement with the design package. Report all conditions that will prevent a proper installation.

Do not take any corrective action without written permission from the Government. Work will proceed only when conditions have been corrected and accepted by the installer. Submit manufacturer's printed installation instructions for all flooring materials and accessories, including preparation of substrate, seaming techniques, and recommended adhesives.

3.2 SURFACE PREPARATION

Provide a smooth, true, level plane for surface preparation of the flooring, except where indicated as sloped. Floor to be flat to within 3/16 inch in 10 feet. Prepare subfloor in accordance with flooring manufacturer's recommended instructions. Prepare the surfaces of lightweight concrete slabs (as defined by the flooring manufacturer) as recommended by the flooring manufacturer. Comply with ASTM F710 for concrete subfloor preparation. Floor fills or toppings may be required as recommended by the flooring manufacturer. Install underlayments, when required by the flooring manufacturer, in accordance with manufacturer's recommended printed installation instructions. Comply with ASTM F1482 for panel type underlayments. Before any work under this section is begun, correct all defects such as rough or scaling concrete, chalk and dust, cracks, low spots, high spots, and uneven surfaces. Repair all damaged portions of concrete slabs as recommended by the flooring manufacturer.

Remove concrete curing and sealer compounds from the slabs, other than the type that does not adversely affect adhesion. Remove paint, varnish, oils, release agents, sealers, waxes, and adhesives, as required by the flooring product in accordance with manufacturer's printed installation instructions.

SECTION 09 65 00 Page 8Am #0003

3.3 MOISTURE, ALKALINITY AND BOND TESTS

Determine the suitability of the concrete subfloor for receiving the resilient flooring with regard to moisture content and pH level by moisture and alkalinity tests. Conduct moisture testing in accordance with ASTM F1869 or ASTM F2170, unless otherwise recommended by the flooring manufacturer. Conduct alkalinity testing as recommended by the flooring manufacturer. Determine the compatibility of the resilient flooring adhesives to the concrete floors by a bond test in accordance with the flooring manufacturer's recommendations. Submit copy of test reports for moisture and alkalinity content of concrete slab, and bond test stating date of test, person conducting the test, and the area tested.

3.4 GENERAL INSTALLATION

Do not install building construction materials that show visual evidence of biological growth.

3.5 PLACING LUXURY VINYL TILES

Install luxury vinyl tile flooring using glue down installation. Install flooring and accessories in accordance with manufacturer's printed installation instructions. Prepare and apply adhesives in accordance with manufacturer's directions for installation method specified. Keep tile lines and joints square, symmetrical, tight, and even. Keep each floor in true, level plane, except where slope is indicated. Vary edge width as necessary to maintain full-size tiles in the field, no edge tile to be less than one-half the field tile size, except where irregular shaped rooms make it impossible. Cut flooring to fit around all permanent fixtures, built-in furniture and cabinets, pipes, and outlets. Cut, fit, and scribe edge tile to walls and partitions after field flooring has been applied.

3.6 PLACING RUBBER TILE

Install rubber tile and accessories in accordance with manufacturer's printed installation instructions. Prepare and apply adhesives in accordance with manufacturer's printed directions. Provide square, symmetrical, tight, and even flooring lines and joints. Keep each floor in true, level plane, except where slope is indicated. Vary width of edge tiles as necessary to maintain full-size tiles, except where irregular-shaped rooms makes it impossible. Cut flooring to fit around all permanent fixtures, built-in furniture and cabinets, pipes, and outlets. Cut, fit, and scribe flooring to walls and partitions after field flooring has been applied.

3.7 PLACING MOULDING

Provide moulding where flooring termination is higher than the adjacent finished flooring and at transitions between different flooring materials. When required, locate moulding under door centerline.

Moulding is not required at doorways where thresholds are provided.

Secure moulding with adhesive as recommended by the manufacturer. Prepare and apply adhesives in accordance with manufacturer's printed directions.

Anchor aluminum moulding to floor surfaces as recommended by the manufacturer.

