W912DS-17-R-0001
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
a. Revise the Price Schedule
b. Revise the Specification
c. Revise the Draw ings
d. Answ er to Offerors Questions for only Information. Incorporate FAR 52.217-5 Evaluation of Options.
Proposal Due Date is Extended to 3 February 2017 at 2:00 P.M. Eastern Standard Time NOTE: Offerors must acknow ledge receipt of this amendment by the date specified in the proposal (or as amended) by one of the follow ing methods: In the space provided on the SF 1442, by separate letter, or by signing block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENT BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR PROPOSAL IN ACCORDANCE WITH THE LATE PROPOSAL, LATE MODIFICATION OF PROPOSAL, OR LATE WITHDRAWAL OF PROPOSAL (FAR 15.208).
1. CONTRACT ID CODE PAGE OF PAGES
J 1 30
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 23-Jan-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS-17-R-0001
X 9B. DATED (SEE ITEM 11)
14-Dec-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
23-Jan-2017
CODE
US ARMY CORPS OF ENGINEERS, NEW YORK
26 FEDERAL PLAZA, RM 1843
NEW YORK NY 10278-0090
W912DS 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 10 00 - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 20-Jan-2017 02:00 PM to 03-Feb-2017 02:00 PM.
CLIN 0007 is added as follows:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0007 1 Job OPTION Optional Item
FFP
All work (includes all plant, labor and material) for Grass turf in lieu of artificial turf. This item is a deduct option and the price shall reflect the amount to be deducted to install grass turf instead of the artificial turf and its associated drainage.
FOB: Destination
NET AMT
CLIN 0008 is added as follows:
0008 1 Job OPTION Optional Item
FFP
All work (includes all plant, labor and material) for the 4800 Area Water Line Replacement - Phase 1, Gas Alley to NCOA as shown on six drawings labeled "4800 Area Water Line Replacement - Phase 1, Gas alley to NCOA Grass dated 12 Jan 2017. The optional Item will be OMA funded.
The following have been deleted:
TOTAL AMOUNT
SECTION 00 72 00 - CONTRACT CLAUSES
The following have been added by reference:
52.217-5 Evaluation Of Options JUL 1990
SECTION 00 73 00 - SPECIAL CONTRACT REQUIREMENTS
The following Acceptance/Inspection Schedule was added for CLIN 0007:
INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
N/A N/A N/A Government
The following Acceptance/Inspection Schedule was added for CLIN 0008:
INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
N/A N/A N/A Government
The following have been added by full text:
AMENDMENT 0005
Section Supplies or Services and Price
0001 1 Job Base Item
FFP
All work (includes all plant, labor and material) for the construction of the NCO Academy Complex Facility (Building 4870) and the storage Facility (Building 4872) within their respective five-foot line described in the plans and specifications except for all work included in items in the below CLINs
Section 00 10 00 - SOLICITATION/CONTRACT FORM
0002 1 Job Base Item
FFP
All work (includes all plant, labor and material) outside the five-foot line of the building perimeter of Buildings 4870 and 4872 except for work included in items in the below CLINs
0003 1 Job Base Item
FFP
All work (includes all plant, labor and material) for the construction of the track and artificial turf.
0004 1 Job Base Item
FFP
All work (includes all plant, labor and material) for the demolition shown on Drawing C-102.
0005 1 Job Base Item
FFP
All work (includes all plant, labor and material) for the abatement of lead and asbestos for the building requiring demolition shown on Drawing C-102. (OMA Funded)
0006 1 Job Base Item
FFP
All work for the Final Record Drawing Submission. this Line Item is Pre-priced and cannot be changed. $100,000.00
$100,000.00
0007 1 Job OPTION Optional Item
FFP
All work (includes all plant, labor and material) for Grass turf in lieu of artificial turf. This item is a deduct option and the price shall reflect the amount to be deducted to install grass turf instead of the artificial turf and its associated drainage.
0008 1 Job OPTION Optional Item
FFP
All work (includes all plant, labor and material) for the 4800 Area Water Line Replacement - Phase 1, Gas Alley to NCOA as shown on six drawings labeled "4800 Area Water Line Replacement - Phase 1, Gas alley to NCOA Grass dated 12 Jan 2017. The optional Item will be OMA funded.
TOTAL AMOUNT
Total Base Items: (CLINS 0001 – 0006) __________________
Total Optional Items (CLINS 0007 – 0008) __________________
Total Base Item and Optional Items (CLINs 0001 -0008) _______________
NOTES:
(1) Total Offer shall include all costs associated with each item number including all bonding, overhead and profit.
(2) Offerors must submit a price for every CLIN. Failure to do so may result in Offer being unacceptable.
(3) Line Item Number 0005 is pre-priced at $100,000.00, it’s a firm fixed line item, and the price shown may not be changed.
(4) Optional Items (0007 and 0008): At any time prior to 365 calendar days after award of the contract, the Government at its discretion, may exercise these Options. Exercising of these optional items will not alter the project completion date of the contract.
FY16 NCO Academy Complex Fort Drum, NY
W921DS-17-R-0001
Amendment 0005
AMENDMENT 0005 to DRAWINGS and SPECIFICATIONS for NCO Academy Complex, Fort Drum, NY.
TO OFFORERS
The following changes shall be made to the drawings and specifications.
