Army_SustainabilityReportCard_2020 B125 Renovation LEED IDC.pdf

PDF 525 KB Posted

Attached to
Renovate Bldg. 125 Fort Hamilton, Brooklyn, New York
Solicitation number
W912DS23B0022
Issued by

About this file

This document is a sustainability report card for a renovation project at Building 125 at Fort Hamilton in Brooklyn, New York. The project involved renovating the building to achieve LEED Silver certification. Key details include the project being carried out under solicitation number W912DS23B0022 issued by the Department of the Army Corps of Engineers New York District. The awarded contractor was Group1. Project metrics covered in the report card include achieving at least 30% energy savings below baseline, installing renewable energy and water metering systems, diverting at least 60% of construction waste, and attaining prerequisites for integrated design, commissioning, indoor air quality, and low-emitting materials.

View the file

Other files

File Type Posted
C.04.01 Bid Abstract Bldg 125 Final.pdf PDF
A-605 and S-102 S-103 Amd 5.pdf PDF
B.08.03 Amendment 05.pdf PDF
09 06 00 Amd 5.pdf PDF
10 21 13 Amd 5.pdf PDF
E-002 and ED102 Amd 3.pdf PDF
LEED_v4_for_Interior_Design_and_Construction_Checklist B125 Reno Ft Hamilton.pdf PDF
Fort Hamilton Planning Charrete.pdf PDF
M-101 thru 107 (rev 02) and 602 (rev 01) Amd 5.pdf PDF
07 27 10 Amd 5.pdf PDF
12 50 00.13 FFE Data Sheet Item Code M4 revised.pdf PDF
01 33 29 Amd 5.pdf PDF
B.08.03 Amendment 04.pdf PDF
B.08.03 Amendment 03.pdf PDF
A-405 20230830.pdf PDF
A-408 20230830.pdf PDF
A-501 20230831.pdf PDF
1AB-101 20230830.pdf PDF
A-605 20230831.pdf PDF
A-101 A-403 A-501 AD-101 AD-403 20230829.pdf PDF
Renovation BLDG 125-Mechanical Room - Sheet - M-111 - MECHANICAL ROOM PLAN.pdf PDF
B.08.03 Amendment 02.pdf PDF
A-602 Amendment 2 20230823.pdf PDF
Amendment 2 Mechanical Drawings M102 thru 107 M601 M701.pdf PDF
A-404 Amendment 2 20230824.pdf PDF
A-601 Amendment 2 20230823.pdf PDF
B.08.03 Amendment 01.pdf PDF
B.08.03 Site Visit Sign in sheet_16 Aug 23 (002).jpg JPG image
B.08.03 Invitation for Bid W912DS23B0022.pdf PDF
JA_Hamilton_125_Simplex Signed.pdf PDF
Fort Hamilton Bldg 125-100_PCNT_Specification_07-31-2023.pdf PDF
B.08.03 Invitation for Bid W912DS23B0022.pdf PDF
B125 RTA Complete set R4 07 August 2023.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT INFORMATION

FY MILCON Project No. / Other Customer Reference No.:

Project Design Level:

Units (SF/SM): Facility #:

Award Date:

BOD Date:

Project No.:

Project Title:

Location:

USACE Project Manager:

Facility Area:

SUSTAINABILITY DATA - GUIDING PRINCIPLES for SUSTAINABLE DEVELOPMENT

OVERALL COMPLIANCE:

- If project is for more than one building for which tracking is required, complete a separate form for each building.

- If an element was not achieved at project completion, mark "Not Attained" and include a justification in the "Not attained reason" field.