SECTION 09 65 00 Page 9Am #0003

3.8 PLACING WALL BASE

Install wall base in accordance with manufacturer's printed installation instructions. Prepare and apply adhesives in accordance with manufacturer's printed directions. Tighten base joints and make even with adjacent resilient flooring. Fill voids along the top edge of base at masonry walls with caulk. Roll entire vertical surface of base with hand roller, and press toe of base with a straight piece of wood to ensure proper alignment. Avoid excess adhesive in corners.

3.9 PLACING STAIR TREADS, RISERS

Secure and install stair treads, risers in accordance with manufacturer's printed installation instructions. Cover the surface of treads and risers within 6 inch to the stair edges. Provide equal length pieces butted together to cover the treads and risers for stairs wider than manufacturer's standard lengths.

3.10 CLEANING

Immediately upon completion of installation of flooring in a room or an area, dry and clean the flooring and adjacent surfaces to remove all surplus adhesive. Clean flooring as recommended in accordance with manufacturer's printed maintenance instructions and within the recommended time frame. As required by the manufacturer, apply the recommended number of coats and type of polish and finish in accordance with manufacturer's written instructions.

3.11 PROTECTION

From the time of installation until acceptance, protect flooring from damage as recommended by the flooring manufacturer. Remove and replace flooring which becomes damaged, loose, broken, or curled and wall base which is not tight to wall or securely adhered.

