Section_J_-_REP_Analytes.pdf

PDF 28 KB Posted

Attached to
Environmental Remediation Services at Fort Belvoir, Virginia
Solicitation number
W912DR-19-R-0015
Issued by

About this file

This document outlines environmental remediation and compliance services required under a forthcoming solicitation from the U.S. Army Corps of Engineers Baltimore District. The solicitation will seek proposals for a Single Award Task Order Contract with a total value of $45 million and minimum guarantee of $15,000 to provide a range of environmental services at Fort Belvoir, Virginia. Services will include environmental compliance, restoration, conservation, pollution prevention, and management activities such as air and water quality monitoring, hazardous and solid waste handling, wetlands permitting, cultural and natural resource surveys, and pollution prevention programs. The contract period of performance will include a one-year base period and four one-year options. Proposals are due in September 2019, and award is expected by that date. The solicitation will be set aside for small businesses with fewer than 500 employees.

REP Analytes

View the file

Other files

File Type Posted
B.08.03_Solicitation_Amendment_4_07NOV2019.pdf PDF
B.08.03_Solicitation_Amendment_3_06NOV2019.pdf PDF
RFI_questions_and_responses_10-31-19_.pdf PDF
Section_J_-_Calibration_Protocols.pdf PDF
Section_J_-_SAA_DPW-ENRD_Inspection_Checklist_rev7MAY14.pdf PDF
Section_J_-_SAA_ECO_Inspection_Checklist_rev11JUN14.pdf PDF
B.08.03_Solicitation_Amendment_30OCT2019.pdf PDF
Section_J_-_Datasheet_template.pdf PDF
Section_J_-_APP_N_-_CFR-2012-title49-vol2-sec172-400.pdf PDF
Section_J_-_HWMMP_Dec_2014.pdf PDF
Section_J_-_Turn-in_Form.pdf PDF
Section_J_-_Guide_for_SamplingRedacted_Redacted.pdf PDF
Section_J_-_APP_M_-_90-Day_HWAS_Management_Flowchart-rev4APR14.pdf PDF
Section_J_-_APP_I_-Permitted_Facility_Inventory.pdf PDF
Section_J_-_81599_Fort_Belvoir_-_Rivanna_Station_Minor_NSR_Permit_Redacted.pdf PDF
Section_J_-_MS4_Permit_VAR040093_29_November_2018_-_31_October_2023.pdf PDF
Section_J_-16_AUG_16_-_NSR_-_North_Area_73630_Redacted.pdf PDF
Section_J_-_Visual_Assessment_template.pdf PDF
Section_J_-_Label_Reference_Sheet.pdf PDF
Section_J_-_APP_L_-_HM_HW_Compatability_Chart.pdf PDF
Section_J_-_APP_K_-_SAA_Flowcharts.pdf PDF
Section_J_-_VA0092771_Modified_Permit_May_2017.pdf PDF
Section_J_-_21_MAR_03_-_Title_V_Permit_70550_Redacted.pdf PDF
Section_J_-_APP_H_-_Inspection_Forms.pdf PDF
CAA_Response_to_Comments_FTBL_SATOC_Solicitation_2019.docx DOCX document
Section_J_-_Fort_Belvoir_SPCC_Plan_Signed_and_Approved_-_updated_September_2017.pdf PDF
Section_J_-_Field_Note_Reference_Sheet.pdf PDF
Section_J_-_RCRA_Final_Permit_with_Class_1_Modification_May2019.pdf PDF
Section_J_-_17_JUN_16_-_NSR_-_Consolidated_Permit_70550_Redacted.pdf PDF
Section_J_-_APP_J_-_HW_Identification_And_Classification_Flowchart.pdf PDF
B.08.02_Solicitation_W912DR19R0015-0001_24OCT2019.pdf PDF
Price_Schedule_16OCT2019.pdf PDF
Solicitation_W912DR19R0015_09OCT2019.pdf PDF
SF_LLL.pdf PDF
Past_Performance_Questionnaire_Template.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Constituent/Analyte to be sampled: 001 002 003 004 005 006 007 008 009 010 011 012 013 014 015 016 017 019 020 021 022 023 024 025 026 027 028 029 030 031 032 033 SW 01 SW 03

Warren

Road 01

Warren

Road 02

Flow (MGD) X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X pH X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Total Residual Chlorine (TRC)

Chloride X X X X

Total Petroleum Hydrocarbons (TPH) X X X X X X X X X X X X X X

Ammonia (as N) X

Total Organic Carbon (TOC) X X X X X

Total Disolved Solids (TDS) X X X X

Specific Conductance X X X X X

Arsenic, Total Recoverable X X X X X

Total Suspended Solids (TSS) X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Total Nitrogen X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Total Kjeldahl Nitrogen (TKN) X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Nitrate + Nitrite (NO2 + NO3) X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Total Phosphorous X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Aluminum, Total Recoverable X

Cadmium, Total Recoverable X X X X X

Cadmium, Dissolved X

Chromium Dissolved X X X X X X X X X X

Copper Dissolved X X X X X X X X X X X X X

Copper Total Recoverable X X X

Iron, Total Recoverable X

Mercury, Total Recoverable X X X X X

Mercury, Dissolved X X X

Selenium, Total Recoverable X X X X X

Lead, Dissolved X X X X X X X X X

Lead, Total Recoverable X X X X X

Magnesium, Total Recoverable X X X X X

Nickel, Dissolved X X X X X X X X X X

Silver, Dissolved X

Silver, Total Recoverable X X X X X

Zinc, Total Recoverable X X X

Cyanide, Total X X X X X

Biochemical Oxygen Deman BOD5 X

Chemical Oxygen Demand (COD) X

Oil and Grease X X

Propylene Glycol X

Dissolved Oxygen (D.O.) X

Hardness, Total (as CaCO3) X X X X X X X X X X X X X X X X X

Annual PCBs X X

PCBs - April - September X X

PCBs - October - March X X X X X X X X X X X X X X X X X X X

Q1/Q4 Sampling requirement

Q2/Q3 Sampling requirement

Outfall #

Sampling for each outfall must be completed once every six months.

File details come from the government source that posted it. Updated .