Copy_of_Lead_DataRequest_20160315.pdf

PDF 207 KB Posted

Attached to
Non-Commissioned Officer (NCO) Academy Complex, Fort Drum, New York
Solicitation number
W912DS-17-R-0001
Issued by

About this file

W912DS-17-R-0001-0005 LEAD DATA REQUEST

View the file

Other files

File Type Posted
C-751.pdf PDF
W912DS-17-R-0001-AMENDMENT_0012.pdf PDF
CP_NCOA-DMMA-CF.pdf PDF
W912DS-17-R-0001-0011.pdf PDF
W912DS-17-R-0001-AMENDMENT_0010.pdf PDF
W912DS-17-R-0001-0010_ET-602_Card_Access_System.pdf PDF
W912DS-17-R-0001-AMENDMENT_0009.pdf PDF
Plan_Set_-_REV1.pdf PDF
W912DS-17-R-0001-AMENDMENT_0008.pdf PDF
NCOA-STRUCT_Amendment7_31Jan2017.pdf PDF
Appendix_J_-_NOI__100__RTA_NCOA_SWPPP_rev01-31-2017-2.pdf PDF
Amend__7_SPECs_Reissued_02-01-17.pdf PDF
100__NCOA_SWPPP_rev01-31-2017_(No_Appendix).pdf PDF
W912DS-17-R-0001-AMENDMENT_0007.pdf PDF
NCOA_Plumbing_Revised_Dwgs_Amend_7.pdf PDF
100pcnt_LEED_Checklist_20160930.pdf PDF
ADDITIONAL_RFIs_20170126_REV.pdf PDF
NCOA_Civil_Dwgs_Amend_7.pdf PDF
W912DS-17-R-0001-0006.pdf PDF
W912DS-17-R-0001-0006.pdf PDF
W912DS-17-R-0001-AMENDMENT_0005.pdf PDF
Fort_Drum_Lab_Data-_500_Area_Buildings_excerpt.pdf PDF
Copy_of_Asbestos_DataRequest_20160315.pdf PDF
Amend__5_SPECs_Reissued_1-22-17.pdf PDF
Amend__5_Arch_Drawings_Reissued_1-20-17_.pdf PDF
C-GP0001_NCOA_Grading_Plan_bound.dwg DWG drawing
PLAN_SET.pdf PDF
C-GP0001_NCOA_Grading_Plan_converted.dgn —
Amend__5_Civil_drawings_reissued.pdf PDF
Fort_Drum_ACM_Report_-_500_Area_Buildings_excerpt.pdf PDF
1-10-17_Site_Visit_Sign_In_roster.pdf PDF
W912DS-17-R-0001-AMENDMENT_0004.pdf PDF
NCOA_INT_REV1.pdf PDF
W912DS-17-R-0001-AMENDMENT_0003.pdf PDF
NCOA_revCivilSheets_12-29-2016.pdf PDF
Sign_In_Roster_for_NCOA_Site_Visit_20_DEC_2016.pdf PDF
W912DS-17-R-0001-AMENDMENT_0002.pdf PDF
RFI-0001_NCOA_DR-WDs.pdf PDF
W912DS-17-R-0001-0001.pdf PDF
Site_Visit_Map.pdf PDF
RTA_100PCNT_DESIGN_-_SPECS_SUBMISSION.pdf PDF
W912DS-17-R-0001_SOLICITATION_FOR_NCO_ACADEMY_COMPLEX_FORT_DRUM_NEW_YORK.pdf PDF
RTA_100PCNT_DESIGN_-_DRAWINGS_SUBMISSION.pdf PDF
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Building

No.

RPUID Build Date Lead Survey

Lead Survey

Date

Lead Paint Sampling

Location ID Building Floor Lead Surveyed? Lead Present? Lead Material Type Lead Hazard Type

Lead Material Location

Type

RCRA TCLP

Lead (mg/L)

TCLP-Lead

Result (mg/L)

Total Lead

Sampling

Result - Field

Blanks

Result/Sampling Note

513 311225 07/01/1941 2003 Lead Sampling Work Plan (USACE - DACA31-00-D-0023) 20030601 T-0513C-0 1 Yes Yes To Be Determined Paint Throughout Building 5 0.990

513 311225 07/01/1941 2004 Lead Paint Sampling Report (USACE - DACA31-00-D-0023) 20040527 T-513C-000 1 Yes Yes To Be Determined Paint Throughout Building 5 0.990

514 311226 07/01/1941 2003 Lead Sampling Work Plan (USACE - DACA31-00-D-0023) 20030601 T-0514C-0 1 Yes Yes To Be Determined Paint Throughout Building 5 0.820