-- End of Section --

SECTION 09 65 00 Page 10Am #0003

SECTION TABLE OF CONTENTS

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

SECTION 23 09 00

INSTRUMENTATION AND CONTROL FOR HVAC

02/19

PART 1 GENERAL

1.1 SUMMARY

1.1.1 System Requirements

1.1.2 End to End Accuracy

1.1.3 Verification of Dimensions

1.1.4 Drawings

1.2 RELATED SECTIONS

1.3 REFERENCES

1.4 DEFINITIONS

1.4.1 Alarm Generation (All protocols)

1.4.2 Building Automation and Control Network (BACnet) (BACnet)

1.4.3 BACnet Advanced Application Controller (B-AAC) (BACnet)

1.4.4 BACnet Application Specific Controller (B-ASC) (BACnet)

1.4.5 BACnet Building Controller (B-BC) (BACnet)

1.4.6 BACnet Broadcast Management Device (BBMD) (BACnet)

1.4.7 BACnet/IP (BACnet)

1.4.8 BACnet Internetwork (BACnet)

1.4.9 BACnet Interoperability Building Blocks (BIBBs) (BACnet)

1.4.10 BACnet Network (BACnet)

1.4.11 BACnet Operator Display (B-OD) (BACnet)

1.4.12 BACnet Segment (BACnet)

1.4.13 BACnet Smart Actuator (B-SA) (BACnet)

1.4.14 BACnet Smart Sensor (B-SS) (BACnet)

1.4.15 BACnet Testing Laboratories (BTL) (BACnet)

1.4.16 BACnet Testing Laboratories (BTL) Listed (BACnet)

1.4.17 Binary (All protocols)

1.4.18 Broadcast (BACnet)

1.4.19 Building Control Network (BCN) (All protocols)

1.4.20 Building Point of Connection (BPOC) (All protocols)

1.4.21 Commandable (All protocols)

1.4.22 Commandable Objects (BACnet)

1.4.23 Configurable (All protocols)

1.4.24 Control Logic Diagram (All protocols)

1.4.25 Device (BACnet)

1.4.26 Device Object (BACnet)

1.4.27 Device Profile (BACnet)

1.4.28 Digital Controller (All protocols)

1.4.29 Direct Digital Control (DDC) (All protocols)

1.4.30 Field Point of Connection (FPOC) (All protocols)

1.4.31 Gateway (All protocols)

1.4.32 IEEE 802.3 Ethernet (All protocols)

1.4.33 Internet Protocol (IP, TCP/IP, UDP/IP) (All protocols)

1.4.34 Input/Output (I/O) (All protocols)

1.4.35 I/O Expansion Unit (All protocols)

1.4.36 IP subnet (All protocols)

SECTION 23 09 00 Page 1Am #0003

1.4.37 Local-Area Network (LAN) (All protocols)

1.4.38 Local Display Panels (LDPs) (All protocols)

1.4.39 MAC Address (All protocols)

1.4.40 Master-Slave/Token-Passing (MS/TP) (BACnet)

1.4.41 Monitoring and Control (M&C) Software (All protocols)

1.4.42 Network Number (BACnet)

1.4.43 Object (BACnet)

1.4.44 Object Identifier (BACnet)

1.4.45 Object Instance (BACnet)

1.4.46 Object Properties (BACnet)

1.4.47 Operator Configurable (All protocols)

1.4.48 Override (All protocols)

1.4.49 Packaged Equipment (All protocols)

1.4.50 Packaged Unit (All protocols)

1.4.51 Performance Verification Test (PVT) (All protocols)

1.4.52 Physical Segment (BACnet)

1.4.53 Polling (All protocols)

1.4.54 Points (All protocols)

1.4.55 Proportional, Integral, and Derivative (PID) Control Loop

(All protocols)

