This document provides specifications for toilet compartments and related bathroom partitions to be installed under the solicitation for renovations to Building 125 at Fort Hamilton in Brooklyn, New York. The specifications cover materials, construction requirements, finishes, colors, and installation instructions for phenolic and solid plastic toilet enclosures, urinal screens, wall-hung and ceiling-mounted partitions, and associated hardware. Products must meet standards for indoor air quality, accessibility, and recycled content. Installation drawings are required along with product data, samples, and certification of warranties.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Fort Hamilton Bldg 125 HAMILTONBLDG125 Amendment #05
SECTION 10 21 13
TOILET COMPARTMENTS
08/20
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ALUMINUM ASSOCIATION (AA)
AA DAF45 (2003; Reaffirmed 2009) Designation System for Aluminum Finishes
ASTM INTERNATIONAL (ASTM)
ASTM A123/A123M (2017) Standard Specification for Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Products
ASTM A167 (2011) Standard Specification for Stainless and Heat-Resisting Chromium-Nickel Steel Plate, Sheet, and Strip
ASTM A336/A336M (2021) Standard Specification for Alloy Steel Forgings for Pressure and High-Temperature Parts
ASTM A385/A385M (2022) Standard Practice for Providing High-Quality Zinc Coatings (Hot-Dip)
ASTM B36/B36M (2018) Standard Specification for Brass Plate, Sheet, Strip, and Rolled Bar
ASTM B86 (2022) Standard Specification for Zinc and Zinc-Aluminum (ZA) Alloy Foundry and Die Castings
ASTM B221 (2021) Standard Specification for Aluminum and Aluminum-Alloy Extruded Bars, Rods, Wire, Profiles, and Tubes
ASTM B456 (2017; R 2022) Standard Specification for Electrodeposited Coatings of Copper Plus Nickel Plus Chromium and Nickel Plus Chromium
CSA GROUP (CSA)
CSA B45.5-17/IAPMO Z124 (2017; Errata 2017; Errata 2018) Plastic Plumbing Fixtures
SECTION 10 21 13 Page 1
INTERNATIONAL CODE COUNCIL (ICC)
ICC A117.1 (2017) Standard And Commentary Accessible and Usable Buildings and Facilities
SCIENTIFIC CERTIFICATION SYSTEMS (SCS)
SCS SCS Global Services (SCS) Indoor Advantage
SOCIETY OF AUTOMOTIVE ENGINEERS INTERNATIONAL (SAE)
SAE AMS2460 (2013; Rev A) Plating, Chromium
U.S. GENERAL SERVICES ADMINISTRATION (GSA)
CID A-A-60003 (Basic; Notice 1) Partitions, Toilet, Complete
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
36 CFR 1191 Americans with Disabilities Act (ADA) Accessibility Guidelines for Buildings and Facilities; Architectural Barriers Act (ABA) Accessibility Guidelines
UNDERWRITERS LABORATORIES (UL)
UL 2818 (2013) GREENGUARD Certification Program For Chemical Emissions For Building Materials, Finishes And Furnishings
1.2 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for information only. When used, a code following the "G" classification identifies the office that will review the submittal for the Government.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-02 Shop Drawings
Fabrication Drawings
Installation Drawings ; G
SD-03 Product Data
Cleaning and Maintenance Instructions
Colors And Finishes
Painted Metal
Sound-Deadening Cores
Anchoring Devices and Fasteners
Hardware and Fittings
SECTION 10 21 13 Page 2
Brackets
Door Hardware
Recycled content for plastic laminate partitions and screens ; S
Recycled content for solid phenolic partitions and screens ; S D-04 Samples
Colors and Finishes ; G
Hardware and Fittings
Anchoring Devices and Fasteners
SD-07 Certificates
Warranty
1.3 CERTIFICATIONS
1.3.1 Indoor Air Quality
1.3.1.1 Laminated Plastic and Solid Phenolic Products
Provide products certified to meet indoor air quality requirements by UL 2818 (Greenguard) Gold, SCS Global Services Indoor Advantage Gold or provide certification or validation by other third-party program that products meet the requirements of this Section. Provide current product certification documentation from certification body.
