US Army Corps of Engineers ®
SHEET ID
U S
A
R M
Y
C
O R
P
O
F
E
N G
I N
E E
R S
N E
W
Y
O R
K
N E
W
Y
O R
K
N
Y
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
C H
E C
K E
D
B
Y
A N
S I
D
F I L
E
N
A M
E
I S
S U
E
D
A T
E
C O
N T
R A
C T
N
S O
L I C
I T
A T
I O
N
N
O
F I L
E
N
U M
B E
R
1 2 3 4 5
D
C
B
A
N C
O
A
C A
D E
M Y
M
P L
E X
M A
R K
D E
S C
R I P
T I O
N D
A T
E
F I L
E
N
A M
E
L
U
S A
C E
N
E W
R
K
D
I S
T R
I C
T
D
C
E
N
A
D E
S
I G
N
F
T
D
R U
M
N
Y
C
A D
B
I M
C
A D
C
L O
T T
E D
B
N
O R
M A
N
T
A N
Y A
O C
T O
B E
R
W D
S R
W D
K U
S S
E R
Y
R B
A I L
E Y
T N
O R
M A
N
T N
O R
M A
N
G E
N E
R A
L
C
I V
I L
N
O T
E S
C-002
C d w g
GENERAL CIVIL NOTES
1. THE CONTRACTOR SHALL COMPLY WITH ALL CITY, COUNTY, STATE AND
FEDERAL REGULATIONS APPLICABLE TO CONSTRUCTION OF THIS SITE.
2. ALL LABOR, MATERIALS, AND METHODS OF CONSTRUCTION SHALL BE IN
STRICT ACCORDANCE WITH THE MINIMUM ENGINEERING AND
CONSTRUCTION STANDARDS ADOPTED BY THE U.S. ARMY CORPS OF
ENGINEERS (USACE). WHERE CONFLICTS OR OMISSIONS EXIST, THE
USACE STANDARDS SHALL DICTATE. SUBSTITUTIONS AND DEVIATION
FROM PLANS AND SPECIFICATIONS SHALL BE PERMITTED ONLY WHEN
WRITTEN APPROVAL HAS BEEN ISSUED BY THE CONTRACTING OFFICER'S
REPRESENTATIVE (COR).
3. ALL DIMENSIONS ARE TAKEN FROM/TO FENCE LINES, CENTERLINE OF
UTILITY, CENTER OF MANHOLE OR CATCH BASIN, CENTERLINE OF ROAD,
FACE OF BUILDING, FACE OF CURB, FACE OF WALL, OR CENTERLINE OF
STRIPING UNLESS OTHERWISE NOTED.
3. EXISTING CONDITIONS SHOWN ARE BASED UPON A TOPOGRAPHIC AND
IMPROVEMENT SURVEY PROVIDED BY AUBERTINE AND CURRIER, PLLC,
DATED 10/26/2015 AND GIS DATA PROVIDED BY FORT DRUM . ALL EXISTING
UTILITY INFORMATION SHOULD BE CONSIDERED APPROXIMATE AND MUST
BE VERIFIED BY THE CONTRACTOR PRIOR TO CONSTRUCTION OR
ORDERING MATERIALS. THE HORIZONTAL DATUM FOR THE SURVEY IS
BASED ON NYS CENTRAL ZONE NORTH AMERICAN DATUM OF 1983/1996
(NAD83(1996) ). THE VERTICAL DATUM FOR THE SURVEY IS BASED ON THE
NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVD88).
4. ALL REQUIRED EROSION AND SEDIMENT CONTROL MEASURES SHALL BE
PROVIDED, INSTALLED, AND MAINTAINED AS SHOWN ON THE APPLICABLE
EROSION, SEDIMENTATION AND POLLUTION CONTROL PLANS CONTAINED
WITHIN THESE CONSTRUCTION DOCUMENTS.
5. CONTRACTOR TO MOVE ALL CONSTRUCTION DEBRIS OFF THE FORT DRUM
PROPERTY AND DISPOSE DEBRIS AT A LEGAL, PERMITTED LANDFILL
CONSISTENT WITH ALL LOCAL, STATE, AND FEDERAL REQUIREMENTS.
6. NO BURNING IS ALLOWED ON FORT DRUM PROPERTY.
7. ALL BURIED PIPES AND UTILITIES SHALL HAVE A MINIMUM DEPTH AS
SPECIFIED BY THE FORT DRUM UTILITY TRENCH DETAIL AS SHOWN IN
DETAIL A2 ON SHEET C-520.
8. CONTRACTOR TO ENSURE ALL EXISTING TOPS OF MANHOLES AND VALVE
BOXES ARE RAISED OR LOWERED TO BE FLUSH WITH FINISHED GRADES,
UNLESS SHOWN OTHERWISE.
9. ALL NEW PAVEMENT AND SIDEWALKS SHALL BE CONSTRUCTED FLUSH
WITH EXISTING, WITH NO PONDING OF STORMWATER, UNLESS OTHERWISE
NOTED.
10. CONTRACTOR SHALL GRADE ALL DISTURBED AREAS TO ENSURE POSITIVE
DRAINAGE AWAY FROM ALL BUILDINGS AND TO DRAINAGE STRUCTURES
OR DITCHES. NATURAL FLOW OF SURROUNDING WATERS SHALL NOT BE
DISTURBED DURING CONSTRUCTION UNLESS OTHERWISE SHOWN.
11. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS, COORDINATES,
AND DIMENSIONAL INFORMATION PRIOR TO CONSTRUCTION. THE
CONTRACTOR SHALL BRING ALL DISCREPANCIES TO THE ATTENTION OF
THE OWNER'S PROJECT MANAGER PRIOR TO STARTING CONSTRUCTION.
12. ALL TRAFFIC SIGNS AND PAVEMENT MARKINGS SHALL BE IN ACCORDANCE
WITH THE "MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES" (MUTCD),
LATEST EDITION.
13. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING
INSTALLATION OF ALL NEW UTILITIES WITH THOSE THAT ARE EXISTING. IF
EXISTING UTILITIES ARE IN CONFLICT WITH NEW UTILITIES, THE SITE
CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER'S
REPRESENTATIVE (COR) BEFORE PROCEEDING WITH CONSTRUCTION.
14. ALL TOPSOIL AND EXCAVATED MATERIAL SHALL BE STOCKPILED IN AN
APPROVED AREA DURING CONSTRUCTION. EXCESS OR UNUSABLE
TOPSOIL SHALL BE DISPOSED OF OFF-SITE IN A MANNER THAT IS LEGAL
AND CONSISTENT WITH ALL LOCAL, STATE AND FEDERAL REQUIREMENTS.
15. THE LOCATION OF ALL EXISTING UTILITIES AND STORM DRAINAGE SHOWN
ON THE PLANS HAVE BEEN DETERMINED FROM THE BEST INFORMATION
AVAILABLE AND ARE GIVEN FOR THE CONVENIENCE OF THE CONTRACTOR.
THE ENGINEER ASSUMES NO RESPONSIBILITY FOR INACCURACY. PRIOR
TO THE START OF ANY CONSTRUCTION ACTIVITY , THE CONTRACTOR
SHALL POTHOLE AND CONFIRM THE ELEVATION OF ALL EXISTING UTILITIES
WHERE NEW UTILITIES CROSS, VERIFY THAT MINIMUM COVER (AS
REQUIRED BY FORT DRUM PUBLIC WORKS) IS MAINTAINED, AND SUBMIT
REVISED PROFILES OF NEW UTILITIES FOR APPROVAL, AS REQUIRED, AND
PRIOR TO PURCHASING MATERIALS.
16. THE CONTRACTOR SHALL EXERCISE CAUTION WHEN CROSSING
UNDERGROUND UTILITIES, WHETHER SHOWN ON THE PLAN OR LOCATED
BY THE UTILITY COMPANY. THE CONTRACTOR SHALL COORDINATE
DISCONNECTION OF EXISTING UTILITIES WITH THE APPROPRIATE UTILITY
PROVIDER.
17. UTILITIES INDICATED SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE
APPLICABLE PROVISIONS OF THE SPECIFICATIONS.
18. IT WILL BE THE RESPONSIBILITY OF THE CONTRACTOR TO ENSURE THAT
ALL REQUIRED PERMITS ARE OBTAINED AND IN HAND BEFORE BEGINNING
ANY CONSTRUCTION. NO CONSTRUCTION OR FABRICATION OF ANY ITEM
SHALL BEGIN UNTIL THE CONTRACTOR HAS RECEIVED ALL PLANS AND
ANY OTHER DOCUMENTATION FROM ALL OF THE PERMITTING AND ANY
OTHER REGULATORY AUTHORITIES. ANY PENALTIES, STOP WORK
ORDERS OR ADDITIONAL WORK RESULTING FROM THECONTRACTOR
BEING IN VIOLATION OF THE REQUIREMENTS ABOVE, SHALL BE FULLY
BORNE BY THE CONTRACTOR.
19. ALL CONTRACTORS/SUBCONTRACTORS THAT WILL BE ENGAGED IN LAND
DISTURBING ACTIVITIES SHALL COMPLY WITH ALL EROSION,
SEDIMENTATION AND POLLUTION CONTROL AND STORMWATER
POLLUTION PREVENTION REQUIREMENTS CONTAINED THROUGHOUT THE
DRAWINGS, SPECIFICATIONS, AND PERMITS.
20. AREAS DISTURBED BY THE CONTRACTOR, WHICH ARE NOT PART OF THIS
PROJECT, SHALL BE RETURNED TO ORIGINAL OR BETTER CONDITION
PRIOR TO THE COMPLETION OF THE PROJECT AS DETERMINED BY THE
OWNER.
21. THE CONTRACTOR'S MEANS, METHODS, SEQUENCE, TECHNIQUES OR
PROCEDURES IN PERFORMING THE WORK IS SOLELY THE RESPONSIBILITY
OF THE CONTRACTOR, WHO IS ALSO RESPONSIBLE FOR COMPLYING WITH
ALL HEALTH AND SAFETY PRECAUTIONS AS REQUIRED BY THE
APPLICABLE REGULATORY AGENCY.
22. THE DESIGN ADEQUACY AND SAFETY OF ALL BRACING, SHORING AND
TEMPORARY SUPPORTS, ETC. ARE THE SOLE RESPONSIBILITY OF THE
CONTRACTOR.
23. PROTECT ALL EXISTING FEATURES AND EXISTING LANDSCAPING THAT
WILL REMAIN. ANY ITEM DAMAGED DURING THE PERFORMANCE OF THE
WORK WILL BE RESTORED TO ORIGINAL CONDITION, OR REPLACED WITH
NEW AT THE CONTRACTOR'S EXPENSE. CONTRACTOR SHALL TAKE
PRECAUTIONS TO AVOID OVERLOADING PAVEMENTS WHICH WILL REMAIN.
