This package includes mechanical drawings and specifications for the renovation of Building 125 at Fort Hamilton in Brooklyn, New York. The drawings show ductwork, piping, and HVAC plans and were prepared for the solicitation by the Department of the Army Corps of Engineers Engineering District New York. Mechanical work includes replacing the ERV unit, adding a DX coil, installing new ductwork and piping throughout the building, and balancing the hydronic system. Contractors must coordinate all mechanical layouts with structural elements and other trades. The solicitation seeks bids for renovating the 1st Marine Corps District headquarters in accordance with the drawings and specifications provided.

View the file

Other files

File Type Posted
C.04.01 Bid Abstract Bldg 125 Final.pdf PDF
A-605 and S-102 S-103 Amd 5.pdf PDF
B.08.03 Amendment 05.pdf PDF
09 06 00 Amd 5.pdf PDF
10 21 13 Amd 5.pdf PDF
E-002 and ED102 Amd 3.pdf PDF
LEED_v4_for_Interior_Design_and_Construction_Checklist B125 Reno Ft Hamilton.pdf PDF
Army_SustainabilityReportCard_2020 B125 Renovation LEED IDC.pdf PDF
Fort Hamilton Planning Charrete.pdf PDF
07 27 10 Amd 5.pdf PDF
12 50 00.13 FFE Data Sheet Item Code M4 revised.pdf PDF
01 33 29 Amd 5.pdf PDF
B.08.03 Amendment 04.pdf PDF
B.08.03 Amendment 03.pdf PDF
A-405 20230830.pdf PDF
A-408 20230830.pdf PDF
A-501 20230831.pdf PDF
1AB-101 20230830.pdf PDF
A-605 20230831.pdf PDF
A-101 A-403 A-501 AD-101 AD-403 20230829.pdf PDF
Renovation BLDG 125-Mechanical Room - Sheet - M-111 - MECHANICAL ROOM PLAN.pdf PDF
B.08.03 Amendment 02.pdf PDF
A-602 Amendment 2 20230823.pdf PDF
Amendment 2 Mechanical Drawings M102 thru 107 M601 M701.pdf PDF
A-404 Amendment 2 20230824.pdf PDF
A-601 Amendment 2 20230823.pdf PDF
B.08.03 Amendment 01.pdf PDF
B.08.03 Site Visit Sign in sheet_16 Aug 23 (002).jpg JPG image
B.08.03 Invitation for Bid W912DS23B0022.pdf PDF
JA_Hamilton_125_Simplex Signed.pdf PDF
Fort Hamilton Bldg 125-100_PCNT_Specification_07-31-2023.pdf PDF
B.08.03 Invitation for Bid W912DS23B0022.pdf PDF
B125 RTA Complete set R4 07 August 2023.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DN DN

DN

DN

DN

WAREHOUSE

LOGISTICS MGMT

SPECIALIST

WORK SPACE

AREA 3

ELECTRIC

TECH EQUIPMENT

AREA

WORK SPACE

AREA 2

COMPTROLLER

140SARC

I/T PROGRAM

MGMT SPVR

126A

CAREER

PLANNER

CHAPLAIN

CLASSROOM/

CONFERENCE

WORK SPACE

AREA

ERVU-1

LOGISTICS

OFFICER

SACO

SUBSTANCE

ABUSE ROOM

COMMANDING

OFFICER

WORK SPACE

AREA

TRAINING TEAM

OIC

TRAINING TEAM

DEPUTY

RECRUITER

INSTRUCTOR

MARKETING AND

COMM O

PRIOR SERVICE

RECRUITING OIC

(PSR)

TRAINING TEAM

CHIEF

SGT MAJOR

OPERATIONS

OFFICER

EX OFFICER

ADJUDANT

DEPLOYMENT

READYNESS

COORDINATOR

CONFERENCE

ROOM

TELECOM/

INTERNET

SERVER ROOM

126B

TELECOM

ELECTRIC

MECHANICAL

ROOM

128A

MISSION

ASSURANCE PM

"ø

S A

"ø

R A

12"ø RA 12"ø SA

8"ø SA

8"ø SA 12"ø RA

6" ø

SA

4"ø SA

6"ø SA

8"ø SA 8"ø SA

8" ø

SA

6"ø SA

4"ø SA 4" ø

SA

4" ø

SA

4"ø SA

4" ø

SA

8"ø SA

4" ø

SA

4" ø

SA

4" ø

SA

8" ø

R A

8" ø

R A

8"ø SA

4" ø

SA

4" ø

SA

4"ø SA 4"ø SA

"ø

S A6"ø SA

4"ø SA

4" ø

SA

4" ø

SA

1. FINAL LOCATION OF THE HEATING PANELS MUST BE COORDINATED WITH

THE FINAL FURNITURE LAYOUT. COORDINATE WITH CONTRACTING

OFFICER REPRESENTATIVE (COR).

2. DUCTWORK LAYOUT MUST BE COORDINATED AT THE FIELD, AS IT NEEDS

TO BE COORDINATED WITH STRUCTURAL ELEMENTS THAT ARE NOT PART

OF THIS CONTRACT. COORDINATION WITH ELECTRICAL AND FIRE

PROTECTION DISCIPLINES IS REQUIRED.

ALSO REQUIRED AT THE FIELD.

3. VERIFY WITH CONTRACTING OFFICER REPRESENTATIVE (COR) FINAL

LAYOUT OF ALL MECHANICAL DUCTWORK.

4. NATURAL GAS (NG) CONNECTIONS, ALTERATIONS, ETC SHALL BE

COORDINATED WITH THE DEPARTMENT OF PUBLIC WORKS, AND THE

UTILITY PROVIDER (NATIONAL GRID).

5. ALL SUPPLY AIR DUCTWORK SHALL BE TOTALLY INSULATED, COMPLETE.

RETURN AIR DUCTWORK NEED NOT BE INSULATED.

6. VOLUME DAMPERS SHALL BE PROVIDED ON EACH INDIVIDUAL BRANCH.

SHALL BE LOCATED AT LEAST 12 INCHES FROM CONNECTION TO FLEXIBLE

DUCT.

7. HVAC SHUT-OFF BUTTON, SHALL BE PROVIDE ON THE LOCATION SHOWN,

IT SHALL BE INSTALLED WITH A CLEAR CASING COVER.