DRAWINGS
1. The following DRAWINGS have been REVISED but NOT REISSUED:
- Drawings:
o ES-101, Keyed Note 14 replace with the following: “Remove abandoned aerial communications line running on the power poles from George Street to the last dead-end pole (#126266) shown on Sht. C-120. Coordinate with the Ft Drum NEC.”
o ES-102, Pole Replacement/Phasing Notes, add the following note: “4. The existing aerial line for pole to be replaced (#126262) shall be extended/modified as required to accommodate the power pole replacement.”
o I-601, Finish Legend: Size Column for SS-1 & SS-2 replace with ‘1/2” or 3/4" Thick’
2. The following DRAWINGS have been REVISED and REISSUED:
- Drawings A-101, A-101A, A-101B, A-102, A-102A, A-102B, A-105A, A-201, A-202, A-335, A-405, A-406, A-411, A-602, A-610, C-101, C-110, C-112, C-120, C-132, C-133, C503
3. The following DRAWINGS have been ADDED:
- Six drawings labeled “4800 Area Water Line Replacement – Phase 1, Gas Alley to NCOA Grass” dated 12 Jan 2017. Drawings G-001, G-100, CU-101, CU-102, CU-501, and CU-502
4. The following DRAWINGS have been DELETED:
- None
SPECIFICATIONS
1. The following SPECIFICATION SECTIONS have been ADDED and are provided in their entirety herein:
- None
2. The following SPECIFICATIONS SECTIONS have been DELETED in their entirety:
- Section 08 14 00
- Section 08 11 16
- Section 08 41 13
3. The following SPECIFICATIONS SECTIONS have been REVISED and REISSUED:
- Section 01 45 00.00 10
- Section 05 52 00
- Section 07 21 13
- Section 07 21 29.00 10
- Section 07 22 00
- Section 07 53 23
- Section 07 60 00
- Section 07 81 00
- Section 08 33 23
- Section 08 71 00
- Section 09 51 00
- Section 09 65 00
- Section 09 90 00
- Section 14 24 00
- Section 22 00 00
4. The following SPECIFICATIONS have been REVISED but NOT REISSUED:
- Section 00 22 10 o Add the following to Paragraph 3 (after sub paragraph 1.2):
“1.3 Joint Venture
a. When an Offeror is submitting a proposal as a joint venture, all members of the joint venture must sign the SF 1442 and any financial surety instrument that is required, unless a written agreement by all members of the joint venture is furnished with the proposal designating one firm with the legal authority to bind the other member(s) of the joint venture. Signatures on the written agreement designating one member of the joint venture as having legal authority to bind all other members of the joint venture must be executed by the duly authorized representatives of the respective joint venture members. All joint venture members will remain jointly and severally liable for all actions, representations, and other activities by the joint venture and by other joint venture members in connection with this solicitation and subsequent contract. A copy of the joint venture agreement and agreement providing evidence of the authority to legally bind all other members of the joint venture must be submitted with the Offeror’s proposal. Failure to comply with the foregoing requirements may eliminate the proposal from further consideration. All Joint Ventures must be registered in the System for Award Management (SAM) (https://www.sam.gov).
b. If submitting a proposal as a joint venture, the experience, past performance, and other information about each of the joint venture partners can be submitted for the joint venture or projects completed by the joint venture maybe submitted. The experience and past performance of each joint venture partner will be considered the experience of the joint venture entity. Joint ventures must also submit the following additional documentation:
1. A copy of the Joint Venture Agreement.
2. A detailed statement outlining the following in terms of percentages, where appropriate:
i. The relationship of the joint venture parties in terms of business ownership, capital contribution, and profit distribution or loss sharing.
ii. The structure of the joint venture and decision making responsibilities of the joint venture parties in terms of who will control the manner and method of performance of the work under the contract.
iii. Identification of key personnel having the authority to bind the joint venture to any and all agreements, including any subcontracts, executed by the joint venture.
iv. Identification of party or parties maintaining the joint venture bank accounts for the payment of all expenses and the deposit of all receipts, keeping the books and records of the joint venture, and paying applicable taxes for the joint venture
v. Identification of party or parties having overall control of the joint venture.
c. Other sections of the proposal shall identify, where appropriate, whether key personnel are employees of the individual joint venture entities and identify the entity, or whether they are hired directly as employees of the joint venture.
d. A complete and legally binding document with all information required under this section titles “Joint Ventures” shall be included in Volume I of the proposal.
e. If the Joint Ventor is a Mentor-Protégé JV submit the SBA approved Mentor-Protégé agreement.
o Paragraph 4.1 (Factor 3 Description) Replace “summary schedule” with “schedule” o Paragraph 5.0 (last sentence) Replace “summary schedule” with “schedule” o Paragraph 5.3.1, Add the following sentence, “The projects submitted for the prime contractor shall indicate they self-performed a minimum of 20% for each project.”
o Paragraph 5.4 (last sentence) Replace “summary schedule” with “schedule” o Paragraph 5.4.1.1.1 delete “summary level” in first sentence and “summary” in third sentence.
o Paragraph 5.4.1.2 & 5.4.1.2.1 delete entire paragraphs.
o Paragraph 5.4.2.1.1 replace the words “summary schedule” with “schedule” o Paragraph 5.4.2.1.2 delete entire paragraph.
o Paragraph 6.1.3 delete the word “design”.
o Attachment 2 delete the following at the bottom of the attachment “Please provide responses to the questions above…which may assist our office in evaluating performance risk (please attach additional pages if necessary)” is deleted by this amendment
- Section 02 40 00 o Paragraph 3.1.5, replace paragraph with the following: “The site is known to contain transite materials as indicated in the "Pre-Demolition Survey" report. The contractor shall be required to comply with all applicable regulations regarding the removal, handling, and disposal of Asbestos Containing Material.”