BUILDING IDENTIFICATION:

1 How many buildings are included in this project?

2 Of those, which building is this form for?

3 New building or stand-alone addition greater than or equal to 10,000 GSF? Yes No

DOCUMENTATION OF COMPLIANCE WITH GUIDING PRINCIPLES

I. Employ Integrated Design Principles 1 Integrated Design

Attained In Compliance Yes N/A Not Attained N/A due to

Mission preclusion Building/site issue Not LCCE Renovation only: not part of scope Installation/region issue

Not attained reason

2 Commissioning Attained In Compliance Yes N/A Not Attained

N/A due to Mission preclusion Building/site issue Not LCCE Renovation only: not part of scope Installation/region issue

Not attained reason

(i) Systems commissioned

Energy & Sustainability Record Card

AE Firm Name:

AE Contract # & T.O.:

Construction Contractor:

Construction Contract & T.O.:

Contractor Sustainability POC:

Category Code:

AE Sustainability POC:

Complies with UFC 1-200-02 and Agency Sustainability Policy Building does not meet the criteria for tracking in UFC 1-200-02/Policy

An Exemption has been: Requested Granted N/A

II. Optimize Energy Performance

3. Energy Efficiency

Attained In Compliance Yes N/A Not Attained N/A due to

Mission preclusion Building/site issue Not LCCE Renovation only: not part of scope Installation/region issue

Not attained reason

(i) Energy Savings Below Baseline %

(ii) Energy Standard

IECC

OTHER:

ASHRAE 90.1-2013 (06NOV16+)

ASHRAE 90.1-2016

C. Energy Efficient Products Attained In Compliance Yes N/A Not Attained

N/A due to Mission preclusion Building/site issue Not LCCE Renovation only: not part of scope Installation/region issue

Not attained reason

4. Renewable Energy Attained In Compliance Yes N/A Not Attained

N/A due to Mission preclusion Building/site issue Not LCCE Renovation only: not part of scope Installation/region issue

Not attained reason

A. Renewable energy technology types Geothermal Daylighting (quantified passive) Ground Source Heat Pumps Mechanical (i.e., direct water pumping) Solar Photovoltaic Micro-hydro Solar Thermal - domestic hot water Concentrating (sterling) Solar Thermal - space conditioning Wind

(i) Annual % of total load

(ii) System size (kwatts)

B. Solar Hot Water Percentage - 30% target Attained In Compliance Yes N/A Not Attained

N/A due to Mission preclusion Building/site issue Not LCCE Renovation only: not part of scope Installation/region issue

Not attained reason

(i) Annual % of total load

(ii) System size (kBTU/Year)

5. Meter (Energy) Attained In Compliance Yes N/A Not Attained

N/A due to Mission preclusion Building/site issue Not LCCE Renovation only: not part of scope Installation/region issue

Not attained reason

6. Energy Use Intensity kBTU/Sq Ft/Year

(i) Total Design Energy Use Intensity (EUI): kBTU/Sq Ft/Year

III. Protect and Conserve Water

7. Indoor Water Use

A. Water-Efficient Products Attained In Compliance Yes N/A Not Attained

N/A due to Mission preclusion Building/site issue Not LCCE Renovation only: not part of scope Installation/region issue

Not attained reason

(i) Total Design Indoor Water Use Intensity (WUI): Gallons/Sq Ft/Year

B. Indoor Water Meter Attained In Compliance Yes N/A Not Attained

N/A due to Mission preclusion Building/site issue Not LCCE Renovation only: not part of scope Installation/region issue

Not attained reason

8. Outdoor Water Use A. Outdoor Water Meter (for 25,000 SF of irrigation)

(i) Is there a permanent irrigation system serving more than 25,000 SF of landscaping?

Yes No

(ii) Water Meter Attained In Compliance Yes N/A Not Attained

N/A due to Mission preclusion Building/site issue Not LCCE Renovation only: not part of scope Installation/region issue

Not attained reason

B. Water-efficient landscape Attained In Compliance Yes N/A Not Attained

N/A due to Mission preclusion Building/site issue Not LCCE Renovation only: not part of scope Installation/region issue

Not attained reason

9. Alternative Water Use

N/A due to Mission preclusion Building/site issue Not LCCE Renovation only: not part of scope Installation/region issue

Not attained reason

Methods Used: Air Handler Condensate Capture Reclaimed Water Grey Water Treated Wastewater Harvested Rainwater OTHER:

