Amendment 2 Mechanical Drawings M102 thru 107 M601 M701.pdf
PDF 9 MB Posted
- Solicitation number
- W912DS23B0022
About this file
This package of construction documents includes mechanical drawings, piping plans, schedules, and sequences of operation for the renovation of Building 125 at Fort Hamilton in Brooklyn, New York. The project involves ductwork, piping, and HVAC system upgrades including replacing an ERV unit and adding a DX coil. The solicitation is issued by the US Army Corps of Engineers New York District on behalf of the Department of the Army for the relocation of the 1st Marine Corps District headquarters to Fort Hamilton. The contractor will be responsible for coordination with structural, electrical, and fire protection disciplines as well as coordinating gas connections and inspections with the local Department of Public Works and utility provider.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DN
B
A
3 4 5
LOGISTICS
OFFICER
LOGISTICS MGMT
SPECIALIST
SUPPLY MGMT
SPECIALIST
SUPPLY CHIEF
SUPPLY OFFICER
SUPPLY/LOG MGT
SPEC (MEDICAL)
SACO
SUBSTANCE
ABUSE ROOM
ALL HANDS
CONFERENCE
ROOM/ CLASS
ROOM
WORK SPACE
AREA 3
WAREHOUSE
SARC
DEP
COMPTROLLER
142 COMPTROLLER
CD-4
CD-5
CD-5
CD-4
CD-4
CD-4
CD-4
CD-4
CD-4
CD-4
8" ø
SA
8"ø SA
6"ø SA
4"ø SA
4" ø
SA
4"ø SA
6"ø SA
4" ø
SA
4" ø
SA
4"ø SA
4" ø
SA
4" ø
SA
4" ø
SA
4"ø SA
4" ø
SA
4"ø SA
6"ø SA
8" ø
SA
4"ø SA
6" ø
SA
4"ø SA 4"ø SA
4"ø SA4"ø SA
6" ø
SA
4" ø
SA
6" ø
SA
4" ø
SA
8"ø SA
4"ø SA
4" ø
SA
4"ø SA
4" ø
SA
8"ø SA
4"ø SA4"ø SA
4"ø SA
4" ø
SA
4" ø
SA
8"ø SA
4"ø SA
12"ø SA
CD-4
CD-4
CD-4
CD-4
CD-4
CD-4
12 CD-4
CD-4
CD-4
CD-4
CD-4
EF-1
PROVIDE A MOTORIZED DAMPER;
INTERLOCK WITH THE TWO (2)
INVERSLY-INTERLOCKED DAMPERS,
AS SHOWN.
PROVIDE A MTD
PROVIDE 6 INCHES DIAMETER
SHUT-OFF MOTORIZED DAMPER;
INVERSLY-INTERLOCK WITH EF-1
12" x 12" LOUVER
WITH MOTORIZED DAMPER
(MOTORIZED DAMPER
BEHIND LOUVER); INVERSLY- INTELOCK
WITH EF-1
RR-10
RR-10
VD
(TYP)
VD
(TYP)
RR-10
RR-10
RR-10
RR-10
RR-10
RR-10
RR-10
RR-10
RR-10
RR-10
RR-10
RR-10
RR-10
RR-10
1. FINAL LOCATION OF THE HEATING PANELS MUST BE COORDINATED WITH THE FINAL FURNITURE LAYOUT.
COORDINATE WITH CONTRACTING OFFICER REPRESENTATIVE (COR).
2. DUCTWORK LAYOUT MUST BE COORDINATED AT THE FIELD, AS IT NEEDS TO BE COORDINATED WITH STRUCTURAL ELEMENTS THAT ARE NOT PART OF THIS CONTRACT. COORDINATION WITH ELECTRICAL AND
FIRE PROTECTION DISCIPLINES IS REQUIRED.
3. VERIFY WITH CONTRACTING OFFICER REPRESENTATIVE (COR) FINAL LAYOUT OF ALL MECHANICAL
DUCTWORK.
4. NATURAL GAS (NG) CONNECTIONS, ALTERATIONS, ETC SHALL BE COORDINATED WITH THE DEPARTMENT OF
PUBLIC WORKS, AND THE UTILITY PROVIDER (NATIONAL GRID).
5. ALL SUPPLY AIR DUCTWORK SHALL BE TOTALLY INSULATED, COMPLETE. RETURN AIR DUCTWORK NEED NOT
BE INSULATED.
6. VOLUME DAMPERS SHALL BE PROVIDED ON EACH INDIVIDUAL BRANCH. SHALL BE LOCATED AT LEAST 12
INCHES FROM CONNECTION TO FLEXIBLE DUCT.
7. HVAC SHUT-OFF BUTTON, SHALL BE PROVIDE ON THE LOCATION SHOWN, IT SHALL BE INSTALLED WITH A
CLEAR CASING COVER.
8. ISOLATION VALVES SHALL BE PROVIDED WHEN NECESSARY AND COORDINATED WITH CONTRACTING OFFICER
REPRESENTATIVE (COR) AT THE FIELD.