- Section 02 82 13 o Paragraph 1.4.1 Add the following after the last sentence; “Contractor to perform confirmatory survey to verify Asbestos Containing Material and condition. This activity is to be reflected in the schedule.”
- Section 04 20 00 o Paragraph 3.6.1.5 delete entire paragraph.
- Section 26 20 00.23 o Paragraph 3.1.5.15, ‘Flexible Connections’, add the following sentence to the end of this paragraph: “Metal Clad (MC) cable can also be utilized for cable drops from junction boxes to lighting fixtures.”
- Section 27 10 00 o Paragraph 2.3.2.2, ‘Horizontal Optical Fiber’ replace with the following paragraph: “Provide duplex 2 strand optical fiber horizontal cable to each communications outlet shown on the plans indicating to have a duplex LC connector. Horizontal optical cable shall be single mode fiber optic cable, 8/125um diameter, tight buffered fiber optic cable. Provide with nonconductive optical fiber plenum cable (OFNP) rated jacket in accordance with NFPA 70 and UL 910. The cable cordage jacket, fiber unit, and group color shall be in accordance with TIA/EIA-598-B.”
- Section 28 20 01.00 10 o Paragraph 2.2.1 replace with the following paragraph: “2.2.1 Mortise Type Locks Stanley/Best Wi-Q Technology or Approved Equal.”
o Paragraph 2.2.2 replace with the following paragraph: “2.2.2 EX Exit Device Trim Stanley/Best Wi-Q Technology or Approved Equal.”
o Paragraph 2.2.2(a), replace with the following paragraph: “a. The specifications as outlined in this document are designed to meet a need for a Wireless Access Control Solution where the reader(s) is combined with the associated locking hardware to provide a battery powered wireless security access control solutions at door(s) and portal(s) indicated on the plans. The system shall use a Stanley/Best Wi-Q TM Technology Wireless Access Control or Approved Equal. Any other Approved Equal wireless access solution shall be acceptable. The system shall consist of major elements as described in the following document.
o Paragraph 2.3, replace entire paragraph and subparagraphs with the following:
“2.3 READER LOCK
This shall be a fully integrated smart locking device with it's own database. It shall have the capability to make all decisions at the device without relying on a separate controller device. The reader / lock shall be able to be installed within the existing door ANSI cut out and require minimal drilling. There shall be no need to rout out the door to drive additional power through any electric transfer hinge. All requirements will be met within the reader / lock itself. In no event shall a wired alternate solution be. The Wireless Reader shall use an AA battery pack; no AC power shall be required at the door. The reader / lock shall also be able to operate as a fully stand alone intelligent device making all the decisions in real time. In the unlikely event that the reader/lock is offline from the host, it shall continue to operate, storing and recording accesses until it is re-connected and back online to the host. The wireless reader/ lock shall be offered in one of four modes.
a. As a self-contained cylindrical reader / lock.
b. As a supplemental quick adapter module to be added to an existing lockset for fire exit devices.
c. As a retrofit kit to be mounted in a double gang box as an upgrade path for a legacy hardwired application to make it wireless.
d. As a wireless access controller interfaced to a hardwired reader and ancillary door devices such as a Request to Exit switch, a Door Switch Monitor and a Door lock sense input.
For cylindrical lock applications the wireless reader shall provide support for an integral Request to Exit (RQE) and Door Switch Monitor (DS).
For mortise lock applications the wireless reader shall provide support for an integral Request to Exit (RQE), Door Switch Monitor (DS), Door Latch Position Switch (LS), and Key Over-ride Sensor (KOS).
For exit device applications the wireless reader shall provide support for an integral Request to Exit (RQE) and Door Switch Monitor (DS).
The reader / lock shall support as a minimum the following "reader" technology:
a. DOD Smart Card Readers, meeting the requirements of paragraph 2.3.1 and 2.3.2 below. Additionally, as standard, the reader shall support exterior applications. Each reader / lock shall have battery power to meet 100,000 lock / transactions.
2.3.1 Smart Cards
Smart card readers shall read credential cards whose characteristics of size and technology meet those defined by ANSI ISO/IEC 7816. Smart card implementation shall adhere to the Government Smart Card Interoperability Specification (GSC-IS) and adhere to the data formats as specified by the DoD SEIWG format. The readers shall have "flash" download capability to accommodate card format changes. The card reader shall have the capability of reading the card data and transmitting the data, or a portion thereof, to the ESS control panel.
2.3.2 Contactless Smart Card
Smart card readers shall read credential cards whose characteristics of size and technology meet those defined by ANSI ISO/IEC 7816. Smart card implementation shall adhere to the Government Smart Card Interoperability Specification (GSC-IS) and adhere to the data formats as specified by the DoD SEIWG format. The readers shall have "flash" download capability to accommodate card format changes. The card reader shall have the capability of reading the card data and transmitting the data, or a portion thereof, to the ESS control panel.”
BIDDER’S QUESTIONS AND GOVERNMENT REPLY
1. Regarding Factor 2, Specialized Experience, the evaluation criteria of the RFP indicates that projects submitted for this factor must have been projects that had a minimum of 25% self-performance. However RFP clause FAR 52.236-1 Performance of Work by the Contractor indicates the awardee must self-perform 20% of the work and RFP clause FAR 52.219-14 indicates the awardee must self-perform 15% of the work.
Could the 25% self-performance requirement in the evaluation criteria be changed to 15% to better fit the project requirement? If not, will projects submitted that have less than 25% self-performance be evaluated?