10. Stormwater Management - update the LID Data tab

IV. Enhance Indoor Environmental Quality

11. Ventilation and Thermal Comfort

A. Ventilation Attained In Compliance Yes N/A Not Attained

N/A due to Mission preclusion Building/site issue Not LCCE Renovation only: not part of scope Installation/region issue

Not attained reason

B. Thermal Comfort Attained In Compliance Yes N/A Not Attained

N/A due to Mission preclusion Building/site issue Not LCCE Renovation only: not part of scope Installation/region issue

Not attained reason

12. Daylighting and Lighting Controls A. Daylight

Attained In Compliance Yes N/A Not Attained N/A due to

Mission preclusion Building/site issue Not LCCE Renovation only: not part of scope Installation/region issue

Not attained reason

B. Automatic dimming controls Attained In Compliance Yes N/A

N/A due to Not Attained

Building/site issue Renovation only: not part of scope

Mission preclusion Not LCCE

13. Indoor Air Quality A. Moisture Control

Attained In Compliance Yes N/A Not Attained N/A due to

Mission preclusion Building/site issue Not LCCE Renovation only: not part of scope Installation/region issue

Not attained reason

B. Low-Emitting Materials Attained In Compliance Yes N/A Not Attained

N/A due to Mission preclusion Building/site issue Not LCCE Renovation only: not part of scope Installation/region issue

Not attained reason

C. Indoor Air Quality during Construction Attained In Compliance Yes N/A Not Attained

N/A due to Mission preclusion Building/site issue Not LCCE Renovation only: not part of scope Installation/region issue

Not attained reason

14. Occupant Health and Wellness Attained In Compliance Yes N/A Not Attained

N/A due to Mission preclusion Building/site issue Not LCCE Renovation only: not part of scope Installation/region issue

Not attained reason

V. Reduce the Environmental Impact of Materials

15. Material Content and Performance

A. Resource Conservation and Recovery Act (RCRA) Section 6002 (recycled content) Attained In Compliance Yes N/A Not Attained

Mission preclusion Building/site issue Not LCCE Renovation only: not part of scope Installation/region issue

Not attained reason

B. Farm Security and Rural Investment Act (FSRIA) section 9002 (Biobased content) Attained In Compliance Yes N/A

N/A due to Not Attained

Building/site issue Renovation only: not part of scope

Mission preclusion Not LCCE

16. Waste Management

N/A due to Mission preclusion Building/site issue Not LCCE Renovation only: not part of scope Installation/region issue

Not attained reason

17. Waste Diversion - 60% target Attained In Compliance Yes N/A Not Attained

N/A due to Mission preclusion Building/site issue Not LCCE Renovation only: not part of scope Installation/region issue

Not attained reason

(i) Percent diverted

VI. Assess and Consider Climate Change Risks

18. Address Climate Change Risk

Attained In Compliance Yes N/A Not Attained N/A due to

Mission preclusion Building/site issue Not LCCE Renovation only: not part of scope Installation/region issue

Not attained reason

THIRD PARTY CERTIFICATION INFORMATION

Is this building pursuing Third Party Certification? Yes No

Sustainability Third Party Certification Rating

Third Party Certification Rating System and Level GBI Green Globes 1 Globe GBI Green Globes 2 Globes GBI Green Globes 3 Globes GBI Green Globes 4 Globes GBI "Guiding Principles Compliance"

USGBC LEED Certified USGBC LEED Silver USGBC LEED Gold USGBC LEED Platinum USGBC "Guiding Principles Assessment"

OTHER:

Reason not included

Attained

UM:
OTHER energy standard:
other alternative water source:
WORKORDER_NUMBER:
FISCAL_YEAR: 23
CUSTOMER_REFERENCE_NBR: W912DS23B0022
PROJECT_TITLE: Renovate Bldg 125
LOCATION_UIC: B.125 Ft Hamilton, Brooklyn, NY
PROJECT_MANAGER: Stella Marco
DESIGN_LEVEL:
FACILITY_AREA:
CATEGORY_CODE:
FACILITY:
AE_FIRM: N/A
AE_CONTRACT_NBR:
IH_DESIGN_MANAGER:
AWARD_DATE:
BOD_DATE:
CONSTRUCTION_CONTRACT:
NUM_BUILDINGS: 1
NEW_CONSTRUCTION_Y: Yes
NEW_CONSTRUCTION_N: Off
TRACKED_BUILDING: B125
SYSTEMS_COMMISSIONED:
EFFICIENCY_STANDARD_ASH2013: Off
EFFICIENCY_STANDARD_IECC: Off
EFFICIENCY_STANDARD_OTHER: Off
INTEGRATED_DESIGN_N_A: Off
INTEGRATED_DESIGN_NOT_ATTAINED:
COMMISSIONING_NOT_ATTAINED:
COMMISSIONING_N_A: Off
ENERGY_REDUCTION_PCT:
ENERGY_EFF_PROD_NOT_ATTAINED:
RENEW_TECH_NA_Installation: Yes
RENEW_TECH_NOT_ATTAINED:
RENEW_TECH_TYPE_GEO: Off
RENEW_TECH_TYPE_DAY: Off
RENEW_TECH_TYPE_WIND: Off
RENEW_TECH_TYPE_GROUND: Off
RENEW_TECH_TYPE_MECH: Off
RENEW_TECH_TYPE_PHOTO: Off
RENEW_TECH_TYPE_DOM: Off
RENEW_TECH_TYPE_SPACE: Off
RENEW_TECH_TYPE_MICRO: Off
RENEW_TECH_TYPE_STER: Off
RENEW_ANNUAL_PCT:
RENEW_SYSTEM_SIZE:
SOLAR_HOT_WATER_N_A: Off
RENEW_TECH_N_A: Yes
RENEW_TECH_NO: Off
ENERGY_EFF_PROD_NO: Off
ENERGY_EFF_PROD_N_A: Off
ENERGY_EFF_NO: Off
ENERGY_EFF_N_A: Off
SOLAR_HOT_WATER_NOT_ATTAINED:
SOLAR_HOT_WATER_PCT:
SOLAR_HOT_WATER_SYSTEM_SIZE:
ENERGY_BUILD_MET_NOT_ATTAINED: (2) Revenue Meters
ENERGY_BUILDING_METERING_N_A: Off
ENERGY_USE_INTENSITY:
WATER_EFF_PROD_NOT_ATTAINED:
WATER_USE_INTENSITY:
WATER_EFF_PROD_N_A: Off
WATER_BUILDING_METERING_N_A: Off
WATER_BUILD_METER_NOT_ATTAINED:
PERM_IRRIGATION_YES: Off
PERM_IRRIGATION_NO: Off
WATER_OUTDOOR_METER_N_A: Off
WATER_OUT_METER_NOT_ATTAINED:
WATER_EFF_LAND_NOT_ATTAINED:
WATER_EFF_LAND_N_A: Off
ALT_WATER_USE_N_A: Off
ALT_WATER_USE_NA_Installation: Off
ALT_WATER_USE_NOT_ATTAINED:
ALT_WATER_USE_HARVEST: Off
ALT_WATER_USE_TREAT: Off
ALT_WATER_USE_AIR: Off
ALT_WATER_USE_GREY: Off
ALT_WATER_USE_RECLAIM: Off
ALT_WATER_USE_OTHER: Off
VENTILATION_N_A: Off
THERMAL_CONDITIONS_N_A: Off
THERM_CONDITIONS_NOT_ATTAINED:
MINIMUM_DAYLIGHT_NOT_ATTAINED:
MINIMUM_DAYLIGHT_N_A: Yes
