AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
See Continuation Page.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9128A18B0002
X 9B. DATED (SEE ITEM 11)
01-Feb-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
Am-0010
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
20-Jul-2018
CODE
CECT - CONTRACTING DIVISION
USACE, HONOLULU DISTRICT
BLDG 252 (CECT-POH)
FT. SHAFTER HI 96858-5440
W9128A 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9128A18B0002 Am-0010
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
1. CHANGES TO SPECIFICATIONS. Attached hereto are revised pages/paragraphs to the specifications. The revision mark “(Am-0010)” is shown on each revised page.
a. REVISED SECTIONS. The following are revised pages/paragraphs to the solicitation. Changes are marked in
“*” asterisks or indicated in bold.
Standard Form 1442 – Page 1 Section 00 21 13 – Page 1, 4, 5, 6 Section 01 90 00 – Page 1 and Paragraph 1.15.1 Section 02 41 00 – Paragraphs 1.2.1, 3.2.1 Section 02 61 13 – Paragraph 3.9 Section 03 30 00.00 10 – Paragraph 2.3.2 Section 08 34 02 – Paragraph 1.4 Section 09 90 00 – Paragraph 3.12.2 Section 32 31 13.53 – Paragraphs 1.1, 1.2, 2.1.1, 2.2.1, 2.2.2, 2.3 Section 33 40 00 – Paragraphs 1.1, 2.3.1
b. DELETED SECTIONS. The following sections are deleted in its entirety.
Section 00 10 00 Section 00 72 00, Attachment A Section 01 50 00 Section 01 90 00 Section 31 31 16.19 Section 31 63 33
c. NEW SECTIONS. The following are new pages to the solicitation.
Section 00 10 00 Section 00 72 00, Attachment A Section 01 50 00 Section 01 90 00 Section 31 31 16.19 Section 31 63 33
d. NEW PAGES. The following are new pages to the solicitation.
Section 00 60 00, Appendix A – Requests for Information (#148 through 231)
2. CHANGES TO DRAWINGS.
a. REVISED DRAWINGS. The following revised drawings replace like-numbered drawings and are issued herewith.
Sheet ID Sheet Number Mark Revision Date G-001 1 of 410 4 7/5/18
GI001
GI002
GI002a
3a of 410
7/5/18 7/5/18 7/5/18
CD104a
CD203
CD205
CD208
CD209
C104
19a of 410
7/5/18 7/5/18 7/5/18 7/5/18 7/5/18
C106 C109 C110 C111a C155 C164 C165 C207
43a of 410 65a of 410 70a of 410
7/5/18 7/5/18 7/5/18 7/5/18 7/5/18 7/5/18 7/5/18 7/5/18
S131 S503 S553
137a of 410
7/5/18 7/5/18 7/5/18
A-100 A-101 A-102a A-102b A-110 A-122 A-131 A-142 A-226 A-227 A-230 A-231 A-310 A-430 A-431 A-506 A-521 A-532 A-540 A-541 A-600 A-601 A-602 A-603 A-801 A-807
145a of 410 145b of 410
7/5/18 7/5/18 7/5/18 7/5/18 7/5/18 7/5/18 7/5/18 7/5/18 7/5/18 7/5/18 7/5/18 7/5/18 7/5/18 7/5/18 7/5/18 7/5/18 7/5/18 7/5/18 7/5/18 7/5/18 7/5/18 7/5/18 7/5/18 7/5/18 7/5/18 7/5/18
P-123 P-125 P-902
7/5/18 7/5/18 7/5/18
ES101
ES102
7/5/18 7/5/18
ES103
ES104
ES112
ES113
ES114
ES116
ES118
ES503
ES601
ES602
ES603
EL110
EL601
317a of 410 317c of 410 325a of 410 325b of 410
7/5/18 7/5/18 7/5/18 7/5/18 7/5/18 7/5/18 7/5/18 7/5/18 7/5/18 7/5/18 7/5/18
EP129
EP132
EP133
EP134
EP505
EP509
EP601
EP702
EP703
7/5/18 7/5/18 7/5/18 7/5/18 7/5/18 7/5/18 7/5/18 7/5/18 7/5/18
TS104
TS105
TS112
TS113
TS401
TS402
TS403
TS501
T-120 T-130 T-505 T-601
TY102
TY120
TY130
TY503
TY601
TY602
TY702
408g of 410 408i of 410 408j of 410 408p of 410 408r of 410 408s of 410 480u of 410
7/5/18 7/5/18 7/5/18 7/5/18 7/5/18 7/5/18 7/5/18 7/5/18 7/5/18 7/5/18 7/5/18 7/5/18 7/5/18 7/5/18 7/5/18 7/5/18 7/5/18
b. NEW DRAWINGS. The following new drawings are issued herewith.
