Section_J_-_SAA_ECO_Inspection_Checklist_rev11JUN14.pdf

PDF 122 KB Posted

Attached to
Environmental Remediation Services at Fort Belvoir, Virginia
Solicitation number
W912DR-19-R-0015
Issued by

About this file

This document provides details regarding an upcoming environmental remediation services contract opportunity at Fort Belvoir, Virginia. The U.S. Army Corps of Engineers Baltimore District plans to issue a Request for Proposal on or around July 15, 2019 for a single award task order contract with a total value of $45 million and minimum guarantee of $15,000 to provide a full range of environmental compliance, restoration, conservation, pollution prevention, and management services at Fort Belvoir exclusively. Services will include air and water quality compliance, solid and hazardous waste management, environmental sampling and testing, remediation of contaminated soils and groundwater, construction, and operation and maintenance of remediation facilities. The contract base period is one year with four one-year options and task orders will be fixed price. The award is expected in September 2019 and offerors must register in the System for Award Management to participate.

SAA ECO Inspection Checklist

View the file

Other files

File Type Posted
B.08.03_Solicitation_Amendment_4_07NOV2019.pdf PDF
B.08.03_Solicitation_Amendment_3_06NOV2019.pdf PDF
RFI_questions_and_responses_10-31-19_.pdf PDF
Section_J_-_Calibration_Protocols.pdf PDF
Section_J_-_SAA_DPW-ENRD_Inspection_Checklist_rev7MAY14.pdf PDF
B.08.03_Solicitation_Amendment_30OCT2019.pdf PDF
Section_J_-_Datasheet_template.pdf PDF
Section_J_-_APP_N_-_CFR-2012-title49-vol2-sec172-400.pdf PDF
Section_J_-_HWMMP_Dec_2014.pdf PDF
Section_J_-_Turn-in_Form.pdf PDF
Section_J_-_Guide_for_SamplingRedacted_Redacted.pdf PDF
Section_J_-_APP_M_-_90-Day_HWAS_Management_Flowchart-rev4APR14.pdf PDF
Section_J_-_APP_I_-Permitted_Facility_Inventory.pdf PDF
Section_J_-_81599_Fort_Belvoir_-_Rivanna_Station_Minor_NSR_Permit_Redacted.pdf PDF
Section_J_-_MS4_Permit_VAR040093_29_November_2018_-_31_October_2023.pdf PDF
Section_J_-16_AUG_16_-_NSR_-_North_Area_73630_Redacted.pdf PDF
Section_J_-_Visual_Assessment_template.pdf PDF
Section_J_-_Label_Reference_Sheet.pdf PDF
Section_J_-_APP_L_-_HM_HW_Compatability_Chart.pdf PDF
Section_J_-_APP_K_-_SAA_Flowcharts.pdf PDF
Section_J_-_VA0092771_Modified_Permit_May_2017.pdf PDF
Section_J_-_REP_Analytes.pdf PDF
Section_J_-_21_MAR_03_-_Title_V_Permit_70550_Redacted.pdf PDF
Section_J_-_APP_H_-_Inspection_Forms.pdf PDF
CAA_Response_to_Comments_FTBL_SATOC_Solicitation_2019.docx DOCX document
Section_J_-_Fort_Belvoir_SPCC_Plan_Signed_and_Approved_-_updated_September_2017.pdf PDF
Section_J_-_Field_Note_Reference_Sheet.pdf PDF
Section_J_-_RCRA_Final_Permit_with_Class_1_Modification_May2019.pdf PDF
Section_J_-_17_JUN_16_-_NSR_-_Consolidated_Permit_70550_Redacted.pdf PDF
Section_J_-_APP_J_-_HW_Identification_And_Classification_Flowchart.pdf PDF
B.08.02_Solicitation_W912DR19R0015-0001_24OCT2019.pdf PDF
Price_Schedule_16OCT2019.pdf PDF
Solicitation_W912DR19R0015_09OCT2019.pdf PDF
SF_LLL.pdf PDF
Past_Performance_Questionnaire_Template.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WASTE ACCUMULATION AREA INSPECTION CHECKLIST

AUTHORIZATION ID:

INSPECTION DATE:

1. 40 CFR 262.34(c)(1)

2. 40 CFR 262.34(c)(1);

40 CFR 265.171

3. 40 CFR 262.34(c)(1);

40 CFR 265.173(a)

4. HWMMP Sect 5.5.2

5. 40 CFR 262.34(c)(1);

40 CFR 265.172

6. HWMMP Sect 5.5.1

7. HWMMP Sect 5.5.2

8. HWMMP Sect 5.5.2

9. 40 CFR

262.34(c)(1)(ii)

10.

11. 40 CFR 262.34(c)(1)

12.

a. 40 CFR 262.34(c)(2)

b. 40 CFR 273.35(c)

c. HWMMP Sect 11.3

13. HWMMP Sect 5.5.3

14. HWMMP Sect 5.7

15. HWMMP Sect 5.7

16. HWMMP Sect 5.3

17. HWMP Sect 5.9

INSPECTOR NAME:

Is waste accumulated at or near the point of generation and “under the control of the operator”?

