This document outlines sustainability requirements and reporting for a federal construction project. The project involves renovating Building 125 at Fort Hamilton in Brooklyn, New York, under solicitation number W912DS23B0022 from the Department of the Army Corps of Engineers Engineering District New York.

The specification requires compliance with various sustainability standards and third-party certification. It outlines documentation that must be submitted to verify achievement of guiding sustainability principles and LEED Silver certification, including checklists, calculations, product data, and certification documentation. It also provides tables outlining volatile organic compound and low-emitting material requirements. Meeting records and coordination are needed to track sustainability goals.

View the file

Other files

File Type Posted
C.04.01 Bid Abstract Bldg 125 Final.pdf PDF
A-605 and S-102 S-103 Amd 5.pdf PDF
B.08.03 Amendment 05.pdf PDF
09 06 00 Amd 5.pdf PDF
10 21 13 Amd 5.pdf PDF
E-002 and ED102 Amd 3.pdf PDF
LEED_v4_for_Interior_Design_and_Construction_Checklist B125 Reno Ft Hamilton.pdf PDF
Army_SustainabilityReportCard_2020 B125 Renovation LEED IDC.pdf PDF
Fort Hamilton Planning Charrete.pdf PDF
M-101 thru 107 (rev 02) and 602 (rev 01) Amd 5.pdf PDF
07 27 10 Amd 5.pdf PDF
12 50 00.13 FFE Data Sheet Item Code M4 revised.pdf PDF
B.08.03 Amendment 04.pdf PDF
B.08.03 Amendment 03.pdf PDF
A-405 20230830.pdf PDF
A-408 20230830.pdf PDF
A-501 20230831.pdf PDF
1AB-101 20230830.pdf PDF
A-605 20230831.pdf PDF
A-101 A-403 A-501 AD-101 AD-403 20230829.pdf PDF
Renovation BLDG 125-Mechanical Room - Sheet - M-111 - MECHANICAL ROOM PLAN.pdf PDF
B.08.03 Amendment 02.pdf PDF
A-602 Amendment 2 20230823.pdf PDF
Amendment 2 Mechanical Drawings M102 thru 107 M601 M701.pdf PDF
A-404 Amendment 2 20230824.pdf PDF
A-601 Amendment 2 20230823.pdf PDF
B.08.03 Amendment 01.pdf PDF
B.08.03 Site Visit Sign in sheet_16 Aug 23 (002).jpg JPG image
B.08.03 Invitation for Bid W912DS23B0022.pdf PDF
JA_Hamilton_125_Simplex Signed.pdf PDF
Fort Hamilton Bldg 125-100_PCNT_Specification_07-31-2023.pdf PDF
B.08.03 Invitation for Bid W912DS23B0022.pdf PDF
B125 RTA Complete set R4 07 August 2023.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Fort Hamilton Bldg 125 HAMILTONBLDG125 Amendment #05

SECTION 01 33 29

SUSTAINABILITY REQUIREMENTS AND REPORTING

02/21

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

COUNCIL ON ENVIRONMENTAL QUALITY (CEQ) (WHITE HOUSE)

HPSB Guiding Principles (2016) Guiding Principles for Sustainable Federal Buildings and Determining Compliance with the Guiding Principles for Sustainable Federal Buildings

INTERNATIONAL CODE COUNCIL (ICC)

ICC IgCC (2018) International Green Construction Code

SHEET METAL AND AIR CONDITIONING CONTRACTORS' NATIONAL ASSOCIATION

(SMACNA)

ANSI/SMACNA 008 (2007) IAQ Guidelines for Occupied Buildings Under Construction, 2nd Edition

U.S. DEPARTMENT OF AGRICULTURE (USDA)

FSRIA 9002 Farm Security and Rural Investment Act Section 9002 (USDA BioPreferred Program)

U.S. DEPARTMENT OF DEFENSE (DOD)

UFC 1-200-02 (2020; with Change 1, 2020; Change 2, 2022) High Performance and Sustainable Building Requirements

UFC 3-600-01 (2016; with Change 6, 2021) Fire Protection Engineering for Facilities

U.S. DEPARTMENT OF ENERGY (DOE)

Energy Star (1992; R 2006) Energy Star Energy Efficiency Labeling System (FEMP)

U.S. GREEN BUILDING COUNCIL (USGBC)

LEED v4 ID+C LEED for Interior Design and Construction

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

40 CFR 247 Comprehensive Procurement Guideline for Products Containing Recovered Materials

SECTION 01 33 29 Page 1

1.2 SUMMARY

This section includes requirements for Sustainability documentation and reporting submittals per the federally mandated High Performance and Sustainable Building (HPSB) or HPSB "Guiding Principles" (GP), and Third Party Certification (TPC) requirements, in accordance with UFC 1-200-02 High Performance and Sustainable Building Requirements, and other identified requirements.

