This set of construction documents includes plans and specifications for renovating Building 125 at Fort Hamilton in Brooklyn, New York. The project involves demolishing existing interior partitions and systems and constructing new tenant spaces, including offices, conference rooms, and storage areas. Key aspects of the work include installing new mechanical, electrical and plumbing systems; erecting fire-rated walls; and upgrading the life safety, fire alarm and suppression systems. The solicitation is for a firm fixed-price construction contract awarded by the U.S. Army Corps of Engineers, New York District. The renovation aims to relocate the 1st Marine Corps District headquarters to better suit its needs.

View the file

Other files

File Type Posted
C.04.01 Bid Abstract Bldg 125 Final.pdf PDF
A-605 and S-102 S-103 Amd 5.pdf PDF
B.08.03 Amendment 05.pdf PDF
09 06 00 Amd 5.pdf PDF
10 21 13 Amd 5.pdf PDF
E-002 and ED102 Amd 3.pdf PDF
LEED_v4_for_Interior_Design_and_Construction_Checklist B125 Reno Ft Hamilton.pdf PDF
Army_SustainabilityReportCard_2020 B125 Renovation LEED IDC.pdf PDF
Fort Hamilton Planning Charrete.pdf PDF
M-101 thru 107 (rev 02) and 602 (rev 01) Amd 5.pdf PDF
07 27 10 Amd 5.pdf PDF
12 50 00.13 FFE Data Sheet Item Code M4 revised.pdf PDF
01 33 29 Amd 5.pdf PDF
B.08.03 Amendment 04.pdf PDF
B.08.03 Amendment 03.pdf PDF
A-405 20230830.pdf PDF
A-408 20230830.pdf PDF
A-501 20230831.pdf PDF
1AB-101 20230830.pdf PDF
A-605 20230831.pdf PDF
Renovation BLDG 125-Mechanical Room - Sheet - M-111 - MECHANICAL ROOM PLAN.pdf PDF
B.08.03 Amendment 02.pdf PDF
A-602 Amendment 2 20230823.pdf PDF
Amendment 2 Mechanical Drawings M102 thru 107 M601 M701.pdf PDF
A-404 Amendment 2 20230824.pdf PDF
A-601 Amendment 2 20230823.pdf PDF
B.08.03 Amendment 01.pdf PDF
B.08.03 Site Visit Sign in sheet_16 Aug 23 (002).jpg JPG image
B.08.03 Invitation for Bid W912DS23B0022.pdf PDF
JA_Hamilton_125_Simplex Signed.pdf PDF
Fort Hamilton Bldg 125-100_PCNT_Specification_07-31-2023.pdf PDF
B.08.03 Invitation for Bid W912DS23B0022.pdf PDF
B125 RTA Complete set R4 07 August 2023.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DN

DN

DN

DN

DN

DN

R E

F

REF.

FACP

TRA

F

FFFFF

F

BAT

DS

DS

LOC

LOC

LOC

F

F

F

DN

DN

FDFDFD

FDFD

FD

A-201

A-201

A-201

A-402

A-401

A-403

A-301

A-302

A-302

A-302

A-302

A-301

B

A

1 2 3 4 5 6 87

107A

116 118

106108

122124

126B

125127

128A

135 133

134136

145147149

126A

109A

100A

40' - 10 1/2"

/2

12' - 0"

A-408

131A 127A

148A

425' - 0"

336' - 5 1/4"

0 8' 16' 32'

SCALE: 1/16" = 1'-0"

N

LEGEND

MASONRY PARTITION

(SEE PARTITION SCHEDULE

FOR MORE INFORMATION)

NO FIRE RATING

1 HR FIRE RATING

GENERAL NOTES

1. SEE A-401 - A-403 FOR WALL TAGS, DOOR TAGS, WINDOW

TAGS,

2. SEE DRAWING A-103 FOR ROOM SCHEDULE

3. CONTRACTOR WILL INSPECT INSULATION AND

VAPOR BARRIER IN EAST SIDE OF THE BUILDING.

IF THE INSULATION AND VAPOR RETARDER ARE

NOT COMPLIANT WITH ASHRAE 90.1 AND HAVE AN

R VALUE OF R-49 CONTRACTOR WILL INSTALL

NEW INSULATION MEETING THE REQUIREMENTS

AND VAPOR RETARDER AS PER WALL SECTION 4

IN SHEET A-304

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

C

U s e rs

\e e n d c m g \D o c u m e n ts

\F o rt

H a m ilt o n B u ild in g

\M o d e l\ B

-D

M M

-A -M

D L .r v t

/2

/2

:4

:1

P

M

A-101

F L O

O R

P L A

N

W

A

IN

W R

IG

H

T D

R B

R O

O K

L Y

N N

Y

N E

W Y

O R

K D

IS

T

R

IC

T F

E D

E R

A L P

L A

Z A

N E

W Y

O R

K N

Y

C .G

C .G

C .G

C .G

A U

G U

S T

W D

S -2

-B

-0

B L D

G

S T

M A

R

IN

E C

O R

P S

D

IS

T R

IC

T

R E

L O

C A

T

IO

N T

O F

T

H A

M

IL

T O

N N

Y

1/16" = 1'-0"

PROPOSED FLOOR PLAN

R e v is io n s t o w a ll ty p e s

/2

/2

F

LOC

F

DN

2107 SF

WAREHOUSE

682 SF

ALL HANDS

CONFERENCE

ROOM/ CLASS

ROOM

105 SF

SUPPLY OFFICER

100 SF

SUPPLY CHIEF

100 SF

SUPPLY MGMT

SPECIALIST

145100 SF

LOGISTICS MGMT

SPECIALIST

114 SF

LOGISTICS

OFFICER

100 SF

DEP

COMPTROLLER

2305 SF

WORK SPACE

AREA 3

114 SF

SUPPLY/LOG MGT

SPEC (MEDICAL)

100 SF

COMPTROLLER

65 SF

SACO

SUBSTANCE

ABUSE ROOM

113 SF

SARC

7' - 4"

A-301

A-301

B

A

3 4 5

A01

A01

A01 A01 A01

A01

A01

A01 A01

A01

A01

A01

A01

A01

A01

A01

132A

132B

137139141143145147149

137B

142 140

137A

10' - 0"

/2

6' - 5 1/2"11' - 4"10' - 0"

W1W1W1W1W1W1

W1W1W1

147C

A-408

Sim

147E

147D

A02A02

37' - 5 1/2"

8'4' 16'0

SCALE: 3/16" = 1'-0"

8'4' 16'0

SCALE: 3/16" = 1'-0"

N

XXX

XX

XX

XX

FD

LEGEND

DOOR TAG

WINDOW TAG

WALL TAG

EQUIPMENT

FLOOR DRAIN

XX LOUVER TAG

MASONRY PARTITION

(SEE PARTITION SCHEDULE

FOR MORE INFORMATION)

NO FIRE RATING

1 HR FIRE RATING

KEY PLAN

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

C

U s e rs

\e e n d c m g \D o c u m e n ts

\F o rt

H a m ilt o n B u ild in g

\M o d e l\ B

-D

M M

-A -M

D L .r v t

/2

/2

:4

:1

P

M

A-403

E N

L A

R G

E D

F L O

O R

P L A

N

W

A

IN

W R

IG

H

T D

R B

R O

O K

L Y

N N

Y

N E

W Y

O R

K D

IS

T

R

IC

T F

E D

E R

A L P

L A

Z A

N E

W Y

O R

K N

Y

C .G

C .G

C .G

C .G

A U

G U

S T

W D

S -2

-B

-0

B L D

G

S T

M A

R

IN

E C

O R

P S

D

IS

T R

IC

T

R E

L O

C A

T

IO

N T

O F

T

H A

M

IL

T O

N N

Y

3/16" = 1'-0"

ENLARGED FLOOR PLAN 3

R e v is io n s t o w a ll ty p e s

/2

/2

LIGHT GAUGE STUD & GYP. BD.