1.4 REGULATORY REQUIREMENTS
Comply with to ICC A117.1 code for access for the handicapped operation of toilet compartment door and hardware.
1.5 DELIVERY, STORAGE, AND HANDLING
Deliver materials in the manufacturer's original unopened packages with the brand, item identification, and project reference clearly marked.
Store components in a dry location that is adequately ventilated; free from dust, water, other contaminants, and damage during delivery, storage, and construction.
1.6 WARRANTY
Provide manufacturer's warranty to repair or replace defective materials and workmanship for a period of one year from date of final acceptance of the work.
SECTION 10 21 13 Page 3
PART 2 PRODUCTS
2.1 SYSTEM REQUIREMENTS
Provide a complete and usable toilet partition system, including toilet enclosures, room entrance screens, urinal screens, system of panels, hardware, and support components. Furnish the partition system from a single manufacturer, with a standard product as shown in the most recent catalog data. Submit Fabrication Drawings for toilet partitions and urinal screens consisting of fabrication and assembly details to be performed in the factory. Submit manufacturer's Cleaning and Maintenance Instructions in accordance with Section 01 78 23 OPERATIONS AND
MAINTENANCE DATA.
2.2 MATERIALS
2.2.1 Phenolic Core (Finish 4) (Finish 4A)
Provide compressed cellulose fibers impregnated with resins. Provide smooth material without creases or ripples, with a Flame Spread Index of 75 or less and a Smoke Developed Index of 450 or less. The surface laminate is fused to the resin-impregnated core.
2.2.2 Sound-Deadening Cores
Provide sound deadening consisting of treated kraft paper honeycomb cores with a cell size of not more than 1 inch . Provide resin-material content weighing not less than 11 percent of the finished core weight. Face expanded cores on both sides with kraft paper.
2.2.3 Anchoring Devices and Fasteners
Provide steel anchoring devices and fasteners hot-dipped galvanized after fabrication, in conformance with ASTM A385/A385M and ASTM A123/A123M .
Conceal all galvanized anchoring devices.
2.2.4 Brackets
Provide two-ear panel wall brackets, T-style, 1 inch stock. Provide stirrup style panel-to-pilaster brackets.
2.2.5 Hardware and Fittings
2.2.5.1 General Requirements
Provide hardware for the toilet partition system that complies with CID A-A-60003 for the specified type and style of partitions. Provide hardware finish highly resistant to alkalis, urine, and other common toilet room acids. Comply with 36 CFR 1191 of latching devices and hinges for handicap compartments; provide stainless steel devices and hinges with door latches that operate without either tight grasping or twisting of the wrist of the operator. Submit three samples of each item, including anchoring devices and fasteners. Approved hardware samples may be installed in the work if properly identified.
Material Conformance Standard
SECTION 10 21 13 Page 4
Cold-rolled sheet steel ASTM A336/A336M , commercial quality
Zinc-base alloy ASTM B86, Alloy AC41-A
Brass ASTM B36/B36M, Alloy C26800
Aluminum ASTM B221
Corrosion-resistant steel ASTM A167, Type 304
2.2.5.2 Finishes
a. Provide chrome plating that complies with ASTM B456.
b. Provide finish that complies with SAE AMS2460, Class I, Type I.
c. Provide aluminum with clear anodic coating that complies with AA DAF45.
d. Provide corrosion-resistant steel with a No. 4 finish.
e. Provide stainless steel with a No. 4 finish.
f. Provide exposed fasteners that match the hardware and fittings.
2.2.6 Door Hardware
2.2.6.1 Hinges
Provide adjustable hinges to hold in-swinging doors open at any angle up to 90 degrees and outswinging doors up to 10 degrees. Provide self-lubricating hinges with the indicated swing. Provide hinges that are semi-concealed and have the following type of return movement:
a. Gravity return movement
2.2.6.2 Latch and Pull
Provide latch and pull that is a combination rubber-faced door strike and keeper equipped with emergency access. Provide surface mounted concealed latch.
2.2.6.3 Coat Hooks
Provide coat hooks that are combination units with hooks and rubber tipped pins.
