Section_J_-_Datasheet_template.pdf

PDF 137 KB Posted

Attached to
Environmental Remediation Services at Fort Belvoir, Virginia
Solicitation number
W912DR-19-R-0015
Issued by

About this file

This document includes a federal contract opportunity notice and an environmental sampling datasheet template. The federal contract opportunity is for environmental remediation services at Fort Belvoir, Virginia, with a total estimated value of $45 million. The U.S. Army Corps of Engineers, Baltimore District, intends to issue a Request for Proposal on or around July 15, 2019 for a single-award task order contract with a minimum guarantee of $15,000. The contract will have a base year and four option years and will provide environmental compliance, restoration, conservation, pollution prevention, and management services at Fort Belvoir. Eligible vendors must be registered in the System for Award Management database. Award is expected in September 2019. The environmental sampling datasheet template provides fields to record parameters including pH, temperature, conductivity, and dissolved oxygen during stormwater sampling at industrial outfalls on Fort Belvoir.

Datasheet Template

View the file

Other files

File Type Posted
B.08.03_Solicitation_Amendment_4_07NOV2019.pdf PDF
B.08.03_Solicitation_Amendment_3_06NOV2019.pdf PDF
RFI_questions_and_responses_10-31-19_.pdf PDF
Section_J_-_Calibration_Protocols.pdf PDF
Section_J_-_SAA_DPW-ENRD_Inspection_Checklist_rev7MAY14.pdf PDF
Section_J_-_SAA_ECO_Inspection_Checklist_rev11JUN14.pdf PDF
B.08.03_Solicitation_Amendment_30OCT2019.pdf PDF
Section_J_-_APP_N_-_CFR-2012-title49-vol2-sec172-400.pdf PDF
Section_J_-_HWMMP_Dec_2014.pdf PDF
Section_J_-_Turn-in_Form.pdf PDF
Section_J_-_Guide_for_SamplingRedacted_Redacted.pdf PDF
Section_J_-_APP_M_-_90-Day_HWAS_Management_Flowchart-rev4APR14.pdf PDF
Section_J_-_APP_I_-Permitted_Facility_Inventory.pdf PDF
Section_J_-_81599_Fort_Belvoir_-_Rivanna_Station_Minor_NSR_Permit_Redacted.pdf PDF
Section_J_-_MS4_Permit_VAR040093_29_November_2018_-_31_October_2023.pdf PDF
Section_J_-16_AUG_16_-_NSR_-_North_Area_73630_Redacted.pdf PDF
Section_J_-_Visual_Assessment_template.pdf PDF
Section_J_-_Label_Reference_Sheet.pdf PDF
Section_J_-_APP_L_-_HM_HW_Compatability_Chart.pdf PDF
Section_J_-_APP_K_-_SAA_Flowcharts.pdf PDF
Section_J_-_VA0092771_Modified_Permit_May_2017.pdf PDF
Section_J_-_REP_Analytes.pdf PDF
Section_J_-_21_MAR_03_-_Title_V_Permit_70550_Redacted.pdf PDF
Section_J_-_APP_H_-_Inspection_Forms.pdf PDF
CAA_Response_to_Comments_FTBL_SATOC_Solicitation_2019.docx DOCX document
Section_J_-_Fort_Belvoir_SPCC_Plan_Signed_and_Approved_-_updated_September_2017.pdf PDF
Section_J_-_Field_Note_Reference_Sheet.pdf PDF
Section_J_-_RCRA_Final_Permit_with_Class_1_Modification_May2019.pdf PDF
Section_J_-_17_JUN_16_-_NSR_-_Consolidated_Permit_70550_Redacted.pdf PDF
Section_J_-_APP_J_-_HW_Identification_And_Classification_Flowchart.pdf PDF
B.08.02_Solicitation_W912DR19R0015-0001_24OCT2019.pdf PDF
Price_Schedule_16OCT2019.pdf PDF
Solicitation_W912DR19R0015_09OCT2019.pdf PDF
SF_LLL.pdf PDF
Past_Performance_Questionnaire_Template.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Fort Belvoir Industrial Stormwater Sampling Datasheet

Outfall: Samplers:

Date: Outfall Arrival Time:

Sample Time:

Field-measured water quality parameters:

pH Temp

°C ɥS/cm ɥmhos/cm

(1 ÷ ɥS/cm)

Temp

°C mg/L

N/A N/A N/A N/A

If collecting dissolved metals, were they filtered? Yes No

Do the bottles you filled match the COC? Yes No

Semi Circle inches width of H2O: Replicate 1 sec Replicate 3 sec

Replicate 2 sec Average sec

Triangle inches width of H2O: 1. Divide volume/avg time:

depth of H2O: 2. Multiply by 0.0864 to get: 0 MGD

Semi Ellipse: inches width of H2O:

depth of H2O: Length: feet

Replicate 1 sec Replicate 3 sec

Trapezoid: inches Replicate 2 sec Average sec top width H2O: Divide length by avg. time to get flow: ft/s bottom width: Compute Flow:

depth of H2O: 1. Find Area in in using info to the left in

2. Divide by 144 to convert to ft ft

Rectangle: inches 3. Multiple by Flow, computed above. ft /s depth of H2O: 4. Multiply by 7.48 to get:

width of H2O: 5. Multiply by 0.0864 MGD concrete asphault grass mud/silt riprap true stream vegetation loose sand

Rain Start Time:

Describe storm pattern (light to heavy, etc.):

pH Probe

All REPs

Specific Conductivity Probe

ONLY REPs 002, 008, 009, 015, 032

Dissolved Oxygen Probe

ONLY REP 002

Time how long to fill the container.

Temp

°C

N/A N/A

Notes:

Estimating Flow: You will complete either the Bucket Method or the Cross Section Method Section of this form.

Timing measurements should be taken three times each!

Cross-Section Timing Bucket Fill

Circle the shape that best describes the channel where you measured flow and measure the water dimensions only.

Give volume/description of the container you filled:

Circle channel material(s): earthen other:

gravel/erodedbramble

Area=π*1/2width /2

Compute Flow:

gallons/sec

Area=1/2width*depth

Cross-Section Timing, continued

Time how long for a ball to move a length of channel.

Area=π*1/2width*depth

Area= 1/2(t. width+b. width)*depth gallons/sec

Area= width*depth

File details come from the government source that posted it. Updated .