MOISTURE_CONTROL_PLAN_N_A: Off
MOISTURE_CONTROL_NOT_ATTAINED:
LOW_EMITTING_MAT_NOT_ATTAINED:
LOW_EMITTING_MATERIALS_N_A: Off
INDOOR_AIR_QUAL_N_A: Off
INDOOR_AIR_QUAL_NOT_ATTAINED:
OCCUPANT_HEALTH_NOT_ATTAINED:
OCCUPANT_HEALTH_N_A: Off
RECYCLED_CONTENT_N_A: Off
RECYCLED_CONTENT_NOT_ATTAINED:
WASTE_MANAGEMENT_N_A: Off
WASTE_MANAGEMENT_NOT_ATTAINED:
WASTE_DIVERSION_NOT_ATTAINED:
WASTE_DIVERSION_PCT:
WASTE_DIVERSION_N_A: Off
CLIMATE_CHNG_RSK_N_A: Off
CLIMATE_CHNG_RSK_NOT_ATTAINED:
INTEGRATED_DESIGN_YES: Off
INTEGRATED_DESIGN_NO: Off
INTEGRATED_DESIGN_NA_MISSION: Off
INTEGRATED_DESIGN_NA_BUILDING: Off
INTEGRATED_DESIGN_NA_NOT: Off
INTEGRATED_DESIGN_NA_RENOVATIO: Off
INTEGRATED_DESIGN_NA_INSTALLAT: Off
COMMISSIONING_YES: Off
COMMISSIONING_NO: Off
COMMISSIONING_NA_MISSION: Off
COMMISSIONING_NA_BUILDING: Off
COMMISSIONING_NA_NOT: Off
COMMISSIONING_NA_RENOVATION: Off
COMMISSIONING_NA_INSTALLATION: Off
ENERGY_EFF_NA_BUILDING: Off
ENERGY_EFF_NA_RENOVATION: Off
ENERGY_EFF_PROD_YES: Off
ENERGY_EFF_PROD_NA_MISSION: Off
ENERGY_EFF_PROD_NA_BUILDING: Off
ENERGY_EFF_PROD_NA_NOT: Off
ENERGY_EFF_PROD_NA_RENOVATION: Off
ENERGY_EFF_PROD_NA_INSTALLATIO: Off
RENEW_TECH_YES: Off
RENEW_TECH_NA_MISSION: Off
RENEW_TECH_NA_BUILDING: Yes
RENEW_TECH_NA_NOT: Off
RENEW_TECH_NA_RENOVATION: Yes
SOLAR_HOT_WATER_YES: Off
SOLAR_HOT_WATER_NO: Off
SOLAR_HOT_WATER_NA_MISSION: Off
SOLAR_HOT_WATER_NA_BUILDING: Off
SOLAR_HOT_WATER_NA_NOT: Off
SOLAR_HOT_WATER_NA_RENOVATION: Off
SOLAR_HOT_WATER_NA_INSTALLATIO: Off
ENERGY_BUILDING_METERING_YES: Yes
ENERGY_BUILDING_METERING_NO: Off
ENERGY_BUILD_METER_NA_MISSION: Off
ENERGY_BUILD_METER_NA_BUILDING: Off
ENERGY_BUILD_METER_NA_NOT: Off
ENERGY_BUILD_METER_NA_RENOVATI: Off
ENERGY_BUILD_METER_NA_INSTALLA: Off
WATER_EFF_PROD_YES: Off
WATER_EFF_PROD_NO: Off
WATER_EFF_PROD_NA_MISSION: Off
WATER_EFF_PROD_NA_BUILDING: Off
WATER_EFF_PROD_NA_NOT: Off
WATER_EFF_PROD_NA_RENOVATION: Off
WATER_EFF_PROD_NA_INSTALLATION: Off
WATER_BUILDING_METERING_YES: Off
WATER_BUILDING_METERING_NO: Off
WATER_BUILD_METER_NA_MISSION: Off
WATER_BUILD_METER_NA_BUILDING: Off
WATER_BUILD_METER_NA_NOT: Off
WATER_BUILD_METER_NA_RENOVATIO: Off
WATER_BUILD_METER_NA_INSTALLAT: Off