24. CONTRACTOR SHALL INSPECT ALL SEDIMENT AND EROSION CONTROL
MEASURES DAILY AND DURING PROLONGED PERIODS OF CONTINUOUS
RAINFALL EVENTS TO ENSURE THAT ALL CONTROLS ARE FUNCTIONING
PROPERLY. DAMAGED CONTROLS SHALL BE REPLACED BY THE END OF
THE WORKDAY.
25. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING A
MARKED-UP SET OF DESIGN DRAWINGS SHOWING "AS-BUILT" CONDITIONS.
THESE "RECORD DRAWINGS" SHALL BE MADE AVAILABLE TO THE OWNER
UPON REQUEST. THE MARK-UPS SHALL BE AT THE SITE AT ALL TIMES AND
SHALL BE UTILIZED TO DEVELOP FINAL RECORD DRAWINGS.
26. EACH SHEET IS PART OF A MULTI-SHEET SET OF CONSTRUCTION PLANS
AND SHALL BE READ WITH THE FULL SET TO BEST ENSURE PROPER
INTERPRETATION.
27. SHEET KEYNOTES ON THE PLANS ARE SPECIFIC TO THAT SHEET ONLY.
MISSING SEQUENTIAL NUMBERS DO NOT APPLY TO THAT SHEET.
GENERAL CIVIL DEMOLITION NOTES
1. "DEMOLISH" SHALL MEAN TO REMOVE AN OBJECT IN ITS ENTIRETY.
RESTORE GRADES AND SURFACE IMPROVEMENTS TO MATCH EXISTING
CONDITIONS OR PER REQUIREMENTS OF NEW WORK, WHICHEVER IS
APPLICABLE.
2. EROSION AND SEDIMENTATION CONTROL MEASURES AND TEMPORARY
CONSTRUCTION FENCING SHALL BE IN PLACE PRIOR TO COMMENCEMENT
OR CONCURRENT WITH DEMOLITION.
3. CONTRACTOR SHALL ESTABLISH SURVEY CONTROL NETWORK OUTSIDE
LIMITS OF DEMOLITION PRIOR TO COMMENCEMENT OF WORK. THIS WORK
MUST BE PERFORMED BY A NEW YORK STATE LICENSED LAND SURVEYOR.
4. ALL DEMOLITION WORK SHALL BE COORDINATED WITH CONTRACTOR'S
SCHEDULE, LOGISTICS PLAN (APPROVED BY OWNER), EROSION,
SEDIMENTATION AND POLLUTION CONTROL PLAN PRIOR TO WORK.
5. ALL INTERNAL FENCING, TRASH, AND LITTER TO BE FULLY DEMOLISHED
AND REMOVED FROM SITE (TO A LEGAL LANDFILL). PERIMETER FENCING
TO REMAIN UNLESS NOTED OTHERWISE.
6. ALL CONSTRUCTION AND DEMOLITION DEBRIS (C&D), WITH THE
EXCEPTION OF CLEAN, UNCONTAMINATED CONCRETE (NOT TO EXCEED 1
CUBIC YARD IN SIZE), ASPHALT, BRICK, MASONRY, STONE, AGGREGATE,
SOIL, BRUSH, AND STUMPAGE WILL BE DISPOSED OF OFF-POST IAW
FEDERAL, STATE, AND LOCAL LAW AND REGULATION. DISPOSAL OF CLEAN
SPOILS ON POST WILL BE DONE AT AN APPROVED, PRE-DETERMINED SITE
COORDINATED THROUGH THE FORT DRUM PUBLIC WORKS, MASTER
PLANNING BRANCH.
7. ALL SOLID WASTES GENERATED AND DISPOSED OF IN CONJUNCTION WITH
THIS PROJECT (INCLUDING ALL C&D DEBRIS) WILL BE TRACKED AND
RECORDED BY WEIGHT. WEIGHTS FOR SOLID WASTES DISPOSED OF OFF
POST AT A PERMITTED FACILITY WILL BE TALLIED USING WEIGHT TICKETS.
CLEAN SPOILS DISPOSED OF ON POST AS PART OF REHABILITATION OR
MITIGATION PROGRAMS, WILL BE CONSIDERED RECYCLE/REUSE
MATERIALS. WEIGHTS FOR THESE SPOILS WILL BE TALLIED BY BEST
ESTIMATE (IN TONS OR POUNDS). TOTALS FOR SOLID WASTE DISPOSAL
AND RECYCLE WILL BE FORWARDED TO THE PW-ENVIRONMENTAL
DIVISION, ATTN: ANTHONY.P.REALI.CIV@MAIL.MIL .
8. AT THE END OF EACH FISCAL QUARTER OR UPON PROJECT COMPLETION,
WHICH EVER OCCURS FIRST. ELECTRONIC REPORTING IS REQUIRED.
9. WORK SITES ARE TO BE POLICED DAILY TO ENSURE C&D DEBRIS AND
LITTER ARE PROPERLY CONTAINED. DUMPSTERS AND ROLL-OFFS WILL BE
COVERED AT THE END OF EACH WORKDAY TO PREVENT BLOW-AWAY
LITTER AND DEBRIS.
10. ALL FEDERAL, STATE, AND LOCAL RECYCLING RULES AND INITIATIVES
WILL BE STRICTLY OBSERVED.
11. EVERY RECYCLING EFFORT WILL BE EXHAUSED BEFORE SENDING
MATERIAL SUCH AS (C&D, REFUSE, ETC.) TO THE LANDFILL .
