Cost Breakdown Sheet Amendment 0004 Super Hornet Procurement B Kuwait.pdf

PDF 70 KB Posted

Attached to
Amendment 0015 to Super Hornet Procurement B, Package 005 (Organizational Level Maintenance Hangar) and Package 001A/B (Base Infrastructure)
Solicitation number
W912ER21R0025
Issued by

About this file

This cost breakdown sheet amendment provides pricing details for the construction of several facilities as part of a Super Hornet procurement project in Kuwait. The amendment covers pricing for mobilization, site utilities and infrastructure, a power check pad, compass calibration pad, pump house, water storage tank, organizational level corrosion control hangar, organizational level maintenance hangar, vehicle parking sunshades and equipment shelter, guard house, and associated site work. Pricing is broken down by item with costs provided for direct labor, direct equipment, direct materials, subcontractor costs, indirect costs, bond, overhead/indirect costs, profit, and total proposed cost. The Department of the Army Corps of Engineers Engineering District Middle East solicitation W912ER21R0025 is for the construction of an organizational level maintenance hangar with eight aircraft bays and associated shop spaces as well as an organizational level corrosion control hangar with two additional aircraft bays located at Al Jaber Air Base in Kuwait.

View the file

Other files

File Type Posted
A154_Amendment 0015 to Solicitation W912ER21R0025 Super Hornet Procurement B Kuwait.pdf PDF
A154_Amendment 0014 to Solicitation W912ER21R0025 Super Hornet Procurement B Kuwait.pdf PDF
AMENDMENT 0013 SPECIFICATIONS DOC FOR VOL 6 OF 7 (PKG 1B SEC 01 50 00) JAN 22.pdf PDF
A154_Amendment 0013 to Solicitation W912ER21R0025 Super Hornet Procurement B Kuwait.pdf PDF
2022_0106_Pkg 5_ Rev A 0013_All Drawings.pdf PDF
2021_1229_Pkg 1A_ A 0013_All Drawings.pdf PDF
AMENDMENT 0013 SPECIFICATIONS DOC FOR VOL 2 OF 7 (PKG 1A) - JAN 22.pdf PDF
AMENDMENT 0013 SPECIFICATIONS DOC FOR VOL 4 OF 7 (PKG 5) JAN 22.pdf PDF
AMENDMENT 0013 NARRATIVE - 21R0025 Superhornet Procurement B -JAN 22.pdf PDF
A154_Amendment 0012 to Solicitation W912ER21R0025 Super Hornet Procurement B Kuwait.pdf PDF
2021_1220_Pkg 1B A_12_All Drawings.pdf PDF
2021_1214_Pkg 1A_ A11_All Drawings.pdf PDF
AMENDMENT 0011 - SPECIFICATIONS DOC FOR VOL 6 OF 7 - PACKAGE 1B.PDF PDF
AMENDMENT 0011 - SPECIFICATIONS DOC FOR VOL 2 OF 7 - PACKAGE 1A.pdf PDF
AMENDMENT 0011 - SPECIFICATIONS DOC FOR VOL 4 OF 7 - PACKAGE 5.pdf PDF
A154_Amendment 0011 to Solicitation W912ER21R0025 Super Hornet Procurement B Kuwait.pdf PDF
2021_1214__Pkg 5_A11_All Drawings.pdf PDF
Amendment 0011 PROPOSAL SCHEDULE AND COST BREAKDOWN Super Hornet Kuwait.xls XLS spreadsheet
A154_Amendment 0010 to Solicitation W912ER21R0025 Super Hornet Procurement B Kuwait.pdf PDF
DRAWING DOCUMENT VOL 3 FOR PKG 1B.pdf PDF
REVISED COVER - VOL 4 OF 5 (NOW 7) PKG 5 SPECS ORG LEVEL MAINT HANGAR.pdf PDF
VOL 6 OF 7 - SPEC PKG 1B 480088 Base Infrastr Elec and Telecomm SPECIFICATIONS.pdf PDF
480088 480569_Ku Super Hornet COST PROPOSAL - 11-19-2021 Amendment 0009.pdf PDF
480088 480569_Ku Super Hornet COST BREAKDOWN - 11-19-2021 Amendment 0009.pdf PDF
AMENDMENT 0009 SPEC DOCUMENT FOR VOL 4 OF 7 (PKG 5).pdf PDF
REVISED COVER - VOL 2 OF 5 (NOW 7) SPECS PKG 1A BASE INFRSTR FOR FAC AT CLIN5 4800881A.pdf PDF
REVISED COVER - VOL 5 OF 5 (NOW 7) SPECS FOR PKG 5 SUPP DOCS - SPECS_CLIN 5_VOL2.pdf PDF
A154_Amendment 0009 to Solicitation W912ER21R0025 Super Hornet Procurement B Kuwait.pdf PDF
AMENDMENT 0009 SPEC DOCUMENT FOR VOL 2 OF 7 (PKG 1A).pdf PDF
REVISED COVER - VOL 3 OF 5 (NOW 7) PKG 1A BASE INFRA (FOR PKG 5) SUPP DOCS - 480088 AE-SPECS_CLIN 5_VOL2 FROM ORIG FILE.pdf PDF
VOL 7 OF 7 - SPEC PKG 1B 480088 Base Infrastr Elec and Telecomm Supplemental Docs.pdf PDF
A154_Amendment 0008 to Solicitation W912ER21R0025 Super Hornet Procurement B Kuwait.pdf PDF
AMENDMENT 0008 - SPEC DOCUMENT SEC 33 16 15 FOR PKG 1A.pdf PDF
2021_1015_Proc B_Pkg 1A_Amendment 0008_All Drawings.pdf PDF
2021_1007_Proc B_Pkg 1A_Rev Amendment 0007_All Drawings - 04NOV21.pdf PDF
AMENDMENT 0008 - SPEC DOCUMENT FOR PKG 5 (3 SECTIONS).pdf PDF
2021_1015_Proc B_Pkg 5_Amendment 0008_All Drawings.pdf PDF
AMENDMENT 0007 SPECIFICATION DOC FOR PKG 5.pdf PDF
2021_1014_Proc B_Pkg 5_Rev Amendment 0007_All Drawings.pdf PDF
A154_Amendment 0007 to Solicitation W912ER21R0025 Super Hornet Procurement B Kuwait.pdf PDF
AMENDMENT 0007 SPECIFICATION DOC FOR PKG 1A.pdf PDF
A154_Amendment 0006 to Solicitation W912ER21R0025 Super Hornet Procurement B Kuwait.pdf PDF
2021_0827_Proc B_Package 1A_Amendment 0005_All Drawings.pdf PDF
2021_0827_Proc B_Package 5_Amendment 0005_All Drawings.pdf PDF
A154_Amendment 0005 to Solicitation W912ER21R0025 Super Hornet Procurement B Kuwait.pdf PDF
A154_Amendment 0004 W912ER21R0025 Super Hornet Procurement B Kuwait.pdf PDF
Package 1A_Amendment 0004_All Drawings Super Hornet Procurement B Kuwait.pdf PDF
Proposal Schedule Amendment 0004 Super Hornet Procurement B Kuwait.pdf PDF
Package 5_Amendment 0004_All Drawings Super Hornet Procurement B Kuwait.pdf PDF
APPENDIX A (RFP Attachments) W912ER21R0025 Super Hornet Procurement B Kuwait.docx DOCX document
Show 40 more

