W9128A-18-B-0002_Am-0008_Specifications.pdf

PDF 8 MB Posted

Attached to
FY16 MCAF KNMD043004, Fighter Alert Facility, Joint Base Pearl Harbor-Hickam (JBPHH), Oahu, Hawaii
Solicitation number
W9128A-18-B-0002
Issued by

About this file

Am-0008 - Specifications

View the file

Other files

File Type Posted
W9128A-18-B-0002_Abstract_of_Bids.pdf PDF
W9128A-18-B-0002_Am-0013.pdf PDF
W9128A-18-B-0002_Am-0013_Specifications.pdf PDF
W9128A-18-B-0002_Am-0013_Drawings.pdf PDF
W9128A-18-B-0002_Am-0012.pdf PDF
W9128A-18-B-0002_Am-0011_Drawings_(3_of_3).pdf PDF
W9128A-18-B-0002_Am-0011_Drawings_(2_of_3).pdf PDF
W9128A-18-B-0002_Am-0011_Drawings_(1_of_3).pdf PDF
W9128A-18-B-0002_Am-0011_Specifications.pdf PDF
W9128A-18-B-0002_Am-0011.pdf PDF
W9128A-18-B-0002_Am-0010_Specifications.pdf PDF
W9128A-18-B-0002_Am-0010.pdf PDF
W9128A-18-B-0002_Am-0010_Drawings_(1_of_3).pdf PDF
W9128A-18-B-0002_Am-0010_Drawings_(3_of_3).pdf PDF
W9128A-18-B-0002_Am-0010_Drawings_(2_of_3).pdf PDF
W9128A-18-B-0002_Am-0009.pdf PDF
W9128A-18-B-0002_Am-0008.pdf PDF
W9128A-18-B-0002_Am-0007_Drawings_(2_of_6).pdf PDF
W9128A-18-B-0002_Am-0007_Drawings_(5_of_6).pdf PDF
W9128A-18-B-0002_Am-0007_Drawings_(6_of_6).pdf PDF
W9128A-18-B-0002_Am-0007_Drawings_(3_of_6).pdf PDF
W9128A-18-B-0002_Am-0007.pdf PDF
W9128A-18-B-0002_Am-0007_Drawings_(4_of_6).pdf PDF
W9128A-18-B-0002_Am-0007_Drawings_(1_of_6).pdf PDF
W9128A-18-B-0002_Am-0006.pdf PDF
W9128A-18-B-0002_Am-0005_Drawings_(2_of_3).pdf PDF
W9128A-18-B-0002_Am-0005_Drawings_(1_of_3).pdf PDF
W9128A-18-B-0002_Am-0005_Specifications.pdf PDF
W9128A-18-B-0002_Am-0005.pdf PDF
W9128A-18-B-0002_Am-0005_Drawings_(3_of_3).pdf PDF
W9128A-18-B-0002_Am-0004.pdf PDF
W9128A-18-B-0002_Am-0003_Drawings_(1_of_2).pdf PDF
W9128A-18-B-0002_Am-0003.pdf PDF
W9128A-18-B-0002_Am-0003_Drawings_(2_of_2).pdf PDF
W9128A-18-B-0002_Am-0003_Specifications.pdf PDF
W9128A-18-B-0002_Am-0002.pdf PDF
W9128A-18-B-0002_Am-0001.pdf PDF
W9128A-18-B-0002_Specifications.pdf PDF
W9128A-18-B-0002_Drawings_(2_of_2).pdf PDF
W9128A-18-B-0002_IFB.pdf PDF
W9128A-18-B-0002_Drawings_(1_of_2).pdf PDF
SECNAV_5512-1.pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MCAF FIGHTER ALERT FACILITY, JBPHH, OAHU, HAWAII KNMD 043004

PROJECT TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 32 00 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

01 33 29 SUSTAINABILITY REPORTING

PROJECT TABLE OF CONTENTS Page 1

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 45 00 RMS3 - CONTRACTOR MODE (RMS3/CM)