8. ISOLATION VALVES SHALL BE PROVIDED WHEN NECESSARY AND

COORDINATED WITH CONTRACTING OFFICER REPRESENTATIVE (COR) AT

THE FIELD.

9. CONTRACTOR SHALL BE REQUIRED TO SIZE AND PROVIDE A DX COIL FOR

THE ERVU-1. THE DX COIL SHALL BE SIZE TO MEET ROOM SUPPLY AIR

DESIGN CONDITIONS (78 DEG F, 50% RH, IN CONJUCTION WITH HEATING COIL

DURING SUMMER COOLING SEASON INCLUSIVE OF CONTROLS).

CONTRACTOR HAS THE OPTION TO CONNECT THE DX COIL TO THE VRF

SYSTEM (HEAT PUMP), OR PROVIDE A SEPARATE CONDENSING UNIT. THIS

SHALL ALSO INCLUDE ITS CONTROLS, COMPLETE. ALL ELECTRICAL

REQUIREMENTS SHALL BE COORDINATED WITH ELECTRICAL CONTRACTOR

AS REQUIRED, COMPLETE.

10. CONTRACTOR SHALL PROVIDE CIRCUIT SETTER (BALANCING VALVE) FOR

FLOW BALANCING. ADDITIONALLY, CONTRACTOR SHALL PROVIDE SHUT-

OFF/ISOLATION VALVE (1/4-TURN BALL VALVES) AT ALL PIPE BRANCHES

FOR FLOW ISOLATION (NOTE: CURRENTLY NOT SHOWN ON PLANS).

GENERAL NOTES:

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

Fi le

P at h:

Pl ot D at e:

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

S:

\P ro je ct s\

Ft _H am ilt on \B ld g_

5_

R en ov \C

AD

_B

IM

\1

4_ M ec h\

Te nz in -9

0% re vi se d fo ld er

\R en ov at io n

BL

D

G

.rv t 9/

7/

:0 3:

P

M

M-101

O

VE

R

AL

L D

U C

TW

O

R K

PL

AN

W

AI

N W

R

IG

H T

D R

BR

O O

KL

YN

N Y

N

EW

Y

O R

K D

IS

TR

IC

T

F

ED

ER

AL

P

LA

ZA

, N

EW

Y O

R K, N Y

N O

T

FO

R C

O N

ST

R

U C

TI

O

N

D es ig ne r

Au th or

C he ck er

JU

LY

1, BL

D G

ST

M

AR

IN

E

C O

R

PS

D

IS

TR

IC

T R

EL

O

C

AT

IO

N

T O

F T

FO

R

T H

AM

IL

TO

N

, N Y

R ev is ed N ot es

, a nd a dd iti on al in fo rm at io n pr ov id ed D at e

1/16" = 1'-0"D1 OVERALL DUCTWORK PLAN

SCALE: = 1'-0"

0 16 3216

1/16"

B

A

3 4 5

LOGISTICS

OFFICER

LOGISTICS MGMT

SPECIALIST

SUPPLY MGMT

SPECIALIST

SUPPLY CHIEF

SUPPLY OFFICER

SUPPLY/LOG MGT

SPEC (MEDICAL)

SACO

SUBSTANCE

ABUSE ROOM

ALL HANDS

CONFERENCE

ROOM/ CLASS

ROOM

WORK SPACE

AREA 3

WAREHOUSE

SARC

DEP

COMPTROLLER

142 COMPTROLLER

CD-4

CD-5

CD-5

CD-4

CD-4

CD-4

CD-4

CD-4

CD-4

CD-4

8" ø

SA

8"ø SA

6"ø SA

4"ø SA

4" ø

SA

4"ø SA

6"ø SA

4" ø

SA

4" ø

SA

4"ø SA

4" ø

SA

4" ø

SA

4" ø

SA

4"ø SA

4" ø

SA

4"ø SA

6"ø SA

8" ø

SA

4"ø SA

6" ø

SA

4"ø SA 4"ø SA

4"ø SA4"ø SA

6" ø

SA

4" ø

SA

6" ø

SA

4" ø

SA

8"ø SA

4"ø SA

4" ø

SA

4"ø SA

4" ø

SA

8"ø SA

4"ø SA4"ø SA

4"ø SA

4" ø

SA

4" ø

SA

8"ø SA

4"ø SA

12"ø SA

CD-4

CD-4

CD-4

CD-4

CD-4

CD-4

12 CD-4

CD-4

CD-4

CD-4

CD-4

EF-1

PROVIDE A MOTORIZED DAMPER;

INTERLOCK WITH THE TWO (2)

INVERSLY-INTERLOCKED DAMPERS,

AS SHOWN.

PROVIDE A MTD

PROVIDE 6 INCHES DIAMETER

SHUT-OFF MOTORIZED DAMPER;

INVERSLY-INTERLOCK WITH EF-1

12" x 12" LOUVER

WITH MOTORIZED DAMPER

(MOTORIZED DAMPER

BEHIND LOUVER); INVERSLY- INTELOCK

WITH EF-1

RR-10

RR-10

VD

(TYP)

VD

(TYP)

RR-10

RR-10

RR-10

RR-10

RR-10

RR-10

RR-10

RR-10

RR-10

RR-10

RR-10

RR-10

RR-10

RR-10

1. FINAL LOCATION OF THE HEATING PANELS MUST BE COORDINATED WITH THE FINAL FURNITURE LAYOUT.

COORDINATE WITH CONTRACTING OFFICER REPRESENTATIVE (COR).

2. DUCTWORK LAYOUT MUST BE COORDINATED AT THE FIELD, AS IT NEEDS TO BE COORDINATED WITH STRUCTURAL ELEMENTS THAT ARE NOT PART OF THIS CONTRACT. COORDINATION WITH ELECTRICAL AND

FIRE PROTECTION DISCIPLINES IS REQUIRED.

3. VERIFY WITH CONTRACTING OFFICER REPRESENTATIVE (COR) FINAL LAYOUT OF ALL MECHANICAL

DUCTWORK.

4. NATURAL GAS (NG) CONNECTIONS, ALTERATIONS, ETC SHALL BE COORDINATED WITH THE DEPARTMENT OF

PUBLIC WORKS, AND THE UTILITY PROVIDER (NATIONAL GRID).