Sheet ID Sheet Number Title
A-804a 217a of 410 ECP – AIR BARRIER PLAN & SECTION
3. The bid opening date and time is EXTENDED (see SF1442, Page 1, Block 13A).
FY16 MCAF KNMD043004, F-22 Fighter Alert Facility, Joint Base Pearl Harbor-Hickam (JBPHH), Oahu, Hawaii
X
COLIN K WAKI 808-835-4393
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
01-Feb-2018
(RFP)
(IFB)
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance within _______7 calendar days and complete it within ________721 calendar days after receiving award, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________52.211-10
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________1 copies to perform the work required are due at the place specified in Item 8 by ___________ local time ______________ 9 Aug 2018 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______ 180 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
CECT - CONTRACTING DIVISION
USACE, HONOLULU DISTRICT
BLDG 252 (CECT-POH)
FT. SHAFTER HI 96858-5440
W9128A
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
02:00 PM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX: TEL: TEL: FAX:
W9128A18B0002 90
(Am-0010)
W9128A-18-B-0002
Section 00 10 00 – Page 1
SECTION 00 10 00
BID SCHEDULE
FY16 MCAF KNMD043004, F-22 Fighter Alert Facility, Joint Base Pearl Harbor-Hickam (JBPHH), Oahu, Hawaii
CLIN DESCRIPTION QUANTITY UNIT AMOUNT
BASE SCHEDULE
0001 F-22 Fighter Alert Facility 1 JOB $_____________
OPTIONS
0002 OPTION 1: Install Hangar Doors and Fire 1 JOB $_____________ Protection Systems
0003 OPTION 2: Install Windows, Frames 1 JOB $_____________ and Fixtures
0004 OPTION 3: Electronic Security System (ESS) 1 JOB $_____________
0005 OPTION 4: Alert Facility Generator 1 JOB $_____________
0006 OPTION 5: Parking Lot 1 JOB $_____________
0007 OPTION 6: Sentry Aloha Open Storage 1 JOB $_____________
0008 OPTION 7: Telecom from New Alert Facility 1 JOB $_____________ to the Existing HH174E Connection Point
0009 OPTION 8: Telecom from Existing HH174E 1 JOB $_____________ to Building 4069
TOTAL PRICE FOR BASE SCHEDULE AND ALL OPTIONS $_____________
THE FOLLOWING WILL BE COMPLETED BY THE CONTRACTING OFFICER UPON
CONTRACT AWARD:
TOTAL AWARD AMOUNT (BASE SCHEDULE PLUS OPTION(S) _________) $ _____________
Section 00 10 00 – Page 2
BIDDER ELECTS TO WAIVE THE PRICE EVALUATION PREFERENCE FOR HUBZone
SMALL BUSINESS CONCERNS: ( ) NO ( ) YES
______ Bid DOES include Facilities Capital Cost of Money
______ Bid DOES NOT include Facilities Capital Cost of Money
NOTES TO BID SCHEDULE:
1. This procurement is UNRESTRICTED.
2. Bidders must bid on each CLIN item and the TOTAL PRICE. Failure to provide a price on each item in the Bid Schedule may cause the bid to be rejected as non-responsive.
3. Except when it is determined in accordance with FAR 17.206(b) not to be in the Government’s best interests, the Government will evaluate the total price for the Base Schedule together with any option(s) exercised at the time of award, in accordance with FAR clause 52.217-4 [“Evaluation of Options Exercised at Time of Contract Award”]
The Government's priorities in the awarding of options (in descending order) are as follows:
CLIN 0005 – OPTION 4: Alert Facility Generator CLIN 0006 – OPTION 5: Parking Lot CLIN 0007 – OPTION 6: Sentry Aloha Open Storage CLIN 0008 – OPTION 7: Telecom from New Alert Facility to the Existing HH174E
Connection Point CLIN 0009 – OPTION 8: Telecom from Existing HH174E to Building 4069 CLIN 0002 – OPTION 1: Install Hangar Doors and Fire Protection Systems CLIN 0003 – OPTION 2: Install Windows, Frames and Fixtures CLIN 0004 – OPTION 3: Electronic Security System (ESS)
The basis for award will be the Government’s determination of the responsive and responsible bidder with the “lowest price” (as defined hereafter) based on funds available at the time of award. The “lowest price” for purposes of making award will be the lowest total of the Base Schedule plus the most options that can be exercised within available funds at the time of award in accordance with the option priorities as listed above. The Government does not intend to skip any options in the above priority list in making an award: i.e., no other options will be exercised before Option 4; and Option 4 will not be exercised unless there are available funds at the time of award to cover both the Base Schedule and Option 4; Option 5 will not be awarded and exercised unless there are available funds to cover the Base Schedule, Option 4 and Option 5; and so on.
Section 00 10 00 – Page 3
An example of an award calculation follows:
Assume (hypothetically) available funds at time of award = $120,000
Bidder A Bidder B Bidder C Base Schedule $100,000 $90,000 $95,000
Option 4 10,000 25,000 30,000 Option 5 8,000 5,000 5,000 Option 6 3,000 2,000 2,000 Option 7 10,000 5,000 7,000
TOTAL $131,000 $127,000 $139,000
Bidder A: Base + Option 4 + Option 5 = $118,000.
Bidder B: Base + Option 4 + Option 5 = $120,000.
Bidder C: Base = $95,000.
Contract would be awarded to Bidder A, because its total price for Base Schedule and exercisable options within $120,000 available funds is lower than Bidder B’s total price for Base Schedule and the same options. Neither Bidder A’s nor B’s bids allow exercise of Option 6, because adding that next option causes both their totals to exceed $120,000 available funds. Both Bidder A’s and B’s bids beat Bidder C’s bid, which does not result in any options being exercisable.
4. By submission of a price under OPTIONS, the Bidder agrees that the Government may exercise the OPTION(S) at the time of award, or at any time within 180 calendar days following the date of the award of the basic contract.