514 311226 07/01/1941 2005 Lead Paint Sampling Report (USACE - DACA31-00-D-0023) 20040527 T-514C-000 1 Yes Yes To Be Determined Paint Throughout Building 5 0.820

515 311227 07/01/1941 2003 Lead Sampling Work Plan (USACE - DACA31-00-D-0023) 20030601 T-0515C-0 1 Yes Yes To Be Determined Paint Throughout Building 5 0.800

515 311227 07/01/1941 2006 Lead Paint Sampling Report (USACE - DACA31-00-D-0023) 20040527 T-515C-000 1 Yes Yes To Be Determined Paint Throughout Building 5 0.800

540 311240 07/01/1941 2003 Lead Sampling Work Plan (USACE - DACA31-00-D-0023) 20030601 T-0540C-0 1 Yes Yes To Be Determined Paint Throughout Building 5 0.910

540 311240 07/01/1941 2007 Lead Paint Sampling Report (USACE - DACA31-00-D-0023) 20040527 T-540C-000 1 Yes Yes To Be Determined Paint Throughout Building 5 0.910

541 311241 07/01/1941 2003 Lead Sampling Work Plan (USACE - DACA31-00-D-0023) 20030601 T-0541C-0 1 Yes Yes To Be Determined Paint Throughout Building 5 1.600

541 311241 07/01/1941 2008 Lead Paint Sampling Report (USACE - DACA31-00-D-0023) 20040527 T-541C-000 1 Yes Yes To Be Determined Paint Throughout Building 5 1.600

542 311242 07/01/1941 2003 Lead Sampling Work Plan (USACE - DACA31-00-D-0023) 20030601 T-0542C-0 1 Yes Yes To Be Determined Paint Throughout Building 5 2.000

542 311242 07/01/1941 2009 Lead Paint Sampling Report (USACE - DACA31-00-D-0023) 20040527 T-542C-000 1 Yes Yes To Be Determined Paint Throughout Building 5 2.000

543 311243 07/01/1941 2003 Lead Sampling Work Plan (USACE - DACA31-00-D-0023) 20030601 T-0543C-0 1 Yes Yes To Be Determined Paint Throughout Building 5 1.100

543 311243 07/01/1941 2010 Lead Paint Sampling Report (USACE - DACA31-00-D-0023) 20040527 T-543C-000 1 Yes Yes To Be Determined Paint Throughout Building 5 1.000

544 311244 07/01/1942 2003 Lead Sampling Work Plan (USACE - DACA31-00-D-0023) 20030601 T-0544C-0 1 Yes Yes To Be Determined Paint Throughout Building 5 0.990

544 311244 07/01/1942 2003 Lead Sampling Work Plan (USACE - DACA31-00-D-0023) 20030601 T-0544C-1 1 Yes Yes To Be Determined Paint Throughout Building 5 2.400

544 311244 07/01/1942 2011 Lead Paint Sampling Report (USACE - DACA31-00-D-0023) 20040527 T-544C-000 1 Yes Yes To Be Determined Paint Throughout Building 5 0.990

544 311244 07/01/1942 2012 Lead Paint Sampling Report (USACE - DACA31-00-D-0023) 20040527 T-544C-001 1 Yes Yes To Be Determined Paint Throughout Building 5 2.400

544 311244 07/01/1942 2026 Lead Paint Sampling Report (USACE - DACA31-00-D-0023) 20040527 T-544C-004 1 Yes Yes To Be Determined Paint Throughout Building 0.005 Analyte was not detected above the reporting limit.

545 311245 07/01/1942 2003 Lead Sampling Work Plan (USACE - DACA31-00-D-0023) 20030601 T-0545C-0 1 Yes Yes To Be Determined Paint Throughout Building 5 0.330

545 311245 07/01/1942 2003 Lead Sampling Work Plan (USACE - DACA31-00-D-0023) 20030601 T-0545C-1 1 Yes Yes To Be Determined Paint Throughout Building 5 0.450

545 311245 07/01/1942 2013 Lead Paint Sampling Report (USACE - DACA31-00-D-0023) 20040527 T-545C-000 1 Yes Yes To Be Determined Paint Throughout Building 5 0.330

545 311245 07/01/1942 2014 Lead Paint Sampling Report (USACE - DACA31-00-D-0023) 20040527 T-545C-001 1 Yes Yes To Be Determined Paint Throughout Building 5 0.450

550 315043 07/01/1941 2003 Lead Sampling Work Plan (USACE - DACA31-00-D-0023) 20030601 T-0550C-0 1 Yes Yes To Be Determined Paint Throughout Building 5 0.260

550 315043 07/01/1941 2015 Lead Paint Sampling Report (USACE - DACA31-00-D-0023) 20040527 T-550C-000 1 Yes Yes To Be Determined Paint Throughout Building 5 0.260