5. ALL SUPPLY AIR DUCTWORK SHALL BE TOTALLY INSULATED, COMPLETE. RETURN AIR DUCTWORK NEED NOT

BE INSULATED.

6. VOLUME DAMPERS SHALL BE PROVIDED ON EACH INDIVIDUAL BRANCH. SHALL BE LOCATED AT LEAST 12

INCHES FROM CONNECTION TO FLEXIBLE DUCT.

7. HVAC SHUT-OFF BUTTON, SHALL BE PROVIDE ON THE LOCATION SHOWN, IT SHALL BE INSTALLED WITH A

CLEAR CASING COVER.

8. ISOLATION VALVES SHALL BE PROVIDED WHEN NECESSARY AND COORDINATED WITH CONTRACTING OFFICER

REPRESENTATIVE (COR) AT THE FIELD.

9. CONTRACTOR SHALL BE REQUIRED TO SIZE AND PROVIDE A DX COIL FOR THE ERVU-1. THE DX COIL SHALL BE SIZE TO MEET ROOM SUPPLY AIR DESIGN CONDITIONS (78 DEG F, 50% RH, IN CONJUCTION WITH HEATING COIL DURING SUMMER COOLING SEASON INCLUSIVE OF CONTROLS). CONTRACTOR HAS THE OPTION TO CONNECT THE DX COIL TO THE VRF SYSTEM (HEAT PUMP), OR PROVIDE A SEPARATE CONDENSING UNIT. THIS SHALL ALSO INCLUDE ITS CONTROLS, COMPLETE. ALL ELECTRICAL REQUIREMENTS SHALL BE COORDINATED

WITH ELECTRICAL CONTRACTOR AS REQUIRED, COMPLETE.

10. CONTRACTOR SHALL PROVIDE CIRCUIT SETTER (BALANCING VALVE) FOR FLOW BALANCING. ADDITIONALLY, CONTRACTOR SHALL PROVIDE SHUT-OFF/ISOLATION VALVE (1/4-TURN BALL VALVES) AT ALL PIPE BRANCHES

FOR FLOW ISOLATION (NOTE: CURRENTLY NOT SHOWN ON PLANS).

GENERAL NOTES:

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

Fi le

P at h:

Pl ot D at e:

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

S:

\P ro je ct s\

Ft _H am ilt on \B ld g_

5_

R en ov \C

AD

_B

IM

\1

4_ M ec h\

Te nz in -9

0% re vi se d fo ld er

\R en ov at io n

BL

D

G

.rv t 9/

7/

:0 3:

P

M

M-102

D U

C

TW

O R

K

PL

AN

I

W

AI

N W

R

IG

H T

D R

BR

O O

KL

YN

N Y

N

EW

Y

O R

K D

IS

TR

IC

T

F

ED

ER

AL

P

LA

ZA

, N

EW

Y O

R K, N Y

N O

T

FO

R C

O N

ST

R

U C

TI

O

N

D es ig ne r

Au th or

C he ck er

JU

LY

1, BL

D G

ST

M

AR

IN

E

C O

R

PS

D

IS

TR

IC

T R

EL

O

C

AT

IO

N

T O

F T

FO

R

T H

AM

IL

TO

N

, N Y

R ev is ed N ot es

, a nd a dd iti on al in fo rm at io n pr ov id ed D at e

3/16" = 1'-0"B1 DUCTWORK PLAN I

SCALE: = 1'-0"3/16"

0 4 8 124

12" = 1'-0"1 MECHANICAL GENERAL NOTES 1.1

A

5 6 7

CORRIDOR

100A

COMMANDING

OFFICER

CORRIDOR

100A

TECH EQUIPMENT

AREA

TELECOM/

INTERNET

SERVER ROOM

126B

I/T PROGRAM

MGMT SPVR

126A

ELECTRIC

MECHANICAL

ROOM

128A

FEMALE

RESTROOM/

LOCKERS

MALE

RESTROOM/SHOWERS

135 MISSION

ASSURANCE PM

UTILITY CHASE

131A

DEPLOYMENT

READYNESS

COORDINATOR

ADJUDANT

EX OFFICER

ADMIN SUPPORT

COORDINATOR

PERSONNEL

OFFICER

CAREER

PLANNER

CHAPLAIN

SGT MAJOR

CONFERENCE

ROOM

RR-10

RR-10

RR-10

CD-4

CD-4

CD-4

CD-4

CD-4

CD-4

CD-4

CD-4

CD-4

CD-5

CD-5

CD-5

CD-5

CD-4

CD-4

CD-5

CD-5

ERVU-1

8"ø SA

"ø

S A

"ø

R A

"ø

S A

12"ø SA

12"ø SA

14"ø SA

"ø

S A

14"ø SA

4"ø SA

4" ø

SA

4"ø SA

4" ø

SA

14"ø SA

4"ø SA

4" ø

SA

4" ø

SA

4"ø SA

12"ø SA

8"ø SA

4"ø SA

"ø

S A

4" ø

SA

4"ø SA

4" ø

SA

4" ø

SA

4"ø SA

4" ø

SA

4"ø SA

4" ø

SA

10"ø RA

8" ø

R A

8" ø

R A

10"ø RA

12"ø RA

"ø

R A

12"ø RA

SUPPLY AIR

OUTSIDE AIR PLENUM

RR-10

RR-10

RR-10

RR-10

RR-10

RR-10

RR-10

RR-10

RR-10

RR-10

0 RR-10

RR-10

RR-10

RR-10

EF-2

PROVIDE A MOTORIZED DAMPER

INTERLOCK WITH ERVU-1

CD-6

CD-6

CD-6

CD-6

DUCTWORK TO BE CONNECTED

TO OUTSIDE AIR PLENUM

EXHAUST LOUVER

CONNECTED TO EXHAUST

AIR FROM ERVU-1

PROVIDE FIRE DAMPERS

(2 HR RATED)

PROVIDE FIRE DAMPERS

(2 HR RATED)

1. FINAL LOCATION OF THE HEATING PANELS MUST BE COORDINATED WITH THE FINAL FURNITURE LAYOUT.

COORDINATE WITH CONTRACTING OFFICER REPRESENTATIVE (COR).

2. DUCTWORK LAYOUT MUST BE COORDINATED AT THE FIELD, AS IT NEEDS TO BE COORDINATED WITH STRUCTURAL ELEMENTS THAT ARE NOT PART OF THIS CONTRACT. COORDINATION WITH ELECTRICAL AND

FIRE PROTECTION DISCIPLINES IS REQUIRED.