1.4.56 Proprietary (BACnet)

1.4.57 Protocol Implementation Conformance Statement (PICS) (BACnet)

1.4.58 Repeater (All protocols)

1.4.59 Router (All protocols)

1.4.60 Segment (All protocols)

1.4.61 Standard BACnet Objects (BACnet)

1.4.62 Standard BACnet Properties (BACnet)

1.4.63 Standard BACnet Services (BACnet)

1.4.64 UMCS (All protocols)

1.4.65 UMCS Network (All protocols)

1.4.66 Writable Property (BACnet)

1.5 PROJECT SEQUENCING

1.6 SUSTAINABILITY REQUIREMENTS

1.7 SUBMITTALS

1.8 DATA PACKAGE AND SUBMITTAL REQUIREMENTS

1.9 SOFTWARE FOR DDC HARDWARE AND GATEWAYS

1.9.1 Configuration Software

1.9.2 Controller Configuration Settings

1.9.3 Programming Software

1.9.4 Controller Application Programs

1.10 QUALITY CONTROL CHECKLISTS

1.10.1 Pre-Construction Quality Control (QC) Checklist

1.10.2 Post-Construction Quality Control (QC) Checklist

1.10.3 Closeout Quality Control (QC) Checklist

PART 2 PRODUCTS

2.1 GENERAL PRODUCT REQUIREMENTS

2.2 PRODUCT DATA

2.3 OPERATION ENVIRONMENT

2.4 WIRELESS CAPABILITY

2.5 ENCLOSURES

2.5.1 Outdoors

2.5.2 Mechanical and Electrical Rooms

2.5.3 Other Locations

2.6 WIRE AND CABLE

2.6.1 Terminal Blocks

2.6.2 Control Wiring for Binary Signals

2.6.3 Control Wiring for Analog Signals

SECTION 23 09 00 Page 2Am #0003

2.6.4 Power Wiring for Control Devices

2.6.5 Transformers

PART 3 EXECUTION

3.1 INSTALLATION

3.1.1 Dielectric Isolation

3.1.2 Penetrations in Building Exterior

3.1.3 Device Mounting Criteria

3.1.4 Labels and Tags

3.1.5 Surge Protection

3.1.5.1 Power-Line Surge Protection

3.1.5.2 Surge Protection for Transmitter and Control Wiring

3.1.6 Basic Cybersecurity Requirements

3.1.6.1 Passwords

3.1.6.2 Wireless Capability

3.1.6.3 IP Network Physical Security

3.2 DRAWINGS AND CALCULATIONS

3.2.1 Sample Drawings

3.2.2 Drawing Index and Legend

3.2.3 Thermostat and Occupancy Sensor Schedule

3.2.4 Valve Schedule

3.2.5 Damper Schedule

3.2.6 Project Summary Equipment Schedule

3.2.7 Equipment Schedule

3.2.8 Occupancy Schedule

3.2.9 DDC Hardware Schedule

3.2.9.1 DDC Hardware Identifier

3.2.9.2 HVAC System

3.2.9.3 BACnet Device Information

3.2.9.3.1 Device Object Identifier

3.2.9.3.2 Network Number

3.2.9.3.3 MAC Address

3.2.9.3.4 BTL Listing

3.2.9.3.5 Proprietary Services Information

3.2.9.3.6 Alarming Information

3.2.9.3.7 Scheduling Information

3.2.9.3.8 Trending Information

3.2.10 Points Schedule

3.2.10.1 Point Name

3.2.10.2 Description

3.2.10.3 DDC Hardware Identifier

3.2.10.4 Settings

3.2.10.5 Range

3.2.10.6 Input or Output (I/O) Type

3.2.10.7 Object and Property Information

3.2.10.8 Network Data Exchange Information (Gets Data From, Sends

Data To)

3.2.10.9 Override Information (Object Type and Instance Number)

3.2.10.10 Trend Object Information

3.2.10.11 Alarm Information

3.2.10.12 Configuration Information

3.2.11 Riser Diagram

3.2.12 Control System Schematics

3.2.13 Sequences of Operation Including Control Logic Diagrams

3.2.14 Controller, Motor Starter and Relay Wiring Diagram

3.3 CONTROLLER TUNING

3.4 START-UP

3.4.1 Start-Up Test

SECTION 23 09 00 Page 3Am #0003

3.4.1.1 Systems Check

3.4.1.1.1 Step 1 - System Inspection

3.4.1.1.2 Step 2 - Calibration Accuracy Check

3.4.1.1.3 Step 3 - Actuator Range Check

3.4.1.2 Weather Dependent Test

3.4.2 Start-Up Testing Report

3.5 PERFORMANCE VERIFICATION TEST (PVT)

3.5.1 PVT Procedures

3.5.1.1 Sensor Accuracy Checks

3.5.1.2 Endurance Test

3.5.1.3 PVT Equipment List

3.5.2 PVT Execution

3.5.3 PVT Report

3.6 OPERATION AND MAINTENANCE (O&M) INSTRUCTIONS

3.7 MAINTENANCE AND SERVICE

3.7.1 Description of Work

3.7.2 Personnel

3.7.3 Scheduled Inspections

3.7.4 Scheduled Work

3.7.5 Emergency Service

3.7.6 Operation

3.7.7 Records and Logs

3.7.8 Work Requests

3.7.9 System Modifications

3.8 TRAINING

3.8.1 Training Documentation

3.8.2 Training Course Content

3.8.3 Training Documentation Submittal Requirements

ATTACHMENTS:

QC Checklist for BACnet Systems

QC CHECKLIST FOR BACNET SYSTEMS

-- End of Section Table of Contents --

SECTION 23 09 00 Page 4Am #0003

SECTION 23 09 00

INSTRUMENTATION AND CONTROL FOR HVAC

02/19

PART 1 GENERAL

1.1 SUMMARY

Provide a complete Direct Digital Control (DDC) system, except for the Front End which is specified in Section 25 10 10 UTILITY MONITORING AND CONTROL (UMCS) FRONT END AND INTEGRATION, suitable for the control of the heating, ventilating and air conditioning (HVAC) and other building-level systems as indicated and shown and in accordance with Section 23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC, Section 23 09 23.02 BACNET DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING CONTROL SYSTEMS for BACnet or Niagara BACnet systems, and other referenced Sections.