5. See Section 00 21 13, FAR 52.204-7 System for Award Management (Oct 2016), regarding registration in the SAM database. Failure to register in the SAM database will make the apparent low Bidder ineligible for award. Bidders must have and/or maintain an active registration with the System for Award Management (SAM) website. To register in SAM, go to http://www.sam.gov.
6. The Government reserves the right to exercise within the option exercise period any remaining options not exercised at time of award in any priority order, if the Government obtains additional funding after award.
7. Small Business Subcontracting Plan (applies if the Bidder is other than a small business concern):
In accordance with Section 00 72 00, FAR Clause 52.219-9, Small Business Subcontracting Plan, the apparent low bidder shall submit the Small Business Subcontracting Plan NO LATER THAN seven (7) working days after the bid opening date.
The apparent low Bidder may fax the plan to (808) 835-4395 or (808) 835-4396. Failure to submit the Small Business Subcontracting Plan in a timely manner may cause the apparent low Bidder to be considered non-responsive.
The following are the subcontract goals:
1) 23% of subcontract amount with small businesses
2) 11.5% of subcontract amount with small disadvantaged businesses
3) 5% of subcontracted amount with women-owned small businesses
Section 00 10 00 – Page 4
4) 3% of subcontracted amount with HUBZone small businesses
5) 2% of subcontracted amount with veteran-owned small businesses
6) 1.5% of subcontracted amount with service disabled veteran-owned small businesses
A sample Small Business Subcontracting Plan has been included as an attachment to Section 00 21 13.
8. Each Bidder must submit the following documents. Failure to submit all required documents may result in the apparent low Bidder being ineligible for award.
a. SF 1442 (pages 1 and 2) including acknowledging all amendments.
b. Bid Schedule
c. Bid Guarantee (See SF 1442, Block 13B and Clause No. 52.228-1, Bid Guarantee, in
Section 00 72 00)
d. Section 00 45 00, Representations and Certifications
e. Section 00 45 00 - Representations & Certifications, Appendix A - SF LLL, Disclosure of
Lobbying Activities
9. All Bidders shall provide one (1) copy of the entire bid on a CD within seven (7) calendar days after the date of bid opening.
10. The micropile quantities and the 40 foot length are identified in Drawing S503. If the actual required quantities and lengths, as finally approved by the Contracting Officer or authorized representative, are materially different from what was identified in Drawing S503, the Government will negotiate an equitable adjustment (increase or decrease to the contract price).
Unanticipated conditions encountered during construction may necessitate quantities of work that vary from that shown on the drawings. To minimize delays associated with encountering unanticipated conditions during construction, provide a unit price for each of the following items. If unanticipated conditions are encountered during construction, promptly notify the Contracting Officer that such a condition has been encountered, describe the condition encountered, and provide a listing of which of the following items may be necessary. Upon notification, the Contracting Officer will promptly investigate the matter, and if necessary, may issue a Change Order directing the Contractor to proceed with any or all of the required items. Bidders are advised the following unit prices will not be part of the contract, but are a starting point for initiating the change order process.
DESCRIPTION UNIT UNIT PRICE
1) Micropiles – Additional Length LF $___________
2) Micropiles – Omitted Length LF $___________
11. The magnitude of the construction project is between $25,000,000 and $50,000,000.
Section 00 10 00 – Page 5
12. Requests for Information (RFIs) must be submitted no later than July 25, 2018, 2:00 PM Hawaii Standard Time. The Government Points of Contact for RFIs are as follows:
Mr. Colin Waki Telephone Number: (808) 835-4393 E-mail Address: colin.k.waki@usace.army.mil
Mr. Kent A. Tamai Telephone Number: (808) 835-4377 E-mail Address: kent.a.tamai@usace.army.mil
13. SITE VISIT INFORMATION: Cameras, including cell phones, will not be allowed during the site visit.
14. Pending Issues: NONE
Section 00 10 00 – Page 6
PAYMENT(S)
Compensation for all work to be performed under this task order will be made under the payment item(s) listed herein. The principal features of the work to be included under the payment item(s) are noted. Work required by drawings and scope of work and not particularly mentioned shall be included in and be paid for under the task order price for the item to which the work pertains. Price(s) and payment(s) for the item(s) shall cover all work, complete and finished in accordance with drawings, scope of work and shall be full compensation for all work in connection therewith, including quality control and cost of performance-and payment-bond premiums in the CONTRACT CLAUSES. Price(s) and payment(s) shall constitute full and final compensation for furnishing all materials, equipment, management, supervision labor, transportation, fuel, power, water, lodging and all incidental items necessary to complete the work, except as otherwise specified to be furnished by the Government. For the purpose of CONTRACT CLAUSE entitled “PROMPT PAYMENT FOR CONSTRUCTON CONTRACTS”, the term “designated billing office” and “designated payment office” are as follows:
a. Billing Office
U.S. Army Corps of Engineers, Honolulu District Fort Shafter Resident Office, Bldg 230 Fort Shafter, HI 96858-5440
b. Payment Office
USACE Finance Center Attn: CEFC-FP 5722 Integrity Drive Millington, TN 38054-5005
Item numbers mentioned herein after correspond to the item numbers in the BID SCHEDULE.