3. VERIFY WITH CONTRACTING OFFICER REPRESENTATIVE (COR) FINAL LAYOUT OF ALL MECHANICAL

DUCTWORK.

4. NATURAL GAS (NG) CONNECTIONS, ALTERATIONS, ETC SHALL BE COORDINATED WITH THE DEPARTMENT OF

PUBLIC WORKS, AND THE UTILITY PROVIDER (NATIONAL GRID).

5. ALL SUPPLY AIR DUCTWORK SHALL BE TOTALLY INSULATED, COMPLETE. RETURN AIR DUCTWORK NEED NOT

BE INSULATED.

6. VOLUME DAMPERS SHALL BE PROVIDED ON EACH INDIVIDUAL BRANCH. SHALL BE LOCATED AT LEAST 12

INCHES FROM CONNECTION TO FLEXIBLE DUCT.

7. HVAC SHUT-OFF BUTTON, SHALL BE PROVIDE ON THE LOCATION SHOWN, IT SHALL BE INSTALLED WITH A

CLEAR CASING COVER.

8. ISOLATION VALVES SHALL BE PROVIDED WHEN NECESSARY AND COORDINATED WITH CONTRACTING OFFICER

REPRESENTATIVE (COR) AT THE FIELD.

9. CONTRACTOR SHALL BE REQUIRED TO SIZE AND PROVIDE A DX COIL FOR THE ERVU-1. THE DX COIL SHALL BE SIZE TO MEET ROOM SUPPLY AIR DESIGN CONDITIONS (78 DEG F, 50% RH, IN CONJUCTION WITH HEATING COIL DURING SUMMER COOLING SEASON INCLUSIVE OF CONTROLS). CONTRACTOR HAS THE OPTION TO CONNECT THE DX COIL TO THE VRF SYSTEM (HEAT PUMP), OR PROVIDE A SEPARATE CONDENSING UNIT. THIS SHALL ALSO INCLUDE ITS CONTROLS, COMPLETE. ALL ELECTRICAL REQUIREMENTS SHALL BE COORDINATED

WITH ELECTRICAL CONTRACTOR AS REQUIRED, COMPLETE.

10. CONTRACTOR SHALL PROVIDE CIRCUIT SETTER (BALANCING VALVE) FOR FLOW BALANCING. ADDITIONALLY, CONTRACTOR SHALL PROVIDE SHUT-OFF/ISOLATION VALVE (1/4-TURN BALL VALVES) AT ALL PIPE BRANCHES

FOR FLOW ISOLATION (NOTE: CURRENTLY NOT SHOWN ON PLANS).

GENERAL NOTES:

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

Fi le

P at h:

Pl ot D at e:

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

S:

\P ro je ct s\

Ft _H am ilt on \B ld g_

5_

R en ov \C

AD

_B

IM

\1

4_ M ec h\

Te nz in -9

0% re vi se d fo ld er

\R en ov at io n

BL

D

G

.rv t 9/

7/

:0 3:

P

M

M-103

D U

C

TW

O R

K

PL

AN

II

W

AI

N W

R

IG

H T

D R

BR

O O

KL

YN

N Y

N

EW

Y

O R

K D

IS

TR

IC

T

F

ED

ER

AL

P

LA

ZA

, N

EW

Y O

R K, N Y

N O

T

FO

R C

O N

ST

R

U C

TI

O

N

D es ig ne r

Au th or

C he ck er

JU

LY

1, BL

D G

ST

M

AR

IN

E

C O

R

PS

D

IS

TR

IC

T R

EL

O

C

AT

IO

N

T O

F T

FO

R

T H

AM

IL

TO

N

, N Y

R ev is ed N ot es

, a nd a dd iti on al in fo rm at io n pr ov id ed D at e

3/16" = 1'-0"B1 DUCTWORK PLAN II

SCALE: = 1'-0"3/16"

0 4 8 124

12" = 1'-0"1 MECHANICAL GENERAL NOTES 1.2

B

A

CLASSROOM/

CONFERENCE

WORK SPACE

AREA

MENS RESTROOM

STUDIO/ PRINT

ROOM

MARKETING AND

COMM O

RECRUITER

INSTRUCTOR

PRIOR SERVICE

RECRUITING OIC

(PSR)

TRAINING TEAM

DEPUTY

106TRAINING TEAM

OIC

TRAINING TEAM

CHIEF

LACTATION

ROOM

BREAK ROOM

SORTING ROOM

WORK SPACE

AREA

114 ELECTRIC

TELECOM

WORK SPACE

AREA

OPERATIONS

OFFICER

8"ø SA

8"ø SA

4" ø

SA

4"ø SA

4" ø

SA

4"ø SA4"ø SA

4" ø

SA

4" ø

SA

4"ø SA

4"ø SA

MENSLOCKER

AND SHOWER

107A

WOMENS REST

ROOM

WOMENS

LOCKER AND

SHOWER

109A

RR-10

CD-4

CD-5

CD-5

CD-5

CD-5

CD-4

CD-4

CD-4

CD-4

CD-4

CD-4

CD-5

CD-4

CD-4

CD-5

CD-4

CD-5

CD-4

CD-4

SCALE: = 1'-0"3/16"

0 4 8 124

12"ø RA

8"ø SA

12"ø RA 12"ø RA 12"ø RA

8" ø

R A

8" ø

R A

8" ø

R A

4" ø

SA

4" ø

SA

4" ø

SA

4" ø

SA

4"ø SA

4" ø

SA

4" ø

SA

4" ø

SA

4" ø

SA

RR-10

RR-10

RR-10

RR-10

RR-10

RR-10

RR-10

RR-10

RR-10

RR-10

RR-10

RR-10

0 RR-10

RR-10

RR-10

0RR-10

HVAC SHUT DOWN

PUSH BUTTON

VD

(TYP) VD

(TYP)

CD-6

CD-6

CD-6

CD-6

CD-5

CD-5

CD-6

CD-6

CD-6

EF-3

1. FINAL LOCATION OF THE HEATING PANELS MUST BE COORDINATED WITH THE FINAL FURNITURE LAYOUT.

COORDINATE WITH CONTRACTING OFFICER REPRESENTATIVE (COR).