9. CONTRACTOR SHALL BE REQUIRED TO SIZE AND PROVIDE A DX COIL FOR THE ERVU-1. THE DX COIL SHALL BE SIZE TO MEET ROOM SUPPLY AIR DESIGN CONDITIONS. CONTRACTOR HAS THE OPTION TO CONNECT THE DX COIL TO THE VRF SYSTEM (HEAT PUMP), OR PROVIDE A SEPARATE CONDENSING UNIT. THIS SHALL ALSO INCLUDE ITS CONTROLS, COMPLETE. ALL ELECTRICAL REQUIREMENTS SHALL BE COORDINATED WITH
ELECTRICAL CONTRACTOR AS REQUIRED, COMPLETE.
10. CONTRACTOR SHALL PROVIDE CIRCUIT SETTER (BALANCING VALVE) FOR FLOW BALANCING. ADDITIONALLY, CONTRACTOR SHALL PROVIDE SHUT-OFF/ISOLATION VALVE (1/4-TURN BALL VALVES) AT ALL PIPE BRANCHES
FOR FLOW ISOLATION (NOTE: CURRENTLY NOT SHOWN ON PLANS).
GENERAL NOTES:
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
Fi le
P at h:
Pl ot D at e:
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
S:
\P ro je ct s\
Ft _H am ilt on \B ld g_
5_
R en ov \C
AD
_B
IM
\1
4_ M ec h\
Te nz in -9
0% re vi se d fo ld er
\R en ov at io n
BL
D
G
.rv t 8/
/2
2:
:2
PM
M-102
D U
C
TW
O R
K
PL
AN
I
W
AI
N W
R
IG
H T
D R
BR
O O
KL
YN
N Y
N
EW
Y
O R
K D
IS
TR
IC
T
F
ED
ER
AL
P
LA
ZA
, N
EW
Y O
R K, N Y
N O
T
FO
R C
O N
ST
R
U C
TI
O
N
D es ig ne r
Au th or
C he ck er
JU
LY
1, BL
D G
ST
M
AR
IN
E
C O
R
PS
D
IS
TR
IC
T R
EL
O
C
AT
IO
N
T O
F T
FO
R
T H
AM
IL
TO
N
, N Y
R ev is ed N ot es
, a nd a dd iti on al in fo rm at io n pr ov id ed D at e
3/16" = 1'-0"B1 DUCTWORK PLAN I
SCALE: = 1'-0"3/16"
0 4 8 124
12" = 1'-0"1 MECHANICAL GENERAL NOTES 1.1
A
5 6 7
CORRIDOR
100A
COMMANDING
OFFICER
CORRIDOR
100A
TECH EQUIPMENT
AREA
TELECOM/
INTERNET
SERVER ROOM
126B
I/T PROGRAM
MGMT SPVR
126A
ELECTRIC
MECHANICAL
ROOM
128A
FEMALE
RESTROOM/
LOCKERS
MALE
RESTROOM/SHOWERS
135 MISSION
ASSURANCE PM
UTILITY CHASE
131A
DEPLOYMENT
READYNESS
COORDINATOR
ADJUDANT
EX OFFICER
ADMIN SUPPORT
COORDINATOR
PERSONNEL
OFFICER
CAREER
PLANNER
CHAPLAIN
SGT MAJOR
CONFERENCE
ROOM
RR-10
RR-10
RR-10
CD-4
CD-4
CD-4
CD-4
CD-4
CD-4
CD-4
CD-4
CD-4
CD-5
CD-5
CD-5
CD-5
CD-4
CD-4
CD-5
CD-5
ERVU-1
8"ø SA
"ø
S A
"ø
R A
"ø
S A
12"ø SA
12"ø SA
14"ø SA
"ø
S A
14"ø SA
4"ø SA
4" ø
SA
4"ø SA
4" ø
SA
14"ø SA
4"ø SA
4" ø
SA
4" ø
SA
4"ø SA
12"ø SA
8"ø SA
4"ø SA
"ø
S A
4" ø
SA
4"ø SA
4" ø
SA
4" ø
SA
4"ø SA
4" ø
SA
4"ø SA
4" ø
SA
10"ø RA
8" ø
R A
8" ø
R A
10"ø RA
12"ø RA
"ø
R A
12"ø RA
SUPPLY AIR
OUTSIDE AIR PLENUM
RR-10
RR-10
RR-10
RR-10
RR-10
RR-10
RR-10
RR-10
RR-10
RR-10
0 RR-10
RR-10
RR-10
RR-10
EF-2
PROVIDE A MOTORIZED DAMPER
INTERLOCK WITH ERVU-1
CD-6
CD-6
CD-6
CD-6
DUCTWORK TO BE CONNECTED
TO OUTSIDE AIR PLENUM
EXHAUST LOUVER
CONNECTED TO EXHAUST
AIR FROM ERVU-1
PROVIDE FIRE DAMPERS
(2 HR RATED)
PROVIDE FIRE DAMPERS
(2 HR RATED)
1. FINAL LOCATION OF THE HEATING PANELS MUST BE COORDINATED WITH THE FINAL FURNITURE LAYOUT.
COORDINATE WITH CONTRACTING OFFICER REPRESENTATIVE (COR).
2. DUCTWORK LAYOUT MUST BE COORDINATED AT THE FIELD, AS IT NEEDS TO BE COORDINATED WITH STRUCTURAL ELEMENTS THAT ARE NOT PART OF THIS CONTRACT. COORDINATION WITH ELECTRICAL AND
FIRE PROTECTION DISCIPLINES IS REQUIRED.