01 45 04 CONTRACTOR QUALITY CONTROL

01 45 35 SPECIAL INSPECTIONS

01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS

01 57 20 ENVIRONMENTAL PROTECTION

01 62 35 RECYCLED / RECOVERED MATERIALS

01 78 00 CLOSEOUT SUBMITTALS

01 78 23 OPERATION AND MAINTENANCE DATA

01 90 00 MISCELLANEOUS PROVISIONS

01 91 00.15 TOTAL BUILDING COMMISSIONING

DIVISION 02 - EXISTING CONDITIONS

02 41 00 DEMOLITION AND DECONSTRUCTION

02 61 13 EXCAVATION AND HANDLING OF CONTAMINATED MATERIAL

02 82 16.00 20 ENGINEERING CONTROL OF ASBESTOS CONTAINING MATERIALS

02 83 13.00 20 LEAD IN CONSTRUCTION

02 84 16 HANDLING OF LIGHTING BALLASTS AND LAMPS CONTAINING PCBs

AND MERCURY

DIVISION 03 - CONCRETE

03 11 13.00 10 STRUCTURAL CAST-IN-PLACE CONCRETE FORMING

03 20 00.00 10 CONCRETE REINFORCING

03 30 00.00 10 CAST-IN-PLACE CONCRETE

03 35 00.00 10 CONCRETE FINISHING

03 39 00.00 10 CONCRETE CURING

DIVISION 04 - MASONRY

04 20 00 UNIT MASONRY

DIVISION 05 - METALS

05 05 23.13 10 ULTRASONIC INSPECTION OF WELDMENTS

05 12 00 STRUCTURAL STEEL

05 30 00 STEEL DECKS

05 40 00 COLD-FORMED METAL FRAMING

05 50 13 MISCELLANEOUS METAL FABRICATIONS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00 ROUGH CARPENTRY

06 20 00 FINISH CARPENTRY

06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS

06 61 16 SOLID SURFACING FABRICATIONS

01 35 13.05 20 SPECIAL PROJECT PROCEDURES

(Am0007)(Am-0008)

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 21 16 MINERAL FIBER BLANKET INSULATION

07 22 00 ROOF AND DECK INSULATION

07 27 10.00 10 BUILDING AIR BARRIER SYSTEM

07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS

07 42 13 METAL WALL PANELS

07 52 00 MODIFIED BITUMINOUS MEMBRANE ROOFING

07 60 00 FLASHING AND SHEET METAL

07 61 14.00 20 STEEL STANDING SEAM ROOFING

07 84 00 FIRESTOPPING

07 92 00 JOINT SEALANTS

DIVISION 08 - OPENINGS

08 11 13 STEEL DOORS AND FRAMES

08 11 16 ALUMINUM DOORS AND FRAMES AND WINDOW WALL

08 14 00 WOOD DOORS

08 31 00 ACCESS DOORS AND PANELS

08 33 23 OVERHEAD COILING DOORS

08 34 02 BULLET-RESISTANT COMPONENTS

08 34 16.20 VERTICAL LIFT FABRIC DOORS

08 34 73 SOUND CONTROL DOOR ASSEMBLIES

PROJECT TABLE OF CONTENTS Page 2

08 51 13 ALUMINUM WINDOWS

08 71 00 DOOR HARDWARE

08 81 00 GLAZING

08 91 00 METAL WALL LOUVERS

DIVISION 09 - FINISHES

09 22 00 SUPPORTS FOR GYPSUM BOARD

09 29 00 GYPSUM BOARD

09 30 10 CERAMIC TILING

09 51 00 ACOUSTICAL CEILINGS

09 65 00 RESILIENT FLOORING

09 67 23.15 FUEL RESISTIVE RESINOUS FLOORING, 3-COAT SYSTEM

09 68 00 CARPETING

09 69 13 RIGID GRID ACCESS FLOORING

09 90 00 PAINTS AND COATINGS

DIVISION 10 - SPECIALTIES

10 14 00.20 PLAQUE SIGNAGE

10 21 13 TOILET COMPARTMENTS

10 28 13 TOILET ACCESSORIES

10 44 16 FIRE EXTINGUISHERS

DIVISION 11 - EQUIPMENT

11 44 00 FOOD COOKING EQUIPMENT

DIVISION 12 - FURNISHINGS

12 24 13 ROLLER WINDOW SHADES

(Am0007)