2. DUCTWORK LAYOUT MUST BE COORDINATED AT THE FIELD, AS IT NEEDS TO BE COORDINATED WITH STRUCTURAL ELEMENTS THAT ARE NOT PART OF THIS CONTRACT. COORDINATION WITH ELECTRICAL AND

FIRE PROTECTION DISCIPLINES IS REQUIRED.

3. VERIFY WITH CONTRACTING OFFICER REPRESENTATIVE (COR) FINAL LAYOUT OF ALL MECHANICAL

DUCTWORK.

4. NATURAL GAS (NG) CONNECTIONS, ALTERATIONS, ETC SHALL BE COORDINATED WITH THE DEPARTMENT OF

PUBLIC WORKS, AND THE UTILITY PROVIDER (NATIONAL GRID).

5. ALL SUPPLY AIR DUCTWORK SHALL BE TOTALLY INSULATED, COMPLETE. RETURN AIR DUCTWORK NEED NOT

BE INSULATED.

6. VOLUME DAMPERS SHALL BE PROVIDED ON EACH INDIVIDUAL BRANCH. SHALL BE LOCATED AT LEAST 12

INCHES FROM CONNECTION TO FLEXIBLE DUCT.

7. HVAC SHUT-OFF BUTTON, SHALL BE PROVIDE ON THE LOCATION SHOWN, IT SHALL BE INSTALLED WITH A

CLEAR CASING COVER.

8. ISOLATION VALVES SHALL BE PROVIDED WHEN NECESSARY AND COORDINATED WITH CONTRACTING OFFICER

REPRESENTATIVE (COR) AT THE FIELD.

9. CONTRACTOR SHALL BE REQUIRED TO SIZE AND PROVIDE A DX COIL FOR THE ERVU-1. THE DX COIL SHALL BE SIZE TO MEET ROOM SUPPLY AIR DESIGN CONDITIONS (78 DEG F, 50% RH, IN CONJUCTION WITH HEATING COIL DURING SUMMER COOLING SEASON INCLUSIVE OF CONTROLS). CONTRACTOR HAS THE OPTION TO CONNECT THE DX COIL TO THE VRF SYSTEM (HEAT PUMP), OR PROVIDE A SEPARATE CONDENSING UNIT. THIS SHALL ALSO INCLUDE ITS CONTROLS, COMPLETE. ALL ELECTRICAL REQUIREMENTS SHALL BE COORDINATED

WITH ELECTRICAL CONTRACTOR AS REQUIRED, COMPLETE.

10. CONTRACTOR SHALL PROVIDE CIRCUIT SETTER (BALANCING VALVE) FOR FLOW BALANCING. ADDITIONALLY, CONTRACTOR SHALL PROVIDE SHUT-OFF/ISOLATION VALVE (1/4-TURN BALL VALVES) AT ALL PIPE BRANCHES

FOR FLOW ISOLATION (NOTE: CURRENTLY NOT SHOWN ON PLANS).

GENERAL NOTES:

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

Fi le

P at h:

Pl ot D at e:

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

S:

\P ro je ct s\

Ft _H am ilt on \B ld g_

5_

R en ov \C

AD

_B

IM

\1

4_ M ec h\

Te nz in -9

0% re vi se d fo ld er

\R en ov at io n

BL

D

G

.rv t 9/

7/

:0 4:

P

M

M-104

D U

C

TW

O R

K

PL

AN

II

I

W

AI

N W

R

IG

H T

D R

BR

O O

KL

YN

N Y

N

EW

Y

O R

K D

IS

TR

IC

T

F

ED

ER

AL

P

LA

ZA

, N

EW

Y O

R K, N Y

N O

T

FO

R C

O N

ST

R

U C

TI

O

N

D es ig ne r

Au th or

C he ck er

JU

LY

1, BL

D G

ST

M

AR

IN

E

C O

R

PS

D

IS

TR

IC

T R

EL

O

C

AT

IO

N

T O

F T

FO

R

T H

AM

IL

TO

N

, N Y

R ev is ed N ot es

, a nd a dd iti on al in fo rm at io n pr ov id ed D at e

3/16" = 1'-0"B1 DUCTWORK PLAN III

12" = 1'-0"1 MECHANICAL GENERAL NOTES 1.3

A

3 4 5

1 1/2" DIA HWS

1 1/2" DIA HWS

WAREHOUSE

SARC

DEP

COMPTROLLER

142 COMPTROLLER

LOGISTICS

OFFICER

LOGISTICS MGMT

SPECIALIST

SUPPLY MGMT

SPECIALIST

SUPPLY CHIEF

SUPPLY OFFICER

SUPPLY/LOG MGT

SPEC (MEDICAL)

SACO

SUBSTANCE

ABUSE ROOM

UH-1 UH-2

UH-3 UH-4

WORK SPACE

AREA 3

1 1/2 " DIA HWR

1 1/2" HWR

3/4" DIA HWS

3/4" DIA HWR

3/4" DIA HWR

3/4" DIA HWS

1 1/2" DIA HWS

1 1/2" DIA HWR

3/4" DIA

HWR

3/4" DIA

HWS

PR-6-6 PR-6-6 PR-6-6PR-6-6PR-6-6PR-6-6

PR-6-8 PR-6-6 PR-6-6 PR-6-6 PR-6-6 PR-6-6 PR-6-6

HWS Capped

HWS Capped

Circuit Setter Flow Bypass (Apprx 1 %)

Circuit Setter Flow Bypass (Apprx 1%)

Shut-off Ball Valve (Tag Fully Open, Normal Position)

Shut-off Ball Valve (Tag Fully Open, Normal Position)

HWR Capped

HWR Capped

FOR VFD PUMP (P-1 & P-2)

PRESSURE DIFFERENTIAL

SENSOR, SET CONTROL PRESSURE

15 FTHD (ADJUSTABLE)

FOR VFD PUMP (P-1 & P-2)

PRESSURE DIFFERENTIAL

SENSOR, SET CONTROL PRESSURE

15 FTHD (ADJUSTABLE)

PCOMP-D

PCOMP-D

PIPE ANCHOR

PIPE ANCHOR

1. FINAL LOCATION OF THE HEATING PANELS MUST BE COORDINATED WITH THE FINAL FURNITURE LAYOUT.

COORDINATE WITH CONTRACTING OFFICER REPRESENTATIVE (COR).

