W912WJ21B0017 Amendment 0007.pdf
PDF 586 KB Posted
- Solicitation number
- W912WJ21B0017
About this file
This amendment to the solicitation provides responses to requests for information regarding the environmental remediation services opportunity at the Stratford Army Engine Plant in Stratford, Connecticut. The U.S. Army Corps of Engineers, New England District seeks to mechanically dredge approximately 13,000 cubic yards of sediments from the outfall drainage channel OF-008 to remediate metals and PCB contamination. Dredged materials must be dewatered, solidified with cementitious materials, and placed on-site for future beneficial reuse, with a small portion requiring off-site disposal at approved RCRA D and TSCA landfills and requiring segregation during dredging. OF-008 will be backfilled with clean sand. The 375-calendar day period of performance requires the contractor to provide all necessary equipment and materials to complete the dredging and processing of sediments. The solicitation is set aside for small businesses and is available electronically through SAM.gov, with any questions to be directed to the specified Contract Specialist.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The above referenced solicitation is hereby amended to provided responses to Reqeusts for Information. All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 12-Aug-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912WJ21B0017
X 9B. DATED (SEE ITEM 11)
16-Jul-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
12-Aug-2021
CODE
U S ARMY ENGR DISTRICT, NEW ENGLAND
696 VIRGINIA RD
CONCORD MA 01742-2751
W912WJ 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912WJ21B0017
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMEND 0007
Requests for Information:
1. The documents talk about the dewatering discharge location being trenched across Sniffens Lane and discharged off the end of the causeway. Is this for bypass water as well as treated water from the temporary water treatment plant?
Response: The primary intent of the Sniffens Lane trench is for the conveyance of water from the Oufall-008 work area that has been in contact with contaminated sediments or materials to the temporary water treatment system for processing and discharge. The assumption is the treatment plant will be located closer to the causeway. The contractor may modify and utilize this trench for any other systems they deem necessary that cross the public roadway.
2. Are there invert elevations for OF-008?
Response: Invert elevations for the outfalls in the drainage ditch could not be obtained during the existing conditions survey due to sediment buildup and/or vegetation that were present at the time of the survey effort. The contractor will have to proceed with caution when excavating within their vicinity.
3. The maximum sediment management bin size shall be a maximum of 1,000 cubic yards. Please confirm that 02 61 23 3.3.6.1 is referring to the minimum amount of sediment (approximately 600cy) in the bin reuqired for sampling and not bin size.
Response: Confirmed. Composite sampling within the sediment management bins is referring to the volume of material in the bin and not the bin capacity.
4. Other than the 48” Storm Drain entering Outfall 008 at Sta 0+25 +/- is the Government aware of any other specific location where other culverts or pipes entering Outfall 008 ditch?
Response: Outfall 010 is also present (shown just Southwest of OF-008 on sheet C-101, around the same station 0+25). The failed tidal gate culvert near the Marine Basin is also present, but conditions and location is currently unknown. No other culverts/pipe/outfalls are known to be within the drainage ditch limits.
5. Can invert elevations and slope of the 48” Storm Drain be provided so that the flow rate coming from this system be calculated?
Response: See response to Amendment 0007, RFI #2.
(End of Summary of Changes)