Response: Amend #5 added/revised the self-performance requirement to 20% for Factor 2.
2. We will intend to pursue the project referenced above with our SBA approved Protege in a Joint Venture.
Typically, when a Mentor Protege Joint Venture is a proposer, solicitations define that relevant project experience can be provided by either the Mentor or the Protege. Please clarify any specific specialized experience or past performance criteria as it relates to a Joint Venture. Response: See Amend #4 revision to section 00 22 10 paragraph 3.1.3 addressing Joint Ventures.
3. Will the Projnet/Dr Checks system be used for RFI’s? We cannot find a Projnet Key Code to submit RFI’s via Projnet. Please advise the key code or how / where do we address prebid RFI’s. Response: Dr Checks will not be used for RFIs. Prebid RFIs are emailed to:
Loretta.E.Parris@usace.army.mil and Nicholas.P.Emanuel@usace.army.mil
4. We request a second site visit to review the demolition and existing site conditions with our subcontracting team. Please advise a date that works best and base access requirements. Response: Amend
3. Second site visit was conducted 10 JAN 17
5. Specification section 01 45 00. 00 paragraph 3.4.3 states that the specialize QC personnel (listed in the matrix on page 5 of this section) states “…These individuals or specialized technical companies must be directly employed by the prime Contractor and may not be employed by a supplier or subcontractor on this project..” As this project is set aside for small business this requirement represents an enormous overhead expense for the prime contractor and to the Government. Based on preliminary project durations estimates, this cost could exceed $950,000. It is our experience that these specialized QC personnel are allowed to be employed by the subcontractor, act as the QC in their specialty and allowed to work in their areas of expertise as long it does not interfere with the duties as QC. The following is text we are familiar with from other districts.
In addition to CQC personnel specified elsewhere in the contract, the Contractor shall provide as part of the CQC organization specialized personnel to assist the CQC System Manager for the following areas identified per Experience Matrix Table. These individuals may be employees of the prime or subcontractor. These individuals identified per the Experience Matrix Table, shall be responsible to the CQC System Manager; be physically present at the construction site during work on their areas of responsibility; have the necessary education and/or experience in accordance with the experience matrix listed herein. These individuals in the Experience Matrix Table may perform other duties but must be allowed sufficient time to perform their assigned quality control duties as described in the Quality Control Plan. Response: 01 45 00 paragraph
3.4.3 is correct. Specialized CQC staff are only employed by the Prime Contractor during that feature of work.
6. Please provide the lead and asbestos survey information for the 20 building to be demolished. Response:
Survey provided as part of Amend #5
7. What is the government’s intended awarded date for this project? This will determine our schedule and winter construction activities. Response: Expected award is 30 MAR 17.
8. “Pass-doors” are specified in section 10-22-39, page 5, accessories 2.3, 2.3.1 doors. Also reference detail 3/A-102A. Can you confirm this door is not by the operable partition section? Response: The pass-door is only required in room’s 223 folding partition. Detail 3/A-102A is used in all other classrooms egress doors between classrooms.
9. The IF series of drawings, FF&E Plan Notes, note 1 states: REFER TO FURNITURE, FIXTURES &
EQUIPMENT (FF&E) PACKAGE FOR PROCUREMENT INFORMATION, PRODUCT
SPECIFICATIONS AND QUANTITIES. Please validate the contractor is purchasing the furniture for this project? If so, Please provide the FF&E package referred to in the note. Response: The Government is purchasing the FF&E.
10. Reference Drawing C-101:
a. depicts keynotes for 24, 25, and 26, but there is NO note under the sheet keynotes section. Response:
Keynotes corrected. See re-issued drawing in Amend #4.
b. There are 2 signs showing to be removed on the southwest side of the construction area beyond the limits of disturbance. Should these be included in the bid? Response: No work outside of construction limits.
c. There is a keynote 23 shown on the west side of the construction area outside the limits of disturbance.
Should this be deleted or changed to a different keynote? Response: Keynote corrected. See re-issued drawing in Amend #4.
11. Reference paragraph 5.2.1 Past Performance Questionnaires (PPQ): Question is the following:
For a project that does not have a CPARS evaluation, please confirm that offerors can submit a previously-completed PPQ-0 form rather than requesting their customer to complete a new questionnaire. This approach would be consistent with USACE Acquisition Instruction (UAI guidance on the use, and re-use of the form PPQ-0. And For a project that has a CPARS rating…..can a copy of this CPARS rating be submitted in lieu of the attachment PPQ as requested in the RFP document. Response: Submitting a previously-completed PPQ is acceptable. A PPQ must be submitted for each project (submitting CPARS rating is not acceptable in place of the PPQ)
12. Section 5.3.1: Please clarify what is considered “automated” classrooms. Response: Classrooms with the audio visual, communication and electrical features similar to the scope specified for the classrooms in this project.
13. Section 5.3.1: Is an offeror to provide exactly 3 projects? Can it be less than 3? Response: “Contractor shall demonstrate (3) projects not less than 75% complete or physically completed within the last ten
(10) years.” Per Amend #2.
14. Section 5.3.1: Please reference the following paragraph:
Relevant Scope: Construction of individual projects or multiple Task Orders under a MATOC are acceptable, if each meets the criteria. Examples should be given for Magnitude and complexity of the following type projects to show relevant SPECIALIZED EXPERIENCE.