CLIN 0001 – F-22 Fighter Alert Facility
CLIN 0001 will be paid for at the contract price, complete in place and ready for use including the construction of new crew quarters, alert shelter, entry control point, and sentry aloha buildings, airfield pavement and striping, taxiway, taxiway and security lighting, security fence, car and pedestrian gates, hush house concrete foundation, building demolition and disposal, site work and utilities, secured and unsecured data and voice communications systems, traffic control, site security, phasing, final connections, debris removal and disposal, ground clearing, removal and disposal of asbestos, lead base paint, and mercury suspected items at approved land fill sites, testing, cleanup, and all incidental items necessary to complete the work.
CLIN 0002 – OPTION 1: Install Hangar Doors and Fire Protection Systems
CLIN 0002 will be paid for at the contract price, complete in place and ready for use including the construction of new vertical lift fabric doors at the Alert shelter, high expansion foam fire suppression system, pump room, foam room, 4 exit man doors, 3 coat fuel resistive resinous flooring, roof and wall insulation, demolition and disposal, site work and utilities, debris removal and disposal, ground clearing, testing, cleanup, and all incidental items necessary to
Section 00 10 00 – Page 7 complete the work. Crew Quarter construction will consist of a new pump room and installation of pump, piping, controls and connections to the Alert Shelter fire suppression system, demolition and disposal, site work and utilities, debris removal and disposal, ground clearing, testing, cleanup, and all incidental items necessary to complete the work.
CLIN 0003 – OPTION 2: Install Windows, Frames and Fixtures
CLIN 0003 will be paid for at the contract price, complete in place and ready for use including the construction of new high pressure rated windows and frames on the south side of the building of the crew quarters, demolition and disposal, site work and utilities, debris removal and disposal, cleanup, and all incidental items necessary to complete the work.
CLIN 0004 – OPTION 3: Electronic Security System (ESS)
CLIN 0004 will be paid for at the contract price, complete in place and ready for use including but not limited to: submittals for review and approval, purchasing and installing the electronic security system as identified in Section 28 10 05, subparagraph 2.1, System Description, the related ESS acceptance testing as identified in Section 28 08 10, Electronic Security System Acceptance Testing, disposal, clean up, and all incidental items necessary to make the security system operable and functional for the intended purposes and existing installation security system.
CLIN 0005 – OPTION 4: ALERT FACILITY GENERATOR
CLIN 0005 will be paid for at the contract price, complete in place and ready for use including but not limited to the construction of new 600 kW generator with fuel tank, remote fill station, fuel piping, valves, power and conduit from generator to remote fuel station, disposal, and all incidental items necessary to complete the work.
CLIN 0006 – OPTION 5: PARKING LOT
CLIN 0006 will be paid for at the contract price, complete in place and ready for use including but not limited to: utilities, partial demolition, resurfacing and reconstruction of parking lot, drive aisle connection to existing parking lot, and signing and striping.
CLIN 0007 – OPTION 6: SENTRY ALOHA OPEN STORAGE
CLIN 0007 will be paid for at the contract price, complete in place and ready for use including but not limited to: chain link fencing and gate (swing and sliding), coordination with user for final layout with existing fabric structure to remain.
CLIN 0008 – OPTION 7: TELECOM FROM NEW ALERT FACILITY TO THE EXISTING
HH174E CONNECTION POINT
CLIN 0008 will be paid for at the contract price, complete in place and ready for use including but not limited to: the construction of new underground telecom ductline, manholes, and handholes from existing HH174E to Crew Quarters. Work also includes providing new 24 str SM fiber optic cable and 50 pair copper cable from Crew Quarters to Building 4069 via new manholes/handholes and via existing HH174E and existing interconnected handholes/manholes to Building 4069. Work also includes reinforcement of concrete encased ductline at taxiway and apron areas and horizontal directional drilling at water crossings
Section 00 10 00 – Page 8 where indicated in the contract drawings. Work also includes all labor, equipment, and materials to construct new ductline to minimize disruptions to airfield operations in accordance with HAFB requirements.
CLIN 0009 – OPTION 8: TELECOM FROM EXISTING HH174E TO BLDG 4069
CLIN 0009 will be paid for at the contract price, complete in place and ready for use including but not limited to: the construction of new underground telecom ductline, manholes and handholes from existing HH174E to existing Building 4069. Work also includes providing new 24 str SM fiber optic cable and 50 pair copper cable from Crew Quarters to Building 4069 via new manholes/handholes to Building 4069. Work also includes reinforcement of concrete encased ductline at taxiway and apron areas and horizontal directional drilling at water crossings where indicated in the contract drawings. Work also includes all labor, equipment, and materials to construct new ductline to minimize disruptions to airfield operations in accordance with HAFB requirements.
Section 00 21 13 – Page 1
Section 00 21 13 - Instructions to Bidders
CLAUSES INCORPORATED BY REFERENCE
52.204-7 Alt I System for Award Management-- Alternate I JUL 2013 52.214-3 Amendments To Invitations For Bids DEC 2016 52.214-4 False Statements In Bids APR 1984 52.214-5 Submission Of Bids DEC 2016 52.214-6 Explanation To Prospective Bidders APR 1984 52.214-7 Late Submissions, Modifications, and Withdrawals of Bids NOV 1999 52.214-18 Preparation of Bids-Construction APR 1984 52.214-19 Contract Award-Sealed Bidding-Construction AUG 1996 52.214-27 Price Reduction for Defective Certified Cost or Pricing Data - Modifications - Sealed
Bidding
AUG 2011
52.214-28 Subcontracting Certified Cost Or Pricing Data--Modifications--Sealed Bidding OCT 2010 52.215-16 Facilities Capital Cost of Money JUN 2003 52.217-4 Evaluation Of Options Exercised At Time Of Contract Award JUN 1988 52.223-1 Biobased Product Certification MAY 2012 52.232-13 Notice Of Progress Payments APR 1984
CLAUSES INCORPORATED BY FULL TEXT
52.211-14 NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, AND ENERGY PROGRAM USE (APR 2008)
Any contract awarded as a result of this solicitation will be DX rated order; X DO rated order certified for national defense, emergency preparedness, and energy program use under the Defense Priorities and Allocations System (DPAS) (15 CFR 700), and the Contractor will be required to follow all of the requirements of this regulation. [Contracting Officer check appropriate box.]