Latest 50 of 84 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP: W912ER21R0025 P2# 480088 & 480569

PROJECT: Super Hornet Packages 001 & 005 Amendment 0004 PROPOSER:

LOCATION: Kuwait DATE:

Primary Facilities

Mobilization and Demobilization in accordance with the contract documents

Construct Utility Infrastructure ( Facility A) (CLIN 1A) in accordance with the contract documents

Construct Power Check Pad (Facility B) and Compass Calibration Pad (Facility C) (CLIN 1A) Complete with Sitework and Utilitiies Infrastructure in accordance with the contract documents.

Construct Pump House and Water Storage Tank (Facility P) (CLIN 1A) in accordance with the contract documents.

Construct Oginizational Level Corrosion Control Hanger (Facility D) (CLIN 5) in accordance with the contract documents

Construct Organizational Level Maintenance Hanger (Facility J) (CLIN

5) in accordance with the contract documents

Construct Vehicle Parking Sunshades and Equipment Shelter, (Facility N) (CLIN 5) in accordance with the contract documents

Construct Guard House (Facility N) (CLIN 5) in accordance with the contract documents

Associated Site work and Utility and Infrastructure, (Facility D, J and N) (CLIN 5) in accordance with the contract documents.

TOTAL

OVERHEAD/INDIRECT

COST

PROFIT TOTAL PROPOSED

COST

COST BREAKDOWN

ITEM DESCRIPTION INDIRECT COST

JOOH (G&A)*

INDIRECT COST

HOOH (G&A)* BONDDIRECT

MATERIALS COST

SUB

CONTRACTOR

COST

TOTAL

DIRECT

COST

DIRECT LABOR

COST

DIRECT

EQUIPMENT COST

EXHIBIT 1 Page 1 of 2

RFP: W912ER21R0025 P2# 480088 & 480569

PROJECT: Super Hornet Packages 001 & 005 Amendment 0004 PROPOSER:

LOCATION: Kuwait DATE:

TOTAL

OVERHEAD/INDIRECT

COST

PROFIT TOTAL PROPOSED

COST

COST BREAKDOWN

ITEM DESCRIPTION INDIRECT COST

JOOH (G&A)*

INDIRECT COST

HOOH (G&A)* BONDDIRECT

MATERIALS COST

SUB

CONTRACTOR

COST

TOTAL

DIRECT

COST

DIRECT LABOR

COST

DIRECT

EQUIPMENT COST

Enhanced Turnover Assistance for Package 001A and 005 in accordance with contract documents (See Specification 01 15 00.12 10, 1.11)

TOTAL OPTION (ITEM 0010)

TOTAL BASE & OPTION (ITEM 0001 -

0010)

TOTAL BASE (ITEMS 0001 - 0009)

EXHIBIT 1 Page 2 of 2

File details come from the government source that posted it. Updated .