Please validate that this paragraph statement “or multiple task orders under a MATOC” means that an offeror can use several task orders under a Matoc contract that may have smaller square-footage or smaller dollar value may be included and considered as “one” of the 3 required projects to meet the relevancy and complexity requirements. Response: Task Orders cannot be combined. Section 5.3.1 states “multiple task orders under a MATOC are acceptable if each meets the criteria.”
15. Why is there no selection or evaluation criteria or listed for firms that may be Joint Venturing? Doesn’t the FAR require your acquisition to layout the term of the joint venture requirement and how they will be evaluated? Response: See Amend #4 revision to section 00 22 10 adding paragraph 3.1.3 addressing Joint Ventures.
16. Drawing A-411 Detail 3 – Typical Barracks Restroom. Question – There are no toilet accessory requirements shown for the Barracks Restrooms. Are their toilet accessory requirements in these Restrooms?
Response: Toilet accessories are required. See revised A-411 this amendment.
17. Door frame for door number 140A, frame material not specified. Please clarify. Response: THE DOOR
AND FRAME MATERIAL IS HM
18. Doors 139D & 139E are listed on the project door schedule but are not shown on sheet A-101B. Please state the location of the doors and type of frame required (frame type also not listed on door schedule).
Response: Refer to Amendment 0002 Drawings A-402, A-610, A-620 (change 1 dated Dec 21 2016) item
15. Doors 139D and 139E were revised as 103E and 103F, refer to sheet A-610 of same amendment.
19. Door number 139E is designated as a “Type F” door, but dimensions are shown as 3’-0” x 4’-7” (All other “Type F” doors are 3’-0” x 7’-0”). Please confirm that the stated size of 3’-0” x 4’-7” is correct for door 139E. Response: DOOR 103F (139E) IS THE UPPER LEVEL DOOR FOR THE HC LIFT AT THE
AUDITORIUM. THE DIMENSIONS ARE CORRECT.
20. Please confirm that interior store fronts (SF-B, SF-C, SF-D, SF-E, SF-F, SF-G, SF-H) are constructed of hollow metal. Response: YES, comply with section 08 11 13 - STEEL DOORS AND FRAMES.
21. Drawing C-101, Keynote 12 indicates underbrush and tree removal within the limits of disturbance at site A. Trees and underbrush have already been cleared from this area. Please verify the existing clearing limits.
Response: Trees and brush have been cut and mostly cleared. There are still some trees and brush on the site that need removed. One large pile of trees and brush needs removed that is located in the area identified by keynote 26 (see drawing C-101). The site visit showed there are few miscellaneous non-hazardous items not shown on the drawing that are inside the contract limits that will need removed such as “U” picket signs, wooden platforms, etc. This work is considered part of the contract within the project limits.
22. Drawing C-101, the numbering of Keynotes 21-26 need to be corrected as they are used for reference in the drawings, please clarify. (see below) Response: Keynotes corrected. See re-issued drawing this amendment.
23. The Fort Drum Pre-Demolition Survey Report referenced in specification 01 57 19,1.5 Item 4 (pg. 10) is missing from the documents. The Fort Drum Pre-Demolition Survey Report is also referenced in specification 02 41 00, 3.1.1.h (pg. 6). Response: Pre-Demolition Survey Report provided in Amendment #5.
24. 00 22 10,6.3.1.1 requires confirmation of understanding of the requirement to self-perform the amount of work in accordance with appropriate clause in Section 00 72 00. Referencing 00 72 00 it appears that clause 52.236-1 requires 20% self-performance. However 00 22 10,6.3.1.1 also states “(see Section 00 73 00 for a description of the applicable clause for self-performance of work)”. Referencing Section 00 73 00 there is no reference made to any self-performance clause, please clarify 00 22 10,6.3.1.1. Response: See Amend #2 revision to 00 22 10 paragraph 5.3.1.
25. 00 22 10,6.1.3 states “Award may not be made for project cost for design and construction exceeding the price target described herein.” The target value for the project is stated as $16,650,000 in 00 22 10,2.0. As this is not a design-build solicitation is the statement in 00 22 10,6.3.1.1 correct? Response: Amend #4 Deletes reference to “design” in paragraph 6.1.3 of section 00 22 10.
26. SF 1442 Block 13A states that the offer is to be submitted in original + 5 copies. Does NY District require an original + 5 copies of both Volumes 1 and 2? Response: YES
27. Section 00 21 16, GENERAL INSTRUCTIONS requires a CD-ROM for both Volume 1 – Performance Capability and Volume 2 Price and Pro Forma. As final pricing is typically not available until shortly before the time the proposal is due it is not feasible to include the final pricing on the CD-ROM for Volume 2 Price and Pro Forma. Please confirm that it is acceptable to provide the Volume 2 CD-ROM without the final pricing and final pricing will be included on the hard copies of Volume 2 only. Response: Final price must be on the Vol 2 CD-ROM.
28. Please confirm that the Site Safety and Health Officer (SSHO), section 01 35 26, 1.6.1.1 can have other duties on the project (other than the QC Manager) provided the individual meets the requirements of EM385- 1-1, Section 1. Response: YES, but must be able to fully perform duties as SSHO.
29. Is there an anticipated award date that should be incorporated into the proposal project schedule?
Response: Expected award is 30 MAR 17.