2.3 PARTITION PANELS AND DOORS
Fabricate partition panels, and pilasters of materials and construction listed:
Provide solid polyethylene toilet partitions and screens with recycled content of 30 percent minimum.
SECTION 10 21 13 Page 5
2.3.1 Toilet Enclosures
Provide toilet enclosures that comply with CID A-A-60003 , Type I, Style A, floor supported . Furnish width, length, and height of toilet enclosures as shown. Finish surface of panels are solid phenolic, color through the core (Finish 4A); water resistant; graffiti resistant; non-absorbent radius beveled edges. Reinforce panels indicated to receive toilet paper holders or grab bars for mounting of the items required, and provide cut outs for through partition toilet accessories. Provide grab bars to withstand a bending stress, shear stress, shear force, and a tensile force induced by 250 lbf . Grab bars cannot rotate within their fittings.
2.3.2 Urinal Screens
Provide urinal screens that comply with CID A-A-60003 , Type III, StyleF, wall hung. Provide finish for surface of screens as solid phenolic, color through the core (Finish 4A) solid polyethylene (Finish 5) ; water resistant; graffiti resistant; non-absorbent with radius beveled edges;
with manufacturer's standard post design of materials matching the thickness and construction of pilasters. Furnish width and height of urinal screens as shown. Provide thickness to match toilet compartment panel construction. Secure wall hung urinal screens with 42 inches long, continuous flanges. Fabricate screens from the same types of panels and pilasters as the toilet partitions. Use corrosion-resistant steel fittings and fasteners.
2.4 [Enter Appropriate Subpart Title Here] CEILING-HUNG PARTITIONS
Provide pilasters in size indicated that are manufacturer's standard corrosion resistant anchoring assemblies complete with leveling adjustment nuts at pilasters for connection to structural support above finished ceiling. Design anchoring device to transmit the strain and loading on the pilaster directly to the structural support above without putting strain or loading on the finished ceiling. Provide sleeves or caps at tops of pilasters to conceal anchorage.
2.5 FLOOR-ANCHORED PARTITIONS
Provide pilasters in size indicated that are manufacturer's standard corrosion resistant anchoring assemblies complete with leveling adjustment nuts and pilasters for structural connection to floor. Provide anchoring device at the bottom of the pilaster consisting of a steel bar not less than 1/2 by 7/8 inch welded to the reinforced face sheets and having not less than two 3/8 inch round anchorage devices for securing to the floor slab. Provide anchorage devices complete with threaded rods, expansion shields, lock washers, and leveling-adjustment nuts. Provide shoes at pilasters to conceal anchorage.
2.6 OVERHEAD-BRACED PARTITIONS
Provide pilasters in sizes indicated that are manufacturer's standard corrosion-resistant supports, leveling mechanism, and anchors at pilasters to suit floor conditions. Provide shoes at pilasters to conceal supports and leveling mechanism. Provide anchoring device at the bottom of the pilaster consisting of a channel-shaped floor stirrup fabricated from not less than 0.0635 inch thick material and a leveling bolt. Secure the stirrup to the pilaster with not less than a 3/16 inch bolt and nut after the pilaster is leveled. Secure the stirrup to the floor with not less
SECTION 10 21 13 Page 6 than two lead expansion shields and sheetmetal screws. Fabricate overhead brace from a continuous extruded aluminum tube not less than 1 inch wide by 1-1/2 inch high, 0.125 inch wall thickness. Finish is AA-C22A31 in accordance with AA DAF45. Set and secure brace into the top of each pilaster. Provide shoes at pilasters to conceal supports and leveling mechanism.
2.7 PILASTER SHOES
Provide shoes at pilasters to conceal floor-mounted anchorage. Provide aluminum pilaster shoes. Height is a minimum 3 inches .
2.8 HARDWARE
Provide hardware for the toilet partition system that complies with CID A-A-60003 for the specified type and style of partitions. Provide hardware pre-drilled by manufacturer. Use a hardware finish that is highly resistant to alkalis, urine, and other common toilet room acids.