COMPOSITE ASSEMBLY A

CHASE WALL

NON-COMP. BRACED AT 48 IN. O.C.C

A01

3 5/8" METAL STUD

5/8" GYPSUM BD. - BOTH SIDES

ACTUAL THICKNESS - 4 7/8"

UL: NONE

FIRE RATING: NONE

STC RATING: 52

CF1

(2) 3 5/8" METAL STUD

5/8" GYPSUM BD. - BOTH SIDES

8" AIR SPACE

ACTUAL THICKNESS - 1'-4 1/2" MIN.

UL: NONE

FIRE RATING: NONE

STC RATING: 52

TO STRUCTURE ABOVE

METAL STUD

METAL RUNNER CHANNEL

GYP. BOARD

CEILING

METAL RUNNER CHANNEL

ROOF DECK

GYP. BOARD

METAL STUD

CEILING

METAL RUNNER

CHANNEL

ROOF DECK

METAL RUNNER CHANNEL

A02

3 5/8" METAL STUD

5/8" GYPSUM BD. - BOTH SIDES

ACTUAL THICKNESS - 4 7/8"

UL: DES NO. U419

FIRE RATING: 1 HR

STC RATING: 52 (RAL-TL11-125)

CHASE WALL ON EXTERIOR WALL

CEILING

ROOF DECK

8" AIR SPACE

GYP. BOARD

METAL STUD

F

F01

3 5/8" METAL FURRING (ONE SIDE)

5/8" GYPSUM BD. (ONE SIDE)

8" AIR SPACE

ACTUAL THICKNESS - 1' 1/4"

UL: NONE

FIRE RATING: NONE

STC RATING: 52 (RAL-TL11-125)

METAL RUNNER CHANNEL

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

C

U s e rs

\e e n d c m g \D o c u m e n ts

\F o rt

H a m ilt o n B u ild in g

\M o d e l\ B

-D

M M

-A -M

D L .r v t

/2

/2

:4

:1

P

M

A-501

P A

R T

IT

IO

N T

Y P

E S

W

A

IN

W R

IG

H

T D

R B

R O

O K

L Y

N N

Y

N E

W Y

O R

K D

IS

T

R

IC

T F

E D

E R

A L P

L A

Z A

N E

W Y

O R

K N

Y

C .G

C .G

C .G

C .G

A U

G U

S T

W D

S -2

-B

-0

B L D

G

S T

M A

R

IN

E C

O R

P S

D

IS

T R

IC

T

R E

L O

C A

T

IO

N T

O F

T

H A

M

IL

T O

N N

Y

DNDN DN

DN

DN

WH

DN

FACP

TRA F

F F

F

M T

S

54' - 6 1/2"

/2

22' - 9"

/2

21' - 6"

AD-401

AD-402

AD-403

AD-301

AD-302

AD-302 3

AD-302

AD-302

AD-301

BASKETBALL COURT

WALK-IN BOX

MECHANICAL ROOM

THRIFT SHOPDTMS POST CAGESDPW FAMILY HOUSING

B

A

1 2 3 4 5 6 87

24' - 0" 13' - 0" 24' - 0"

21' - 6"

A-105

EXISTING WALL TO REMAIN.

PATCH AND REPAIR AS

REQUIRED

EXISTING WALL TO BE

DEMOLISHED

EXISTING DOOR TO REMAIN

EXISTING DOOR TO BE

DEMOLISHED

LEGEND1. THESE NOTES ARE GENERAL AND NOT INTENDED TO BE WHOLLY

INCLUSIVE. REMOVE ALL EXISTING CONDITIONS TO THE NOTED EXTENT.

2. REFER TO ORIGINAL AS-BUILTS BEFORE DEMOLITION OF CMU PARTITIONS

AND MEP EQUIPMENTS.

3. DASHED LINES DENOTE EXISTING TO BE REMOVED.

4. THIS PLAN IS REFERENCE ONLY. THE GOVERNMENT DOES NOT

GUARANTEE ACCURACY OF THE EXISTING CONDITION.

5. FOR REMOVAL OF PLUMBING ITEMS SEE PLUMBING DRAWINGS.

6.FOR REMOVAL OF MECHANICAL ITEMS SEE MECHANICAL DRAWINGS.

7. FOR REMOVAL OF ELECTRICAL ITEMS SEE ELECTRICAL DRAWINGS.

8. FOR REMOVAL OF FIRE PROTECTION ITEMS SEE FIRE PROTECTION

DRAWINGS.

9. ALL WALL FINISH ON EXTERIOR WALL TO BE REMOVED TO STRUCTURE

10. FOR ALL SANITARY TRENCHING, SEE PLUMBING AND MECHANICAL

DRAWINGS

11. DEMOLISH ALL EXISTING CEILINGS

GENERAL NOTES

0 8' 16' 32'

SCALE: 1/16" = 1'-0"

N

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

C

U s e rs

\e e n d c m g \D o c u m e n ts

\F o rt

H a m ilt o n B u ild in g

\M o d e l\ B

-D

M M

-A -M

D L .r v t

/2

/2

:4

:1

P

M

AD-101

D E

M O

L

IT

IO

N

P L A

N

W

A

IN

W R

IG

H

T D

R B

R O

O K

L Y

N N

Y

N E

W Y

O R

K D

IS

T

R

IC

T F

E D

E R

A L P

L A

Z A

N E

W Y

O R

K N

Y

C .G

C .G

C .G

C .G

A U

G U

S T

W D

S -2

-B

-0

B L D

G

S T

M A

R

IN

E C

O R

P S

D

IS

T R

IC

T

R E

L O

C A

T

IO

N T

O F

T

H A

M

IL

T O

N N

Y

1/16" = 1'-0"

DEMOLITION FLOOR PLAN

A d ju s tm e n t in

W in d o w s a n d

D o o r

S c h e d u le

/d e le ti o n a n d a d d it o n o f n o te s i n d ra w in g s

/2

/2

R e v is io n s t o w a ll ty p e s

/2

/2

AD-301

AD-302

AD-301

DTMS POST CAGESDPW FAMILY HOUSING

B

A

3 4 5

111111

11 11 11 11 11 11 112

2 2

INFILL OPENING IN KIND

INFILL OPENING IN KIND

EXISTING WALL TO REMAIN.