(End of provision)
52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a Firm-Fixed-Price contract resulting from this solicitation.
(End of provision)
52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS--SECONDARY SITE OF THE WORK (MAY
2014)
(a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements,of this solicitation.
(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.
(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.
(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.
Section 00 21 13 – Page 4
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.
(End of provision)
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) An organized site visit has been scheduled for--
March 30, 2018, 1300 to 1700 Hours, Hawaii Standard Time. Please see Am-0002, Standard Form 30 for information on base access and flight line clearance requirements.
(c) Participants will meet at--
Building 3392, 335 Gardner Avenue, Joint Base Pearl Harbor Hickam, Oahu, Hawaii
(End of provision)
52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
http://farsite.hill.af.mil/
(End of provision)
252.203-7005 REPRESENTATION RELATING TO COMPENSATION OF FORMER DOD OFFICIALS (NOV 2011)
(a) Definition. Covered DoD official is defined in the clause at 252.203-7000, Requirements Relating to Compensation of Former DoD Officials.
(b) By submission of this offer, the offeror represents, to the best of its knowledge and belief, that all covered DoD officials employed by or otherwise receiving compensation from the offeror, and who are expected to undertake activities on behalf of the offeror for any resulting contract, are presently in compliance with all post-employment restrictions covered by 18 U.S.C. 207, 41 U.S.C. 2101-2107, and 5 CFR parts 2637 and 2641, including Federal Acquisition Regulation 3.104-2.
(End of provision)
252.204-7004 ALTERNATE A, SYSTEM FOR AWARD MANAGEMENT (FEB 2014)
(a) Definitions. As used in this provision—
Section 00 21 13 – Page 5
“System for Award Management (SAM) database” means the primary Government repository for contractor information required for the conduct of business with the Government.
“Commercial and Government Entity (CAGE) code” means—
(1) A code assigned by the Defense Logistics Information Service (DLIS) to identify a commercial or Government entity; or
(2) A code assigned by a member of the North Atlantic Treaty Organization that DLIS records and maintains in the CAGE master file. This type of code is known as an “NCAGE code.”
“Data Universal Numbering System (DUNS) number” means the 9-digit number assigned by Dun and Bradstreet, Inc. (D&B) to identify unique business entities.
“Data Universal Numbering System +4 (DUNS+4) number” means the DUNS number assigned by D&B plus a 4-character suffix that may be assigned by a business concern. (D&B has no affiliation with this 4-character suffix.) This 4-character suffix may be assigned at the discretion of the business concern to establish additional SAM records for identifying alternative Electronic Funds Transfer (EFT) accounts (see FAR 32.11) for the same parent concern.
“Registered in the System for Award Management (SAM) database” means that—
(1) The contractor has entered all mandatory information, including the DUNS number or the DUNS+4 number, and Contractor and Government Entity (CAGE) code into the SAM database; and
(2) The contractor has completed the Core Data, Assertions, Representations and Certifications, and Points of Contact sections of the registration in the SAM database;
(3) The Government has validated all mandatory data fields, to include validation of the Taxpayer Identification Number (TIN) with the Internal Revenue Service (IRS). The Contractor will be required to provide consent for TIN validation to the Government as part of the SAM registration process; and
(4) The Government has marked the record “Active.”
(b) (1) By submission of an offer, the offeror acknowledges the requirement that a prospective awardee shall be registered in the SAM database prior to award, during performance, and through final payment of any contract, basic agreement, basic ordering agreement, or blanket purchasing agreement resulting from this solicitation.
(2) The offeror shall enter, in the block with its name and address on the cover page of its offer, the annotation “DUNS” or “DUNS+4” followed by the DUNS or DUNS+4 number that identifies the offeror’s name and address exactly as stated in the offer. The DUNS number will be used by the Contracting Officer to verify that the offeror is registered in the SAM database.
(c) If the offeror does not have a DUNS number, it should contact Dun and Bradstreet directly to obtain one.
(1) An offeror may obtain a DUNS number—
(i) Via the internet at http://fedgov.dnb.com/webform or if the offeror does not have internet access, it may call Dun and Bradstreet at 1-866-705-5711 if located within the United States; or
(ii) If located outside the United States, by contacting the local Dun and Bradstreet office. The offeror should indicate that it is an offeror for a U.S. Government contract when contacting the local Dun and Bradstreet office.
Section 00 21 13 – Page 6
(2) The offeror should be prepared to provide the following information:
(i) Company legal business name.
(ii) Tradestyle, doing business, or other name by which your entity is commonly recognized.
(iii) Company physical street address, city, state and Zip Code.
(iv) Company mailing address, city, state and Zip Code (if separate from physical).
(v) Company telephone number.
(vi) Date the company was started.