30. Specification Section 07 22 00 – Roof Deck and Insulation – Paragraph 2.2, protection board refers to thermal barrier underlayment, but is not shown on the drawings. Overlayment board is shown on the drawings. Is underlayment board required? Response: SEE REVISED SPECIFICATION
31. Specification Section 072200 – Roof Deck and Insulation – Paragraph 3.2, Would Carlisle’s 725 TR Air and Vapor Barrier be acceptable in lieu of the specified “Hot Mopped”? Response: SEE REVISED
SPECIFICATION
32. Specification Section 072200 – Roof Deck and Insulation – Paragraph 3.3.1, Would Carlisle Fast 100 Insulation Adhesive be acceptable in lieu of the specified “Hot Mopped”? Response: SEE REVISED
SPECIFICATION
33. Specification Section 07 53 23 – EPDM Roofing – Paragraph 2.1.1, .090 EPDM is not manufactured with scrim or fabric reinforcing. .075 EPDM can be provided with the scrim or fabric reinforcing. Please clarify. Response: USE FABRIC REINFORCED, 0.075 MIL EPDM. SPEC SECTION WAS
34. Contract Drawing A-104, General Note #5 states to see mechanical drawings and specifications for actual sizes and locations of mechanical items. This is pertaining to the roof area. No mechanicals are indicated on the roof per the specifications and drawings. Please confirm. Response: CONFIRMED, AS
DESIGNED THERE IS NO HVAC EQUIPMENT ON THE ROOF.
35. Please provide hardware sets for Doors – 119, 139D, 139E and 214. Response: SEE REVISED SHEET
A-610 AND SPEC SECTION 08 71 00.
36. Doors 139C is shown as a hollow metal door and frame on the door schedule. Please confirm this is desired. Response: THIS IS A WIRE MESH PARTITION DOOR. REFER TO SECTION 10 22 39.
37. Doors 223B, 229B, 230B and 238B are scheduled as hollow metal. Are these doors actually part of the folding partition? Response: ONLY DOOR 223B IS PART OF THE FOLDING PARTITION. FOR
DOORS 229B, 230B, 238B SEE DETAILS 3/A-102A AND 6/A-332.
38. Door 140A is scheduled as an 8080 x 2-3/4” with hardware set 17. The drawings show swinging doors.
Is this an overhead door? Response: DOOR 140A IS A DOUBLE DOOR.
39. Door 104B has double acting hinges in hardware set AHW-7, but still has exit devices and closures.
Please confirm that this is desired. Response: SEE REVISED SECTION 08 71 00
40. The specifications 1.6 Far 52.211-12 Liquidated Damages call for $1,851.10 per day and also $779.00 per day for punch list items not completed in 30 days. In the Solicitation is states that the Liquidated dames is $1,444. 00 per day and no mention of damages for punch list not completed. Which one is correct, it effects are bond rate? Response: This was corrected in amendment #2. The 00 73 00 18 that was dated 30 Oct 2016 was deleted in its entirety by Amendment #2.
41. 28 20 01.00 10 programmable electronic keycard access security system:
a) EP-102 & EP-104 clearly show power outlets and wiring by division 26 contractor.
b) ET-102 & ET-104 clearly show data jacks by division 27 contractor.
c) ET-102 & ET-104 show card reader, door locks, portal gateway, BMS, etc. symbols that would be provided by Stanley.
d) ET-505 detail provides information for card reader and door lock.
e) ET-602 illustrates the wireless card access system riser diagram.
f) Spec section 28 20 01.00 10 programmable electronic keycard access security system is written around Stanley.
g) We have not looked into door hardware schedule, but we’d think it would be linked to Stanley in order to provide compatible doors and frames.
h) On past projects, the data switches to be installed in the telecom rooms as part of the door access system were provided by either the government or Stanley
i) On past projects, it has been either the government or the GC that carried Stanley
Response: The Card Access System may be Stanley or Approved Equal, as indicated on Sheet ET-602, Note 1 and Spec Section 28 20 01.00 10, par. 2.2. The Card Readers will be required to read the DOD standard CAC Smartcards. See attached revisions issued this amendment. Please note that the Card Access System will be stand-alone, and will not be on any network, as per Sheet ET-602, Note 2. The Card Access System is for the barracks area of the NCO Academy.
42. Section 5.4 Volume 1 – Factor 3 – Proposed Contract Duration and Summary Schedule asks for both a summary schedule and a site phasing plan. After reading what is required for each they both share several similarities. Would showing the phases of the project on the summary schedule be sufficient in meeting this requirement, or does the government prefer a separate summary schedule and phasing plan? Response:
Delete requirement for site phasing plan.
Revisions: Section 00 22 10 Delete following paragraphs: 5.4.1.2, 5.4.1.2.1, 5.4.2.1.2
43. If we are proposing as a joint venture, can predecessor experience be submitted in Factors 1 and 2 for one of the JV partners? Response: See revisions to section 00 22 10 paragraph 3.1.3 Joint Ventures issued this amendment.
44. Please confirm that CCASS/CPARS evaluations can be provided in lieu of PPQ forms in Factor 1. This is critical, as we have been informed by multiple USACE districts over the past year that they are no longer allowed to complete PPQ forms if a CCASS/CPARS is available for a particular project. Response:
CCASS/CPARS evaluations can NOT be provided in lieu of PPQ in Factor 1.
45. Please confirm that previously completed PPQ forms can be submitted in Factor 1. Response: Yes, previously completed PPQ forms can be submitted in Factor 1.
46. How many copies are required of Volume 2: Factor 4 Price and Pro Forma Information? Response: See Form 1442 dated 12-14-16 block #13. “Original and 5 copies”
47. Would email submission of proposals be acceptable instead of submitting hard copies? Response: No.
48. Reference classroom tables - See ET-403 notes 1&3, EP-502 details 1, 2 & 3:
a) Are the classroom tables to be provided by the government as typical on Ft. Drum? Response: Yes
b) Are the Cove model power outlets with USB ports and daisy link power cable assemblies and matching openings in the table top to be factory provided? Response: The combination power/data table top mounted outlets are not required to be factory provided. This would be at the contractor's option.