1.3 SUBMITTALS

Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for information only. When used, a code following the "G" classification identifies the office that will review the submittal for the Government.

Submit the following in accordance with Section 01 33 00 SUBMITTAL

PROCEDURES:

SD-01 Preconstruction Submittals

Preliminary High Performance and Sustainable Building Checklist ; G, RO

Sustainability Action Plan ; G, , RO

Preliminary Sustainability eNotebook ; G, RO

SD-11 Closeout Submittals

Final High Performance and Sustainable Building Checklist ; G, RO

Final Sustainability eNotebook ; G, , RO

Amended Final Sustainability eNotebook ; G, RO

Amended Final High Performance and Sustainable Building Checklist ;

G, RO

Third Party Certification Certificate, Assessment, or Validation and Compliance Report ; G, RO

1.4 GUIDING PRINCIPLES VALIDATION (GPV)

Provide the following sustainability activities and documentation to verify achievement of HPSB Guiding Principles Validation (GPV):

a. Analysis of each Guiding Principle Requirement and how project complies. Include final government approved narrative(s) in the HPSB Checklist submittal. Multiple checklists indicate multiple buildings that require individual HPSB Checklist tracking.

b. No changes to the HPSB Checklist are allowed without approval from the Contracting Officer, in accordance with Section 01 33 00 SUBMITTAL REQUIREMENTS. Immediately bring to the attention of the Contracting Officer any project changes that impact meeting the approved HPSB Guiding Principles Requirements for this project. Demonstrate the change will not increase the life-cycle cost and maintains or improves the building performance.

SECTION 01 33 29 Page 2

c. Documentation of all work required to incorporate the applicable HPSB Guiding Principles requirements indicated on the HPSB Checklist and in this contract, including all "S" submittals.

d. Sustainability Action Plan.

e. Construction related documentation for the project Sustainability eNotebook and keep updated with regularly-scheduled Construction Quality Control Meetings. Include construction related documentation containing the following components:

(1) HPSB Checklist(s)

(2) Sustainability Action Plan

(3) Documentation illustrating HPSB Guiding Principles Requirements compliance, including "S" submittals

1.4.1 Sustainability Action Plan

Include the following information in the Sustainability Action Plan:

a. Analysis of each HPSB Guiding Principles Requirement and how project will comply. Final government approved narrative(s) must be included in the HPSB Checklist submittal.

b. Name and contact information for: Contractor's Point of Contact (POC) ensuring sustainability goals are accomplished and documentation is assembled. For TPC that include on-site visit by third party representative, provide list of required attendees.

c. Indoor Air Quality plan.

1.4.2 Calculations

Provide all calculations, product data, labels and product certifications required in this specification to demonstrate compliance with the HPSB Guiding Principles Requirements.

1.5 SUSTAINABILITY SUBMITTALS

Provide HPSB Checklist and other documentation in the Sustainability eNotebook to indicate compliance with the sustainability requirements of the project.

1.5.1 High Performance Sustainable Building (HPSB) Checklist

Provide construction documentation that provides proof of, and supports compliance with, the completed HPSB Checklist.

1.5.1.1 HPSB Checklist Submittals

Submit updated HPSB Checklist with each Sustainability eNotebook submittal. Include the final HPSB Checklist(s) with the interim DD1354 Real Property Record Submittal.

SECTION 01 33 29 Page 3

1.5.2 "S" Submittals for Sustainability Documentation

"S" submittals are the sustainability documentation requirements cited in the various sections of this contract. Submit the GPV and TPC sustainability documentation required in this section as "S" submittals in all affected UFGS Sections.

a. Highlight GPV and TPC compliance data in "S" submittal.

b. Add "S" submittals to the Sustainability eNotebook only after submittal approval, and bookmark them as required in paragraph SUSTAINABILITY ENOTEBOOK below.

c. Ensure all approved "S" submittals are included in each Sustainability eNotebook submittal.

1.5.3 Sustainability eNotebook

The Sustainability eNotebook is an electronic organizational file that serves as a repository for all required sustainability submittals. To support documentation of compliance with an approved HPSB and TPC checklist, provide and maintain a comprehensive and current Sustainability eNotebook. Include all required data in Sustainability eNotebook, to support full compliance with the HPSB Guiding Principles Requirements, including:

a. HPSB checklist

b. Sustainability Action Plan

c. Calculations

d. Labels

e. "S" submittals

f. Certifications, assessments, or validations and compliance report

g. TPC documentation required in paragraph THIRD PARTY CERTIFICATION

(TPC).