3. VERIFY WITH CONTRACTING OFFICER REPRESENTATIVE (COR) FINAL LAYOUT OF ALL MECHANICAL
DUCTWORK.
4. NATURAL GAS (NG) CONNECTIONS, ALTERATIONS, ETC SHALL BE COORDINATED WITH THE DEPARTMENT OF
PUBLIC WORKS, AND THE UTILITY PROVIDER (NATIONAL GRID).
5. ALL SUPPLY AIR DUCTWORK SHALL BE TOTALLY INSULATED, COMPLETE. RETURN AIR DUCTWORK NEED NOT
BE INSULATED.
6. VOLUME DAMPERS SHALL BE PROVIDED ON EACH INDIVIDUAL BRANCH. SHALL BE LOCATED AT LEAST 12
INCHES FROM CONNECTION TO FLEXIBLE DUCT.
7. HVAC SHUT-OFF BUTTON, SHALL BE PROVIDE ON THE LOCATION SHOWN, IT SHALL BE INSTALLED WITH A
CLEAR CASING COVER.
8. ISOLATION VALVES SHALL BE PROVIDED WHEN NECESSARY AND COORDINATED WITH CONTRACTING OFFICER
REPRESENTATIVE (COR) AT THE FIELD.
9. CONTRACTOR SHALL BE REQUIRED TO SIZE AND PROVIDE A DX COIL FOR THE ERVU-1. THE DX COIL SHALL BE SIZE TO MEET ROOM SUPPLY AIR DESIGN CONDITIONS. CONTRACTOR HAS THE OPTION TO CONNECT THE DX COIL TO THE VRF SYSTEM (HEAT PUMP), OR PROVIDE A SEPARATE CONDENSING UNIT. THIS SHALL ALSO INCLUDE ITS CONTROLS, COMPLETE. ALL ELECTRICAL REQUIREMENTS SHALL BE COORDINATED WITH
ELECTRICAL CONTRACTOR AS REQUIRED, COMPLETE.
10. CONTRACTOR SHALL PROVIDE CIRCUIT SETTER (BALANCING VALVE) FOR FLOW BALANCING. ADDITIONALLY, CONTRACTOR SHALL PROVIDE SHUT-OFF/ISOLATION VALVE (1/4-TURN BALL VALVES) AT ALL PIPE BRANCHES
FOR FLOW ISOLATION (NOTE: CURRENTLY NOT SHOWN ON PLANS).
GENERAL NOTES:
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
Fi le
P at h:
Pl ot D at e:
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
S:
\P ro je ct s\
Ft _H am ilt on \B ld g_
5_
R en ov \C
AD
_B
IM
\1
4_ M ec h\
Te nz in -9
0% re vi se d fo ld er
\R en ov at io n
BL
D
G
.rv t 8/
/2
2:
:2
PM
M-103
D U
C
TW
O R
K
PL
AN
II
W
AI
N W
R
IG
H T
D R
BR
O O
KL
YN
N Y
N
EW
Y
O R
K D
IS
TR
IC
T
F
ED
ER
AL
P
LA
ZA
, N
EW
Y O
R K, N Y
N O
T
FO
R C
O N
ST
R
U C
TI
O
N
D es ig ne r
Au th or
C he ck er
JU
LY
1, BL
D G
ST
M
AR
IN
E
C O
R
PS
D
IS
TR
IC
T R
EL
O
C
AT
IO
N
T O
F T
FO
R
T H
AM
IL
TO
N
, N Y
R ev is ed N ot es
, a nd a dd iti on al in fo rm at io n pr ov id ed D at e
3/16" = 1'-0"B1 DUCTWORK PLAN II
SCALE: = 1'-0"3/16"
0 4 8 124
12" = 1'-0"1 MECHANICAL GENERAL NOTES 1.2
DN DN
B
A
CLASSROOM/
CONFERENCE
WORK SPACE
AREA
MENS RESTROOM
STUDIO/ PRINT
ROOM
MARKETING AND
COMM O
RECRUITER
INSTRUCTOR
PRIOR SERVICE
RECRUITING OIC
(PSR)
TRAINING TEAM
DEPUTY
106TRAINING TEAM
OIC
TRAINING TEAM
CHIEF
LACTATION
ROOM
BREAK ROOM
SORTING ROOM
WORK SPACE
AREA
114 ELECTRIC
TELECOM
WORK SPACE
AREA
OPERATIONS
OFFICER
8"ø SA
8"ø SA
4" ø
SA
4"ø SA
4" ø
SA
4"ø SA4"ø SA
4" ø
SA
4" ø
SA
4"ø SA
4"ø SA
MENSLOCKER
AND SHOWER
107A
WOMENS REST
ROOM
WOMENS
LOCKER AND
SHOWER
109A
RR-10
CD-4
CD-5
CD-5
CD-5
CD-5
CD-4
CD-4
CD-4
CD-4
CD-4
CD-4
CD-5
CD-4
CD-4
CD-5
CD-4
CD-5
CD-4
CD-4
SCALE: = 1'-0"3/16"
0 4 8 124
12"ø RA
8"ø SA
12"ø RA 12"ø RA 12"ø RA
8" ø
R A
8" ø
R A
8" ø
R A
4" ø
SA
4" ø
SA
4" ø
SA
4" ø
SA
4"ø SA
4" ø
SA
4" ø
SA
4" ø
SA
4" ø
SA
RR-10
RR-10
RR-10
RR-10
RR-10
RR-10
RR-10
RR-10
RR-10
RR-10
RR-10
RR-10
0 RR-10
RR-10
RR-10
0RR-10
HVAC SHUT DOWN
PUSH BUTTON
VD
(TYP) VD
(TYP)
CD-6
CD-6
CD-6
CD-6
CD-5
CD-5
CD-6
CD-6
CD-6
EF-3
1. FINAL LOCATION OF THE HEATING PANELS MUST BE COORDINATED WITH THE FINAL FURNITURE LAYOUT.
COORDINATE WITH CONTRACTING OFFICER REPRESENTATIVE (COR).
