Amendement 0012 Revised C-102.pdf
PDF 735 KB Posted
- Solicitation number
- W912WJ21B0017
About this file
This document contains a solicitation for environmental remediation services and associated contract documents. The U.S. Army Corps of Engineers, New England District is seeking bids for dredging and disposal of approximately 13,000 cubic yards of sediment from an outfall drainage channel at the Stratford Army Engine Plant in Stratford, Connecticut. The work includes mechanical dredging, dewatering and solidification of most material with cementitious compounds, and segregated disposal of a portion requiring off-site shipment to approved landfills. The period of performance is 375 calendar days. The solicitation is set aside for small businesses and bids are due through the System for Award Management website. The contract award is for dredging and processing services and will require the successful bidder to provide all necessary equipment and materials.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
C O
N C
O R
D
M A
-2
V
IR
G
IN
IA
R
O A
D
N E
W E
N G
L A
N D D
IS
T R
IC
T
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
D R
A W
IN
G C
O D
E
S C
A L E
S H
E E
T O
F
S T
A E
P -0 of Engineers
US Army Corps
O U
T F
A L L
R
E M
E D
IA
T
IO
N
T
R A
T F
O R
D A
R M
Y E
N G
IN
E P
L A
N T
S T
R A
T F
O R
D
C O
N N
E C
T
IC
U T
ISSUE FOR CONSTRUCTION
W
W J
B
S
S
S S
S
S
S
S
S
B u ild in g
B U
IL
D
IN
G
Buildin g
Buildi ng
Buildin g
R C
P
MAIN STREET
.4
.4
.6
.6
AC
S
.5
.6
.6
.6
.6
.7
.8
S
.8
.8
.8
.8
.9
.1
.1
.1
.1
.1
.2
.2
.2
.2
.3
.3
.3
.3
AC
.3
.4
.4
.4
.5
.5
S
.5
.5
.5
.6
.6
.6
.6
.6
.6
.7
.8
S
S
S
.8
W
.9
.1
.1
.1
.1
.1
.2
.2
.3
.3
.3
AC
A C
.3
.4
.4
AC
.7
T
.2
.4
.5
.6
.6
.6
.6
.6
.8
.0
.1
.2
.2
.3
.5
.3
CORPORATI
ON
AVCO
B-
B-
B-
NORTH
PARKI
NG
LOT
...\Outfall 008 Remediation\30000 - Planning & Engineering & Design\30DA0 - Plans & Specs\CAD_BIM\_Sheets\Stockpile and Stormwater C
8:34:31 AM 8/23/2021 PD: AEC_pdf.pltcfg DS: AEC_Screen.dscript
A N
S I
D
N
SHEET NOTES:
B .S
P R
A G
U E
B .S
P R
A G
U E
B3 120'0 60'
STOCKPILE STORMWATER CONTROL AND PROTECTION PLAN
SCALE: 1" = 60'
...\Outfall 008 Remediation\30000 - Planning & Engineering & Design\30DA0 - Plans & Specs\CAD_BIM\_Sheets\Stockpile and Stormwater C
8:34:31 AM 8/23/2021 PD: AEC_pdf.pltcfg DS: AEC_Screen.dscript
B .S
P R
A G
U E
A N
S I
D
C-102
B .S
P R
A G
U E
S T
O C
K P
IL
E S
T O
R M
W A
T E
R A
N D
P R
O T
E C
T
IO
N P
L A
N
SWALE
DRAINAGE
PERIMETER
STOCKPILE
(SEE NOTE 4)
MODIFICATION
CATCH BASIN
AREA
MANAGEMENT
STORMWATER
TEMPORARY
14 12
SWALE
DRAINAGE
PERIMETER
STOCKPILE
4'
1'
PERIMETER DRAINAGE SWALE DETAIL
NOT TO SCALE
DREDGED/EXCAVATED SEDIMENT
SURFACE
STABILIZAED
EROSION
L T
H
IB
O D
E A
U L T
H
IB
O D
E A
U
N
/1
/2
/1
/2
L T
H
IB
O D
E A
U L T
H
IB
O D
E A
U
(SEE NOTES1-4)
WITH 47,000 CY MAXIMUM CAPACITY
MATERIAL STOCKPILE
NORTH PARKING LOT
DIRECTS ALL RUNOFF TO THE MODIFIED CATCH BASIN.