GENERAL CIVIL SITE NOTES
1. CONTRACTOR SHALL FURNISH AND MAINTAIN ANY AND ALL NECESSARY
BARRICADES AROUND THE WORK AND PROVIDE PROTECTION AGAINST
WATER DAMAGE AND SOIL EROSION.
2. ALL BUILDING DIMENSIONS SHALL BE VERIFIED AND COORDINATED WITH
THE ARCHITECTURAL AND STRUCTURAL PLANS.
3. PAVEMENT MARKING, INCLUDING STANDARD HANDICAP SYMBOLS,
PARKING STRIPING AND TRAFFIC ARROWS, SHALL BE PAINTED ON
PAVEMENT AT LOCATIONS SHOWN.
4. ALL SIGNAGE SHALL CONFORM TO THE MOST RECENT NYDOT AND MUTCD
STANDARDS AND SPECIFICATIONS.
GRADING AND DRAINAGE NOTES
1. GRADING SHALL BE AS INDICATED, AND SHALL PRODUCE A FINISHED
SURFACE WITH NO PONDING OF WATER, READY TO RECEIVE PAVEMENT,
PLANTING MATERIALS OR GRASSING.
2. POSITIVE DRAINAGE SHALL BE MAINTAINED AT ALL TIMES TO PREVENT
SATURATION OF EXPOSED SOILS IN CASE OF SUDDEN RAINS, AND FOR
ALL FINISHED GRADING. CONTRACTOR SHALL LOCATE ALL EXISTING
UTILITIES PRIOR TO ANY EXCAVATION.
3. CONTRACTOR SHALL INSTALL ALL PERIMETER EROSION AND SEDIMENT
CONTROL MEASURES PRIOR TO ANY SITE CLEARING OR EXCAVATION.
4. ALL BACKFILL AND FILL MATERIAL SHALL BE FREE OF ORGANIC MATTER
AND WASTE.
5. THE CONTRACTOR SHALL REMOVE ALL EROSION CONTROL FENCING
FROM THE SITE PRIOR TO FINAL PROJECT ACCEPTANCE, AND SHALL
SMOOTH THE GROUND SURFACE WHERE THE FENCE WAS REMOVED THEN
MULCH OR SEED & STRAW (SEASON APPROPRIATE GRASS) THE
RESTORED SURFACE AS SUNLIGHT CONDITIONS WARRANT.
6. CONTRACTOR SHALL MARK/PROTECT ALL BENCHMARKS DURING
CONSTRUCTION.
7. IF BENCHMARK MUST BE DEMOLISHED FOR CONSTRUCTION,
CONTRACTOR SHALL RELOCATE BENCHMARK AND PROVIDE NEW DATA ON
AS-BUlLTS.
8. ALL CUT AND FILL SLOPES SHALL BE 3:1 OR FLATTER (SEE PLANS).
9. ALL SPOT ELEVATIONS SHOWN ARE FINISH GRADE.
SANITARY SEWER NOTES
1. ALL WORK SHALL BE IN ACCORDANCE WITH FORT DRUM UTILITY
STANDARDS AND THE FORT DRUM GEOGRAPHICAL REQUIREMENTS FOR
NCO ACADEMY COMPLEX (PN 55578).
2. ALL SANITARY SEWER PIPE SUPPLIED FOR THIS PROJECT SHALL BE SDR
35 PVC. SEE SPECIFICATIONS.
3. THE INTERIOR OF THE PIPE SHALL BE CLEANED OF ALL DIRT, JOINTING
MATERIAL, AND SUPERFLUOUS MATERIAL OF EVERY DESCRIPTION AS
CONSTRUCTION PROGRESSES. UPON COMPLETION OF THE SEWER
SYSTEM, THE CONTRACTOR SHALL FLUSH ALL MANHOLES AND LINES.
FLUSHED WATER SHALL BE SCREENED TO PREVENT FOREIGN DEBRIS
FROM ENTERING THE DOWNSTREAM PUMPING EQUIPMENT.
4. NO SEWAGE SHALL BE DISCHARGED TO STREAMS, DITCHED, OR ON THE
GROUND FOR ANY REASON. IT IS THE CONTRACTOR'S RESPONSIBILITY TO
PROVIDE ALL PUMPS, HOSES, LABOR, AND EQUIPMENT NECESSARY TO
BYPASS MANHOLES OR SECTIONS OF LINE THAT ARE OPEN FOR ANY
REASON.
5. GRAVITY SEWER SHALL BE LAID WITH AN UNIFORM SLOPE BETWEEN
MANHOLES SO THAT THEY FORM A SEWER WITH A SMOOTH AND UNIFORM
INVERT, VISIBLE AS A FULL CIRCLE FROM MANHOLE TO MANHOLE.
WATER DISTRIBUTION NOTES
1. ALL WORK SHALL BE IN ACCORDANCE WITH FORT DRUM UTILITY
STANDARDS AND THE FORT DRUM GEOGRAPHICAL REQUIREMENTS FOR
NCO ACADEMY COMPLEX (PN 55578).
2. UNLESS OTHERWISE SPECIFIED, ALL WATER PIPING SHALL BE SDR 11
HDPE. SEE SPECIFICATIONS.
3. WATERLINES SHALL BE ADEQUATELY PLUGGED ANYTIME THE TRENCH IS
LEFT UNATTENDED TO PREVENT FOREIGN MATERIALS AND RODENTS
FROM ENTERING THE PIPE.
4. PIPE SIZES SPECIFIED SHALL BE INSIDE DIAMETER.
5. NEW HYDRANTS INSTALLED SHALL BE TAGGED TO IDENTIFY IF THE PLUG
IS LEFT IN.