It would be recommended to coordinate the table top openings/penetrations at the factory for the combination power/data table top mounted unit. Sht. ET-001 Classroom Table Notes 1 indicates to coordinate the table mounted outlets with the Furniture Manufacturer. (This will be coordinated through the COR)
c) Are the Cove model data outlets and matching openings in the table top to be factory provided?
Response: Same answer as above.
d) Is the data wire management to be provided with the tables? Response: The data wire management for the classroom tables is not required to be factory provided. This would be at the contractor's option. (This will be coordinated through the COR)
49. Reference data conduit confirmation
See ET-001 note 15, ET-504 details 2, 3, 4 & 5: Drawing details illustrate it is the government’s intent to install 1.25” conduits from all work stations or floor boxes to cable tray as shown on the contract drawings.
This is supported by ET-001 note 15 indicating that “non-continuous type supports will not be permitted on this project.” There is a discrepancy as to which conduits are to be bonded to the cable tray. In detail 2, bonding to tray is shown. In details 3, 4 & 5, no bonding is shown. Q: are all 1.25” conduits for horizontal cat 6 cabling to be bonded to the cable tray? Response: Sheet ET-504 Details 3 through 5 indicate to see the "Typical Cable Tray Details". The Typical Cable Tray Detail #1 indicates to bond the conduit to the cable tray. Details 3 through 5 are for the various types of outlets. Yes, all conduit is to be bonded to the cable tray. Please note that Sht. ET-001, Note 6 indicates compliance with UFC 3-580-01 which requires all conduit to be bonded to the cable tray.
50. Reference MC cable exclusion See Specification section 26 20 00.23 MC cable is not listed in this specification section. There does not appear to be any notation in the specs that MC cable will not be allowed for branch circuit wiring.
a) Is MC cable allowed for branch circuit wiring? Response: Spec Section 26 20 00.23, par. 3.1.4 'Wiring Methods' does not list Metal-Clad (MC) cables for the branch circuit wiring (i.e., as a wiring method). As per Sheet E-002, General Note 14 MC cables is permitted only for cable drops to wiring devices (i.e., to an outlet) and lighting fixtures. Using MC cable as a raceway is not permitted.
b) Would MC cable be allowed for branch circuit wiring within the walls from outlet box to outlet box if a branch circuit conduit was used to the panel for circuit home runs? Response: Sheet E-002, General Note 14 indicates that MC cables shall only be permitted for cable drops to wiring devices and lighting fixtures. Spec Section 26 20 00.23, par. 3.1.5.15 has been revised by this amendment to clarify that MC cable is permitted for connection/drops to lighting fixtures.
51. The specifications allow 3-6’ length X ½” diameter flexible connections from a junction box to light fixture.
We assume no “daisy chaining” of light fixtures would be allowed. Response: Specification Section 26 20
00.23 par. 3.1.4 does not permit MC cable for the branch circuit, unless otherwise indicated. Sheet E- 002, General Note 14 indicates that MC cables shall only be permitted for cable drops to wiring devices and lighting fixtures. Spec Section 26 20 00, par. 3.1.5.15 has been revised by this amendment to allow MC cable for cable drops to lighting fixtures.
a) Would MC cable be allowed in lieu of ½” flex for the connection from a light fixture to a junction box?
Response: Sheet E-002, General Note 14 indicates that MC cables shall only be permitted for cable drops to wiring devices and lighting fixtures. Spec Section 26 20 00.23, par. 3.1.5.15 has been revised this amendment to clarify that MC cable is permitted for connection/drops to lighting fixtures.
b) If so, would MC cable lengths greater than 6’ be allowed because a ground conductor is integral to the MC cable? Response: The length of MC cable can exceed 6 feet, as long as connection to one electrical fixture. Sheet E-002, General Note 14 indicates that MC cables shall only be permitted for cable drops to wiring devices and lighting fixtures. Spec Section 26 20 00, par. 3.1.5.15 has been revised this amendment to allow MC cable for cable drops to lighting fixtures.
52. Video teleconference outlets: ET-001 shows video teleconference data outlets as having a duplex LC connector and two cat 6 jacks; ET-503 detail 4 shows the VT outlets as having two cat 6 green jacks and a duplex LC connector; and ET-501 & 502: No horizontal fiber patch panels are shown and no fiber type for VT data outlets is indicated.
a) Is a duplex fiber required from VT outlets to the TR? Response: A duplex fiber is required to each VT outlet. Sht. ET-001 symbol calls for a duplex LC connector, which would require a duplex (2 strand) horizontal distribution fiber optic cable to be routed from the VT outlet to the Communications Room.
b) If so, please identify fiber type. SM or MM? OS1, OS2, OM1, OM2, OM3, OM4. Duplex tight buffered?
CMG, CMR or CMP? Response: The horizontal optical fiber shall be single mode (SM) type. Please see attached amendment for the specifics of the horizontal distribution fiber optic cable.
c) Is a horizontal fiber patch panel required in the TR (none shown) for termination of the duplex horizontal fiber cables? Response: A dedicated fiber patch panel (FPP) for the VT outlets is not required. The rack details on Sht. ET-501 show the approximate quantity of FPPs required. The contractor is required to provide sufficient quantity for termination of all fiber optic cables, plus a 25% spare capacity as per Spec Section 27 10 00, par. 2.4.7. A dedicated fiber patch panel for the VT outlets is not required, since only two (2) VT outlets are required on this project.