2. DUCTWORK LAYOUT MUST BE COORDINATED AT THE FIELD, AS IT NEEDS TO BE COORDINATED WITH STRUCTURAL ELEMENTS THAT ARE NOT PART OF THIS CONTRACT. COORDINATION WITH ELECTRICAL AND

FIRE PROTECTION DISCIPLINES IS REQUIRED.

3. VERIFY WITH CONTRACTING OFFICER REPRESENTATIVE (COR) FINAL LAYOUT OF ALL MECHANICAL

DUCTWORK.

4. NATURAL GAS (NG) CONNECTIONS, ALTERATIONS, ETC SHALL BE COORDINATED WITH THE DEPARTMENT OF

PUBLIC WORKS, AND THE UTILITY PROVIDER (NATIONAL GRID).

5. ALL SUPPLY AIR DUCTWORK SHALL BE TOTALLY INSULATED, COMPLETE. RETURN AIR DUCTWORK NEED NOT

BE INSULATED.

6. VOLUME DAMPERS SHALL BE PROVIDED ON EACH INDIVIDUAL BRANCH. SHALL BE LOCATED AT LEAST 12

INCHES FROM CONNECTION TO FLEXIBLE DUCT.

7. HVAC SHUT-OFF BUTTON, SHALL BE PROVIDE ON THE LOCATION SHOWN, IT SHALL BE INSTALLED WITH A

CLEAR CASING COVER.

8. ISOLATION VALVES SHALL BE PROVIDED WHEN NECESSARY AND COORDINATED WITH CONTRACTING OFFICER

REPRESENTATIVE (COR) AT THE FIELD.

9. CONTRACTOR SHALL BE REQUIRED TO SIZE AND PROVIDE A DX COIL FOR THE ERVU-1. THE DX COIL SHALL BE SIZE TO MEET ROOM SUPPLY AIR DESIGN CONDITIONS (78 DEG F, 50% RH, IN CONJUCTION WITH HEATING COIL DURING SUMMER COOLING SEASON INCLUSIVE OF CONTROLS). CONTRACTOR HAS THE OPTION TO CONNECT THE DX COIL TO THE VRF SYSTEM (HEAT PUMP), OR PROVIDE A SEPARATE CONDENSING UNIT. THIS SHALL ALSO INCLUDE ITS CONTROLS, COMPLETE. ALL ELECTRICAL REQUIREMENTS SHALL BE COORDINATED

WITH ELECTRICAL CONTRACTOR AS REQUIRED, COMPLETE.

10. CONTRACTOR SHALL PROVIDE CIRCUIT SETTER (BALANCING VALVE) FOR FLOW BALANCING. ADDITIONALLY, CONTRACTOR SHALL PROVIDE SHUT-OFF/ISOLATION VALVE (1/4-TURN BALL VALVES) AT ALL PIPE BRANCHES

FOR FLOW ISOLATION (NOTE: CURRENTLY NOT SHOWN ON PLANS).

GENERAL NOTES:

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

Fi le

P at h:

Pl ot D at e:

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

S:

\P ro je ct s\

Ft _H am ilt on \B ld g_

5_

R en ov \C

AD

_B

IM

\1

4_ M ec h\

Te nz in -9

0% re vi se d fo ld er

\R en ov at io n

BL

D

G

.rv t 9/

7/

:0 4:

P

M

M-105

M

EC

H

AN

IC

AL

P

IP

IN

G

P

LA

N I

W

AI

N W

R

IG

H T

D R

BR

O O

KL

YN

N Y

N

EW

Y

O R

K D

IS

TR

IC

T

F

ED

ER

AL

P

LA

ZA

, N

EW

Y O

R K, N Y

N O

T

FO

R C

O N

ST

R

U C

TI

O

N

D es ig ne r

Au th or

C he ck er

JU

LY

1, BL

D G

ST

M

AR

IN

E

C O

R

PS

D

IS

TR

IC

T R

EL

O

C

AT

IO

N

T O

F T

FO

R

T H

AM

IL

TO

N

, N Y

R ev is ed N ot es

, a nd a dd iti on al in fo rm at io n pr ov id ed D at e

3/16" = 1'-0"A1 MECHANICAL PIPING PLAN I

SCALE: = 1'-0"3/16"

0 4 8 124

12" = 1'-0"1 MECHANICAL GENERAL NOTES 1.4

SEE NOTE 10

A

5 6 7

B-1

B-2

FEMALE

RESTROOM/

LOCKERS

MALE

RESTROOM/SHOWERS

WORK SPACE

AREA 2

PERSONNEL

OFFICER

MECHANICAL

ROOM

128A

TELECOM/

INTERNET

SERVER ROOM

126B

ELECTRIC

J.C.

I/T PROGRAM

MGMT SPVR

126A

CORRIDOR

100A

COMMANDING

OFFICER

CAREER

PLANNER

CHAPLAIN

CORRIDOR

100A

MISSION

ASSURANCE PM

DEPLOYMENT

READYNESS

COORDINATOR

UTILITY CHASE

131A

ADJUDANT

EX OFFICER

TECH EQUIPMENT

AREA

ADMIN SUPPORT

COORDINATOR

PR-6-6 PR-6-6 PR-8-6 PR-8-6 PR-8-6 PR-8-6 PR-6-6 PR-6-6

SGT MAJOR

FP ROOM

127A

CONFERENCE

ROOM

PR-6-8PR-6-6PR-6-6PR-8-8PR-6-6PR-6-8PR-6-8

2" DIA HWS

2" DIA HWR

1/2" DIA HWR

1/2" DIA HWS

2 1/2" DIA HWS

2 1/2" DIA HWR

1/2" DIA HWS

1 1/4" DIA HWR

1 1/4" DIA HWS

3/4" DIA HWS

1 1/4" HWS

P-1

P-2

3/4" DIA HWR

1" DIA HWS

1" DIA HWR

UH-5

UH-6

UH-5

CUH-5 CUH-3

FOR PIPING CONNECTION SEE

DWG M-801

EXISTING ACTIVE STEAM BOILER

TO REMAIN FOR USE

PIPE ANCHOR

PIPE ANCHOR

1. FINAL LOCATION OF THE HEATING PANELS MUST BE COORDINATED WITH THE FINAL FURNITURE LAYOUT.

COORDINATE WITH CONTRACTING OFFICER REPRESENTATIVE (COR).