1.5.3.1 Sustainability eNotebook Format

Provide Sustainability eNotebook in the form of an Adobe PDF file;

bookmark each HPSB Guiding Principles Requirement, TPC requirement, and sub-bookmark at each document. Match format to HPSB Guiding Principles numbering system indicated herein. Maintain up-to-date information, such as spreadsheets, templates, with each current submittals. For TPC projects, provide a second Table of Contents using TPC numbering system, for maintaining documentation unique to TPC.

Contracting Officer may deduct from the monthly progress payment accordingly if Sustainability eNotebook information is not current and on track per project goals.

1.5.3.2 Sustainability eNotebook Submittal Schedule

Provide Sustainability eNotebook Submittals at the following milestones of the project:

SECTION 01 33 29 Page 4

a. Preliminary Sustainability eNotebook

Submit preliminary Sustainability eNotebook with updated Preliminary High Performance and Sustainable Building Checklist and TPC checklist at the first post award meeting in accordance with Section 01 30 00

ADMINISTRATIVE REQUIREMENTS.

b. Construction Quality Control Meetings.

Provide up-to-date GP and TPC documentation in the Sustainability eNotebook and TPC Online tool for each meeting.

c. Final Sustainability eNotebook

Submit updated Sustainability eNotebook with updated Final High Performance and Sustainable Building Checklist with TPC Checklist at Beneficial Occupancy Date (BOD). Final progress payment retainage may be held by Contracting Officer until Final Sustainability construction phase documentation is complete.

d. Amended Final Sustainability eNotebook

Amend and resubmit the Amended Final Sustainability eNotebook with Amended Final High Performance and Sustainable Building Checklist and amended TPC Checklist, to include post-occupancy corrections, updates, and requirements. Final progress payment retainage may be held by Contracting Officer until amended final sustainability documentation is complete. Submit the Amended Final Sustainability eNotebook Submittal on DVDs to the Contracting Officer no later than 30 days after final GP, TPC determination.

1.6 DOCUMENTATION REQUIREMENTS

a. Incorporate each of the following HPSB Guiding Principles requirements into project and provide documentation that proves compliance with each listed requirement. Items below are organized by HPSB Guiding Principles . For life-cycle cost analysis requirements, one document with all analyses is acceptable, with Contracting Officer approval.

b. For each of the following paragraphs that require the use of products listed on Government-required websites, provide documentation of the process used to select products, or process used to determine why listed products do not meet project performance requirements.

1.6.1 Commissioning (Cx)

Develop and incorporate Commissioning requirements into the documents, in accordance with Section 01 91 00.15 BUILDING COMMISSIONING.

1.6.2 Energy Efficient Products

Provide only energy-using products that are Energy Star rated or have Federal Energy Management Program (FEMP) recommended efficiency. Where Energy Star or FEMP recommendations have not been established, provide most efficient products that are life-cycle cost-effective. Provide only energy using products that meet FEMP requirements for low standby power consumption. Energy efficient products can be found at:

SECTION 01 33 29 Page 5 https://www.energy.gov/eere/femp/federal-energy-management-program and http://www.energystar.gov/ .

For construction submittal documentation, provide proof that product is labeled energy efficient and complies with the cited requirements.

1.6.3 Building-level Power Metering

Provide building-level meters for electricity, natural gas, and steam where applicable.

1.6.3.1 Construction Submittal Documentation

Provide manufacturer's data validating compatibility with base-wide system and component advanced meter requirements.

1.6.4 Indoor Water Use

Provide Construction Documentation proof that fixtures are labeled EPA WaterSense, for products available with EPA WaterSense labeling; for all other fixtures, proof they comply with EPA WaterSense efficiency requirements.

1.6.5 Indoor Water Metering

Provide building-level meters for potable water use. Provide the requirements cited in the following paragraphs:

1.6.5.1 Construction Submittal Documentation

Provide manufacturer's data validating compatibility with base-wide system and component advanced meter requirements.

1.6.6 Outdoor Water Use

Where new irrigation is required, provide only non-potable sources.

Provide the requirements cited in the following paragraphs:

1.6.6.1 Construction Submittal Documentation

Provide manufacturer's data validating compatibility with base-wide system and component advanced meter requirements.