Hardware includes: chrome plated nonferrous cast pivot hinges, gravity type, adjustable for door close positioning; nylon bearings; chrome plated aluminum door latch; door strike and keeper with rubber bumper; and cast alloy chrome plated coat hook and bumper, . Provide latching devices and hinges for handicap compartments complying with 36 CFR 1191 and stainless steel door latches that operate without either tight grasping or twisting of the wrist of the operator. Use stainless steel, tamper proof type screws and bolts. Wall mounting brackets are continuous, full height, stainless steel, in accordance with toilet compartment manufacturer's instructions.. Provide floor-mounted anchorage consisting of corrosion-resistant anchoring assemblies with threaded rods, lock washers, and leveling adjustment nuts at pilasters for structural connection to floor.
2.9 COLORS AND FINISHES
2.9.1 Colors
Provide color as specified in Section 09 06 00 SCHEDULES FOR FINISHES.
2.9.2 Finishes
2.9.2.1 Finishes, No 4A
Provide manufacturer's standard color through the core (Finish 4A) formed under high pressure rendering a single component section not less than 1 inch thick. Colors extend throughout the panel thickness.
2.9.2.2 Finish No. 6
Provide homogeneous filled acrylic (Finish 6) with through body colors meeting CSA B45.5-17/IAPMO Z124 .
PART 3 EXECUTION
3.1 PREPARATION
Take field measurements prior to the preparation of drawing and fabrication to ensure proper fits. Verify that field measurements, SECTION 10 21 13 Page 7 surfaces, substrates and conditions are as required, and ready to receive work. Verify correct spacing of plumbing fixtures. Verify correct location of built in framing, anchorage, and bracing. Report in writing to Contracting Officer prevailing conditions that adversely affect satisfactory execution of the work of this section. Do not proceed with work until unsatisfactory conditions have been corrected.
3.2 METAL PARTITION FABRICATION
a. Fabricate metal partition panels, doors, screens, and pilasters required for the project from galvanized-steel face sheets with formed edges. Laminate face sheets via pressure to the sound-deadening core with edges sealed with a continuous locking strip and corners mitered and welded. Ground all welds smooth. Provide concealed reinforcement for installation of hardware, fittings, and accessories. Surface of face sheets must be , free from wave, warp, or buckle.
b. Before application of an enamel coating system, solvent-clean galvanized-steel surfaces to remove processing compounds, oils, and other contaminants harmful to coating-system adhesion. After cleaning,coat the surfaces with a metal-pretreatment phosphate coating. After pretreatment, finish exposed galvanized-steel surfaces with a baked-enamel coating system as specified.
c. Provide an enamel coating system consisting of a factory-applied baked acrylic enamel coating system. Provide a coating system that is a durable, washable, stain-resistant, and mar-resistant finish.
3.3 INSTALLATION
Do not install items that show visual evidence of biological growth.
Install partitions rigid, straight, plumb, and level, with the panels centered between the fixtures. Provide a panel clearance of not more than 1/2 inch and secure the panels to walls and pilasters with continuous full height wall brackets. Locate wall brackets so that holes for wall bolts occur in masonry or tile joints. Secure panels to pilasters with brackets matching the wall brackets. Provide for adjustment due to minor floor variations. Locate head rail joints at pilaster center lines. Install adjacent components for consistency of line and plane. Equip each door with hinges, one door latch, and one coat hook and bumper. Align hardware to uniform clearance at vertical edges of doors.
a. Secure panels to hollow plastered walls with toggle bolts using not less than 1/4-20 screws of the length required for the wall thickness. Provide toggle bolts with a load-carrying strength of not less than 600 pounds per anchor.
b. Secure panels to ceramic tile on hollow plastered walls or hollow concrete-masonry walls with toggle bolts using not less than 1/4-20 screws of the length required for the wall thickness. Provide toggle bolts with a load-carrying strength of not less than 600 pounds per anchor.
c. Secure panels to solid masonry or concrete with lead or brass expansion shields designed for use with not less than 1/4-20 screws, with a shield length of not less than 1-1/2 inches . Provide expansion shields with a load-carrying strength of not less than 600 pounds per anchor.