(vii) Number of employees at your location.
(viii) Chief executive officer/key manager.
(ix) Line of business (industry).
(x) Company Headquarters name and address (reporting relationship within your entity).
(d) If the Offeror does not become registered in the SAM database in the time prescribed by the Contracting Officer, the Contracting Officer will proceed to award to the next otherwise successful registered Offeror.
(e) Processing time, which normally takes 48 hours, should be taken into consideration when registering. Offerors who are not registered should consider applying for registration immediately upon receipt of this solicitation.
(f) Offerors may obtain information on registration at https://www.acquisition.gov.
(End of Provision)
252.204-7008 COMPLIANCE WITH SAFEGUARDING COVERED DEFENSE INFORMATION CONTROLS
(OCT 2016)
(a) Definitions. As used in this provision--
Controlled technical information, covered contractor information system, covered defense information, cyber incident, information system, and technical information are defined in clause 252.204-7012, Safeguarding Covered Defense Information and Cyber Incident Reporting.
(b) The security requirements required by contract clause 252.204-7012 shall be implemented for all covered defense information on all covered contractor information systems that support the performance of this contract.
(c) For covered contractor information systems that are not part of an information technology service or system operated on behalf of the Government (see 252.204-7012(b)(2))--
(1) By submission of this offer, the Offeror represents that it will implement the security requirements specified by National Institute of Standards and Technology (NIST) Special Publication (SP) 800-171, ``Protecting Controlled Unclassified Information in Nonfederal Information Systems and Organizations'' (see http://dx.doi.org/10.6028/NIST.SP.800-171) that are in effect at the time the solicitation is issued or as authorized by the contracting officer not later than December 31, 2017.
FY16 MCAF RNMD043004, F‐22 Fighter Alert Facility Joint Base Pearl Harbor Hickam (JBPHH), Oahu, Hawaii
RFI # References Question Government Response 148 Section 31.63.33.3.5.2 Specification section 31.63.33.3.5.2 has the allowable micropile capacity listed as 10 kips and verification tested to 2 times that design load for a total of 20 kips. Drawing sheet S503 note 7 states the verification test is supposed to go to 160 kips. This difference in loads is also evident in the proof testing. What is the design load for the micropiles and what is the maximum test loads that the contractor is expected to test the micropiles to?
Please see revised Section 31 63 33, Paragraphs 3.5.2 and 3.5.3, per Am-0010.
149 What corrosion protection (at all) is required for the micropiles?
Please see revised Section 31 63 33, paragraph 3.3.3, per Am- 0010.
150 Sheet S531 On details C1 & C2, there is a note pointing to the concrete pedestal “See Arch Drwgs” for the height. I can’t find anything calling this out on the architectural drawings. Also, what is the size of the pedestal?
Please see revised Drawing S-531, per Am-0007.
151 13 34 19 Metal Building System
Will a liner panel be required inside? If so, what height? Please see revised Drawing A-506, per Am-0010.
152 13 34 19 Metal Building System
Will vinyl covered insulation be required at the ceiling? If so, what is the R value?
Please see revised Drawings A-506 and A-521, per Am-0010.
153 Drawing A-531 Option #1 for the Vertical Fold Up doors shows steel support details at A1/A531. Sections are shown for Mullion Hoist, Mullion Fork, and Wind Bracing; but the sections do not give the member sizes or specifiy maximum allowable loads that can be applied to the building. Please clarify.
Please see revised Drawing S331, Detail A1, per Am-0007 for additional framing loads due to the door.
154 Drawing C-111 Hush House Pad/Aircraft Apron and Towway/Taxiway - please confirm if it is concrete or AC paving. One note states connect new AC pavement to existing AC pavement and another locations states connect Concrete pavement to existing AC pavement. Please provide details as well.
Please see revised Drawing C111a, per Am-0005.
155 Is it the intent of the Army Corp of Engineers to fully execute the specification section 32 13 11 Concrete Pavement for Airfields Pavement and require an “on-site” batch plant and the full requirements of the air field paving concrete submittal to be submitted through the Center of Expertise in Omaha, NE Army Corp of Engineers District Office ?
The contractor may use concrete from a ready mixed concrete plant provided it meets the specification. Information for an on-site batch plant is provided to facilitate such a facility if the Contractor feels it will be necessary to meet the specification.
See revised Section 32 13 11 Paragraph 2.11.1, per Am-0008, where Batching and Mixing Plant has been marked as "Optional".
Section 00 60 00, Appendix A (Am‐0010)
156 Will the design team (engineer and/or architect) waive the air entrainment requirement?
Section 32 13 11 and Section 34 73 13 shall not be waived.
Please see revised Section 33 44 00, Paragraph 2.3.1, per Am- 0010.
157 A-600 Finish schedule lists room AS300 Alert Shelter as floor finish EP-1, A-130 & A-430 both call out for FRF-1 as the floor coating in the hanger, - Please clarify
EP-1 deleted. Please see revised Drawing A-600 per Am- 0007, and Section 09 67 23.15 per the original solicitation.
158 Please identify spec for EP-1 coatings? EP-1 deleted. Please see revised Drawing A-600 per Am- 0007, and Section 09 67 23.15 per the original solicitation.
159 A-801 CQ 222 janitor closet is indicated for porcelain tile PCT-1, A- 600 calls for concrete sealer CS-1, - Please clarify
Concrete Sealer confirmed, please see revised Drawing A-801, per Am-0007.