1.6.7 Outdoor Water Meters

Provide meters for outdoor systems that use potable water. Provide the requirements cited in the following paragraphs:

1.6.7.1 Construction Submittal Documentation

Provide manufacturer's data validating compatibility with base-wide system and component advanced meter requirements.

1.6.8 Moisture Control

Provide the following:

SECTION 01 33 29 Page 6

1.6.8.1 Construction Submittal Documentation

Ensure construction materials are separated and protected in accordance with other sections in this contract document, with adequate humidity controls during construction. In accordance with Section 01 78 23 OPERATION AND MAINTENANCE DATA, includes plan for ongoing building moisture control.

Coordinate with the moisture control requirements of Section 01 45 00.00 10

QUALITY CONTROL.

1.6.9 Reduce Volatile Organic Compounds (VOC) (Low-Emitting Materials)

Meet the requirements of Table 3-1 at the end of this specification.

For Construction submittal documentation, provide certifications or labels that demonstrate compliance with cited requirements, based on the attached

TABLE 3-1.

1.6.10 Indoor Air Quality During Construction

Prior to construction, create indoor air quality plan. Develop and implement an IAQ construction management plan during construction and flush building air before occupancy.

For renovation of occupied existing buildings, meet the requirements of ANSI/SMACNA 008 IAQ Guidelines for Occupied Buildings Under Construction.

Provide documentation showing that after construction ends and prior to occupancy, HVAC filters were replaced and building air was flushed out in accordance with the cited standard.

1.6.11 Recycled Content

Comply with 40 CFR 247 . Refer to:

https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program for assistance identifying products cited in 40 CFR 247 . Selected products must comply with non-proprietary requirements of the Federal Acquisition Regulation and must meet performance requirements.

1.6.11.1 Construction Submittal Documentation

a. Provide manufacturers' documents stating the recycled content by material, or written justification for claiming one of the exceptions allowed on the cited website.

b. Substitutions: Submit for Government approval for proposed alternative products or systems that provide equivalent performance and appearance and have greater contribution to project recycled content requirements. For all such proposed substitutions, submit with the Sustainability Action Plan accompanied by product data demonstrating equivalence.

c. In order to complete compliance with FAR 52.223-9 Estimate of Percentage of Recovered Material Content for EPA Designated Items, refer to submittal requirement for recycled/recovered material content in Section 01 78 00 CLOSEOUT SUBMITTALS.

SECTION 01 33 29 Page 7

1.6.12 Bio-Based Products

Provide products and materials composed of the highest percentage of bio-based materials (including rapidly renewable resources and certified sustainably harvested products), consistent with FSRIA 9002 USDA BioPreferred Program, to the maximum extent possible without jeopardizing the intended end use or detracting from the overall quality delivered to the end user and when available at a reasonable cost. Use only supplies and materials of a type and quality that conform to applicable specifications and standards.

Comply with FSRIA 9002 USDA BioPreferred Program. Refer to www.biopreferred.gov for the product categories and BioPreferred Catalog.

Selected products must comply with non-proprietary requirements of the Federal Acquisition Regulation and must meet performance requirements.

Provide the following documentation:

a. USDA BioPreferred label for each product; for bio-based products used on project but not listed with BioPreferred program, provide bio-based content and percentage.

b. In order to complete compliance with FAR 52.223-1 Biobased Product Certification, refer to submittal requirement for biobased products in Section 01 78 00 CLOSEOUT SUBMITTALS, paragraphs CERTIFICATION OF EPA DESIGNATED ITEMS and CERTIFICATION OF USDA DESIGNATED ITEMS.

1.6.13 Waste Material Management (Recycling – Construction)

Divert demolition and construction debris in accordance with Section

01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL.

1.6.14 Additional Sustainability Requirements

Provide the additional sustainability requirements cited in this paragraph.

1.6.14.1 Third Party Certification (TPC) Documentation

Third Party Certification certificate, assessment, or validation, and compliance report requirements are in addition to all requirements under header above GUIDING PRINCIPLES VALIDATION (GPV).

1.6.14.1.1 TPC Registration

This project has been designed for, and must be constructed to achieve LEED v4 ID+C Silver . Project is already registered with the TPC Organization. Provide construction related sustainability documentation, in the format required by the TPC Organization, to the Contracting Officer for approval, and for final approval by the TPC organization. Third Party Certification is met when Government receives TPC organization certificate, assessment, or validation and compliance report and plaque.

Execute the following:

a. Refer to TPC Checklist at the end of this specification section.