08 51 23 STEEL WINDOWS

(DELETED) (DELETED)

(DELETED) (DELETED)

METAL WALL AND DOOR LOUVERS

(Am-0008)

DIVISION 13 - SPECIAL CONSTRUCTION

13 34 19 METAL BUILDING SYSTEMS

13 48 00 SEISMIC PROTECTION FOR MISCELLANEOUS EQUIPMENT

13 48 00.00 10 SEISMIC PROTECTION FOR MECHANICAL EQUIPMENT

DIVISION 21 - FIRE SUPPRESSION

21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION

21 13 20.00 20 FOAM FIRE EXTINGUISHING FOR AIRCRAFT HANGARS

21 21 03.00 10 WET CHEMICAL FIRE EXTINGUISHING SYSTEM

21 30 00 FIRE PUMPS

DIVISION 22 - PLUMBING

22 00 00 PLUMBING, GENERAL PURPOSE

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS

23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC

23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC

23 09 23.13 20 BACnet DIRECT DIGITAL CONTROL SYSTEMS FOR HVAC

23 09 93 SEQUENCES OF OPERATION FOR HVAC CONTROL

23 64 10 WATER CHILLERS, VAPOR COMPRESSION TYPE

23 64 26 CHILLED, CHILLED-HOT, AND CONDENSER WATER PIPING SYSTEMS

23 82 02.00 10 UNITARY HEATING AND COOLING EQUIPMENT

DIVISION 25 - INTEGRATED AUTOMATION

25 50 00.00 20 CYBERSECURITY OF FACILITY-RELATED CONTROL SYSTEMS

DIVISION 26 - ELECTRICAL

26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS

26 05 48.00 10 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT

26 08 00 APPARATUS INSPECTION AND TESTING

26 12 19.10 THREE-PHASE PAD-MOUNTED TRANSFORMERS

26 13 00 SF6/HIGH-FIREPOINT FLUIDS INSULATED PAD-MOUNTED SWITCHGEAR

26 20 00 INTERIOR DISTRIBUTION SYSTEM

26 24 13 SWITCHBOARDS

26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION

26 32 15.00 10 DIESEL-GENERATOR SET STATIONARY 100-2500 KW, WITH

AUXILIARIES

26 36 00.00 10 AUTOMATIC TRANSFER SWITCH AND BY-PASS/ISOLATION SWITCH

26 41 00 LIGHTNING PROTECTION SYSTEM

26 51 00 INTERIOR LIGHTING

26 56 00 EXTERIOR LIGHTING

26 56 20.00 10 AIRFIELD AND HELIPORT LIGHTING AND VISUAL NAVIGATION AIDS

DIVISION 27 - COMMUNICATIONS

27 05 14.00 10 CABLE TELEVISION PREMISES DISTRIBUTION SYSTEM

27 05 29.00 10 PROTECTIVE DISTRIBUTION SYSTEM (PDS) FOR SIPRNET

COMMUNICATION SYSTEMS

27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM

27 51 16 RADIO AND PUBLIC ADDRESS SYSTEMS

PROJECT TABLE OF CONTENTS Page 3

(DELETED) (DELETED)

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 31 76 INTERIOR FIRE ALARM SYSTEM