160 S551 Will the new Hush House Fndn follow the same plan for the augmentor/deflector plan show on Detail 1/S2?
See Revised Drawing S152, Detail A1 for augmentor/deflector plan, per Am-0007.
161 S551 There is an isolation pad shown on Det 3/S2 on this page. Will this isolation pad be required on the new hush house foundation plan. There is not one shown on the new foundation plan as shown on S151.
See Revised Drawing S152, Detail A3 for isolation pad, per Am- 0007.
162 A-603 Under Option #1 At the Alert Shelter door schedule, doors 300J, 300K, 300L & 300M are shown to be 2” thick. No material is listed. Are these doors to be hollow metal and 1-3/4” thick, the same as door #301, which is also in option #1?
Also, these 5 door are in a prefinished metal siding wall.
There is no detail referenced or shown for the installation of these doors in this type of wall. Please clarify.
Please see revised Drawing A-603, 3. Door Schedule Alert Shelter, per Am-0007.
Please see revised Drawing A2/A-532, per Am-0007.
163 Drawings TS-105 and
TS-501
The wastes generated using HDD are both solid and liquid, made up of the formation materials in a bentonite slurry. Is there an on-base disposal area for the drilling waste material?
Please see revised Drawings, TS104, TS105, and TS501, per Am-0010.
164 Drawings TS-105 and
TS-501
We have done HDD projects at 10 Air Force bases including Hickam. The last time we worked at Hickam Onizuka Village, we encountered sandy soils up to eight feet below ground surface. Can we expect similar conditions at the taxiway?
Please see Specification Attachment "Geotechnical Engineering Exploration", per Am-0005.
165 Drawings S-111 and A-
The roof drawings on S-111, detail C3, do not match elevations on page A-210. Please advise.
Please see revised Drawing S111, Detail A1 and C3, per Am- 0007. Gable wall to match Drawing A-210 is depicted.
166 Drawing S-151 Are we to expect new building loads and/or new anchorage requirements from the Hush House relocation contractor?
What is the (anticipated) timing for their work?
Please see S151 to S154 and S551 to S558, per Am-0007.
167 Drawing GI-005 and Specification 01 50 00
Please clarify that the Government office that is to "remain for duration of project" shown on drawing GI-005 is existing building 3435? Existing sentry aloha? If this is true, please clarify construction/phasing requirements for the new entry control point which seems to interfere with the existing building. Also, please clarify that the Government Project Office identified in specification 01 50 00, Paragraph 3.4 is required in addition to existing building 3435.
Please see revised Drawing GI005, per Am-0007.
168 Drawing S-131 Drawing S-131, C1 - Foam Room drawings show footers designated as F-11; however they are not drawn to be that size, which is 6' x 12' x 1'-8". Drawings appear to show footers as approximately 2'-6" x 2'-6". Please clarify.
Please see revised Drawing S531, Detail B1, per Am-0007, for F-11 footing size.
169 Drawings TS-104 and
TS-105
Aircraft traffic flow interruptions will need to occur for horizontal directional drilling wells shown on TS-104 and TS-105 on Taxiways M, T, and V. If any and all contractural conditions of excavation permits, notifications, and signatory approvals are met and there is a government imposed cessation while scheduled work activities are commencing, will any elapsed time as a result interruption of work be reimbursable by the government? If not, is it expected that the contractor carry a contingency for such occurrences? Will the contractor be liable for any scheduling impacts that occur that are beyond the contractor's control?
The Contractor shall bid the project as shown on the plans and spec.
170 Drawings S-331, S- 531, and A-506
Detail C1 on Dwg S-331 has a note that calls for the installation of a "Concrete Wall" for the foam room. However, detail B1 on Dwg S-531 shows a wall section detailing a steel frame and metal siding wall. Similarly, the wall section on Dwg A-506 shows metal siding on metal studs. Please confirm that a concrete wall is not required for the foam room.
Please see revised Drawing S331, Detail C1, per Am-0007.
Foam room wall is not concrete.
171 S151 has numerous Det cuts referencing Sheets S551, S552, S553, S554 & S555. I do not see those sheets. Will some more drawings be sent out?
Please see new Drawings S551 through S558, per Am-0007.
172 Drawing FX-131 Alert Shelter - Fire suppression systems drawing FX-131 is showing to provide a fire suppression system which we are taking as a wet system; however, in the fire alarm and fire suppression controls system drawings it does not show any difference between CLIN 001 and CLIN 002, option 1. Please clarify that the foam system for CLIN 002, option 1, replaces the wet suppression system.
Please see original solicitation sheets FX-131, FX132, FX133, FX134, FA133, FA134 and FA631 , Per Original Solicitation Drawings. Please see revised Drawings Sheets FA131, FA132, FA602, per Am-0007. All drawings are part of Option 1.
173 Drawing C-111a C-111a shows an underdrain ("See Mech. Dwgs for underdrain"). This drain is not coming from any floor drains in the Hush House. Please advise
Please see revised Drawings P-150 per AM-0007, and P-151 and P-901 per Am-0005.
174 One of our electrical subcontractors noticed that drawings EL104 and EP140 have the wrong scale.
Please see revised Drawings EL140 and EP140, per Am-0007.
175 Section 01 45 04 Paragraph 3.4.3 CQC personnel states:
“…In addition to CQC personnel specified elsewhere in the contract, provide as part of the CQC organization specialized personnel to assist the CQC System Manager for the following areas: electrical, mechanical, civil, structural, environmental, architectural, materials technician.