(Multiple checklists indicate multiple buildings that require TPC.)

b. Immediately bring to the attention of the Contracting Officer any project changes that impact meeting the approved TPC Requirements for this project. Demonstrate the change will not increase the life-cycle cost and maintains or improves the building performance.

SECTION 01 33 29 Page 8

c. Complete all work required to incorporate the applicable TPC Requirements.

d. Maintain the construction related information in the Sustainability eNotebook pertaining to additions and changes to the approved sustainability requirements. Maintain the Sustainability eNotebook in electronic format. For more explanation, refer to paragraph SUSTAINABILITY eNOTEBOOK. Provide the following components in the Sustainability eNotebook, in addition to the GPV components above:

(1) TPC Checklist

(2) Provide construction documentation required to achieve third party certification

e. Provide the following information in the Sustainability Action Plan.

Provide this TPC information in addition to the GPV Action Plan items above:

(1) Planned method to achieve each TPC requirement.

(2) For each TPC requirement that is attempted but not achieved, provide narrative explaining how mission or activity precludes achieving specific sustainability requirement or goal. Provide analysis of particular requirement and level to which project is able to comply.

(3) Provide name and contact information for: Sustainability Point of Contact (POC) and other names of sustainability professionals responsible for ensuring TPC sustainability goals are accomplished and documentation is assembled. Sustainability POCs are also responsible for ensuring GPV required in paragraph GUIDING PRINCIPLES VALIDATION (GPV) above.

f. Bear all costs associated with construction changes that affect sustainability design requirements, constructing, demonstrating, and documenting that project complies with approved TPC requirements, including but not limited to:

(1) TPC coordination with Government's AE and other consultants, TPC website requirements, and management for construction related documentation.

(2) Construction work required to incorporate TPC requirements.

(3) Submittals required to demonstrate compliance with Government approved TPC checklists.

(4) Documentation illustrating compliance with TPC requirements and additional documentation required by the TPC.

g. Provide all calculations, product data, and certifications, assessments, or validations required in this contract to demonstrate compliance with the TPC Requirements of this section.

1.6.14.2 Third Party Certification (TPC) Documentation

Third Party Certification certificate, assessment, or validation, and

SECTION 01 33 29 Page 9 compliance report requirements are in addition to all requirements under header above GUIDING PRINCIPLES VALIDATION (GPV).

1.6.14.2.1 TPC Already Registered

Project is already registered with TPC organization to achieve LEED v4 ID+C Silver. When applicable, request TPC online access turnover from Government. Manage and provide all documentation for requirements of TPC and obtain Final Certification or validation. Third Party Certification is met when Government receives TPC organization certificate, assessment, or validation and compliance report and plaque.

1.6.14.2.2 TPC Management and Certification

Execute the following TPC Certification, assessment, or validation requirements:

a. Refer to TPC Checklist at the end of this specification section.

(Multiple checklists indicate multiple buildings that require TPC.)

b. Immediately bring to the attention of the Contracting Officer any project changes that impact meeting the approved TPC Requirements for this project. Demonstrate the change will not increase the life-cycle cost and maintains or improves the building performance.

c. Complete all work required to incorporate the applicable TPC Requirements.

d. Maintain the construction related information in the Sustainability eNotebook pertaining to additions and changes to the approved sustainability requirements. When construction changes are made that affect design sustainability requirements, provide all required updates to affected design requirements and update in the Sustainability eNotebook. Maintain the Sustainability eNotebook in electronic format. For more explanation, refer to paragraph SUSTAINABILITY eNOTEBOOK. Provide the following components in the Sustainability eNotebook, in addition to the GPV components above:

(1) TPC Checklist

(2) Completed TPC forms. Transmit by the method required by the TPC organization.

(3) Copy of all correspondence with the TPC organization including proof of TPC registration

(4) Documentation illustrating compliance with TPC requirements and additional documentation as requested by the TPC

(5) TPC Award Certificate, assessment, or validation and compliance report.

e. Provide the following information in the Sustainability Action Plan.

Provide this TPC information in addition to the Sustainability Action Plan items above:

(1) Planned method to achieve each TPC requirement.

(2) For each TPC requirement that is attempted but not achieved, SECTION 01 33 29 Page 10 provide narrative explaining how mission or activity precludes achieving specific sustainability requirement or goal. Provide analysis of particular requirement and level to which project is able to comply.

(3) Provide name and contact information for: Sustainability point of contact (POC) and other names of sustainability professionals responsible for ensuring TPC sustainability goals are accomplished and documentation is assembled. Sustainability POCs are also responsible for ensuring GPV required in paragraph GUIDING PRINCIPLES VALIDATION (GPV) above.

f. Bear all costs associated with construction changes that affect sustainability design requirements, constructing, demonstrating, and documenting that project complies with approved TPC requirements, including but not limited to:

(1) Final TPC review, certification, assessment, or validation and plaque fees.