MINIMUM OF 1.5% POSITIVE DRAINAGE PITCH WHICH
1. THE PERIMETER DRAINAGE SWALE SHALL HAVE A
DETAIL NOTES:
:1
A
U G
COMPLETED.
CONSTRUCTION AND FULL TURF COVER OF THE STOCKPILE HAS BEEN
THE STOCKPILE MAY ENTER. RESTORE FLOW THROUGH CATCH BASIN ONCE
TEMPORARY STORMWATER MANAGEMENT AREAS SO THAT NO RUNOFF FROM
4. DURING CONSTRUCTION, MODIFY THE EXISTING CATCH BASINS WITHIN THE
REFER TO SPECIFICATIONS SECTION 02 24 50 FOR ADDITIONAL INFORMATION.
MANAGEMENT AREA AS NECESSARY TO MITIGATE ALL ANTICIPATED FLOWS.
CONTRACTOR MAY ADJUST THE GRADES AND SIZES OF THE STORMWATER
AREA PLANS TO BE SUBMITTED BY CONTRACTOR AND APPROVED BY COR.
DRAINAGE SYSTEMS INDICATED ON THIS SHEET. STORMWATER MANAGEMENT
THE STORMWATER MANAGEMENT AREAS TO THE EXISTING CATCH BASINS AND
STABILIZED/PROTECTED FROM EROSION (TOPSOIL AND SEEDED), CONNECT
THE STOCKPILE IS COMPLETED AND THE FINAL SURFACE HAS BEEN
OFF OF THE CAUSEWAY AS SHOWN ON SHEET G-102. AFTER CONSTRUCTION OF
PROCESSED/TREATED IN THE WATER TREATMENT SYSTEM, AND DISCHARED
DURING CONSTRUCTION SHALL BE COLLECTED IN THE BASIN,
TEMPORARY DETENTION BASIN DURING CONSTRUCTION. STOCKPILE RUNOFF
3. STORMWATER MANAGEMENT AREAS SHALL BE CONSTRUCTED AS A
STOCKPILE RUNOFF.
COMPLY WITH PERMIT REQUIREMENTS OF COLLECTING ALL UNCAPPED
COLLECTION SWALE IMMEDIATELY AFTER SLOPE/SWALE CONSTRUCTION TO
SPECIFICATION SECTION 01 57 23, ON THE SIDE SLOPES BELOW THE
CONTRACTOR SHALL LOAM AND SEED, OR USE PLASTIC SHEETING PER
MAINTAIN POSITIVE DRAINAGE AS THE STOCKPILE HEIGHT GROWS.
ADJUST THE PERIMETER SWALE AS NEEDED DURING CONSTRUCTION TO
SHOWN REPRESENT THE MAXIMUM STOCKPILE DIMENSIONS ALLOWED. FIELD
REMAIN IN PLACE BOTH DURING AND AFTER CONSTRUCTION. THE STOCKPILES
STOCKPILE TO THE STORMWATER MANAGEMENT AREA. THE SWALE SHALL
SWALE TO COLLECT AND DIRECT STORMWATER RUNNOFF FROM THE
STORMWATER MANAGEMENT AREAS. CONSTRUCT A STOCKPILE PERIMETER
2. STOCKPILES TO BE GRADED TO SHED WATER TOWARDS TEMPORARY
FOR SEEDING STABILIZATION.
02 55 00. MAXIMUM HEIGHT OF STOCKPILES INCLUDE 12 INCHES OF TOPSOIL
MINIMUM UNCONFINED COMPRESSIVE STRENGTH IN SPECIFICATIONS SECTION
SHOWN ARE 2H:1V BASED ON STABILITY ANALYSIS AFTER THE ACHIEVING THE
TOP OF THE PILE LABELED AT 18 FEET ABOVE EXISTING GRADE. SIDE SLOPES
HEIGHT WITH THE BOTTOM OF THE PILE LABELED AT EXISTING GRADE AND THE
1. NORTH PARKING LOT MATERIAL STOCKPILES ASSUME 18 FEET MAXIMUM
S T
O C
K P
IL
E T
O P
S O
IL
T
H
IC
K N
E S
S C
O R
R E
C T
E D T
O
I
N C
H E
File details come from the government source that posted it. Updated .