2. DUCTWORK LAYOUT MUST BE COORDINATED AT THE FIELD, AS IT NEEDS TO BE COORDINATED WITH STRUCTURAL ELEMENTS THAT ARE NOT PART OF THIS CONTRACT. COORDINATION WITH ELECTRICAL AND

FIRE PROTECTION DISCIPLINES IS REQUIRED.

3. VERIFY WITH CONTRACTING OFFICER REPRESENTATIVE (COR) FINAL LAYOUT OF ALL MECHANICAL

DUCTWORK.

4. NATURAL GAS (NG) CONNECTIONS, ALTERATIONS, ETC SHALL BE COORDINATED WITH THE DEPARTMENT OF

PUBLIC WORKS, AND THE UTILITY PROVIDER (NATIONAL GRID).

5. ALL SUPPLY AIR DUCTWORK SHALL BE TOTALLY INSULATED, COMPLETE. RETURN AIR DUCTWORK NEED NOT

BE INSULATED.

6. VOLUME DAMPERS SHALL BE PROVIDED ON EACH INDIVIDUAL BRANCH. SHALL BE LOCATED AT LEAST 12

INCHES FROM CONNECTION TO FLEXIBLE DUCT.

7. HVAC SHUT-OFF BUTTON, SHALL BE PROVIDE ON THE LOCATION SHOWN, IT SHALL BE INSTALLED WITH A

CLEAR CASING COVER.

8. ISOLATION VALVES SHALL BE PROVIDED WHEN NECESSARY AND COORDINATED WITH CONTRACTING OFFICER

REPRESENTATIVE (COR) AT THE FIELD.

9. CONTRACTOR SHALL BE REQUIRED TO SIZE AND PROVIDE A DX COIL FOR THE ERVU-1. THE DX COIL SHALL BE SIZE TO MEET ROOM SUPPLY AIR DESIGN CONDITIONS (78 DEG F, 50% RH, IN CONJUCTION WITH HEATING COIL DURING SUMMER COOLING SEASON INCLUSIVE OF CONTROLS). CONTRACTOR HAS THE OPTION TO CONNECT THE DX COIL TO THE VRF SYSTEM (HEAT PUMP), OR PROVIDE A SEPARATE CONDENSING UNIT. THIS SHALL ALSO INCLUDE ITS CONTROLS, COMPLETE. ALL ELECTRICAL REQUIREMENTS SHALL BE COORDINATED

WITH ELECTRICAL CONTRACTOR AS REQUIRED, COMPLETE..

10. CONTRACTOR SHALL PROVIDE CIRCUIT SETTER (BALANCING VALVE) FOR FLOW BALANCING. ADDITIONALLY, CONTRACTOR SHALL PROVIDE SHUT-OFF/ISOLATION VALVE (1/4-TURN BALL VALVES) AT ALL PIPE BRANCHES

FOR FLOW ISOLATION (NOTE: CURRENTLY NOT SHOWN ON PLANS).

GENERAL NOTES:

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

Fi le

P at h:

Pl ot D at e:

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

S:

\P ro je ct s\

Ft _H am ilt on \B ld g_

5_

R en ov \C

AD

_B

IM

\1

4_ M ec h\

Te nz in -9

0% re vi se d fo ld er

\R en ov at io n

BL

D

G

.rv t 9/

7/

:0 4:

P

M

M-106

M

EC

H

AN

IC

AL

P

IP

IN

G

P

LA

N

II

W

AI

N W

R

IG

H T

D R

BR

O O

KL

YN

N Y

N

EW

Y

O R

K D

IS

TR

IC

T

F

ED

ER

AL

P

LA

ZA

, N

EW

Y O

R K, N Y

N O

T

FO

R C

O N

ST

R

U C

TI

O

N

D es ig ne r

Au th or

C he ck er

JU

LY

1, BL

D G

ST

M

AR

IN

E

C O

R

PS

D

IS

TR

IC

T R

EL

O

C

AT

IO

N

T O

F T

FO

R

T H

AM

IL

TO

N

, N Y

R ev is ed N ot es

, a nd a dd iti on al in fo rm at io n pr ov id ed D at e

3/16" = 1'-0"B1 MECHANICAL PIPING PLAN II

SCALE: = 1'-0"3/16"

0 4 8 124

12" = 1'-0"1 MECHANICAL GENERAL NOTES 1.5

SEE NOTE 10

SEE NOTE 10

SEE NOTE 10

SEE NOTE 10

DN

B

A

3/4" DIA HWS

OPERATIONS

OFFICER

CLASSROOM/

CONFERENCE

WORK SPACE

AREA

WORK SPACE

AREA

114 ELECTRIC

TELECOM

SORTING ROOM

BREAK ROOM

LACTATION

ROOM

MENSLOCKER

AND SHOWER

107A

RECRUITER

INSTRUCTOR

104 STUDIO/ PRINT

ROOM

MARKETING AND

COMM O

TRAINING TEAM

DEPUTY

TRAINING TEAM

CHIEF

115 PRIOR SERVICE

RECRUITING OIC

(PSR)

MENS RESTROOM

WOMENS REST

ROOM

WOMENS

LOCKER AND

SHOWER

109A

3/4" DIA HWR 1/2" DIA HWR

1/2" DIA HWS

CUH-4 CUH-6CUH-2

CHU-7

VESTIBULE

PR-6-8 PR-8-6 PR-8-6

PR-6-6

PR-6-6

PR-10-15 PR-10-15 PR-10-15 PR-10-15 PR-10-15 PR-10-15PR-10-15

3/4" DIA HWS

3/4" DIA HWR

1" DIA HWS

1" DIA HWR

1" DIA HWR

1" DIA HWS

Circuit Setter Flow Bypass (Apprx. 1%)

FOR VFD PUMP (P-1 & P-2)

PRESSURE DIFFERENTIAL

SENSOR, SET CONTROL PRESSURE

15 FTHD (ADJUSTABLE)

FOR VFD PUMP (P-1 & P-2)

PRESSURE DIFFERENTIAL

SENSOR, SET CONTROL PRESSURE

15 FTHD (ADJUSTABLE)

Circuit Setter Flow Bypass (Apprx. 1%)

PCOMP-A

PR-6-6

1. FINAL LOCATION OF THE HEATING PANELS MUST BE COORDINATED WITH THE FINAL FURNITURE LAYOUT.

COORDINATE WITH CONTRACTING OFFICER REPRESENTATIVE (COR).