(2) Online (or offline with secure facilities) TPC management and documentation.

(3) Obtaining TPC certification or validation based on Government-approved sustainability goals.

(4) Construction work required to incorporate TPC requirements.

(5) Submittals required to demonstrate compliance with Government approved TPC checklists.

g. Provide all calculations, product data, and certifications, assessments, or validations required in this specification to demonstrate compliance with the TPC Requirements.

h. Provide all TPC management and documentation. Transmit TPC requirements by the method required by TPC organization.

i. Provide all required responses to third party organization.

j. Facilitate and participate in required TPC site visit. Coordinate with the Contract Officer to determine participating team members.

Include Commissioning provider on applicable projects.

k. Provide TPC Plaque and Certificate, assessment, or validation. Provide TPC compliance report that includes level achieved and reasons for non-compliance or not applicable elements. Use format below to create the Plaque, Certificate, assessment or validation, compliance report, and Letter of Congratulations (when provided). Forward to parties designated by Contracting Officer:

(1) Plaque:

Name: Final Building Name. If unknown, provide Form DD1391 Project Name.

(2) Certificate, Assessment or Validation:

Project Title, first line: P-(X); Form DD1391 Project Name).

SECTION 01 33 29 Page 11

Project Title, second line: UIC (Installation code)

(3) Letter Congratulations (when provided):

Address letter to Facility's Installation Commander Name. Address the letter to an individual person.

(4) Compliance Report:

Title page must cite Project title: P-(X); (1391 Project Name);

Final Building Name if known; UIC (installation code); Owner Service; User organization if known; date of compliance.

Include TPC scoresheet if applicable.

l. Once Final Certification is achieved, turn over Administrative rights to online TPC to the Department of Public Works or designee, contact information provided by the Contracting Officer.

PART 2 PRODUCTS

Not used.

PART 3 EXECUTION

3.1 SUSTAINABILITY COORDINATION

Provide sustainability focus and coordination at all meetings to achieve sustainability goals. Coordinate meeting requirements with other UFGS Sections meeting requirements in this project. Ensure the designated TPC accredited sustainability professional responsible for GP and TPC documentation participates in these meetings to coordinate documentation completion. Review GP and TPC sustainability requirements, HPSB Checklist and TPC documentation, Sustainability Action Plan, and completeness status of Sustainability eNotebook, and TPC status at the following meetings:

a. Pre-Construction Conference

b. Construction Quality Control Meetings

c. Facility Turnover Meetings

Conduct review no later than 60 days before final turnover and identify any outstanding issues that affect correct completion of all documentation and final TPC certification, assessment or validation, and actions that will achieve requirements. Conduct corrective actions prior to turnover, to ensure all requirements are achieved.

3.2 THIRD PARTY CERTIFICATION CERTIFICATE, ASSESSMENT, OR VALIDATION AND

COMPLIANCE REPORT

Finalize the process requirements and obtain the TPC Plaque and Certificate, assessment, or validation, and compliance report, indicating completion of the project's sustainability goals. Include TPC compliance report with final TPC scoresheet as applicable.

Provide one original framed copy of the certificate, assessment, or validation, mounted in 1 inch deep metal frames, with double matt, and wire hangers, in location approved by Contracting Officer. Deliver three

SECTION 01 33 29 Page 12 original certificate, assessment, or validation, and compliance report to Contractor Officer, unless otherwise instructed. Provide and hang Plaque in a prominent interior location approved by the Contracting Officer.

SECTION 01 33 29 Page 13

3.3 TABLE 3-1 VOLATILE ORGANIC COMPOUNDS (VOC) (LOW EMITTING MATERIALS)

REQUIREMENTS

TABLE 3- 1 Vol at i l e Or gani c Compounds ( VOC) ( Low Emi t t i ng Mat er i al s) Requirements

Source: ICC IgCC Chapter 8 (Materials) (Interior Applications Only)

MATERI AL CATEGORY EMISSIONS

REQUIREMENT

MATERI ALS WI TH

ADDED VOC

REQUIREMENT

EMISSIONS

REQUIREMENTS

Adhesi ves and Sealants

CDPH/EHLB/Standard met hod V1. 1 ( Cal i f or ni a Sect i on 01350) (Use "office" or "classroom" space limits for all applications) or Adhesives (carpet, resilient, wood flooring; base cove; ceramic tile; drywall and panel; primers) Sealants (acoustical;

firestop; HVAC Air duct; primers) Caulks

SCAQMD Rul e 1168 (Use "other" category for HVAC duct sealant) (for firestop adhesive, UFC 3-600-01 overrides conflicting requirements)

Aerosol adhesives Sect i on 3 of Gr een Seal St andar d

GS-36

(except:

cleaners, solvent cements, and primers used with plastic piping and conduit in plumbing, fire suppression, and electrical systems; HVAC air duct sealants when the application space air temp is less than 40 F (4.5 C).