PATCH AND REPAIR AS

REQUIRED

EXISTING WALL TO BE

DEMOLISHED

EXISTING DOOR TO REMAIN

EXISTING DOOR TO BE

DEMOLISHED

LEGEND

1. THESE NOTES ARE GENERAL AND NOT INTENDED TO BE WHOLLY

INCLUSIVE. REMOVE ALL EXISTING CONDITIONS TO THE NOTED EXTENT.

2. REFER TO ORIGINAL AS-BUILTS BEFORE DEMOLITION OF CMU PARTITIONS

AND MEP EQUIPMENTS.

3. DASHED LINES DENOTE EXISTING TO BE REMOVED.

4. THIS PLAN IS REFERENCE ONLY. THE GOVERNMENT DOES NOT

GUARANTEE ACCURACY OF THE EXISTING CONDITION.

5. FOR REMOVAL OF PLUMBING ITEMS SEE PLUMBING DRAWINGS.

6.FOR REMOVAL OF MECHANICAL ITEMS SEE MECHANICAL DRAWINGS.

7. FOR REMOVAL OF ELECTRICAL ITEMS SEE ELECTRICAL DRAWINGS.

8. FOR REMOVAL OF FIRE PROTECTION ITEMS SEE FIRE PROTECTION

DRAWINGS.

9. ALL WALL FINISH ON EXTERIOR WALL TO BE REMOVED TO STRUCTURE

10. FOR ALL SANITARY TRENCHING, SEE PLUMBING AND MECHANICAL

DRAWINGS

11. DEMOLISH ALL EXISTING CEILINGS

GENERAL NOTES

DEMOLITION NOTES

CASEWORK TO BE REMOVED

2 DOOR AND FRAME TO BE REMOVED

WALL TO BE REMOVED

4 PLUMBING FIXTURE TO BE REMOVED

FLOOR FINISH TO BE REMOVED5

CONCRETE SLAB TO BE REMOVED6

STAIR TO BE REMOVED7

PARTIAL WALL TO BE REMOVED FOR DOOR8

REMOVE SLAB ABOVE FINISH FLOOR9

FILL IN DEPRESSED SUMP PUMP SLAB10

REMOVE WINDOW, FRAME, CONCRETE SILL AND FLASHING11

OVERHEAD DOOR TO BE REMOVED AND INFILLED WITH CMU

BLOCK

CONC. RAMP AND METAL RAILING TO BE REMOVED13

WINDOW AND FRAME TO BE REMOVED PREP OPENING FOR

INFILL WITH CMU BLOCK

PREP AREAS FOR PLUMBING FIXTURES15

N

8'4' 16'0

SCALE: 3/16" = 1'-0"

8'4' 16'0

SCALE: 3/16" = 1'-0"

KEY PLAN

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

C

U s e rs

\e e n d c m g \D o c u m e n ts

\F o rt

H a m ilt o n B u ild in g

\M o d e l\ B

-D

M M

-A -M

D L .r v t

/2

/2

:4

:1

P

M

AD-403

E N

L A

R G

E D

D E

M O

L

IT

IO

N

P L A

N

W

A

IN

W R

IG

H

T D

R B

R O

O K

L Y

N N

Y

N E

W Y

O R

K D

IS

T

R

IC

T F

E D

E R

A L P

L A

Z A

N E

W Y

O R

K N

Y

C .G

C .G

C .G

C .G

A U

G U

S T

W D

S -2

-B

-0

B L D

G

S T

M A

R

IN

E C

O R

P S

D

IS

T R

IC

T

R E

L O

C A

T

IO

N T

O F

T

H A

M

IL

T O

N N

Y

3/16" = 1'-0"

ENLARGED DEMOLITION PLAN 3

R e v is io n s t o w a ll ty p e s

/2

/2

BUILDING LOCATION

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

US Army Corps of Engineers ®

SOLICITATION NO.:

CONTRACT NO.:

ISSUE DATE:

VOLUME:

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

C

U s e rs

\e e n d c m g \D o c u m e n ts

\F o rt

H a m ilt o n B u ild in g

\M o d e l\ B

-D

M M

-A -M

D L .r v t

/2

/2

:4

:1

P

M

G-001

C O

V E

R S

H E

E T

W

A

IN

W R

IG

H

T D

R B

R O

O K

L Y

N N

Y

N E

W Y

O R

K D

IS

T

R

IC

T F

E D

E R

A L P

L A

Z A

N E

W Y

O R

K N

Y

C .G

C .G

C .G

C .G

A U

G U

S T

W D

S -2

-B

-0

B L D

G

S T

M A

R

IN

E C

O R

P S

D

IS

T R

IC

T

R E

L O

C A

T

IO

N T

O F

T

H A

M

IL

T O

N N

Y

NEW YORK DISTRICT

W912DS-23-B-0022

AUGUST 1, 2023

125 WAINWRIGHT DR., BROOKLYN NY 11209

BLDG 125 1ST MARINE CORPS DISTRICT

RELOCATION TO FT. HAMILTON, NY

103259

R.T.A.

DRAWING ABBREVIATIONS INDEX OF DRAWINGS BUILDING SUMMARY

NUMBERING SYSTEM:

XX100

DISCIPLINE:

C - CIVIL

L - LANDSCAPE

A - ARCHITECTURE

M - MECHANICAL

E - ELECTRICAL

P - PLUMBING

S - STRUCTURAL

K - FOOD SERVICE

DISCIPLINE MODIFIER

SHEET NUMBER WITHIN

SERIES

ANNOTATION CALLOUTS/DRAWING SYMBOLS

GENERAL NOTES

A ---------------------

A LABELCLASS A DOOR

A/C AIR CONDITION

A/C UNITAIR CONDITIONING UNIT

A/E ARCHITECT/ENGINEER

AB ANCHOR BOLT

ACC ACCESSIBLE

ACS AUTOMATIC CONTROL SYSTEM

ACS DR ACCESS DOOR

ACS PNLACCESS PANEL

ACT ACOUSTICAL CEILING TILE

ADA AMERICANS WITH DISABILITIES ACT

ADMIN ADMINISTRATION

AFC ABOVE FINISHED COUNTER

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AFS ABOVE FINISHED SLAB

AGGR AGGREGATE

AHU AIR HANDLING UNIT

AIB AIR INFILTRATION BARRIER

ALT ALTERNATE

ALUM ALUMINUM

ANOD ANODIZE

APC ACOUSTICAL PANEL CEILING

APPROX APPROXIMATE

AR AS REQUIRED

ARCH ARCHITECT

ASC ABOVE SUSPENDED CEILING

ASSY ASSEMBLY

ATC ACOUSTICAL TILE CEILING

AVG AVERAGE

AW ARCHITECTURAL WOODWORK

AWT ACOUSTICAL WALL TREATMENT

B ---------------------

B LABELCLASS B DOOR

BALC BALCONY

BB BASEBOARD

BC BOOKCASE

BD BOARD

BDRY BOUNDARY

BFF BELOW FINISH FLOOR

BHMA BUILDER'S HARDWARE MANUFACTURER'S

ASSOCIATION

BLDG BUILDING

BLKG BLOCKING

BLT IN BUILT-IN

BN BULLNOSE

BOS BOTTOM OF STEEL

BOT BOTTOM

BP BUILDING PAPER

BRKT BRACKET

BSMT BASEMENT

BTWN BETWEEN

BUR BUILT-UP ROOFING

C ---------------------

C CONC CAST CONCRETE

C LABELCLASS C DOOR

CAB CABINET

CATW CATWALK

CAV CAVITY

CBB CEMENTITIOUS (BACKER) BOARD

CD CONSTRUCTION DOCUMENTS

CDW CHILLED DRINKING WATER

CEM PLAS CEMENT PLASTER

CER CERAMIC

CF CONTRACTOR FURNISHED

CF/CI CONTRACTOR FURNISHED/CONTRACTOR

INSTALLED

CFE CONTRACTOR FURNISHED EQUIPMENT

CFLG COUNTERFLASHING

CFM CUBIC FEET PER MINUTE

CFMF COLD-FORMED METAL FRAMING

CFS CUBIC FEET PER SECOND

CG CORNER GUARD

CI CAST IRON

CIP CAST-IN-PLACE

CJ CONTROL JOINT

CL CENTER LINE

CLG CEILING

CLG DIFF CEILING DIFFUSER

CLG HT CEILING HEIGHT

CLL COLUMN LINE

CLO CLOSET

CLR COLOR

CLRM CLASSROOM

CMU CONCRETE MASONRY UNIT

CNDS CONDENSATE

CDR CARD READER

CO CLEANOUT

COL COLUMN

COMM COMMUNICATION

CONC CONCRETE

CONC FLR CONCRETE FLOOR

CONF CONFERENCE

CONT CONTINUE

COORD COORDINATE

CORR CORRIDOR

CP CONCRETE PIPE

CPT CARPET

CR CONTROL ROOM

CS CAST STONE

CSWK CASEWORK

CT CERAMIC TILE

CTB CERAMIC TILE BASE

CTF CERAMIC TILE FLOOR

CTR CENTER

CU FT CUBIC FEET

CW CASEMENT WINDOW

D ---------------------

D DEPTH

D LABELCLASS D DOOR

DBL DOUBLE

DEMO DEMOLITION

DEPT DEPARTMENT

DET DETAIL

DIA DIAMETER

DIR DIRECTION

DIST DISTANCE

DOC DOCUMENT

DR DOOR

DS DOWNSPOUT

E ---------------------

E LABEL CLASS E DOOR

EA EACH

EF EACH FACE

EIFS EXTERIOR INSULATION AND FINISH SYSTEM

EJ EXPANSION JOINT

ES EACH SIDE

EL ELEVATION

ELEV ELEVATOR

ENTR ENTRANCE

EPS EXPANDED POLYSTYRENE BOARD

(INSULATION)

EQ EQUAL

EWC ELECTRIC WATER COOLER

EXP EXPOSED

EXT EXTERIOR

EXT EXTINGUISHER

EXT GR EXTERIOR GRADE

G ---------------

GB GRAB BAR

GFCI GOVERNMENT FURNISHED CONTRACTOR

INSTALLED

GFGI GOVERNMENT INSTALLED FURNISHED

INSTALLED BY GOVERNMENT

GFRG GLASS-FIBER-REINFORCED GYPSUM

GLZ GLAZING

GR FL GROUND FLOOR

GUT GUTTER

GYP BD GYPSUM BOARD

GYP PLAS GYPSUM PLASTER

H -------------

HB HOSE BIBB

HDPE HIGH DENSITY POLYETHYLENE

HDW HARDWARE

HDWD HARDWOOD

HEPA HIGH EFFICIENCY PARTICULATE AIR (FILTER)

HM HOLLOW METAL

HMD HOLLOW METAL DOOR

HORIZ HORIZONTAL

HT HEIGHT

HYDR HYDRAULIC

F ---------------------

FA FIRE ALARM

FAAP FIRE ALARM ANNUNCIATOR PANEL

FAS BD FASCIA BOARD

FC BRK FACE BRICK

FCO FLOOR CLEANOUT

FD FLOOR DRAIN

FDTN FOUNDATION

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER CABINET

FED FEDERAL

FF FINISH FACE

FF EL FINISH FLOOR ELEVATION

FF INSUL FOIL BACKED INSULATION

FGL FIBERGLASS

FH FIRE HOSE

FHP FULL HEIGHT PARTITION

FIN FINISH

FIN BS FINISH BOTH SIDES

FIN FLR FINISH FLOOR

FIN GR FINISH GRADE

FIXT FIXTURE

FLDG FOLDING

FLEX FLEXIBLE

FLG FLOORING

FLMT FLUSH MOUNT

FLR FLOOR

FM FACTORY MUTUAL

FOC FACE OF CONCRETE

FOM FACE OF MASONRY

FR FIRE RESISTANT

FRG FIBER REINFORCED GYPSUM

FRMG FRAMING

FRP FIBERGLASS REINFORCED PLASTIC

FRTW FIRE RETARDANT TREATED WOOD

FS FEDERAL SPECIFICATION

FSTNR FASTENER

FT FEET

FTG FOOTING

FWC FABRIC WALLCOVERING

G ---------------------

G NATURAL GAS

GALV GALVANIZED

GB GRAB BAR

GFCI GOVERNMENT FURNISHED CONTRACTOR

INSTALLED

GFGI GOVERNMENT INSTALLED FURNISHED

INSTALLED BY GOVERNMENT

GFRG GLASS-FIBER-REINFORCED GYPSUM

GLZ GLAZING

GR FL GROUND FLOOR

GUT GUTTER

GYP BD GYPSUM BOARD

GYP PLAS GYPSUM PLASTER

H ---------------------

HB HOSE BIBB

HDPE HIGH DENSITY POLYETHYLENE

HDW HARDWARE

HDWD HARDWOOD

HEPA HIGH EFFICIENCY PARTICULATE AIR (FILTER)

HM HOLLOW METAL

HMD HOLLOW METAL DOOR

HORIZ HORIZONTAL

HT HEIGHT

HYDR HYDRAULIC

I ---------------------

IBC INTERNATIONAL BUILDING CODE

INSUL INSULATION

INT INTERIOR

ILO IN LIEU OF

J ---------------------

JAN JANITOR

K ---------------------

KPD KEYPAD

KIT KITCHEN

KPL KICKPLATE

L ---------------------

LAM LAMINATE

LAV LAVATORY

LBR LUMBER

LBS POUND

LDG LANDING

LF LINEAR FEET (FOOT)