2. DUCTWORK LAYOUT MUST BE COORDINATED AT THE FIELD, AS IT NEEDS TO BE COORDINATED WITH STRUCTURAL ELEMENTS THAT ARE NOT PART OF THIS CONTRACT. COORDINATION WITH ELECTRICAL AND
FIRE PROTECTION DISCIPLINES IS REQUIRED.
3. VERIFY WITH CONTRACTING OFFICER REPRESENTATIVE (COR) FINAL LAYOUT OF ALL MECHANICAL
DUCTWORK.
4. NATURAL GAS (NG) CONNECTIONS, ALTERATIONS, ETC SHALL BE COORDINATED WITH THE DEPARTMENT OF
PUBLIC WORKS, AND THE UTILITY PROVIDER (NATIONAL GRID).
5. ALL SUPPLY AIR DUCTWORK SHALL BE TOTALLY INSULATED, COMPLETE. RETURN AIR DUCTWORK NEED NOT
BE INSULATED.
6. VOLUME DAMPERS SHALL BE PROVIDED ON EACH INDIVIDUAL BRANCH. SHALL BE LOCATED AT LEAST 12
INCHES FROM CONNECTION TO FLEXIBLE DUCT.
7. HVAC SHUT-OFF BUTTON, SHALL BE PROVIDE ON THE LOCATION SHOWN, IT SHALL BE INSTALLED WITH A
CLEAR CASING COVER.
8. ISOLATION VALVES SHALL BE PROVIDED WHEN NECESSARY AND COORDINATED WITH CONTRACTING OFFICER
REPRESENTATIVE (COR) AT THE FIELD.
9. CONTRACTOR SHALL BE REQUIRED TO SIZE AND PROVIDE A DX COIL FOR THE ERVU-1. THE DX COIL SHALL BE SIZE TO MEET ROOM SUPPLY AIR DESIGN CONDITIONS. CONTRACTOR HAS THE OPTION TO CONNECT THE DX COIL TO THE VRF SYSTEM (HEAT PUMP), OR PROVIDE A SEPARATE CONDENSING UNIT. THIS SHALL ALSO INCLUDE ITS CONTROLS, COMPLETE. ALL ELECTRICAL REQUIREMENTS SHALL BE COORDINATED WITH
ELECTRICAL CONTRACTOR AS REQUIRED, COMPLETE.
10. CONTRACTOR SHALL PROVIDE CIRCUIT SETTER (BALANCING VALVE) FOR FLOW BALANCING. ADDITIONALLY, CONTRACTOR SHALL PROVIDE SHUT-OFF/ISOLATION VALVE (1/4-TURN BALL VALVES) AT ALL PIPE BRANCHES
FOR FLOW ISOLATION (NOTE: CURRENTLY NOT SHOWN ON PLANS).
GENERAL NOTES:
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
Fi le
P at h:
Pl ot D at e:
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
S:
\P ro je ct s\
Ft _H am ilt on \B ld g_
5_
R en ov \C
AD
_B
IM
\1
4_ M ec h\
Te nz in -9
0% re vi se d fo ld er
\R en ov at io n
BL
D
G
.rv t 8/
/2
2:
:2
PM
M-104
D U
C
TW
O R
K
PL
AN
II
I
W
AI
N W
R
IG
H T
D R
BR
O O
KL
YN
N Y
N
EW
Y
O R
K D
IS
TR
IC
T
F
ED
ER
AL
P
LA
ZA
, N
EW
Y O
R K, N Y
N O
T
FO
R C
O N
ST
R
U C
TI
O
N
D es ig ne r
Au th or
C he ck er
JU
LY
1, BL
D G
ST
M
AR
IN
E
C O
R
PS
D
IS
TR
IC
T R
EL
O
C
AT
IO
N
T O
F T
FO
R
T H
AM
IL
TO
N
, N Y
R ev is ed N ot es
, a nd a dd iti on al in fo rm at io n pr ov id ed D at e
3/16" = 1'-0"B1 DUCTWORK PLAN III
12" = 1'-0"1 MECHANICAL GENERAL NOTES 1.3
A
3 4 5
1 1/2" DIA HWS
1 1/2" DIA HWS
WAREHOUSE
SARC
DEP
COMPTROLLER
142 COMPTROLLER
LOGISTICS
OFFICER
LOGISTICS MGMT
SPECIALIST
SUPPLY MGMT
SPECIALIST
SUPPLY CHIEF
SUPPLY OFFICER
SUPPLY/LOG MGT
SPEC (MEDICAL)
SACO
SUBSTANCE
ABUSE ROOM
UH-1 UH-2
UH-3 UH-4
WORK SPACE
AREA 3
1 1/2 " DIA HWR
1 1/2" HWR
3/4" DIA HWS
3/4" DIA HWR
3/4" DIA HWR
3/4" DIA HWS
1 1/2" DIA HWS
1 1/2" DIA HWR
3/4" DIA
HWR
3/4" DIA
HWS
PR-6-6 PR-6-6 PR-6-6PR-6-6PR-6-6PR-6-6
PR-6-8 PR-6-6 PR-6-6 PR-6-6 PR-6-6 PR-6-6 PR-6-6
HWS Capped
HWS Capped
Circuit Setter Flow Bypass (Apprx 1 %)
Circuit Setter Flow Bypass (Apprx 1%)
Shut-off Ball Valve (Tag Fully Open, Normal Position)
Shut-off Ball Valve (Tag Fully Open, Normal Position)
HWR Capped
HWR Capped
FOR VFD PUMP (P-1 & P-2)
PRESSURE DIFFERENTIAL
SENSOR, SET CONTROL PRESSURE
15 FTHD (ADJUSTABLE)
FOR VFD PUMP (P-1 & P-2)