SECTION 01 33 29 Page 14

TABLE 3- 1 Vol at i l e Or gani c Compounds ( VOC) ( Low Emi t t i ng Mat er i al s) Requirements

Source: ICC IgCC Chapter 8 (Materials) (Interior Applications Only)

MATERI AL CATEGORY EMISSIONS

REQUIREMENT

MATERI ALS WI TH

ADDED VOC

REQUIREMENT

EMISSIONS

REQUIREMENTS

Pai nt s and Coat i ngs CDPH/EHLB/Standard met hod V1. 1 ( Cal i f or ni a Sect i on 01350) (Use "office" or "classroom" space limits for all applications) or Flat and nonflat, nonflat high-gloss, specialty, basement specialty, fire-resistive, floor, low-solids, rust preventative, wood, reflective wall coatings;

concrete/masonry sealers; primers;

sealers;

undercoaters;

shellacs (clear and opaque);

stains; varnishes;

conjugated oil varnish; lacquer;

clear brushing lacquer

Gr een Seal St andar d GS- 11

SECTION 01 33 29 Page 15

TABLE 3- 1 Vol at i l e Or gani c Compounds ( VOC) ( Low Emi t t i ng Mat er i al s) Requirements

Source: ICC IgCC Chapter 8 (Materials) (Interior Applications Only)

MATERI AL CATEGORY EMISSIONS

REQUIREMENT

MATERI ALS WI TH

ADDED VOC

REQUIREMENT

EMISSIONS

REQUIREMENTS

Pai nt s and Coat i ngs CDPH/EHLB/Standard met hod V1. 1 ( Cal i f or ni a Sect i on 01350) (Use "office" or "classroom" space limits for all applications) or Concrete curing compounds; dry fog, faux finishing, graphic arts (sign paints), industrial maintenance, mastic texture, metallic pigmented, multicolor, recycled coatings;

pretreatment wash primers, reactive penetrating sealers; specialty primers, wood preservatives, and zinc primers

Cal i f or ni a Ai r Resour ces Boar d ( CARB) Suggest ed Cont r ol Measur e f or Ar chi t ect ur al Coatings or SCAQMD Rul e 1113r

Pai nt s and Coat i ngs CDPH/EHLB/Standard met hod V1. 1 ( Cal i f or ni a Sect i on 01350) (Use "office" or "classroom" space limits for all applications) or High-temperature coatings; stone consolidants;

swimming-pool coatings; tub- and tile-refining coatings; and waterproofing membranes

Cal i f or ni a Ai r Resour ces Boar d ( CARB) Suggest ed Cont r ol Measur e f or Ar chi t ect ur al Coatings

SECTION 01 33 29 Page 16

TABLE 3- 1 Vol at i l e Or gani c Compounds ( VOC) ( Low Emi t t i ng Mat er i al s) Requirements

Source: ICC IgCC Chapter 8 (Materials) (Interior Applications Only)

MATERI AL CATEGORY EMISSIONS

REQUIREMENT

MATERI ALS WI TH

ADDED VOC

REQUIREMENT

EMISSIONS

REQUIREMENTS

Fl oor Cover i ng Materials

For carpet, all locations:

CDPH/EHLB/Standard Met hod V1. 1 ( Cal i f or ni a Sect i on 01350) or label for Sect i on 9 of CDPH/EHLB/Standard Met hod V1. 1 ( Cal i f or ni a Sect i on 01350) none none

Insulation CDPH/EHLB/Standard met hod V1. 1 (California Section 01350) (Use "office" or "classroom" space limits for all applications) none none

SECTION 01 33 29 Page 17

TABLE 3- 1 Vol at i l e Or gani c Compounds ( VOC) ( Low Emi t t i ng Mat er i al s) Requirements

Source: ICC IgCC Chapter 8 (Materials) (Interior Applications Only)