R F
I
SHEET ID
M
Y
C
O R
E
N G
I N
E E
R S
N E
W
Y
O R
K
N E
W
Y
O R
K
N
Y
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
C H
E C
K E
D
B
Y
A N
S I
D
F I L
E
N
A M
E
I S
S U
E
D
A T
E
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
F I L
E
N
U M
B E
R
1 2 3 4 5
D
C
B
A
N C
O
A
C A
D E
M
P L
E X
M A
R K
D E
S C
R I P
T I O
N D
A T
E
F I L
E
N
A M
E
L
U
S A
C E
N
R
K
D
I S
T R
I C
T
C
E
N
A
D E
S
I G
N
F
T
D
R U
M
N
Y
C
A D
B
I M
C
A D
C
O
T T
E D
N
O R
M A
N
T
A N
Y A
O C
T O
B E
R
W D
S R
W D
K U
S S
E R
Y
R B
A I L
E Y
T N
O R
M A
N
T N
O R
M A
N
D E
M O
L I T
I O
N
P
L A
N
S I T
E
A
C-101
C d w g
GENERAL SHEET NOTES
1. REFER TO SHEETS C-001 & C-002 FOR GENERAL CIVIL NOTES,
LEGENDS, AND ABBREVIATIONS.
2. THIS SHEET IS PART OF A MULTI-SHEET SET OF
CONSTRUCTION PLANS AND SHALL BE READ WITH THE FULL
SET TO BEST ENSURE PROPER INTERPRETATION.
3. EROSION AND SEDIMENT CONTROL MEASURES MUST BE IN
PLACE PRIOR TO ANY DEMOLITION OR EARTH DISTURBANCE.
4. UTILITIES THAT ARE STATED TO BE PROTECTED SHALL BE
PROTECTED DURING ALL PHASES OF CONSTRUCTION.
SHEET KEYNOTES
1. ASPHALT PAVING SHALL BE CLEANLY SAWCUT AND
DEMOLISHED AT LIMITS OF DISTURBANCE, TYPICAL
2. DEMOLISH GRAVEL TRAIL
3. DEMOLISH GRAVEL SURFACE
4. LIFT STATION DEMOLISHED BY FORT DRUM IN FEBRUARY 2016.
5. GAS STORAGE DEMOLISHED BY FORT DRUM IN FEBRUARY
2016.
6. PROTECT GAS LINE TO REMAIN
7. POLE #126262 TO BE REPLACED. OVERHEAD ELECTRICAL
LINES TO BE BE EXTENDED AND/OR MODIFIED AS NECESSARY
TO ACCOMMODATE POLE REPLACEMENT. SEE ELECTRICAL
SITE PLAN.
8. DEMOLISH POWER POLES, LINES, AND ASSOCIATED GUY
POLES AND WIRES
9. DEMOLISH POST
10. BOLLARDS DEMOLISHED BY FORT DRUM IN FEBRUARY 2016
11. REMOVE, STORE, AND REPLACE SECTION OF FENCE FOR
INSTALLATION OF NEW 8" SANITARY SEWER
12. DEMOLISH UNDERBRUSH AND TREES WITHIN LIMITS OF
DISTURBANCE
13. PROTECT SANITARY SEWER AND SEWER MANHOLE TO REMAIN
14. PROTECT FIRE HYDRANT ASSEMBLY TO REMAIN. MAINTAIN
FREE ACCESS AT ALL TIMES DURING CONSTRUCTION. ADJUST
TO FINISHED GRADE AFTER CONSTRUCTION IF REQUIRED. SEE
DETAIL B4/C-521.
15. PRESERVE AND PROTECT GRAVEL TRAIL TO REMAIN.
16. CONTROL POINT SHALL BE RESTORED AND RECORDED UPON
COMPLETION OF DEMOLITION WORK
17. PROTECT WATER VALVE TO REMAIN. ADJUST TO FINISHED
GRADE.
18. PROTECT POWER POLE TO REMAIN
19. RELOCATE TRACER WIRE BOX. SEE SHEET C-122 FOR NEW
LOCATION.
20. DEMOLISH ABANDONED CLEANOUT
21. PROTECT 6" HDPE FORCE MAIN TO REMAIN. POTHOLE AND
CONFIRM THE FORCE MAIN ELEVATION PRIOR TO
CONSTRUCTION TO VERIFY THAT MINIMUM DEPTH IS
MAINTAINED FROM FINISHED GRADE (AS REQUIRED BY FORT
DRUM PUBLIC WORKS), AND SUBMIT REVISED PROFILES FOR
APPROVAL PRIOR TO PURCHASING MATERIALS.
22. EXISTING MONITORING WELL TO REMAIN
23. PROTECT UNDERGROUND COMMUNICATIONS CONDUITS TO
REMAIN
24. PROTECT COMMUNICATIONS MANHOLE TO REMAIN
25. DEMOLISH SIGN
26. CONTRACTOR STAGING AREA
27. REMOVE ABANDONED 8" VC FORCE MAIN THAT LIES WITHIN
CONTRACT LIMITS. DEPTH VARIES 2-6' DEEP.