LIB LIBRARY

LIN LINEAR

LKR LOCKER

LOC LOCATION

LT LIGHT

LVDR LOUVER DOOR

LVR LOUVER

M ---------------------

MACH RM MACHINE ROOM

MATL MATERIAL

MAX MAXIMUM

MC MOISTURE CONTENT

MD METAL DECK

MECH MECHANICAL

MECH RM MECHANICAL ROOM

MEMB MEMBRANE

MF MILL FINISH

MFR MANUFACTURER

MID MIDDLE

MIL STD MILITARY STANDARD

MIN MINIMUM, MINUTE

MIRR MIRROR

MISC MISCELLANEOUS

MLDG MOLDING (MOULDING)

MO MASONRY OPENING

MOD MODIFY

MB MOISTURE BARRIER

MTG MOUNTING

MTL METAL

MVBL MOVABLE

MWP MEMBRANE WATERPROOFING

N ---------------------

N NORTH

NA NOT APPLICABLE

NFPA NATIONAL FIRE PROTECTION ASSOCIATION

NIC NOT IN CONTRACT

NO NUMBER

NOM NOMINAL

NP NO PAINT

NRC NOISE REDUCTION COEFFICIENT

NTS NOT TO SCALE

O -------------------

OA OVERALL

OC ON CENTER

OD OUTSIDE DIAMETER

OFD OVERFLOW DRAIN

OFF OFFICE

OGL OBSCURE GLASS

OPH OPPOSITE HAND

OPNG OPENING

OPP OPPOSITE

OPQ OPAQUE

OWSJ OPEN WEB STEEL JOIST

OPR OPERABLE

ORD OVERFLOW ROOF DRAIN

ORIG ORIGINAL

P --------------------

PA PUBLIC ADDRESS

PAR PARAPET

PAT PATTERN

PB PULL BOX

PBD PARTICLEBOARD

PCC PRECAST CONCRETE

PCF POUNDS PER CUBIC FOOT

PCT PERCENT

PERF PERFORATED

PERIM PERIMETER

PH PHASE

PIL PILASTER

PL PROPERTY LINE

PL GL PLATE GLASS

PLAM PLASTIC LAMINATE

PLAS PLASTER

PLBG PLUMBING

PLG PILING

PLYWD PLYWOOD

PNL PANEL

PP PL PUSH/PULL PLATE

PR PAIR

PRCST PRECAST

PRKG PARKING

PS CONC PRESTRESSED CONCRETE

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PT PRESSURE TREATED

PTD PAPER TOWEL DISPENSER

PTDR PAPER TOWEL DISPENSER AND RECEPTACLE

PTN PARTITION

PWR POWER

Q --------------------

QT QUARRY TILE

QTY QUANTITY

R --------------------

RB RESILIENT BASE

RBM REINFORCED BRICK MASONRY

RBR RUBBER

RC REINFORCED CONCRETE

RCP REFLECTED CEILING PLAN

RD ROOF DRAIN

RDG INS RIGID INSULATION, SOLID

REC RECESSED

REC ROOM RECREATION ROOM

REF REFERENCE

REM REMOVABLE

REP REPAIR

REPL REPLACE

REQ REQUIRE

REQD REQUIRED

RESIL RESILIENT

REST RESTROOM

RF RESILIENT FLOORING

RFG ROOFING

RH ROOF HATCH

RHR RIGHT HAND REVERSE

RL ROOF LEADER

RLG RAILING

RM ROOM

RO ROUGH OPENING

RSD ROLLING STEEL DOOR

RV ROOF VENT

RVL REVEAL

S --------------------

SB SPLASH BLOCK

SCHED SCHEDULE

SD SMOKE DETECTOR

SF SQUARE FOOT (FEET)

SFTWD SOFTWOOD

SGL SINGLE

SHT MTL FLASH SHEET METAL (FLASHING)

SHTHG SHEATHING

SHV SHELVING

SIM SIMILAR

SJ SCORED JOINT

SKLT SKYLIGHT

SLNT SEALANT

SMK SMOKE

SMLS SEAMLESS

SP EL SPOT ELEVATION

SPEC SPECIFICATION

SQ SQUARE

SQ IN SQUARE INCH

SQ YD SQUARE YARD

SST STAINLESS STEEL

ST STAIRS

STD STANDARD

STL JST STEEL JOIST

STL RF DK STEEL ROOF DECK

STOR STORAGE

STR STRINGERS

STRB/HRN STROBE/HORN

SUB FL SUBFLOOR

SV SHEET VINYL

SW SIDEWALK

T --------------------

T TREAD

T/S TUB/SHOWER

TC TERRA COTTA

TD TRENCH DRAIN

TEL TELEPHONE

TEMP TEMPORARY

TER TERRAZZO

TFF TOP OF FINISH FLOOR

THK THICKNESS

TK BD TACKBOARD

TMPD GL TEMPERED GLASS

TN TRUE NORTH

TOF TOP OF FOOTING

TOM TOP OF MASONRY

TOP TOP OF PARAPET

TOPO TOPOGRAPHY

TOS TOP OF SLAB

TRANS TRANSOM

TRTD TREATED

TV TELEVISION

REFER TO AEC CAD

STANDARDS FOR PROPER

SHEET NUMBERING

LEGEND

CONCRETE/ PRECAST

CONCRETE

SOIL

SAND, EIFS FINISH COAT,

OR CEMENT PLASTER

BRICK

CMU

STONE

FIBERGLASS SEMI RIGID

INSULATION

FIBERGLASS BATT

INSULATION

MINERAL WOOL SEMI

RIGID INSULATION

EXPANDED

POLYSTYRENE RIGID

INSULATION

EXTRUDED

POLYSTYRENE RIGID

INSULATION

POLYISOCYANURATE

RIGID INSULATION

GYPSUM BOARD

EXTERIOR GYPSUM

SHEATHING

EXTERIOR CEMENT

BOARD

COATED GLASS MAT

WATER RESISTANT

GYP BD

PLYWOOD

COVER BOARD

MATERIALS

S

1 HR FIRE

S

S

S

1 HR FIRE/SMOKE WALL

4 HR FIRE

4 HR FIRE/SMOKE WALL

2 HR FIRE

2 HR FIRE/SMOKE WALL

3 HR FIRE

3 HR FIRE/SMOKE WALL

FIRE RATED WALL SYMBOLS:

*UNLESS OTHERWISE NOTED ON THE DRAWINGS

CEILING SYMBOLS

1i

GRID / COLUMN

LINE

DESIGNATOR

EQUIPMENT NUMBER

DOOR NUMBER

X

WALL TYPE

WINDOW TYPE

Room name

101 ROOM NAME/NUMBER

REVISION TAG

PLAN NORTH

NORTH ARROW w/

TRUE NORTH

INDICATION

EGRESS ROUTE ID

AND SECTION

LENGTH

Room

Rm_Occupancy

150 SF

EGRESS :Egress_ID

Egress_Length

ROOM OCCUPANCY

& AREA

ELEVATION NUMBER

SECTION

EXTERIOR ELEVATION

ENLARGEMENT,

DETAIL

SPOT ELEVATION

Name

Elevation

FLOOR LEVEL & NAME

PLATE NUMBER WHERE

SECTION/DETAIL IS

DRAWN

PLATE NUMBER WHERE

SECTION/DETAIL IS

DRAWN

PLATE NUMBER WHERE

SECTION/DETAIL IS

DRAWN

A SHEET KEYNOTE

A101

Ref

R e f

Ref

R e f

INTERIOR ELEVATION

A-101

1 TYP

PLATE NUMBER WHERE

SECTION/DETAIL IS

DRAWN

EXIT LIGHT

2' x 2' ACT CEILING

4' x 4' ACT CEILING

GYP. BD. CEILING

1' x 1' ACT CEILING

2 X 4 LIGHT FIXTURE

2 x 2 LIGHT FIXTURE

SUSP. FLUORESCENT

LIGHT

RETURN AIR GRILLE

SUPPLY AIR GRILLE

EXHAUST AIR GRILLE

PROJECT INFORMATION

PROJECT NAME: BLDG 125 1ST MARINE CORPS DISTRICT RELOCATION TO FT. HAMILTON, NY

PROPOSED USE: BUSINESS/ STORAGE

OWNER-CONTACT PERSON: CONTRACTING OFFICER

APPLICABLE CODES

REFER TO SHEET FS100 AND FS101 FOR APPLICABLE CODES

BUILDING PLANNING

THIS IS A MIXED OCCUPANCY BUILDING

FIRE SEPARATION IS REQUIRED, REFER TO SHEET FS101, MIXED USE AND OCCUPANCY

SEPARATION

REFER TO SHEET G-004 FOR BUILDING AREA TABULATILONS AND CATEGORY CODES GROSS

SQUARE FOOTAGE

TYPE OF CONSTRUCTION

CONSTRUCTION TYPE: THE BUILDING WILL BE TYPE II B FULLY SPRINKLERED CONSTRUCTION

PER IBC. STEEL STUD BACK-UP AND CONCRETE MASONRY UNIT (CMU) BACK-UP CAVITY WALLS

WITH RIGID INSULATION AND BRICK VENEER ON EXTERIOR SIDE. FLOOR IS CONCRETE SLAB-ON-

GRADE WITH AN UNDERGROUND CABLE VAULT. REFER TO SHEET FS100.

ESSENTIAL FACILITY (CHAPTER 16, IBC)

NOT AN ESSENTIAL FACILITY

GENERAL BUILDING LIMITATIONS

REFER TO SHEET FS100 FOR BUILDING AREA AND HEIGHT LIMITATION CALCULATIONS

FIRE PROTECTION SYSTEMS

REFER TO (FA) SHEET FOR FIRE ALARM SYSTEM, INCLUDING SMOKE CONTROL AND (FX) SHEETS FOR

FIRE SUPPRESSION SYSTEM TO INCLUDE STANDPIPE.

FIRE RESISTANT CONSTRUCTION

REFER TO SHEET FS101 FIRE RESISTIVE REQUIREMENTS

OPTIONAL ITEMS

ALL DRAWINGS WITH 1 IN FRONT OF DISCIPLINE DESIGNATOR EXAMPLE 1A-201 WILL HAVE

ELEMENTS THAT RE LISTED IN THE OPTIONAL BID ITEMS

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

C

U s e rs

\e e n d c m g \D o c u m e n ts

\F o rt

H a m ilt o n B u ild in g

\M o d e l\ B

-D

M M

-A -M

D L .r v t

/2

/2

:4

:1

P

M

G-002

G E

N E

R A

L N

O T

E S

W

A

IN

W R

IG

H

T D

R B

R O

O K

L Y

N N

Y

N E

W Y

O R

K D

IS

T

R

IC

T F

E D

E R

A L P

L A

Z A

N E

W Y

O R

K N

Y

C .G

C .G

C .G

C .G

A U

G U

S T

W D

S -2

-B

-0

B L D

G

S T

M A

R

IN

E C

O R

P S

D

IS

T R

IC

T

R E

L O

C A

T

IO

N T

O F

T

H A

M

IL

T O

N N

Y

1. THE DRAWINGS INDICATE THE GENERAL EXTENT OF THE WORK. THE DRAWINGS ARE NOT

INTENDED TO INDICATE OR DESCRIBE ALL WORK REQUIRED FOR THE FULL PERFORMANCE

AND COMPLETION OF THE REQUIREMENTS OF THE CONTRACT DOCUMENTS, ON THE BASIS

OF THE GENERAL PERFORMANCE CRITERIA AND GENERAL EXTENT OF WORK INDICATED,

DESCRIBED OR REQUIRED.

2. THE ENUMERATION OF PARTICULAR ITEMS OF WORK IN ONE PORTION OF THE CONTRACT

DOCUMENTS SHALL NOT BE CONSTRUED TO EXCLUDE OTHER ITEMS NECESSARY OR

IMPLIED.

3. THE CONTRACTOR IS RESPONSIBLE FOR THE COORDINATION OF ALL PARTS OF THE WORK

SO THAT NO WORK SHALL BE LEFT IN AN UNFINISHED OR INCOMPLETE CONDITION.

4. ALL WORK SHALL CONFORM TO APPLICABLE INDUSTRY AND MANUFACTURER'S PUBLISHED

STANDARDS FOR QUALITY OF MATERIALS AND WORKMANSHIP. ANY CONFLICTING

REQUIREMENTS OF THE SOURCES LISTED ABOVE SHALL BE BROUGHT TO THE

CONTRACTING OFFICER'S ATTENTION PRIOR TO PROCEEDING WITH THE WORK.

5. THE CONTRACTOR SHALL PROTECT EXISTING, IN-PLACE, AND NEW WORK.

6. ALL WORK NOTED "N.I.C." OR "G.F.G.I." IS MEANT TO EXCLUDE THIS SCOPE OF WORK FROM

THE CONSTRUCTION CONTRACT.

7. THE CONTRACTOR SHALL PAY FOR AND COORDINATE THE COLLECTION, SEPARATION,

RECYCLE, REMOVAL AND LEGAL DISPOSAL OF MATERIALS AND RUBBISH.

8. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND SHALL VERIFY ALL NEW AND

EXISTING CONDITIONS, SHOWN. THE CONTRACTOR SHALL NOTIFY THE CONTRACTING

OFFICER IN WRITING OF ANY DIFFERING CONDITIONS BEFORE COMMENCEMENT OF WORK.

COMMENCEMENT OF WORK SHALL CONSTITUTE ACCEPTANCE OF ALL NEW AND EXISTING

CONDITIONS.