Is container in good condition ‐ no dents, corrosion, leaks, noticeable spills, or bulging?

Is container closed except when adding or removing waste?

Are containers stored in a manner that avoids direct contact with the flooring (i.e., on a pallet)?

Is waste compatible with container that it is stored in?

Are incompatible wastes properly segregated?

COMMENTS / CORRECTIVE ACTIONS (REQUIRED FOR ITEMS

MARKED NO). Attach documentation of implementation of corrective actions (i.e., service order, work order, photos):

SAA DESCRIPTION:

LOCATION:

INSPECTOR:

Non‐Regulated Waste: date waste first added to container Are liquid wastes stored in secondary containment that is large enough to hold 110% of volume stored?

Is a compatible spill kit located ≤ 50 ft from accumulation area?

Are containers of highly flammable wastes properly grounded?

Does aisle space allow for unobstructed movement of personnel and equipment (i.e., fire protection, spill control, decon)?

Is container marked with the contents of the container?

40 CFR

262.34(c)(1)(ii) HWMMP Sect 5.5.4;

40 CFR 273.34;

Is a current authorization letter posted in the accumulation area?

Are training certificates available for all applicable personnel?

Is a current Site Specific Spill Plan posted in accumulation area?

Is the container marked with the appropriate type of waste?

Hazardous Waste / Universal Waste / Non‐Regulated Waste

Is the volume of waste present less than the authorized amount?

Is the container dated appropriately (30‐MAY‐2014 format)?

Hazardous Waste: no date unless full Universal Waste: date waste first added to container

QA/QC Verification by DPW‐ENRD

DATE: COMMENTS:

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No rev11JUN14

SAA DESCRIPTION:
LOCATION:
AUTHORIZATION ID:
INSPECTOR:
INSPECTION DATE:
COMMENTS CORRECTIVE ACTIONS REQUIRED FOR ITEMS MARKED NO Attach documentation of implementation of corrective actions ie service order work order photosYes No:
COMMENTS CORRECTIVE ACTIONS REQUIRED FOR ITEMS MARKED NO Attach documentation of implementation of corrective actions ie service order work order photosYes No_2:
COMMENTS CORRECTIVE ACTIONS REQUIRED FOR ITEMS MARKED NO Attach documentation of implementation of corrective actions ie service order work order photosYes No_3:
COMMENTS CORRECTIVE ACTIONS REQUIRED FOR ITEMS MARKED NO Attach documentation of implementation of corrective actions ie service order work order photosYes No_4:
COMMENTS CORRECTIVE ACTIONS REQUIRED FOR ITEMS MARKED NO Attach documentation of implementation of corrective actions ie service order work order photosYes No_5:
COMMENTS CORRECTIVE ACTIONS REQUIRED FOR ITEMS MARKED NO Attach documentation of implementation of corrective actions ie service order work order photosYes No_6:
COMMENTS CORRECTIVE ACTIONS REQUIRED FOR ITEMS MARKED NO Attach documentation of implementation of corrective actions ie service order work order photosYes No_7:
COMMENTS CORRECTIVE ACTIONS REQUIRED FOR ITEMS MARKED NO Attach documentation of implementation of corrective actions ie service order work order photosYes No_8:
COMMENTS CORRECTIVE ACTIONS REQUIRED FOR ITEMS MARKED NO Attach documentation of implementation of corrective actions ie service order work order photosYes No_9:
COMMENTS CORRECTIVE ACTIONS REQUIRED FOR ITEMS MARKED NO Attach documentation of implementation of corrective actions ie service order work order photosYes No_10:
COMMENTS CORRECTIVE ACTIONS REQUIRED FOR ITEMS MARKED NO Attach documentation of implementation of corrective actions ie service order work order photosYes No_11:
COMMENTS CORRECTIVE ACTIONS REQUIRED FOR ITEMS MARKED NO Attach documentation of implementation of corrective actions ie service order work order photosYes No_12:
COMMENTS CORRECTIVE ACTIONS REQUIRED FOR ITEMS MARKED NO Attach documentation of implementation of corrective actions ie service order work order photosYes No_13:
COMMENTS CORRECTIVE ACTIONS REQUIRED FOR ITEMS MARKED NO Attach documentation of implementation of corrective actions ie service order work order photosYes No_14:
COMMENTS CORRECTIVE ACTIONS REQUIRED FOR ITEMS MARKED NO Attach documentation of implementation of corrective actions ie service order work order photosYes No_15:
COMMENTS CORRECTIVE ACTIONS REQUIRED FOR ITEMS MARKED NO Attach documentation of implementation of corrective actions ie service order work order photosYes No_16:
COMMENTS CORRECTIVE ACTIONS REQUIRED FOR ITEMS MARKED NO Attach documentation of implementation of corrective actions ie service order work order photosYes No_17:

File details come from the government source that posted it. Updated .