DEMOLITION PLAN - SITE 'A'
SCALE: 1" = 50'
0 25' 50' 100' 150'
SHEET LEGEND
DEMOLISH BUILDING OR SITE FEATURE
DEMOLISH ASPHALT PAVEMENT
DEMOLISH SURFACE GRAVEL
DEMOLISH GRAVEL TRAIL
DEMOLISH TREES AND UNDERBRUSH
WITHIN THE PROJECT LIMITS
DEMOLISH OR RELOCATE UTILITY
DEMOLISH TREE/ SITE FEATURE
EX. POWER POLE
EX. POWER POLE
EX. FH
EX. FH
EX. SANITARY
SEWER PUMP
STATION
EX. GRAVEL TRAIL
EXIST. GRAVEL TRAIL
LIMITS OF
DISTURBANCE
LIMITS OF
DISTURBANCE
R F
I S
A M
E N
D M
E N
T
R
E V
I S
I O
SHEET ID
M
Y
C
O R
E
N G
I N
E E
R S
N E
W
Y
O R
K
N E
W
Y
O R
K
N
Y
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
C H
E C
K E
D
B
Y
A N
S I
D
F I L
E
N
A M
E
I S
S U
E
D
A T
E
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
F I L
E
N
U M
B E
R
1 2 3 4 5
D
C
B
A
N C
O
A
C A
D E
M
P L
E X
M A
R K
D E
S C
R I P
T I O
N D
A T
E
F I L
E
N
A M
E
L
U
S A
C E
N
R
K
D
I S
T R
I C
T
C
E
N
A
D E
S
I G
N
F
T
D
R U
M
N
Y
C
A D
B
I M
C
A D
C
O
T T
E D
N
O R
M A
N
T
A N
Y A
O C
T O
B E
R
W D
S R
W D
GENERAL SHEET NOTES
1. REFER TO SHEET C-001 & C-002 FOR GENERAL CIVIL NOTES, LEGENDS, AND
ABBREVIATIONS.
2. THIS SHEET IS PART OF A MULTI-SHEET SET OF CONSTRUCTION PLANS AND SHALL
BE READ WITH THE FULL SET TO BEST ENSURE PROPER INTERPRETATION.
3. ALL EXISTING CONDITIONS SHOWN WERE TAKEN FROM GIS DATA PROVIDED BY
FORT DRUM. CONTRACTOR SHALL VERIFY EXISTING CONDITIONS PRIOR TO
CONSTRUCTION AND NOTIFY CONTRACTING OFFICER OF DIFFERING CONDITIONS.
4. EROSION AND SEDIMENT CONTROL MEASURES MUST BE IN PLACE PRIOR TO ANY
DEMOLITION OR EARTH DISTURBANCE.
5. DEMOLITION INCLUDES THE REMOVAL AND PROPER DISPOSAL OF ALL MATERIALS,
INCLUDING BUT NOT LIMITED TO, FOUNDATIONS, FOOTINGS, AND UTILITIES.
6. ALL BUILDING UTILITIES SHALL BE PLUGGED, BLIND FLANGED, CAPPED OR OTHER
MEANS OF TERMINATION AS APPROPRIATE. UTILITIES SHALL BE REMOVED A
MINIMUM OF FIVE (5) FEET FROM THE BUILDING FOOTING/FOUNDATION PERIMETER
OR AT THE NEAREST JOINT, VALVE OR FLANGE BEYOND THE FIVE FEET MINIMUM
DISTANCE.
7. UTILITY TERMINATION SHALL INCLUDE COMPLETE AND PROPER COORDINATION
WITH THE RESPECTIVE UTILITY PROVIDER/OWNER PRIOR TO PERFORMING ANY
WORK. TERMINATION OF UTILITIES TO BE COMPLETED WITH THE APPROPRIATE
CAPS AND PLUGS PER PROVIDER/OWNER REQUIREMENTS.
8. ASBESTOS CONTAINING MATERIALS AND OTHER REGULATED MATERIALS, INCLUDING
BUT NOT LIMITED TO, FLUORESCENT LIGHT FIXTURES, LIGHTED EXIT SIGNS, SMOKE
DETECTORS, FIRE EXTINGUISHERS, TRANSFORMERS, AIR CONDITIONERS AND
CHILLER UNITS, THERMOSTATS, ELECTRIC CONTROL PANELS, DRINKING WATER
FOUNTAINS, GENERATORS, CIRCUIT BREAKERS, BATTERIES AND BATTERY CHARGES
WERE FOUND IN THE EXISTING BUILDINGS TO BE DEMOLISHED. THE CONTRACTOR
SHALL REFER TO THE FINDINGS OF THE "PRE-DEMOLITION SURVEY REPORT," DATED
01/09/2012, PROVIDED AT THE END OF SPECIFICATION SECTION 02 41 00, FOR A
COMPLETE LISTING OF ASBESTOS CONTAINING MATERIALS AND OTHER REGULATED
MATERIALS.
9. ASBESTOS CONTAINING MATERIALS AND OTHER REGULATED MATERIALS SHALL BE
REMOVED FROM THE FACILITIES PRIOR TO DEMOLITION.
10. ASBESTOS ABATEMENT CONTRACTORS SHALL COMPLY WITH PART 56 OF TITLE 12
OF THE OFFICIAL COMPILATION OF CODES, RULES AND REGULATIONS OF THE STATE
OF NEW YORK (CITED AS 12 NYCRR PART 56).
11. REFERENCE SPECIFICATION SECTIONS 02 41 00, 02 61 13, 02 81 00, 02 82 13.00 10, AND
02 83 13.00 20 FOR DETAILED INFORMATION REGARDING DEMOLITION AND
DECONSTRUCTION OF EXISTING FACILITIES AND HANDLING OF HAZARDOUS
MATERIALS.