DIVISION 31 - EARTHWORK

31 00 00 EARTHWORK

31 05 19 GEOTEXTILE

31 11 00 CLEARING AND GRUBBING

31 31 16.19 TERMITE CONTROL BARRIERS

31 32 11 SOIL SURFACE EROSION CONTROL

31 63 33 DRILLED MICROPILES

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 01 11.51 RUBBER AND PAINT REMOVAL FROM AIRFIELD PAVEMENTS

32 01 19 FIELD MOLDED SEALANTS FOR SEALING JOINTS IN RIGID

PAVEMENTS

32 01 19.61 RESEALING OF JOINTS AND CRACKS IN RIGID PAVEMENT

32 01 29.61 PARTIAL DEPTH PATCHING OF RIGID PAVING

32 11 23 AGGREGATE BASE COURSES

32 12 13 BITUMINOUS TACK AND PRIME COATS

32 12 15.13 HOT-MIX ASPHALT AIRFIELD PAVING

32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS

32 13 11 CONCRETE PAVEMENT FOR AIRFIELDS PAVEMENTS

32 16 13 CONCRETE SIDEWALKS AND CURBS

32 17 23 PAVEMENT MARKINGS

32 31 13 CHAIN LINK FENCES AND GATES

32 31 13.53 HIGH-SECURITY CHAIN LINK FENCES AND GATES

DIVISION 33 - UTILITIES

33 05 23.13 UTILITY HORIZONTAL DIRECTIONAL DRILLING

33 11 00 WATER UTILITY DISTRIBUTION PIPING

33 30 00 SANITARY SEWERS

33 32 16 PACKAGED UTILITY WASTEWATER PUMPING STATIONS

33 40 00 STORM DRAINAGE UTILITIES

33 52 10 SERVICE PIPING, FUEL SYSTEMS

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 4

33 61 14 EXTERIOR BURIED PREINSULATED WATER PIPING

33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION

33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)

DIVISION 34 - TRANSPORTATION

34 43 00.00 20 AIRFIELD LIGHTING

34 73 13 MOORING AND GROUNDING POINTS FOR AIRCRAFT

ATTACHMENTS

NOTICE OF INTENT (NOI)

STORMWATER POLLUTION PREVENTION PLAN (SWPPP)

TARGETED HAZARDOUS MATERIAL SURVEY

SOIL & GROUNDWATER SCREENING SURVEY REPORT

S-1: STANDARD AIR POLLUTION CONTROL PERMIT APPLICATION FORM

34 71 13.19 ACTIVE VEHICLE BARRIERS

ATTACHMENTS

GEOTECHNICAL ENGINEERING EXPLORATION

-- End of Project Table of Contents --

(DELETED)(DELETED)

(Am0007)

28 10 05 ELECTRONIC SECURITY SYSTEMS (ESS)

28 31 76 INTERIOR FIRE ALARM SYSTEM

28 08 10 ELECTRONIC SECURITY SYSTEM ACCEPTANCE TESTING

33 56 10 FACTORYFABRICATED FUEL STORAGE TANKS

GEOTECHNICAL ENGINEERING EXPLORATION

28 08 10 ELECTRONIC SECURITY SYSTEM ACCEPTANCE TESTING

ELECTRONIC SECURITY SYSTEM ACCEPTANCE TESTING28 08 10

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 110 PAGES

W9128A-15-D-0010

MCAF FIGHTER ALERT FACILITY, JBPHH, OAHU, HAWAII

08 34 73 2.1 SWood Sound Retardant Doors

2.1 SDoor Frames

2.1 SDoor Hardware

2.1 SThresholds

SD-06 Test Reports 2.4.3Acoustical Tests

SD-07 Certificates 2.1Hollow Metal Sound Retardant

Doors 2.1Wood Sound Retardant Doors 2.1Door Frames 2.1Door Hardware 2.1Thresholds

SD-11 Closeout Submittals

2.5.1 SRecycled Content

2.5.2 SVolatile Organic Compounds

(VOC)

08 51 13 SD-02 Shop Drawings

2.2 GWindows

1.10Fabrication Drawings

SD-03 Product Data

2.2 GWindows

2.3.8.1 GHardware

2.3.3 GFasteners

1.11 GWindow Performance

2.4 GThermal-Barrier Windows

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

(Am0007)

08 51 23 2.10.4

Steel Framing Materials 2.3 Mullions 2.5

G G

SD-04 Samples Color Coating Windows

G2.8 2.9

1.10 SD-03 Product Data

G Fabrication Drawings Windows

SD-02 Shop Drawings

SECTION 01 33 00

2.9.1

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 110 PAGES

W9128A-15-D-0010

MCAF FIGHTER ALERT FACILITY, JBPHH, OAHU, HAWAII

08 51 13 2.5 GMullions

2.3.2 GWeatherstripping

2.3.8 GAccessories

2.3.4Adhesives

1.11.5 GThermal Performance

SD-04 Samples 1.4.2.1Finish Sample 1.4.2.2Window Sample

SD-05 Design Data

1.4.3 GDesign Analysis

SD-06 Test Reports 1.4.4Minimum Condensation

Resistance Factor 1.11.2.3Standard Airblast Test

SD-10 Operation and Maintenance Data

2.2 GWindows

1.7Plastic Identification

SD-11 Closeout Submittals

2.1.1 SRecycled Content

2.1.2 SVolatile Organic Compounds

(VOC) Content for Sealants 08 71 00 SD-02 Shop Drawings

1.3Manufacturer's Detail Drawings 1.3Verification of Existing Conditions 1.5Hardware Schedule