WATER_OUTDOOR_METER_YES: Off
WATER_OUTDOOR_METER_NO: Off
WATER_OUTDOOR_METER_NA_MISSION: Off
WATER_OUTDOOR_METER_NA_BUILDIN: Off
WATER_OUTDOOR_METER_NA_NOT: Off
WATER_OUTDOOR_METER_NA_RENOVAT: Off
WATER_OUTDOOR_METER_NA_INSTALL: Off
WATER_EFF_LAND_YES: Off
WATER_EFF_LAND_NO: Off
WATER_EFF_LAND_NA_MISSION: Off
WATER_EFF_LAND_NA_BUILDING: Off
WATER_EFF_LAND_NA_NOT: Off
WATER_EFF_LAND_NA_RENOVATION: Off
WATER_EFF_LAND_NA_INSTALLATION: Off
ALT_WATER_USE_YES: Off
ALT_WATER_USE_NO: Off
ALT_WATER_USE_NA_MISSION: Off
ALT_WATER_USE_NA_BUILDING: Off
ALT_WATER_USE_NA_NOT: Off
ALT_WATER_USE_NA_RENOVATION: Off
VENTILATION_NO: Off
VENTILATION_NA_BUILDING: Off
VENTILATION_NA_RENOVATION: Off
THERMAL_CONDITIONS_YES: Off
THERMAL_CONDITIONS_NO: Off
THERMAL_CONDITIONS_NA_MISSION: Off
THERMAL_CONDITIONS_NA_BUILDING: Off
THERMAL_CONDITIONS_NA_NOT: Off
THERMAL_CONDITIONS_NA_RENOVATI: Off
THERMAL_CONDITIONS_NA_INSTALLA: Off
MINIMUM_DAYLIGHT_YES: Off
MINIMUM_DAYLIGHT_NO: Off
MINIMUM_DAYLIGHT_NA_MISSION: Off
MINIMUM_DAYLIGHT_NA_BUILDING: Off
MINIMUM_DAYLIGHT_NA_NOT: Off
MINIMUM_DAYLIGHT_NA_RENOVATION: Off
MINIMUM_DAYLIGHT_NA_INSTALLATI: Off
MOISTURE_CONTROL_PLAN_YES: Off
MOISTURE_CONTROL_PLAN_NO: Off
MOISTURE_CONTROL_NA_MISSION: Off
MOISTURE_CONTROL_NA_BUILDING: Off
MOISTURE_CONTROL_NA_NOT: Off
MOISTURE_CONTROL_NA_RENOVATION: Off
MOISTURE_CONTROL_NA_INSTALLATI: Off
LOW_EMITTING_MATERIALS_YES: Off
LOW_EMITTING_MATERIALS_NO: Off
LOW_EMITTING_MAT_NA_MISSION: Off
LOW_EMITTING_MAT_NA_BUILDING: Off
LOW_EMITTING_MAT_NA_NOT: Off
LOW_EMITTING_MAT_NA_RENOVATION: Off
LOW_EMITTING_MAT_NA_INSTALLATI: Off
INDOOR_AIR_QUAL_YES: Off
INDOOR_AIR_QUAL_NO: Off
INDOOR_AIR_QUAL_NA_MISSION: Off
INDOOR_AIR_QUAL_NA_BUILDING: Off
INDOOR_AIR_QUAL_NA_NOT: Off
INDOOR_AIR_QUAL_NA_RENOVATION: Off
INDOOR_AIR_QUAL_NA_INSTALLATIO: Off
OCCUPANT_HEALTH_YES: Off
OCCUPANT_HEALTH_NO: Off
OCCUPANT_HEALTH_NA_MISSION: Off
OCCUPANT_HEALTH_NA_BUILDING: Off
OCCUPANT_HEALTH_NA_NOT: Off
OCCUPANT_HEALTH_NA_RENOVATION: Off
OCCUPANT_HEALTH_NA_INSTALLATIO: Off
RECYCLED_CONTENT_YES: Off
RECYCLED_CONTENT_NO: Off
RECYCLED_CONTENT_NA_MISSION: Off
RECYCLED_CONTENT_NA_BUILDING: Off