2. DUCTWORK LAYOUT MUST BE COORDINATED AT THE FIELD, AS IT NEEDS TO BE COORDINATED WITH STRUCTURAL ELEMENTS THAT ARE NOT PART OF THIS CONTRACT. COORDINATION WITH ELECTRICAL AND

FIRE PROTECTION DISCIPLINES IS REQUIRED.

3. VERIFY WITH CONTRACTING OFFICER REPRESENTATIVE (COR) FINAL LAYOUT OF ALL MECHANICAL

DUCTWORK.

4. NATURAL GAS (NG) CONNECTIONS, ALTERATIONS, ETC SHALL BE COORDINATED WITH THE DEPARTMENT OF

PUBLIC WORKS, AND THE UTILITY PROVIDER (NATIONAL GRID).

5. ALL SUPPLY AIR DUCTWORK SHALL BE TOTALLY INSULATED, COMPLETE. RETURN AIR DUCTWORK NEED NOT

BE INSULATED.

6. VOLUME DAMPERS SHALL BE PROVIDED ON EACH INDIVIDUAL BRANCH. SHALL BE LOCATED AT LEAST 12

INCHES FROM CONNECTION TO FLEXIBLE DUCT.

7. HVAC SHUT-OFF BUTTON, SHALL BE PROVIDE ON THE LOCATION SHOWN, IT SHALL BE INSTALLED WITH A

CLEAR CASING COVER.

8. ISOLATION VALVES SHALL BE PROVIDED WHEN NECESSARY AND COORDINATED WITH CONTRACTING OFFICER

REPRESENTATIVE (COR) AT THE FIELD.

9. CONTRACTOR SHALL BE REQUIRED TO SIZE AND PROVIDE A DX COIL FOR THE ERVU-1. THE DX COIL SHALL BE SIZE TO MEET ROOM SUPPLY AIR DESIGN CONDITIONS (78 DEG F, 50% RH, IN CONJUCTION WITH HEATING COIL DURING SUMMER COOLING SEASON INCLUSIVE OF CONTROLS). CONTRACTOR HAS THE OPTION TO CONNECT THE DX COIL TO THE VRF SYSTEM (HEAT PUMP), OR PROVIDE A SEPARATE CONDENSING UNIT. THIS SHALL ALSO INCLUDE ITS CONTROLS, COMPLETE. ALL ELECTRICAL REQUIREMENTS SHALL BE COORDINATED

WITH ELECTRICAL CONTRACTOR AS REQUIRED, COMPLETE.

10. CONTRACTOR SHALL PROVIDE CIRCUIT SETTER (BALANCING VALVE) FOR FLOW BALANCING. ADDITIONALLY, CONTRACTOR SHALL PROVIDE SHUT-OFF/ISOLATION VALVE (1/4-TURN BALL VALVES) AT ALL PIPE BRANCHES

FOR FLOW ISOLATION (NOTE: CURRENTLY NOT SHOWN ON PLANS).

GENERAL NOTES:

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

Fi le

P at h:

Pl ot D at e:

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

S:

\P ro je ct s\

Ft _H am ilt on \B ld g_

5_

R en ov \C

AD

_B

IM

\1

4_ M ec h\

Te nz in -9

0% re vi se d fo ld er

\R en ov at io n

BL

D

G

.rv t 9/

7/

:0 4:

P

M

M-107

M

EC

H

AN

IC

AL

P

IP

IN

G

P

LA

N

II

I

W

AI

N W

R

IG

H T

D R

BR

O O

KL

YN

N Y

N

EW

Y

O R

K D

IS

TR

IC

T

F

ED

ER

AL

P

LA

ZA

, N

EW

Y O

R K, N Y

N O

T

FO

R C

O N

ST

R

U C

TI

O

N

D es ig ne r

Au th or

C he ck er

JU

LY

1, BL

D G

ST

M

AR

IN

E

C O

R

PS

D

IS

TR

IC

T R

EL

O

C

AT

IO

N

T O

F T

FO

R

T H

AM

IL

TO

N

, N Y

R ev is ed N ot es

, a nd a dd iti on al in fo rm at io n pr ov id ed D at e

3/16" = 1'-0"B1 MECHANICAL PIPING PLAN III

SCALE: = 1'-0"3/16"

0 4 8 124

12" = 1'-0"1 MECHANICAL GENERAL NOTES 1.6

US Army Corps of Engineers ®

SHEET ID

U S

AR

M Y C O R

PS

O F

EN

G

IN

EE

R S

D R

AW

N B Y:

D

ES

IG

N

ED

B Y:

SU

BM

IT

TE

D B Y:

SI

ZE

C H

EC

KE

D B Y:

AN

SI

D

IS

SU

E D

AT

E:

C O N

TR

AC

T N O

SO

LI

C

IT

AT

IO

N N O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K D

ES

C R

IP

TI

O N

Fi le P at h:

Pl ot D at e:

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

S:

\P ro je ct s\ Ft _H am ilt on \B ld g_ 5_ R en ov \C

AD

_B

IM

\1 4_ M ec h\ Te nz in -9 0% re vi se d fo ld er \R en ov at io n

BL

D G .rv t

9/ 5/ :3 6:

A M

M-602

M

EC

H

AN

IC

AL

S C H

ED

U

LE

II

W

AI

N W R

IG

H T D R

BR

O O

KL

YN

N Y

N

EW

Y O R K D

IS

TR

IC

T

F

ED

ER

AL

P

LA

ZA

, N

EW

Y O R K, N Y

N O T

FO

R C O N

ST

R U C

TI

O N

D es ig ne r

Au th or

C he ck er

JU

LY

1, BL

D G

ST

M

AR

IN

E C O R

PS

D

IS

TR

IC

T R

EL

O C

AT

IO

N T O F T

FO

R T H

AM

IL

TO

N , N

Y

R ev is ed N ot es , a nd a dd iti on al in fo rm at io n pr ov id ed

D at e

M-101-(rev02)
M-102-(rev02)
M-103-(rev02)
M-104-(rev02)
M-105-(rev02)
M-106-(rev02)
M-107-(rev02)
M-602 -(rev01)
Sheets: M-602 - MECHANICAL SCHEDULE II