PRESSURE DIFFERENTIAL
SENSOR, SET CONTROL PRESSURE
15 FTHD (ADJUSTABLE)
PCOMP-D
PCOMP-D
PIPE ANCHOR
PIPE ANCHOR
1. FINAL LOCATION OF THE HEATING PANELS MUST BE COORDINATED WITH THE FINAL FURNITURE LAYOUT.
COORDINATE WITH CONTRACTING OFFICER REPRESENTATIVE (COR).
2. DUCTWORK LAYOUT MUST BE COORDINATED AT THE FIELD, AS IT NEEDS TO BE COORDINATED WITH STRUCTURAL ELEMENTS THAT ARE NOT PART OF THIS CONTRACT. COORDINATION WITH ELECTRICAL AND
FIRE PROTECTION DISCIPLINES IS REQUIRED.
3. VERIFY WITH CONTRACTING OFFICER REPRESENTATIVE (COR) FINAL LAYOUT OF ALL MECHANICAL
DUCTWORK.
4. NATURAL GAS (NG) CONNECTIONS, ALTERATIONS, ETC SHALL BE COORDINATED WITH THE DEPARTMENT OF
PUBLIC WORKS, AND THE UTILITY PROVIDER (NATIONAL GRID).
5. ALL SUPPLY AIR DUCTWORK SHALL BE TOTALLY INSULATED, COMPLETE. RETURN AIR DUCTWORK NEED NOT
BE INSULATED.
6. VOLUME DAMPERS SHALL BE PROVIDED ON EACH INDIVIDUAL BRANCH. SHALL BE LOCATED AT LEAST 12
INCHES FROM CONNECTION TO FLEXIBLE DUCT.
7. HVAC SHUT-OFF BUTTON, SHALL BE PROVIDE ON THE LOCATION SHOWN, IT SHALL BE INSTALLED WITH A
CLEAR CASING COVER.
8. ISOLATION VALVES SHALL BE PROVIDED WHEN NECESSARY AND COORDINATED WITH CONTRACTING OFFICER
REPRESENTATIVE (COR) AT THE FIELD.
9. CONTRACTOR SHALL BE REQUIRED TO SIZE AND PROVIDE A DX COIL FOR THE ERVU-1. THE DX COIL SHALL BE SIZE TO MEET ROOM SUPPLY AIR DESIGN CONDITIONS. CONTRACTOR HAS THE OPTION TO CONNECT THE DX COIL TO THE VRF SYSTEM (HEAT PUMP), OR PROVIDE A SEPARATE CONDENSING UNIT. THIS SHALL ALSO INCLUDE ITS CONTROLS, COMPLETE. ALL ELECTRICAL REQUIREMENTS SHALL BE COORDINATED WITH
ELECTRICAL CONTRACTOR AS REQUIRED, COMPLETE.
10. CONTRACTOR SHALL PROVIDE CIRCUIT SETTER (BALANCING VALVE) FOR FLOW BALANCING. ADDITIONALLY, CONTRACTOR SHALL PROVIDE SHUT-OFF/ISOLATION VALVE (1/4-TURN BALL VALVES) AT ALL PIPE BRANCHES
FOR FLOW ISOLATION (NOTE: CURRENTLY NOT SHOWN ON PLANS).
GENERAL NOTES:
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
Fi le
P at h:
Pl ot D at e:
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
S:
\P ro je ct s\
Ft _H am ilt on \B ld g_
5_
R en ov \C
AD
_B
IM
\1
4_ M ec h\
Te nz in -9
0% re vi se d fo ld er
\R en ov at io n
BL
D
G
.rv t 8/
/2
2:
:2
PM
M-105
M
EC
H
AN
IC
AL
P
IP
IN
G
P
LA
N I
W
AI
N W
R
IG
H T
D R
BR
O O
KL
YN
N Y
N
EW
Y
O R
K D
IS
TR
IC
T
F
ED
ER
AL
P
LA
ZA
, N
EW
Y O
R K, N Y
N O
T
FO
R C
O N
ST
R
U C
TI
O
N
D es ig ne r
Au th or
C he ck er
JU
LY
1, BL
D G
ST
M
AR
IN
E
C O
R
PS
D
IS
TR
IC
T R
EL
O
C
AT
IO
N
T O
F T
FO
R
T H
AM
IL
TO
N
, N Y
R ev is ed N ot es
, a nd a dd iti on al in fo rm at io n pr ov id ed D at e
3/16" = 1'-0"A1 MECHANICAL PIPING PLAN I
SCALE: = 1'-0"3/16"
0 4 8 124
12" = 1'-0"1 MECHANICAL GENERAL NOTES 1.4
SEE NOTE 10
A
5 6 7
B-1
B-2
FEMALE
RESTROOM/
LOCKERS
MALE
RESTROOM/SHOWERS
WORK SPACE
AREA 2
PERSONNEL
OFFICER
MECHANICAL
ROOM
128A
TELECOM/
INTERNET
SERVER ROOM
126B
ELECTRIC
J.C.