RECYCLED_CONTENT_NA_NOT: Off
RECYCLED_CONTENT_NA_RENOVATION: Off
RECYCLED_CONTENT_NA_INSTALLATI: Off
WASTE_MANAGEMENT_YES: Off
WASTE_MANAGEMENT_NO: Off
WASTE_MANAGEMENT_NA_MISSION: Off
WASTE_MANAGEMENT_NA_BUILDING: Off
WASTE_MANAGEMENT_NA_NOT: Off
WASTE_MANAGEMENT_NA_RENOVATION: Off
WASTE_MANAGEMENT_NA_INSTALLATI: Off
WASTE_DIVERSION_YES: Off
WASTE_DIVERSION_NO: Off
WASTE_DIVERSION_NA_MISSION: Off
WASTE_DIVERSION_NA_BUILDING: Off
WASTE_DIVERSION_NA_NOT: Off
WASTE_DIVERSION_NA_RENOVATION: Off
WASTE_DIVERSION_NA_INSTALLATIO: Off
CLIMATE_CHNG_RSK_YES: Off
CLIMATE_CHNG_RSK_NO: Off
CLIMATE_CHNG_RSK_NA_MISSION: Off
CLIMATE_CHNG_RSK_NA_BUILDING: Off
CLIMATE_CHNG_RSK_NA_NOT: Off
CLIMATE_CHNG_RSK_NA_RENOVATION: Off
CLIMATE_CHNG_RSK_NA_INSTALLATI: Off
EFFICIENCY_STANDARD_ASH2016: Off
AUTO_DIMMING_YES: Yes
AUTO_DIMMING_N_A: Off
AUTO_DIMMING_NO: Off
AUTO_DIMMING_NA_MISSION: Off
AUTO_DIMMING_NA_BUILDING: Off
AUTO_DIMMING_NA_NOT: Off
AUTO_DIMMING_NA_RENOVATION: Off
AUTO_DIMMING_NA_INSTALLATION: Off
automatic dimming not attained:
BIOBASED_PRODUCTS_YES: Off
BIOBASED_PRODUCTS_N_A: Off
BIOBASED_PRODUCTS_NO: Off
BIOBASED_PRODUCTS_NA_MISSION: Off
BIOBASED_PRODUCTS_NA_BUILDING: Off
BIOBASED_PRODUCTS_NA_NOT: Off
BIOBASED_PRODUCTS_NA_RENOVATIO: Off
BIOBASED_PRODUCTS_NA_INSTALLAT: Off
BIOBASED_PRODUCTS_NOT_ATTAINED:
THIRD_PARTY_REQ_YES: Yes
THIRD_PARTY_REQ_NO: Off
CERT_LEVEL_ACHIEVED_CERT: Off
CERT_LEVEL_ACHIEVED_SILVER: Yes
CERT_LEVEL_ACHIEVED_GOLD: Off
CERT_LEVEL_ACHIEVED_PLAT: Off
CERT_LEVEL_ACHIEVED_USGBC_GUID: Off
CERT_LEVEL_ACHIEVED_GBI1: Off
CERT_LEVEL_ACHIEVED_GBI2: Off
CERT_LEVEL_ACHIEVED_GBI3: Off
CERT_LEVEL_ACHIEVED_GBI4: Off
CERT_LEVEL_ACHIEVED_GBI_GUID: Off
CERT_LEVEL_ACHIEVED_OTHER: Off
CERT_LEVEL_OTHER:
THIRD_PARTY_NO_REASON:
contractors Sustainability Coordinator:
CONSTRUCTION_CONTRACTOR:
Group1: Off
Group2: Off
ENERGY_EFF_NOT_ATTAINED:
ENERGY_EFF_NA_INSTALLATION: Off
ENERGY_EFF_NA_NOT: Off
ENERGY_EFF_NA_MISSION: Off
ENERGY_EFF_YES: Off
VENTILATION_NOT_ATTAINED:
VENTILATION_NA_INSTALLATION: Off
VENTILATION_NA_NOT: Off
VENTILATION_NA_MISSION: Off
VENTILATION_YES: Off

File details come from the government source that posted it. Updated .