These individuals must be directly employed by the prime Contractor and may not be employed by a supplier or subcontractor on this project; be responsible to the CQC System Manager; be physically present at the construction site during work on their areas of responsibility;”.
The construction work described in the solicitation is scattered in nature both in location and timing. Would the government reconsider the aforementioned requirement for the Prime Contractor to have in is direct employment the specialized personnel that support the QC Manager to hire Third Party specialists to support the full time QC Manager that meet the qualification requirements for their respective discipline that are subcontracted on an “as needed” basis?
The Contractor shall bid the project as shown on the plans and spec.
176 Sheet A-122, Keynote #1, Calls out “Modified Bitumen Roofing.” I assumed this was for the Option #1 roof as it is low sloped (1:12 Pitch); however, looking at the section on A504/B1 the roof is shown as “Standing Seam Metal Roof.” Is keynote #1 (Modified Bitumen roofing) unused on this project?
Please advise.
Please see revised Drawing A-122, per Am-0007.
177 Sheet A-230, Option #1, calls for vertical lift fabric doors at the Alert Shelter. Please advise if the base bid should assume NO doors at this location.
Confirmed. Please see Drawing A-603, per Am-0007.
178 Concrete Batching Plant: Plans and specs clearly indicate to set up onsite batching plant to produce concrete for the airfield
– PCCP, please advise if this requirement can be waived to significantly reduce the project cost.
The Government is not mandating an on-site batch plant.
179 A-122 & A-504 Spec section 075200 Modified Bituminous Membrane Roofing is specified as well as indicated on drawing sheet A-122 keynote 1 but no call out for roofing system on A-122 for Crew Quarters. However, details B1, B2, B4/A-504 indicates keynote 8 and 13 for pre-finished standing seam metal roof for Crew Quarters. Please confirm roofing system at Crew Quarters and specify all locations of Modified Bituminous Membrane Roofing, if required.
Section 07 52 00 has been deleted, per Am-0008.
180 Please provide finish clarification for the following items:
1. PG A-110: No finish specified for Gypsum Board ceiling in EP101 (Storage) & EP103 (Restroom)
2. PG A-121: Fiber cement board soffit for the crew quarters does not list paint finish. Should it use the same PT-6 finish as the ECP & Sentry Aloha buildings?
3. PG A-141: No finish specified for Gypsum Board ceiling in SA 410 (Women’s), SA 409 (Shower), SA 408 (Men’s), SA 411 (Hallway #2), SA 413 (Storage), SA 412 (Jan Closet), and above kitchen area in SA 400 (Open office)
4. Pg A-142 states in keynote 2 that the continuous gutter should be painted PT-4. However, in pg A-551 the keynote states that the metal gutter is pre-finished sheet metal. Please advise if the gutter will receive paint?
5. Pg A-221 states in keynote 5 that the wood fascia finish is PT-3, however on pg A-220 the wood fascia finish is PT-5.
Which should we use?
1. Please see revised Drawing A-600, per Am-0010.
2. Please see revised Drawing A-121, per Am-0007.
3. Please see revised Drawing A-600, per Am-0010.
4. Please see revised Drawing A-142, per Am-0007.
5. Please see revised Drawing A-221, per Am-0007.
181 S511 1) Addendum 3 drawing S151 refers to drawings S552, S553, S554 and S555 for detailed section cuts. These drawings are not in current documents or addendum 3. Please issue drawing S552 thru S555.
2) Drawing S511 (sheet 136 of 410) are illegible when magnified. Please issue legible drawings S1, S2, S3 and S4.
Please see new Drawings S551 through S558, per Am-0007.
182 Please provide details and product specification for the solid surface countertops. There is currently no finish schedule available for reference.
Please see revised Drawing A-701, per Am-0007.
183 (SEE IMAGE TO THE
RIGHT)
Please provide finish clarification for the following items:
1) In page A-241 no rubber base is specified in Room SA 407 (Equipment Storage). Is this correct or should there be rubber base?
2) In page A-247 no rubber base is specified in Rooms SA412 (Jan Closet), SA 413 (Storage), SA414 (Comm). Is this correct or should there be rubber base?
3) In page A-801 the rubber tile designation is listed as WB-1.
However, in the finish and material schedule in page A-602 there is no WB-1 listed, instead there is RT-1 (Rubber Tile). In addition, the spec section 09 65 00 also refers to rubber tile as RT-1. Should references to WB-1 be RT-1?
4) In page A-801 no floor designations are specified for the Pump Room, Mech, Elec, Comm. Will the flooring be concrete with CS-1?
5) In page A-801 the Main Qtrs #4 carpet does not go all the way to the threshold. Is this correct?
1) No wall base required
2) "RB-1" is identified on Interior Room Finish Schedule, revised Drawing A-600, Am-0007
3) Please see revised Drawing A-801, per Am-0007.
4) Please see revised Drawing A-801, per Am-0007.
5) Please see revised Drawing A-801, per Am-0007. Finish flooring to extend all the way to threshold.
184 02 61 13 attachment JBPHH Operating Procedure for Managing Excess Soil, 01 33 29 paragraph 1.2
The project is to be constructed and documented per the federally mandated High Performance and Sustainable Building requirement. There will be substantial quantities of excess “clean” fill material generated from site, building and MEP excavation activities.