I/T PROGRAM
MGMT SPVR
126A
CORRIDOR
100A
COMMANDING
OFFICER
CAREER
PLANNER
CHAPLAIN
CORRIDOR
100A
MISSION
ASSURANCE PM
DEPLOYMENT
READYNESS
COORDINATOR
UTILITY CHASE
131A
ADJUDANT
EX OFFICER
TECH EQUIPMENT
AREA
ADMIN SUPPORT
COORDINATOR
PR-6-6 PR-6-6 PR-8-6 PR-8-6 PR-8-6 PR-8-6 PR-6-6 PR-6-6
SGT MAJOR
FP ROOM
127A
CONFERENCE
ROOM
PR-6-8PR-6-6PR-6-6PR-8-8PR-6-6PR-6-8PR-6-8
2" DIA HWS
2" DIA HWR
1/2" DIA HWR
1/2" DIA HWS
2 1/2" DIA HWS
2 1/2" DIA HWR
1/2" DIA HWS
1 1/4" DIA HWR
1 1/4" DIA HWS
3/4" DIA HWS
1 1/4" HWS
P-1
P-2
3/4" DIA HWR
1" DIA HWS
1" DIA HWR
UH-5
UH-6
UH-5
CUH-5 CUH-3
FOR PIPING CONNECTION SEE
DWG M-801
EXISTING ACTIVE STEAM BOILER
TO REMAIN FOR USE
PIPE ANCHOR
PIPE ANCHOR
1. FINAL LOCATION OF THE HEATING PANELS MUST BE COORDINATED WITH THE FINAL FURNITURE LAYOUT.
COORDINATE WITH CONTRACTING OFFICER REPRESENTATIVE (COR).
2. DUCTWORK LAYOUT MUST BE COORDINATED AT THE FIELD, AS IT NEEDS TO BE COORDINATED WITH STRUCTURAL ELEMENTS THAT ARE NOT PART OF THIS CONTRACT. COORDINATION WITH ELECTRICAL AND
FIRE PROTECTION DISCIPLINES IS REQUIRED.
3. VERIFY WITH CONTRACTING OFFICER REPRESENTATIVE (COR) FINAL LAYOUT OF ALL MECHANICAL
DUCTWORK.
4. NATURAL GAS (NG) CONNECTIONS, ALTERATIONS, ETC SHALL BE COORDINATED WITH THE DEPARTMENT OF
PUBLIC WORKS, AND THE UTILITY PROVIDER (NATIONAL GRID).
5. ALL SUPPLY AIR DUCTWORK SHALL BE TOTALLY INSULATED, COMPLETE. RETURN AIR DUCTWORK NEED NOT
BE INSULATED.
6. VOLUME DAMPERS SHALL BE PROVIDED ON EACH INDIVIDUAL BRANCH. SHALL BE LOCATED AT LEAST 12
INCHES FROM CONNECTION TO FLEXIBLE DUCT.
7. HVAC SHUT-OFF BUTTON, SHALL BE PROVIDE ON THE LOCATION SHOWN, IT SHALL BE INSTALLED WITH A
CLEAR CASING COVER.
8. ISOLATION VALVES SHALL BE PROVIDED WHEN NECESSARY AND COORDINATED WITH CONTRACTING OFFICER
REPRESENTATIVE (COR) AT THE FIELD.
9. CONTRACTOR SHALL BE REQUIRED TO SIZE AND PROVIDE A DX COIL FOR THE ERVU-1. THE DX COIL SHALL BE SIZE TO MEET ROOM SUPPLY AIR DESIGN CONDITIONS. CONTRACTOR HAS THE OPTION TO CONNECT THE DX COIL TO THE VRF SYSTEM (HEAT PUMP), OR PROVIDE A SEPARATE CONDENSING UNIT. THIS SHALL ALSO INCLUDE ITS CONTROLS, COMPLETE. ALL ELECTRICAL REQUIREMENTS SHALL BE COORDINATED WITH
ELECTRICAL CONTRACTOR AS REQUIRED, COMPLETE.
10. CONTRACTOR SHALL PROVIDE CIRCUIT SETTER (BALANCING VALVE) FOR FLOW BALANCING. ADDITIONALLY, CONTRACTOR SHALL PROVIDE SHUT-OFF/ISOLATION VALVE (1/4-TURN BALL VALVES) AT ALL PIPE BRANCHES
FOR FLOW ISOLATION (NOTE: CURRENTLY NOT SHOWN ON PLANS).