SECTION 10 21 13 Page 8
d. Submit Installation Drawings for toilet partitions, room entrance screens, and urinal screens showing plans, elevations, details of construction, hardware, reinforcing and blocking, fittings, mountings and escutcheons. Indicate on drawings the type of partition, location, mounting height, cutouts, and reinforcement required for toilet-room accessories.
3.4 CEILING-HUNG PARTITIONS
Secure pilasters to the structural support above with the anchorage device specified. Make all leveling devices readily accessible for leveling, plumbing, and tightening the installation. Level the bottoms of doors with bottoms of pilasters when doors are in a closed position.
3.5 FLOOR-ANCHORED PARTITIONS
Secure pilasters to the floor with the anchorage device specified. Make all leveling devices readily accessible for leveling, plumbing, and tightening the installation. Level tops of doors with tops of pilasters when doors are in a closed position. Expansion shields have a minimum 2 inch penetration into the concrete slab.
3.6 OVERHEAD-BRACED PARTITIONS
Secure pilasters to the floor with the anchorage device specified. Make all leveling devices readily accessible for leveling, plumbing, and tightening the installation. Secure overhead brace to the pilaster face with not less than two fasteners per face. Expansion shields have a minimum 2 inch penetration into the concrete slab. Make tops of doors parallel with the overhead brace when doors are in a closed position.
3.7 FINAL ADJUSTMENT
After completion of the installation, make final adjustments to the pilaster-leveling devices, door hardware, and other working parts of the partition assembly. Doors have a uniform vertical edge clearance of approximately 3/16 inch and rest open at approximately 30 degrees when unlatched.
3.8 CLEANING
Touch up baked enamel and powder coat finish with the same color of paint that was used for the finish. Clean all surfaces and adjacent surfaces soiled as a result of the work, in an approved manner compliant with the manufacturer's recommended cleaning and protection from damage procedures until accepted. Remove all equipment, tools, surplus materials, and work debris from the site.
-- End of Section --
SECTION 10 21 13 Page 9
| 10 21 13 - TOILET COMPARTMENTS |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 SUBMITTALS |
| 1.3 CERTIFICATIONS |
| 1.3.1 Indoor Air Quality |
| 1.3.1.1 Laminated Plastic and Solid Phenolic Products |
| 1.4 REGULATORY REQUIREMENTS |
| 1.5 DELIVERY, STORAGE, AND HANDLING |
| 1.6 WARRANTY |
| PART 2 PRODUCTS |
| 2.1 SYSTEM REQUIREMENTS |
| 2.2 MATERIALS |
| 2.2.1 Phenolic Core Finish 4 Finish 4A |
| 2.2.2 Sound-Deadening Cores |
| 2.2.3 Anchoring Devices and Fasteners |
| 2.2.4 Brackets |
| 2.2.5 Hardware and Fittings |
| 2.2.5.1 General Requirements |
| 2.2.5.2 Finishes |
| 2.2.6 Door Hardware |
| 2.2.6.1 Hinges |
| 2.2.6.2 Latch and Pull |
| 2.2.6.3 Coat Hooks |
| 2.3 PARTITION PANELS AND DOORS |
| 2.3.1 Toilet Enclosures |
| 2.3.2 Urinal Screens |
| 2.4 Enter Appropriate Subpart Title HereCEILING-HUNG PARTITIONS |
| 2.5 FLOOR-ANCHORED PARTITIONS |
| 2.6 OVERHEAD-BRACED PARTITIONS |
| 2.7 PILASTER SHOES |
| 2.8 HARDWARE |
| 2.9 COLORS AND FINISHES |
| 2.9.1 Colors |
| 2.9.2 Finishes |
| 2.9.2.1 Finishes, No 4A |
| 2.9.2.2 Finish No. 6 |
| PART 3 EXECUTION |
| 3.1 PREPARATION |
| 3.2 METAL PARTITION FABRICATION |
| 3.3 INSTALLATION |
| 3.4 CEILING-HUNG PARTITIONS |
| 3.5 FLOOR-ANCHORED PARTITIONS |
| 3.6 OVERHEAD-BRACED PARTITIONS |
| 3.7 FINAL ADJUSTMENT |
| 3.8 CLEANING |
File details come from the government source that posted it. Updated .