53. Please advice on the following RFI. The drawings IF XXXX reference to a furniture, fixture & equipment (FF&E) package. I have not been able to find this document. Is the contractor to include in their bid the cost for the FF&E or does the government have an allowance they would like us to carry? Response: The Government is purchasing the FF&E.
54. Please confirm the flashing material indicated on Detail 5 of A-335, which covers the exterior foundation wall insulation. Does the FIN: MTL1 note correspond to the Exterior Finishes Schedule? Will this material match the flashing used for the SSMR Roof, Soffit Panels, and Fascia Panels? Response: REFER TO
REVISED DRAWINGS
55. Detail 9 of A-335 indicates a 3” XPS Insulation with an R-value of 20, while Detail 1 of A-335 indicates a 3” XPS Insulation with an R-value of 15. A 3” XPS Insulation should dictate an R-value of 15 and not 20.
Please clarify the R-value for the 3” XPS Insulation. SHEET A-335 WAS REVISED. ALSO REFER TO
SPEC SECTION 03 30 00, PERIMETER INSULATION AND UNDERSLAB INSULATION –
RADIANT HEAT.
56. Section 10 21 13 Page 5: 2.3.2 Urinal Screens - “Furnish width and height of urinal screens as shown.”
Please clarify the location in the drawings that corresponds to this statement found in the specifications.
Drawings A-405 and A-406 do not depict any urinal screens in the plan or elevation views. Response: SEE
REVISED SHEET A-406
57. Reference 00 22 10, Attachment 2; at the end of the Attachment 2 there is a bolded statement “Please provide responses to the questions above…which may assist our office in evaluating performance risk (please attach additional pages if necessary)”. It appears that this statement was inadvertently pasted in Attachment 2 as the identical statement is included on page 2 of the PPQ evaluation (Solicitation page 29 of 85). Please confirm that this statement on 00 22 10, Attachment 2 should be disregarded. Response: The statement at the bottom of attachment 2 “Please provide responses to the questions above…which may assist our office in evaluating performance risk (please attach additional pages if necessary)” is deleted by this amendment
58. Specification section “08 34 73 Sound Control Door Assemblies” states under paragraph “2.1.2.1 STC Rating”, to provide doors with an STC rating of at least 35. All doors shown on sheet A-610 are shown as having an STC rating of 33 and therefore would not meet this specification requirement. Will STC rated doors be required to have an STC rating of at least 35 as stated in the specifications? And if so, will the required rating of 35 meet the noise criterion requirements as shown on sheet A-605? Response: YES, THE
SPECIFICATIONS RULE OVER THE DRAWINGS. SHEET A-610 WAS REVISED TO CLARIFY
STC REQUIREMENTS.
59. Revised Drawing A-610 outlines the door schedule for Buildings 4870 & 4872. An STC rating of 33 is required for the doors as per the schedule. Section 08 11 13, 2.4 Sound Rated Steel Doors states that Doors shall have a Sound Transmission Class (STC) as indicated on the drawings. However, an STC rating of 35 is required for doors as specified by 2.1.2.1 in Section 08 34 73 – Sound Control Door Assemblies. Please confirm the governing STC rating. Response: SHEET A-610 WAS REVISED TO CLARIFY STC
REQUIREMENTS. CLASSROOM DOORS REQUIRE AN STC OF 35.
60. Solicitation section 00 22 10, 5. 4.1.1.1 states: “Submit a summary level schedule for new construction and required demolition.”. Section 00 22 10, 5.4.1.1.1 sub-paragraph (2) states “Submission must include the following for each activity: activity duration (activity duration not to exceed 20 days)…”. Typically some activity durations for a summary level schedule will exceed the 20 day duration. A detailed schedule used for submission as the final project schedule limits the maximum activity duration, reference specification section 01 32 01.00 10 “Project Schedule” paragraph 3.3.2. As the intent of this proposal schedule is to be a summary schedule we request that the 20 day maximum activity duration be deleted as a requirement of the proposal schedule. Response: The requirement is a schedule with a maximum activity duration of 20 days.
61. Drawing C-110 shows the field area. Please confirm all area within the track shall be artificial turf.
Response: YES
62. Drawings C-110 thru C-113 do not specify any markings or logos. Is the field all green with no lines? If not, what sports will be played on the field? Will there be logos Response: Field to be all green. The field should not include lines or logos as indicated on the plans.
63. I just went through all of the files on the fedbiz site and I am seeing over and over that there is asbestos and lead in these buildings that are to be demolished but I am not seeing a survey anywhere that explains quantities and locations. Do you have an asbestos report by chance or can you point me in the right direction please? Response: Pre-Demolition Survey Report provided in Amendment #5.
64. Solicitation references a Fort Drum "Pre-Demolition Survey", dated January 12, 2012, for additional information on asbestos containing materials and locations, as well as other regulated materials disposal attached to the end of this section. Paragraph 1.4.1 Abatement Work Tasks: The specific ACM to be abated is identified in the Fort Drum "Pre-Demolition Survey Report", dated January 9, 2012. This report is attached to the end of Section 02 41 00 Demolition and Deconstruction. Asbestos containing materials (i.e. drywall, mud, penetrant sealants, door frames, etc.) shall be removed from the facilities prior to demolition and deconstruction." There is nothing attached to the end of the section.