GENERAL NOTES:
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
Fi le
P at h:
Pl ot D at e:
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
S:
\P ro je ct s\
Ft _H am ilt on \B ld g_
5_
R en ov \C
AD
_B
IM
\1
4_ M ec h\
Te nz in -9
0% re vi se d fo ld er
\R en ov at io n
BL
D
G
.rv t 8/
/2
2:
:2
PM
M-106
M
EC
H
AN
IC
AL
P
IP
IN
G
P
LA
N
II
W
AI
N W
R
IG
H T
D R
BR
O O
KL
YN
N Y
N
EW
Y
O R
K D
IS
TR
IC
T
F
ED
ER
AL
P
LA
ZA
, N
EW
Y O
R K, N Y
N O
T
FO
R C
O N
ST
R
U C
TI
O
N
D es ig ne r
Au th or
C he ck er
JU
LY
1, BL
D G
ST
M
AR
IN
E
C O
R
PS
D
IS
TR
IC
T R
EL
O
C
AT
IO
N
T O
F T
FO
R
T H
AM
IL
TO
N
, N Y
R ev is ed N ot es
, a nd a dd iti on al in fo rm at io n pr ov id ed D at e
3/16" = 1'-0"B1 MECHANICAL PIPING PLAN II
SCALE: = 1'-0"3/16"
0 4 8 124
12" = 1'-0"1 MECHANICAL GENERAL NOTES 1.5
SEE NOTE 10
SEE NOTE 10
SEE NOTE 10
SEE NOTE 10
DN DN
DN
B
A
3/4" DIA HWS
OPERATIONS
OFFICER
CLASSROOM/
CONFERENCE
WORK SPACE
AREA
WORK SPACE
AREA
114 ELECTRIC
TELECOM
SORTING ROOM
BREAK ROOM
LACTATION
ROOM
MENSLOCKER
AND SHOWER
107A
RECRUITER
INSTRUCTOR
104 STUDIO/ PRINT
ROOM
MARKETING AND
COMM O
TRAINING TEAM
DEPUTY
TRAINING TEAM
CHIEF
115 PRIOR SERVICE
RECRUITING OIC
(PSR)
MENS RESTROOM
WOMENS REST
ROOM
WOMENS
LOCKER AND
SHOWER
109A
3/4" DIA HWR 1/2" DIA HWR
1/2" DIA HWS
CUH-4 CUH-6CUH-2
CHU-7
VESTIBULE
PR-6-8 PR-8-6 PR-8-6
PR-6-6
PR-6-6
PR-10-15 PR-10-15 PR-10-15 PR-10-15 PR-10-15 PR-10-15PR-10-15
3/4" DIA HWS
3/4" DIA HWR
1" DIA HWS
1" DIA HWR
1" DIA HWR
1" DIA HWS
Circuit Setter Flow Bypass (Apprx. 1%)
FOR VFD PUMP (P-1 & P-2)
PRESSURE DIFFERENTIAL
SENSOR, SET CONTROL PRESSURE
15 FTHD (ADJUSTABLE)
FOR VFD PUMP (P-1 & P-2)
PRESSURE DIFFERENTIAL
SENSOR, SET CONTROL PRESSURE
15 FTHD (ADJUSTABLE)
Circuit Setter Flow Bypass (Apprx. 1%)
PCOMP-A
PR-6-6
1. FINAL LOCATION OF THE HEATING PANELS MUST BE COORDINATED WITH THE FINAL FURNITURE LAYOUT.
COORDINATE WITH CONTRACTING OFFICER REPRESENTATIVE (COR).
2. DUCTWORK LAYOUT MUST BE COORDINATED AT THE FIELD, AS IT NEEDS TO BE COORDINATED WITH STRUCTURAL ELEMENTS THAT ARE NOT PART OF THIS CONTRACT. COORDINATION WITH ELECTRICAL AND
FIRE PROTECTION DISCIPLINES IS REQUIRED.
3. VERIFY WITH CONTRACTING OFFICER REPRESENTATIVE (COR) FINAL LAYOUT OF ALL MECHANICAL
DUCTWORK.
4. NATURAL GAS (NG) CONNECTIONS, ALTERATIONS, ETC SHALL BE COORDINATED WITH THE DEPARTMENT OF
PUBLIC WORKS, AND THE UTILITY PROVIDER (NATIONAL GRID).
5. ALL SUPPLY AIR DUCTWORK SHALL BE TOTALLY INSULATED, COMPLETE. RETURN AIR DUCTWORK NEED NOT
BE INSULATED.
6. VOLUME DAMPERS SHALL BE PROVIDED ON EACH INDIVIDUAL BRANCH. SHALL BE LOCATED AT LEAST 12
INCHES FROM CONNECTION TO FLEXIBLE DUCT.
7. HVAC SHUT-OFF BUTTON, SHALL BE PROVIDE ON THE LOCATION SHOWN, IT SHALL BE INSTALLED WITH A
CLEAR CASING COVER.
8. ISOLATION VALVES SHALL BE PROVIDED WHEN NECESSARY AND COORDINATED WITH CONTRACTING OFFICER
REPRESENTATIVE (COR) AT THE FIELD.