9. DO NOT SCALE DRAWINGS, DIMENSIONS GOVERN. LARGE SCALE DETAILS GOVERN OVER

SMALL SCALE DETAILS. THE CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER IN

WRITING OF ANY DIFFERING CONDITIONS BEFORE COMMENCEMENT OF WORK.

10. ALL DIMENSIONS INDICATED ARE NOT TO VARY BY MORE THAN 1/8".

11. NFPA 241, STANDARD IS CALLED STANDARD FOR SAFEGUARDING CONSTRUCTION,

ALTERATION, AND DEMOLITION OPERATIONS SHALL BE APPLIED.

12. WALL AND CEILING ASSEMBLIES THAT ARE IDENTIFIED WITH A FIRE RESISTIVE RATING

SHALL BE CONSTRUCTED AS DETAILED OR REFERENCED BY UL OR OTHER REFERENCE.

13. DIMENSIONS SHOWN TO STRUCTURAL BEAMS AND COLUMNS ARE TO THE CENTERLINE OF

THE MEMBER UNLESS SPECIFICALLY NOTED OTHERWISE.

14. PROVIDE EXPANSION AND CONTROL JOINTS IN ALL WORK AS PER PRODUCT

MANUFACTURER'S STANDARDS.

15. THE CONTRACTOR SHALL PERFORM ALL WORK IN ACCORDANCE WITH ALL APPLICABLE

CODES, ORDINANCES AND REGULATORY AGENCIES AND SHALL OBTAIN NECESSARY

BUILDING AND FIRE PERMITS FROM ALL AUTHORITIES HAVING JURISDICTION.

16. ALL DISSIMILAR METALS SHALL BE ISOLATED FROM EACH OTHER TO AVOID GALVANIC

CORROSION.

17. NOTES APPEAR ON VARIOUS SHEETS FOR DIFFERENT SYSTEMS AND MATERIALS. SHEETS

ARE TO BE REVIEWED AND NOTES ON ANY ONE SHEET ARE TO BE APPLIED TO RELATED

DRAWINGS AND DETAILS.

18. ALL FINISH AND FIRE RATING REQUIREMENTS INDICATED SHALL APPLY TO THE ENTIRE

LENGTH AND HEIGHT OF THE WALL.

19. WHEN NON-DIMENSIONED PARTITIONS APPEAR IN CONJUNCTION WITH DOOR OPENINGS,

THE DOOR WIDTH AND THE DOOR FRAME DETAILS DETERMINE THE LOCATION OF

ADJACENT WALLS AND FRAMES.

20. DETAILS INDICATED FOR CONSTRUCTION ARE TO BE USED FOR ALL LOCATIONS OF

SIMILAR CONSTRUCTION. WHERE SPECIFIC DIMENSIONS, DETAILS OR DESIGN INTENT

CANNOT BE DETERMINED, CONSULT THE CONTRACTING OFFICER BEFORE PROCEEDING

WITH THE WORK.

21. THE CONTRACTOR SHALL COORDINATE ALL PENETRATIONS WITH ALL TRADES.

22. PROVIDE ACCESS PANELS AS REQUIRED BY APPLICABLE CODES AND AS REQUIRED FOR

MECHANICAL EQUIPMENT AND PLUMBING WORK. ALL ACCESS PANEL LOCATIONS SHALL BE

REVIEWED WITH THE CONTRACTING OFFICER PRIOR TO PROCEEDING.

23. ALL PIPE DUCTS AND BUS DUCTS THAT PENETRATE ASSEMBLIES SHALL BE INSTALLED IN A

MANNER THAT WILL PRESERVE THE MOISTURE RESISTANCE, FIRE RATING, AND

STRUCTURAL INTEGRITY OF THE ASSEMBLY.

24. CONTRACTOR SHALL PLAN THEIR WORK TO PROVIDE ADEQUATE PROTECTION FOR

PERSONS AND PROPERTY AT ALL TIMES AND EXECUTE THE WORK IN SUCH A MANNER TO

AVOID ANY HAZARD TO PERSONS AND PROPERTY AS NECESSARY.

25. CONTRACTOR SHALL CONTINUOUSLY COORDINATE PHASING AND CONSTRUCTION WITH

THE CONTRACTING OFFICER AND DEPARTMENT OF PUBLIC WORKS.

26. CONTRACTOR SHALL COORDINATE WITH CONTRACTING OFFICER, AND EXISTING USER ON

LRC PORTION OF THE BUILDING ON CONSTRUCTION ACTIVITES, CONTRACTOR SHALL NOT

INTERFERE WITH LRC OPERATIONS.