551 315044 07/01/1941 2003 Lead Sampling Work Plan (USACE - DACA31-00-D-0023) 20030601 T-0551C-0 1 Yes Yes To Be Determined Paint Throughout Building 5 2.100

551 315044 07/01/1941 2016 Lead Paint Sampling Report (USACE - DACA31-00-D-0023) 20040527 T-551C-000 1 Yes Yes To Be Determined Paint Throughout Building 5 2.100

552 315045 07/01/1941 2003 Lead Sampling Work Plan (USACE - DACA31-00-D-0023) 20030601 T-0552C-0 1 Yes Yes To Be Determined Paint Throughout Building 5 1.500

552 315045 07/01/1941 2017 Lead Paint Sampling Report (USACE - DACA31-00-D-0023) 20040527 T-552C-000 1 Yes Yes To Be Determined Paint Throughout Building 5 1.500

553 315046 07/01/1941 2003 Lead Sampling Work Plan (USACE - DACA31-00-D-0023) 20030601 T-0553C-0 1 Yes Yes To Be Determined Paint Throughout Building 5 2.000

553 315046 07/01/1941 2018 Lead Paint Sampling Report (USACE - DACA31-00-D-0023) 20040527 T-553C-000 1 Yes Yes To Be Determined Paint Throughout Building 5 2.000

560 315050 07/01/1941 2003 Lead Sampling Work Plan (USACE - DACA31-00-D-0023) 20030601 T-0560C-0 1 Yes Yes To Be Determined Paint Throughout Building 5 2.800

560 315050 07/01/1941 2019 Lead Paint Sampling Report (USACE - DACA31-00-D-0023) 20040527 T-560C-000 1 Yes Yes To Be Determined Paint Throughout Building 5 2.800

561 315051 07/01/1941 2003 Lead Sampling Work Plan (USACE - DACA31-00-D-0023) 20030601 T-0561C-0 1 Yes Yes To Be Determined Paint Throughout Building 5 0.600

561 315051 07/01/1941 2020 Lead Paint Sampling Report (USACE - DACA31-00-D-0023) 20040527 T-561C-000 1 Yes Yes To Be Determined Paint Throughout Building 5 0.600

562 315052 07/01/1941 2003 Lead Sampling Work Plan (USACE - DACA31-00-D-0023) 20030601 T-0562C-0 1 Yes Yes To Be Determined Paint Throughout Building 5 0.450

562 315052 07/01/1941 2021 Lead Paint Sampling Report (USACE - DACA31-00-D-0023) 20040527 T-562C-000 1 Yes Yes To Be Determined Paint Throughout Building 5 0.450

571 315053 07/01/1941 2003 Lead Sampling Work Plan (USACE - DACA31-00-D-0023) 20030601 T-0571C-0 1 Yes Yes To Be Determined Paint Throughout Building 5 0.910

571 315053 07/01/1941 2022 Lead Paint Sampling Report (USACE - DACA31-00-D-0023) 20040527 T-571C-000 1 Yes Yes To Be Determined Paint Throughout Building 5 0.040

572 315054 07/01/1941 2003 Lead Sampling Work Plan (USACE - DACA31-00-D-0023) 20030601 T-0572C-0 1 Yes Yes To Be Determined Paint Throughout Building 5 0.040 Result is less than the reporting limit, but greater than or equal to the method detection limit.

572 315054 07/01/1941 2023 Lead Paint Sampling Report (USACE - DACA31-00-D-0023) 20040527 T-572C-000 1 Yes Yes To Be Determined Paint Throughout Building 5 0.910 Result is less than the reporting limit, but greater than or equal to the method detection limit.

573 315055 07/01/1941 2003 Lead Sampling Work Plan (USACE - DACA31-00-D-0023) 20030601 T-0573C-0 1 Yes Yes To Be Determined Paint Throughout Building 5 1.700

573 315055 07/01/1941 2024 Lead Paint Sampling Report (USACE - DACA31-00-D-0023) 20040527 T-573C-000 1 Yes Yes To Be Determined Paint Throughout Building 5 1.700

574 315056 07/01/1942 2003 Lead Sampling Work Plan (USACE - DACA31-00-D-0023) 20030601 T-0574C-0 1 Yes Yes To Be Determined Paint Throughout Building 5 0.029 Result is less than the reporting limit, but greater than or equal to the method detection limit.

574 315056 07/01/1942 2025 Lead Paint Sampling Report (USACE - DACA31-00-D-0023) 20040527 T-574C-000 1 Yes Yes To Be Determined Paint Throughout Building 5 0.029 Result is less than the reporting limit, but greater than or equal to the method detection limit.