1.1.1 System Requirements

Provide systems meeting the requirements this Section and other Sections referenced by this Section, and which have the following characteristics:

a. The system implements the control sequences of operation shown in the Contract Drawings using DDC hardware to control mechanical and electrical equipment

b. The system meet the requirements of this specification as a stand-alone system and does not require connection to any other system.

c. Control sequences reside in DDC hardware in the building. The building control network is not dependent upon connection to a Utility Monitoring and Control System (UMCS) Front End or to any other system for performance of control sequences. To the greatest extent practical, the hardware performs control sequences without reliance on the building network, unless otherwise pre-approved by the Contracting Officer.

d. The hardware is installed such that individual control equipment can be replaced by similar control equipment from other equipment manufacturers with no loss of system functionality.

e. All necessary documentation, configuration information, programming tools, programs, drivers, and other software are licensed to and otherwise remain with the Government such that the Government or their agents are able to perform repair, replacement, upgrades, and expansions of the system without subsequent or future dependence on the Contractor, Vendor or Manufacturer.

f. Sufficient documentation and data, including rights to documentation and data, are provided such that the Government or their agents can execute work to perform repair, replacement, upgrades, and expansions of the system without subsequent or future dependence on the Contractor, Vendor or Manufacturer.

g. Hardware is installed and configured such that the Government or their

SECTION 23 09 00 Page 5Am #0003 agents are able to perform repair, replacement, and upgrades of individual hardware without further interaction with the Contractor, Vendor or Manufacturer.

1.1.2 End to End Accuracy

Select products, install and configure the system such that the maximum error of a measured value as read from the DDC Hardware over the network is less than the maximum allowable error specified for the sensor or instrumentation.

1.1.3 Verification of Dimensions

After becoming familiar with all details of the work, verify all dimensions in the field, and advise the Contracting Officer of any discrepancy before performing any work.

1.1.4 Drawings

The Government will not indicate all offsets, fittings, and accessories that may be required on the drawings. Carefully investigate the mechanical, electrical, and finish conditions that could affect the work to be performed, arrange such work accordingly, and provide all work necessary to meet such conditions.

1.2 RELATED SECTIONS

Related work specified elsewhere:

a. Section 23 09 23.02 BACNET DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING CONTROL SYSTEMS for BACnet systems with or without Niagara Framework.

b. Section 23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC

d. Section 25 08 10 UTILITY MONITORING AND CONTROL SYSTEMS TESTING

e. Section 25 10 10 UTILITY MONITORING AND CONTROL SYSTEMS (UMCS) FRONT

END AND INTEGRATION

f. Section 25 05 11.00 09 CYBERSECURITY FOR FACILITY-RELATED CONTROL

SYSTEMS

g. Section 01 91 00.15 10 TOTAL BUILDING COMMISSIONING

1.3 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN SOCIETY OF HEATING, REFRIGERATING AND AIR-CONDITIONING

ENGINEERS (ASHRAE)

ASHRAE 135 (2016) BACnet—A Data Communication Protocol for Building Automation and Control Networks

SECTION 23 09 00 Page 6Am #0003

ASHRAE FUN IP (2017) Fundamentals Handbook, I-P Edition

INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)

IEEE C62.41 (1991; R 1995) Recommended Practice on Surge Voltages in Low-Voltage AC Power Circuits

NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)

NEMA 250 (2018) Enclosures for Electrical Equipment (1000 Volts Maximum)

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA 70 (2017; ERTA 1-2 2017; TIA 17-1; TIA 17-2;

TIA 17-3; TIA 17-4; TIA 17-5; TIA 17-6;

TIA 17-7; TIA 17-8; TIA 17-9; TIA 17-10;

TIA 17-11; TIA 17-12; TIA 17-13; TIA

17-14; TIA 17-15; TIA 17-16; TIA 17-17 )

National Electrical Code

NFPA 90A (2018) Standard for the Installation of Air Conditioning and Ventilating Systems

UNDERWRITERS LABORATORIES (UL)

UL 5085-3 (2006; Reprint Nov 20121) Low Voltage Transformers - Part 3: Class 2 and Class 3 Transformers

1.4 DEFINITIONS

The following list of definitions includes terms used in Sections referenced by this Section and are included here for completeness.The definitions contained in this Section may disagree with how terms are defined or used in other documents, including documents referenced by this Section. The definitions included here are the authoritative definitions for this Section and all Sections referenced by this Section.

After each term the protocol related to that term is included in parenthesis.