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

C

U s e rs

\e e n d c m g \D o c u m e n ts

\F o rt

H a m ilt o n B u ild in g

\M o d e l\ B

-D

M M

-A -M

D L .r v t

/2

/2

:4

:2

P

M

G-003

S H

E E

T L

IS

T

W

A

IN

W R

IG

H

T D

R B

R O

O K

L Y

N N

Y

N E

W Y

O R

K D

IS

T

R

IC

T F

E D

E R

A L P

L A

Z A

N E

W Y

O R

K N

Y

C .G

C .G

C .G

C .G

A U

G U

S T

W D

S -2

-B

-0

B L D

G

S T

M A

R

IN

E C

O R

P S

D

IS

T R

IC

T

R E

L O

C A

T

IO

N T

O F

T

H A

M

IL

T O

N N

Y

SHEET LIST

SHEET NUMBER Sheet Name

GENERAL

G-001 COVER SHEET

G-002 GENERAL NOTES

G-003 SHEET LIST

STRUCTURAL

S-101 STRUCTURAL DETAILS

LIFE SAFETY

FS-101 LIFE SAFETY ANALYSIS

FS-102 LIFE SAFETY ANALYSIS

FS-103 LIFE SAFETY PLAN

ARCHITECTURAL

1AB-101 ABATMENT PLAN

AD-101 DEMOLITION PLAN

AD-301 DEMOLITION SECTIONS

AD-302 DEMOLITION SECTIONS

AD-401 ENLARGED DEMOLITION PLAN 1

AD-402 ENLARGED DEMOLITION PLAN 2

AD-403 ENLARGED DEMOLITION PLAN 3

1A-104 ROOF PLAN OPTION

1A-202 ELEVATIONS OPTION

1A-504 ROOF DETAILS OPTION

A-101 FLOOR PLAN

A-102 REFLECTED CEILING PLAN

A-103 ROOM SCHEDULE

A-105 AIR BARRIER PLAN AND SECTIONS

A-201 ELEVATIONS

A-301 SECTIONS

A-302 SECTIONS

A-310 WALL SECTIONS

A-401 ENLARGED FLOOR PLAN 1

A-402 ENLARGED FLOOR PLAN 2

A-403 ENLARGED FLOOR PLAN 3

A-404 ENLARGED RESTROOM ABA STANDARD DETAILS

A-405 ENLARGED RESTROOM PLAN

A-406 ENLARGED RESTOOM PLAN 02

A-407 STANDARD MOUNTING HEIGHTS

A-408 RAMP AND STAIR

A-409 MILLWORK DETAILS

A-501 PARTITION TYPES

A-502 PARTITION DETAILS

A-503 DOOR DETAILS

A-504 WINDOW DETAILS

A-505 MECHANICAL PENETRATION DETAILS

A-509 MICELLANOUS DETAILS

A-601 DOOR SCHEDULE

A-602 WINDOW SCHEDULE

A-603 LOUVER SCHEDULE AND DETAILS

A-604 CEILING DETAILS

A-605 FINISH SCHEDULE

A-606 EXTERIOR SIGNAGE DETAILS

AR-101 ARCHITECTURAL REFERENCE DRAWINGS FLOOR PLAN/ ELEVATION

AR-300 ARCHITECTURAL REFERNCE DRAWINGS WALL SECTIONS AND DETAILS

INTERIOR DESIGN

I-101 PROPOSED FINISH PLAN

I-201 INTERIOR ELEVATIONS

I-401 ENLARGED FINISH PLAN 1

I-402 ENLARGED FINISH PLAN 2

I-403 ENLARGED FNISH PLAN 3

IF101 PROPOSED FURNITURE PLAN

IF401 ENLARGED FURNITURE PLAN 1

IF402 ENLARGED FURNITURE PLAN 2

IF403 ENLARGED FURNITURE PLAN 3

IG101 SIGNAGE TYPICALS

FIRE PROTECTION

FD101 FIRE PROTECTION DEMOLITION

FA001 FIRE ALARM GENERAL NOTES & LEGEND

FA101 FIRE ALARM FLOOR PLAN

FA501 FIRE ALARM DETAILS

FA601 FIRE ALARM RISER DIAGRAM

FA602 FIRE ALARM MATRIX

FX001 FIRE SUPPRESSION GENERAL NOTES & LEGEND

FX100 CODE COMPLIANCE SITE PLAN

FX101 FIRE SUPPRESSION FLOOR PLAN

FX401 FIRE SUPPRESSION LARGE SCALE PLANS & SECTIONS

FX501 FIRE SUPPRESSION DETAILS

FX601 FIRE SUPPRESSION RISER DIAGRAM

PLUMBING

P-001 LEGEND & ABBREVIATIONS

PD-100 PLUMBING DEMOLITION

P-101 PLUMBING OVERALL PLAN

P-102 PLUMBING SERVICE PIPING PLAN I

P-103 PLUMBING SERVICE PIPING PLAN II

P-104 SANITARY OVERALL PLAN

P-105 SANITARY PIPING PLAN I

P-106 SANITARY PIPING PLAN II

P-107 ROOF PLAN

P-501 PLUMBING DETAILS I

P-502 PLUMBING DETAILS II

P-503 PLUMBING DETAILS III

P-601 PLUMBING SCHEDULES

P-901 DOMESTIC RISER DIAGRAM

P-902 SANITARY RISER DIAGRAM

SHEET LIST

SHEET NUMBER Sheet Name

MECHANICAL

M-100 LEGEND & ABBREVIATIONS

MD-101 DEMOLITION PLAN MECHANICAL

MD-102 DEMOLITION PLAN MECHANICAL II AS-BUILT STEAM UNIT

HEATERS

MD-103 DEMOLITION PLAN MECHANICAL III

M-101 OVERALL DUCTWORK PLAN

M-102 DUCTWORK PLAN I

M-103 DUCTWORK PLAN II

M-104 DUCTWORK PLAN III

M-105 MECHANICAL PIPING PLAN I

M-106 MECHANICAL PIPING PLAN II

M-107 MECHANICAL PIPING PLAN III

M-108 VRF PIPING PROPOSED LAYOUT 1

M-109 VRF PIPING PROPOSED LAYOUT 2

M-110 VRF PIPING PROPOSED LAYOUT 3

M-401 MECHANICAL NATURAL GAS CONNECTION

M-501 MECHANICAL DETAILS I

M-502 MECHANICAL DETAILS II

M-503 MECHANICAL DETAILS III

M-601 MECHANICAL SCHEDULE I

M-602 MECHANICAL SCHEDULE II

M-603 MECHANICAL SCHEDULE III

M-604 MECHANICAL SCHEDULE IV

M-605 MECHANICAL SCHEDULE V

M-701 SEQUENCE OF OPERATIONS

M-702 MECHANICAL CONTROL POINTS 1

M-703 MECHANICAL CONTROL POINTS 2

M-704 MECHANICAL CONTROL POINTS 3

M-705 MECHANICAL CONTROL POINTS 4

M-706 MECHANICAL CONTROL POINTS 5

M-801 MECHANICAL SCHEMATICS

ELECTRICAL

E001 ELECTRICAL - NOTES, LEGEND, AND ABBREVIATIONS

E003 SECURITY - NOTES, LEGEND, AND ABBREVIATIONS

E004 ELECTRICAL - TYPICAL DEVICE MOUNTING HEIGHTS

ED101 ELECTRICAL - DEMOLITION SITE PLAN

ED102 ELECTRICAL - DEMOLITION FLOOR PLAN

1EG101 GROUNDING AND LIGHTNING PROTECTION PLAN - ROOF

1EG501 GROUNDING AND LIGHTNING PROTECTION - DETAILS

EL101 LIGHTING - AREA A

EL102 LIGHTING - AREA B

EL103 LIGHTING - AREA C

EL501 LIGHTING - DETAILS

EL601 LIGHTING - LIGHTING FIXTURE SCHEDULE

EL701 LIGHTING - LIGHTING CONTROLS DIAGRAM

EP101 POWER - AREA A

EP102 POWER - AREA B

EP103 POWER - AREA C

EP401 POWER - PART PLANS AND ELEVATIONS

EP601 POWER - ONE LINE DIAGRAM

EP701 POWER - PANEL SCHEDULES

EP702 POWER - PANEL SCHEDULES

EP703 POWER - PANEL SCHEDULES

EP704 POWER - PANEL SCHEDULES

EP705 POWER - PANEL SCHEDULES

ES101 ELECTRICAL - SITE PLAN - POWER

ES501 ELECTRICAL - SITE POWER DETAILS

EY501 SECURITY - DETAILS

EY502 SECURITY - DETAILS

TELECOMMUNICATIONS

E002 COMMUNICATIONS - NOTES, LEGEND, AND ABBREVIATIONS

ET101 TELECOM AND SECURITY - AREA A

ET102 TELECOM AND SECURITY - AREA B

ET103 TELECOM AND SECURITY - AREA C

ET501 TELECOM - DETAILS

ET502 TELECOM - DETAILS

Sheets
A-101 - FLOOR PLAN
A-403 - ENLARGED FLOOR PLAN 3
A-501 - PARTITION TYPES
AD-101 - DEMOLITION PLAN
AD-403 - ENLARGED DEMOLITION PLAN 3
G-001 - COVER SHEET
G-002 - GENERAL NOTES
G-003 - SHEET LIST