9. CONTRACTOR SHALL BE REQUIRED TO SIZE AND PROVIDE A DX COIL FOR THE ERVU-1. THE DX COIL SHALL BE SIZE TO MEET ROOM SUPPLY AIR DESIGN CONDITIONS. CONTRACTOR HAS THE OPTION TO CONNECT THE DX COIL TO THE VRF SYSTEM (HEAT PUMP), OR PROVIDE A SEPARATE CONDENSING UNIT. THIS SHALL ALSO INCLUDE ITS CONTROLS, COMPLETE. ALL ELECTRICAL REQUIREMENTS SHALL BE COORDINATED WITH
ELECTRICAL CONTRACTOR AS REQUIRED, COMPLETE.
10. CONTRACTOR SHALL PROVIDE CIRCUIT SETTER (BALANCING VALVE) FOR FLOW BALANCING. ADDITIONALLY, CONTRACTOR SHALL PROVIDE SHUT-OFF/ISOLATION VALVE (1/4-TURN BALL VALVES) AT ALL PIPE BRANCHES
FOR FLOW ISOLATION (NOTE: CURRENTLY NOT SHOWN ON PLANS).
GENERAL NOTES:
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
Fi le
P at h:
Pl ot D at e:
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
S:
\P ro je ct s\
Ft _H am ilt on \B ld g_
5_
R en ov \C
AD
_B
IM
\1
4_ M ec h\
Te nz in -9
0% re vi se d fo ld er
\R en ov at io n
BL
D
G
.rv t 8/
/2
2:
:3
PM
M-107
M
EC
H
AN
IC
AL
P
IP
IN
G
P
LA
N
II
I
W
AI
N W
R
IG
H T
D R
BR
O O
KL
YN
N Y
N
EW
Y
O R
K D
IS
TR
IC
T
F
ED
ER
AL
P
LA
ZA
, N
EW
Y O
R K, N Y
N O
T
FO
R C
O N
ST
R
U C
TI
O
N
D es ig ne r
Au th or
C he ck er
JU
LY
1, BL
D G
ST
M
AR
IN
E
C O
R
PS
D
IS
TR
IC
T R
EL
O
C
AT
IO
N
T O
F T
FO
R
T H
AM
IL
TO
N
, N Y
R ev is ed N ot es
, a nd a dd iti on al in fo rm at io n pr ov id ed D at e
3/16" = 1'-0"B1 MECHANICAL PIPING PLAN III
SCALE: = 1'-0"3/16"
0 4 8 124
12" = 1'-0"1 MECHANICAL GENERAL NOTES 1.6
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
Fi le
P at h:
Pl ot D at e:
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
S:
\P ro je ct s\
Ft _H am ilt on \B ld g_
5_
R en ov \C
AD
_B
IM
\1
4_ M ec h\
Te nz in -9
0% re vi se d fo ld er
\R en ov at io n
BL
D
G
.rv t 8/
/2
2:
:3
PM
M-601
M
EC
H
AN
IC
AL
S C
H
ED
U
LE
I
W
AI
N W
R
IG
H T
D R
BR
O O
KL
YN
N Y
N
EW
Y
O R
K D
IS
TR
IC
T
F
ED
ER
AL
P
LA
ZA
, N
EW
Y O
R K, N Y
N O
T
FO
R C
O N
ST
R
U C
TI
O
N
D es ig ne r
Au th or
C he ck er
JU
LY
1, BL
D G
ST
M
AR
IN
E
C O
R
PS
D
IS
TR
IC
T R
EL
O
C
AT
IO
N
T O
F T
FO
R
T H
AM
IL
TO
N
, N Y
R ev is ed N ot es
, a nd a dd iti on al in fo rm at io n pr ov id ed D at e
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
Fi le
P at h:
Pl ot D at e:
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
S:
\P ro je ct s\
Ft _H am ilt on \B ld g_
5_
R en ov \C
AD
_B
IM
\1
4_ M ec h\
Te nz in -9
0% re vi se d fo ld er
\R en ov at io n
BL
D
G
.rv t 8/
/2
2:
:3
PM
M-701
SE
Q
U
EN
C E
O F
O
PE
R
AT
IO
N
S
W
AI
N W
R
IG
H T
D R
BR
O O
KL
YN
N Y
N
EW
Y
O R
K D
IS
TR
IC
T
F
ED
ER
AL
P
LA
ZA
, N
EW
Y O
R K, N Y
N O
T
FO
R C
O N
ST
R
U C
TI
O
N
D es ig ne r
Au th or
C he ck er
JU
LY
1, BL
D G
ST
M
AR
IN
E
C O
R
PS
D
IS
TR
IC
T R
EL
O
C
AT
IO
N
T O
F T
FO
R
T H
AM
IL
TO
N
, N Y
R ev is ed N ot es
, a nd a dd iti on al in fo rm at io n pr ov id ed D at e
1" = 1'-0"3 Sequence of Controls page 3
| Sheets: M-102 - DUCTWORK PLAN I |
| Sheets: M-103 - DUCTWORK PLAN II |
| Sheets: M-104 - DUCTWORK PLAN III |
| Sheets: M-105 - MECHANICAL PIPING PLAN I |
| Sheets: M-106 - MECHANICAL PIPING PLAN II |
| Sheets: M-107 - MECHANICAL PIPING PLAN III |
| Sheets: M-601 - MECHANICAL SCHEDULE I |
| Sheets: M-701 - SEQUENCE OF OPERATIONS |
File details come from the government source that posted it. Updated .