1.4.1 Alarm Generation (All protocols)

Alarm Generation is the monitoring of a value, comparison of the value to alarm conditions and the creation of an alarm when the conditions set for the alarm are met. Note that this does NOT include delivery of the alarm to the final destination (such as a user interface) - see paragraph ALARM ROUTING in Section 25 10 10 UTILITY MONITORING AND CONTROL SYSTEM (UMCS)

FRONT END AND INTEGRATION.

1.4.2 Building Automation and Control Network (BACnet) (BACnet)

The term BACnet is used in two ways. First meaning the BACnet Protocol Standard - the communication requirements as defined by ASHRAE 135 including all annexes and addenda. The second to refer to the overall technology related to the ASHRAE 135 protocol.

SECTION 23 09 00 Page 7Am #0003

1.4.3 BACnet Advanced Application Controller (B-AAC) (BACnet)

A hardware device BTL Listed as a B-AAC, which is required to support BACnet Interoperability Building Blocks (BIBBs) for scheduling and alarming, but is not required to support as many BIBBs as a B-BC.

1.4.4 BACnet Application Specific Controller (B-ASC) (BACnet)

A hardware device BTL Listed as a B-ASC, with fewer BIBB requirements than a B-AAC. It is intended for use in a specific application.

1.4.5 BACnet Building Controller (B-BC) (BACnet)

A hardware device BTL Listed as a B-BC. A general-purpose, field-programmable device capable of carrying out a variety of building automation and control tasks including control and monitoring via direct digital control (DDC) of specific systems and data storage for trend information, time schedules, and alarm data. Like the other BTL Listed controller types (B-AAC, B-ASC etc.) a B-BC device is required to support the server ("B") side of the ReadProperty and WriteProperty services, but unlike the other controller types it is also required to support the client ("A") side of these services. Communication between controllers requires that one of them support the client side and the other support the server side, so a B-BC is often used when communication between controllers is needed.

1.4.6 BACnet Broadcast Management Device (BBMD) (BACnet)

A communications device, typically combined with a BACnet router. A BBMD forwards BACnet broadcast messages to BACnet/IP devices and other BBMDs connected to the same BACnet/IP network. Each IP subnet that is part of a BACnet/IP network must have at least one BBMD. Note there are additional restrictions when multiple BBMDs share an IP subnet.

1.4.7 BACnet/IP (BACnet)

An extension of BACnet, Annex J, defines the use of a reserved UDP socket to transmit BACnet messages over IP networks. A BACnet/IP network is a collection of one or more IP subnets that share the same BACnet network number. See also paragraph BACNET BROADCAST MANAGEMENT DEVICE.

1.4.8 BACnet Internetwork (BACnet)

Two or more BACnet networks, connected with BACnet routers. In a BACnet Internetwork, there exists only one message path between devices.

1.4.9 BACnet Interoperability Building Blocks (BIBBs) (BACnet)

A BIBB is a collection of one or more ASHRAE 135 Services intended to define a higher level of interoperability. BIBBs are combined to build the BACnet functional requirements for a device in a specification. Some BIBBs define additional requirements (beyond requiring support for specific services) in order to achieve a level of interoperability. For example, the BIBB DS-V-A (Data Sharing-View-A), which would typically be used by a front-end, not only requires the client to support the ReadProperty Service, but also provides a list of data types (Object / Properties) which the client must be able to interpret and display for the user.

In the BIBB shorthand notation, -A is the client side and -B is the server

SECTION 23 09 00 Page 8Am #0003 side.