12. METERS AND RELATED EQUIPMENT SHALL BE REMOVED AND DELIVERED TO THE
RESPECTIVE UTILITY AUTHORITY OFFICES FOR DISPOSAL OR REUSE.
13. ALL OTHER DEMOLITION DEBRIS SHALL BE REMOVED FROM THE LIMITS OF FORT
DRUM AND BE DISPOSED OF IN A MANNER AS REQUIRED BY LAW AND FORT DRUM
REGULATIONS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DISPOSAL
PERMITS AND REGULATORY REQUIREMENTS.
14. UPON COMPLETION OF DEMOLITION AND DECONSTRUCTION ACTIVITIES AT THE
BUILDING DEMOLITION PROJECT SITE, ALL DISTURBED AREAS SHALL BE VEGETATED
IN ACCORDANCE WITH SHEET C-721.
15. SEE SHEET ED-101 FOR ELECTRICAL DEMOLITION PLAN.
SHEET LEGEND
DEMOLISH BUILDING
DEMOLISH CONCRETE
SIDEWALK
UTILITY CAP
DEMOLITION PLAN - SITE 'B'
SCALE: 1" = 50'
0 25' 50' 100' 150'
K U
S S
E R
Y
R B
A I L
E Y
T N
O R
M A
N
T N
O R
M A
N
D E
M O
L I T
I O
N
P
L A
N
S
I T
E
B
C-102
C d w g
SHEET KEYNOTES
1. CUT EXISTING SANITARY SEWER AT LEAST 5 FEET FROM THE SEWER MAIN AND CAP
BOTH CUT SIDES OF THE LINE
2. EXISTING 6" VC SANITARY SEWER LINE TO BE ABANDONED IN PLACE
3. EXISTING 8" VC SANITARY SEWER MAIN TO REMAIN
4. EXISTING 8" CIPP SANITARY SEWER MAIN TO REMAIN
5. CUT EXISTING WATER LINE AT LEAST 5 FEET FROM THE WATER MAIN AND CAP BOTH
CUT SIDES OF THE LINE
6. EXISTING WATER LINE TO BE BE ABANDONED IN PLACE (SIZE, DEPTH, AND MATERIAL
UNKNOWN)
7. EXISTING 2" DI WATER LINE TO BE ABANDONED IN PLACE (DEPTH UNKNOWN)
8. EXISTING 1.5" DI WATER LINE TO BE ABANDONED IN PLACE (DEPTH UNKNOWN)
9. EXISTING 0.75" DI WATER LINE TO BE ABANDONED IN PLACE (DEPTH UNKNOWN)
10. EXISTING 8" CI WATER MAIN TO REMAIN
11. EXISTING ABANDONED WATER LINE TO REMAIN
12. CUT EXISTING NATURAL GAS LINE AT LEAST 5 FEET FROM THE NATURAL GAS MAIN
AND CAP BOTH CUT SIDES OF THE LINE
13. EXISTING NATURAL GAS LINE TO BE ABANDONED IN PLACE (SIZE, DEPTH, AND
MATERIAL UNKNOWN)
14. EXISTING 1" HDPE NATRUAL GAS LINE TO BE ABANDONED IN PLACE (DEPTH
UKNOWN)
15. EXISTING 6" HDPE NATURAL GAS MAIN TO REMAIN
16. EXISTING 2" HDPE NATURAL GAS LINE TO REMAIN
17. EXISTING 1" HDPE NATURAL GAS LINE TO REMAIN
18. DEMOLISH EXISTING NATURAL GAS TANK (TNKBG122)
19. CONTRACTOR STAGING AREA
SHEET ID
M
Y
C
O R
E
N G
I N
E E
R S
N E
W
Y
O R
K
N E
W
Y
O R
K
N
Y
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
C H
E C
K E
D
B
Y
A N
S I
D
F I L
E
N
A M
E
I S
S U
E
D
A T
E
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
F I L
E
N
U M
B E
R
1 2 3 4 5
D
C
B
A
N C
O
A
C A
D E
M
P L
E X
M A
R K
D E
S C
R I P
T I O
N D
A T
E
F I L
E
N
A M
E
L
U
S A
C E
N
R
K
D
I S
T R
I C
T
C
E
N
A
D E
S
I G
N
F
T
D
R U
M
N
Y
C
A D
B
I M
C
A D
C
O
T T
E D
N
O R
M A
N
T
A N
Y A
O C
T O
B E
R
W D
S R
W D
FINISHED
GRADE
" EXPANSION JOINT BETWEEN
WALK AND RIGID PAVING OR
ADJACENT RIGID STRUCTURE
WIDTH VARIES
(SEE SITE PLAN)
4" PORTLAND CEMENT CONCRETE
NOTE:
1. CROSS SLOPE 2% (MAX)
2. GRANULAR SUBBASE SHALL COMPLY WITH NYSDOT SECTION 733-04, TYPE 2 MATERIAL
3. CONCRETE STRENGTH SHALL COMPLY WITH SPECIFICATION 32 16 13 CONCRETE SIDEWALKS.
EXPANSION JOINT
CONTOL JOINT
1/8"
1/2"
" RADIUS
FINISH
PREMOLDED JOINT FILLER
EXTENDING TO BOTTOM
SURFACE OF CONCRETE
NOTE:
CONTOL JOINT SHALL DIVIDE
SIDEWALK INTO SQUARE
PANELS
NOTE:
PROVIDE EXPANSION JOINTS
@ 50' MAX. SPACING,
ADJACENT TO RIGID
STRUCTURES AND RIGID
PAVING
#57 STONE
COMPACTED TO 95% PER ASTM
D1557
HEAVY-DUTY GRAVEL DRIVE
NO SCALE
K U
S S
E R
Y
R B
A I L
E Y
T N
O R
M A
N
T N
O R
M A
N
C I V
I L
D
E T
A I L S
C-501
C d w g
CRUSHED GRADED AGGREGATE
COMPACTED TO 95% MAXIMUM PER ASTM D1557
(SEE NOTES 1 AND 2)
24" COMPACTED SUBGRADE
TO 95% MIN. PER ASTM D1557
12" COMPACTED SUBGRADE
TO 95% PER ASTM D1557
GEOGRID TENSAR TX 160 OR EQUAL
NON-WOVEN SPUN BONDED POLYPROPYLENE
(LANDSCAPE FABRIC)
NO SCALE
CONCRETE SIDEWALK
6"
4"
GRANULAR SUBBASE
(SEE NOTE 2)
12" COMPACTED SUBGRADE TO
MINIMUM 95% IN ACCORDANCE
WITH ASTM D1557
6x6 - W2.9 x W2.9 WWR
HEAVY-DUTY CONCRETE PAVEMENT
NO SCALE
2.5"
1.5"
8"
PAVEMENT REQUIREMENTS
NYSDOT MARSHALL MIX: SECTION 403, TYPE 7F; OR
NYSDOT MARSHALL MIX: SECTION 403, TYPE 3; OR
NYSDOT SUPERPAVE MIX: SECTION 402, 19.0 mm, F9
TACK COAT
NYSDOT SUPERPAVE MIX: SECTION 402, 9.5 mm, F3
GRANULAR SUBBASE (C)
BITUMINOUS TOP COURSE (A)
BITUMINOUS BINDER COURSE (B)
A
B
NYSDOT SECTION 733-04, TYPE 2C
LIGHT-DUTY
ASPHALT PAVEMENT - PARKING
NO SCALE
3.5"
1.5"
12"
PAVEMENT REQUIREMENTS
NYSDOT MARSHALL MIX: SECTION 403, TYPE 7F; OR
NYSDOT SUPERPAVE MIX: SECTION 402, 9.5 mm, F3
NYSDOT MARSHALL MIX: SECTION 403, TYPE 3; OR
NYSDOT SUPERPAVE MIX: SECTION 402, 19.0 mm, F9
GRANULAR SUBBASE (C)
24" COMPACTED SUBGRADE
TO MIN. 95% PER ASTM D1557
BITUMINOUS TOP COURSE (A)
TACK COAT
BITUMINOUS BINDER COURSE (B)
A
B
NYSDOT SECTION 733-04, TYPE 2C
HEAVY-DUTY ASPHALT PAVEMENT
NO SCALE
24" COMPACTED SUBGRADE
TO MIN. 95% PER ASTM D1557
2"
8"
PAVEMENT REQUIREMENTS
NYSDOT MARSHALL MIX: SECTION 403, TYPE 7F; OR
NYSDOT SUPERPAVE MIX: SECTION 402, 9.5 mm, F3
GRANULAR SUBBASE (C)
BITUMINOUS TOP COURSE (A)
A
NYSDOT SECTION 733-04, TYPE 2
C
LIGHT-DUTY
ASPHALT PAVEMENT - TRACK
NO SCALE
24" COMPACTED SUBGRADE
TO MIN. 95% PER ASTM D1557
GRAVEL BLEACHER PAD
NO SCALE
EXPANSION JOINT
CONTROL JOINT
1/8"
1/2"
" RADIUS
FINISH
PREMOLDED JOINT FILLER
EXTENDING TO BOTTOM
SURFACE OF CONCRETE
NOTE:
CONTRACTION JOINT SHALL
DIVIDE SIDEWALK INTO
SQUARE PANELS
NOTE:
PROVIDE EXPANSION JOINTS
ADJACENT TO RIGID
STRUCTURES AND RIGID
PAVING
NOTE:
1. CROSS SLOPE 2% (MAX)
2. GRANULAR SUBBASE SHALL COMPLY WITH NYSDOT SECTION 733-04, TYPE 2 MATERIAL
3. CONCRETE STRENGTH SHALL COMPLY WITH SPECIFICATION 32 16 13 CONCRETE SIDEWALKS.
3"
PORTLAND CEMENT CONCRETE
10'
12" COMPACTED SUBGRADE TO MINIMUM 95%
IN ACCORDANCE WITH ASTM D1557
4" GRANULAR SUBBASE (SEE NOTE 2)
JOINT SEALANT
1/8"
3/4"
GEOTEXTILE FABRIC
(MIRAFI 500X OR APPROVED
EQUAL)
GEOTEXTILE FABRIC
(MIRAFI 500X OR APPROVED
EQUAL)
GEOTEXTILE FABRIC
(MIRAFI 500X OR APPROVED
EQUAL)
GEOTEXTILE FABRIC
(MIRAFI 500X OR APPROVED
EQUAL)
GEOTEXTILE FABRIC
(MIRAFI 500X OR APPROVED
EQUAL)
NOTE:
1. CRUSHED GRADED AGGREGATE SHALL COMPLY WITH NYSDOT STANDARD
SPECIFICATION SECTION 733-04, TYPE 2.
2. SEE SPECIFICATION SECTION 32 15 00 FOR ADDITIONAL REQUIREMENTS.
G E
N E
R A
L
R
E V
I S
I O
N S
R F
I
File details come from the government source that posted it. Updated .