This document provides an amendment to a solicitation for environmental remediation services at the Stratford Army Engine Plant in Stratford, Connecticut. The amendment responds to contractor questions by revising specification sections regarding superintendent and safety health officer qualifications, clarifying that alternate sediment management bin locations may be proposed, setting an August 11 deadline for requests for information, and confirming that proposed access roads must be included in the work plan for government approval and that contractors need only improve access roads they intend to use.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
This amendment is to provide responses to Requests for Information and to provide revised Specification Sections 01 30 00 and 01 35 26.
All other aspects remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 05-Aug-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912WJ21B0017
X 9B. DATED (SEE ITEM 11)
16-Jul-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
05-Aug-2021
CODE
U S ARMY ENGR DISTRICT, NEW ENGLAND
696 VIRGINIA RD
CONCORD MA 01742-2751
W912WJ 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912WJ21B0017
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
RFI 8.3.2021
1. Spec 01 30 00 paragraph 1.7.2 – Superintendent Qualifications. Please confirm that this Spec Section is not relevant or consider revising this section for the work at Outfall 8 as this is not a dredging project.
Response: The Spec Section has been updated.
2. Spec 01 35 26 paragraph 1.6.2 – SSHO Qualifications. Please consider revising this Spec Section as the work at Outfall 8 is not a dredging project.
Response: The Spec Section has been updated.
3. Can the North parking lot be utilized to set up sediment management bins?
Response: The contractor may propose alternate locations for the Sediment Management Bins for Government consideration in the submitted work plan. In the work plan, the Contractor must ensure that the material and associated water are properly controlled and manged across the site.
4. Is there a due date for questions?
Response: The Government requests all RFIs be submitted no later than 11 August 2021.
5. We want to make sure our RFP reply is consistent with conditions of permits/approvals already obtained for this project, and are therefore asking for a copy of the federal, state and local permits (or other approvals) obtained for this project. Can these please be provided? (As a cross reference, there are no federal, state and local permits listed in the Submittal Register of Specification Section 01 33 00.)
Response: The Government has included the substantive provisions of the General Permit in Appendix C of the specifications. A formal permit is not required with the State of Connecticut. The Contractor must meet the substantive provisions as indicated.
6. Reference Sheet ID G-102, Sheet Notes: “10. Temporary access roads will be on existing pavement, concrete, gravel, and vegetated areas near outfall-008. Temporary access road locations are intended for contractor to temporarily improve for construction purposes.” Where it states “temporarily improve existing access road” AND “construct 20’ wide temporary access road using wood rig mats over wetland”, is it at the contractors discretion to determine if these access roads will be required to be installed/improved for construction based on how contractor plans to complete this contracts scope? Please clarify if these access roads are needed at the Contractors discretion.
Response: Yes, if the contractor does not intend to use all of the access roads, as layed out in G-102, then the contractor would not be responsible for improving these areas. If the contractor uses the access roads, as layed out in G-102, then the contractor must improve the the roads as described in the drawings. The contractor will submit the proposed access road network in the workplan for Government approval.
W912WJ21B0017
(End of Summary of Changes)