The following is a list of some BIBBs used by this or referenced Sections:

DS-COV-A Data Sharing-Change of Value (A side)

DS-COV-B Data Sharing-Change of Value (B side)

NM-RC-B Network Management-Router Configuration (B side)

DS-RP-A Data Sharing-Read Property (A side)

DS-RP-B Data Sharing-Read Property (B side)

DS-RPM-A Data Sharing-Read Property Multiple (A Side)

DS-RPM-B Data Sharing-Read Property Multiple (B Side)

DS-WP-A Data Sharing-Write Property (A Side)

DM-TS-B Device Management-Time Synchronization (B Side)

DM-UTC-B Device Management-UTC Time Synchronization (B Side)

DS-WP-B Data Sharing-Write Property (B side)

SCHED-E-B Scheduling-External (B side)

DM-OCD-B Device Management-Object Creation and Deletion (B side)

AE-N-I-B Alarm and Event-Notification Internal (B Side)

AE-N-E-B Alarm and Event-Notification External (B Side)

T-VMT-I-B Trending-Viewing and Modifying Trends Internal (B Side)

T-VMT-E-B Trending-Viewing and Modifying Trends External (B Side)

1.4.10 BACnet Network (BACnet)

In BACnet, a portion of the control Internetwork consisting of one or more segments connected by repeaters. Networks are separated by routers.

1.4.11 BACnet Operator Display (B-OD) (BACnet)

A basic operator interface with limited capabilities relative to a B-OWS.

It is not intended to perform direct digital control. A B-OD profile could be used for LCD devices, displays affixed to BACnet devices, handheld terminals or other very simple user interfaces.

1.4.12 BACnet Segment (BACnet)

One or more physical segments interconnected by repeaters (ASHRAE 135).

SECTION 23 09 00 Page 9Am #0003

1.4.13 BACnet Smart Actuator (B-SA) (BACnet)

A simple actuator device with limited resources intended for specific applications.

1.4.14 BACnet Smart Sensor (B-SS) (BACnet)

A simple sensing device with limited resources.

1.4.15 BACnet Testing Laboratories (BTL) (BACnet)

Established by BACnet International to support compliance testing and interoperability testing activities and consists of BTL Manager and the BTL Working Group (BTL-WG). BTL also publishes Implementation Guidelines.

1.4.16 BACnet Testing Laboratories (BTL) Listed (BACnet)

A device that has been listed by BACnet Testing Laboratory. Devices may be certified to a specific device profile, in which case the listing indicates that the device supports the required capabilities for that profile, or may be listed as "other".

1.4.17 Binary (All protocols)

A two-state system where an "ON" condition is represented by a high signal level and an "OFF" condition is represented by a low signal level.

'Digital' is sometimes used interchangeably with 'binary'.

1.4.18 Broadcast (BACnet)

Unlike most messages, which are intended for a specific recipient device, a broadcast message is intended for all devices on the network.

1.4.19 Building Control Network (BCN) (All protocols)

The network connecting all DDC Hardware within a building (or specific group of buildings).

1.4.20 Building Point of Connection (BPOC) (All protocols)

A FPOC for a Building Control System. (This term is being phased out of use in preference for FPOC but is still used in some specifications and criteria. When it was used, it typically referred to a piece of control hardware. The current FPOC definition typically refers instead to IT hardware.)

1.4.21 Commandable (All protocols)

See Overridable.

1.4.22 Commandable Objects (BACnet)

Commandable Objects have a Commandable Property, Priority_Array, and Relinquish_Default Property as defined in ASHRAE 135, Clause 19.2, Command Prioritization.

1.4.23 Configurable (All protocols)

A property, setting, or value is configurable if it can be changed via

SECTION 23 09 00 Page 10Am #0003 hardware settings on the device, via the use of engineering software or over the control network from the front end, and is retained through (after) loss of power.

In a BACnet system, a property, setting, or value is configurable if it can be changed via one or more of:

a. via BACnet services (including proprietary BACnet services)

b. via hardware settings on the device

Note this is more stringent than the ASHRAE 135 definition.

1.4.24 Control Logic Diagram (All protocols)

A graphical representation of control logic for multiple processes that make up a system.

1.4.25 Device (BACnet)

A Digital Controller that contains a BACnet Device Object and uses BACnet to communicate with other devices.

1.4.26 Device Object (BACnet)

Every BACnet device requires one Device Object, whose properties represent the network visible properties of that device. Every Device Object requires a unique Object Identifier number on the BACnet Internetwork.

This number is…