MATERI AL CATEGORY EMISSIONS

REQUIREMENT

MATERI ALS WI TH

ADDED VOC

REQUIREMENT

EMISSIONS

REQUIREMENTS

Composi t e Wood, Wood St r uct ur al Panel , and Agr i f i ber Pr oduct s , no added urea-formaldehyde resins including laminating adhesives for composite wood and agrifiber assemblies -particleboard, medium density fiberboard (MDF), wheatboard, strawboard, panel substrates, door cores

Third-party certification (approved by CARB) of Cal i f or ni a Ai r Resour ce Boar d' s ( CARB) r egul at i on, Airborne Toxic Control Measure to Reduce Formaldehyde Emissions from Composite Wood Products or none CDPH/EHLB/Standard met hod V1. 1 (California Section 01350) (Use "office" or "classroom" space limits for all applications) (except:

Structural panel components such as plywood, particle board, wafer board, and oriented strand board identified as "EXPOSURE 1," "EXTERIOR," or

"HUD-APPROVED"

are considered acceptable for interior use.)

Of f i ce Fur ni t ur e Syst ems and Seat i ng installed prior to occupancy

ANSI / BI FMA X7. 1

ANSI / BI FMA X7. 1:

(95-percent of installed office furniture system workstations and seating units)

Sect i on 7. 6. 2 of ANSI / BI FMA e3 (50-percent of office furniture system workstations and seating units) none none

SECTION 01 33 29 Page 18

TABLE 3- 1 Vol at i l e Or gani c Compounds ( VOC) ( Low Emi t t i ng Mat er i al s) Requirements

Source: ICC IgCC Chapter 8 (Materials) (Interior Applications Only)

MATERI AL CATEGORY EMISSIONS

REQUIREMENT

MATERI ALS WI TH

ADDED VOC

REQUIREMENT

EMISSIONS

REQUIREMENTS

Cei l i ng and Wal l assemblies and systems including:

acoustical treatments;

ceiling panels and tiles; tackable wall panels and coverings; wall coverings; wall and ceiling paneling and planking

CDPH/EHLB/Standard met hod V1. 1 ( Cal i f or ni a Sect i on 01350) (Use "office" or "classroom" space limits for all applications) none none

-- End of Section --

SECTION 01 33 29 Page 19

01 33 29 - SUSTAINABILITY REQUIREMENTS AND REPORTING
PART 1 GENERAL
1.1 REFERENCES
1.2 SUMMARY
1.3 SUBMITTALS
1.4 GUIDING PRINCIPLES VALIDATION GPV
1.4.1 Sustainability Action Plan
1.4.2 Calculations
1.5 SUSTAINABILITY SUBMITTALS
1.5.1 High Performance Sustainable Building HPSB Checklist
1.5.1.1 HPSB Checklist Submittals
1.5.2 "S" Submittals for Sustainability Documentation
1.5.3 Sustainability eNotebook
1.5.3.1 Sustainability eNotebook Format
1.5.3.2 Sustainability eNotebook Submittal Schedule
1.6 DOCUMENTATION REQUIREMENTS
1.6.1 Commissioning Cx
1.6.2 Energy Efficient Products
1.6.3 Building-level Power Metering
1.6.3.1 Construction Submittal Documentation
1.6.4 Indoor Water Use
1.6.5 Indoor Water Metering
1.6.5.1 Construction Submittal Documentation
1.6.6 Outdoor Water Use
1.6.6.1 Construction Submittal Documentation
1.6.7 Outdoor Water Meters
1.6.7.1 Construction Submittal Documentation
1.6.8 Moisture Control
1.6.8.1 Construction Submittal Documentation
1.6.9 Reduce Volatile Organic Compounds VOC Low-Emitting Materials
1.6.10 Indoor Air Quality During Construction
1.6.11 Recycled Content
1.6.11.1 Construction Submittal Documentation
1.6.12 Bio-Based Products
1.6.13 Waste Material Management Recycling Œ Construction
1.6.14 Additional Sustainability Requirements
1.6.14.1 Third Party Certification TPC Documentation
1.6.14.1.1 TPC Registration
1.6.14.2 Third Party Certification TPC Documentation
1.6.14.2.1 TPC Already Registered
1.6.14.2.2 TPC Management and Certification
PART 2 PRODUCTS
PART 3 EXECUTION
3.1 SUSTAINABILITY COORDINATION
3.2 THIRD PARTY CERTIFICATION CERTIFICATE, ASSESSMENT, OR VALIDATION AND
3.3 TABLE 3-1 VOLATILE ORGANIC COMPOUNDS VOC LOW EMITTING MATERIALS

File details come from the government source that posted it. Updated .