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

(Am0007)

08 51 23 SD-05 Design Data Design Analysis 1.3.3.1 G

SD-06 Test Reports Air Infiltration Water Infiltration

Standard Airblast Test G1.3.3.3

1.6 1.7

SD-10 Operation and Maintenance Data

Windows, Data Package 1 G2.3 SD-11 Closeout Submittals

Recycled Content for Steel Framing Materials

S2.1

SECTION 01 33 00 (Am-0008)

Air Force Sustainability Requirements Scoresheet HPSB COMPLIANCE (Updated Oct 2016) * required entry

General Information INCOMPLETE KNMD043004 Project ID:

Real Property Unique ID: * Facility Number *

F22 Ready Alert Crew Quarters Building Name:

Joint Base Pearl Harbor-Hickam Installation:

Honolulu City: Honolulu HI State: Hawaii

Yes

CONUS

PACAF MAJCOM

USACE Construction Agent

Fukuchi, Dean AFCEC DM/CM:

PA *

23,134 Building Size (SF):

2016 Program Year:

Design Complete Project Phase:

5/4/2016 Design Started (MM/DD/YY)

12/28/2017 BOD (MM/DD/YY)

GBI GP Guiding Principles Compliance Certification Method

50% HPSB Compliant No Energy Efficiency Achieved (% below ANSI/ASHRAE/IESNA

Standard 90.1-2010) 2016V1 Scoresheet version

SURVEY

INCOMPLETE

Date Project Registered (MM/DD/YY)

Date Project Certified (MM/DD/YY)

5/8/2018 1

HPSB CHECKLIST

ALERT SHELTER

(Am-0007)

SECTION 01 33 29 ATTACHMENT 1

Color Coding: See Instructions Tab for more detail Yes or N/A No Recommended not Required

90.1-2013 HPSB I: Employ Integrated Design Principles (UFC 1-200-02 para 2-2) Total Points 2 Possible Points 2

Yes HPSB I.1 Integrated Design 1

Yes HPSB I.2 Commissioning 1 HPSB II: Optimize Energy Performance (UFC 1-200-02 para 2-4) Total Points 3 Possible Points 4

No HPSB II.1 Energy Efficiency 1

No Reduce energy use 30% below ANSI/ASHRAE/IESNA Standard 90.1-2010 or if not - achieve maximum energy efficiency that is lifecycle cost effective Insert percentage below ANSI/ASHRAE/IESNA Standard 90.1-2010 in terms of energy use (e.g. 32)

Insert building energy intensity (kBtu/yr-sqft) calculated IAW 10 CFR

No Roof Attributes (Recommended) Select roof types (Check below)

N/A HPSB II.2 On-site Renewable Energy - Solar Hot Water Heater System 1

N/A Installed solar hot water heater system or found installation not lifecycle cost effective

0.0 Insert generation capacity (MMBtu/yr)

0.0% Insert percentage of demand N/A HPSB II.3 On-site Renewable Energy 1

N/A Installed renewable energy elements or projects were not lifecycle cost effective Renewable energy types (check below)

0.0 Insert generation capacity (kW)

0.0% Insert percentage of total building Yes HPSB II.4 Measurement and Verification 1

Yes Water Metering: Select N/A if no service

Yes Electric Metering: Select N/A if no service

N/A Natural Gas Metering: Select N/A if no service N/A Steam Metering: Select N/A if no service

HPSB III: Protect and Conserve Water (UFC 1-200-02 para 2-5) Total Points 4 Possible Points 4

Yes HPSB III.1 Indoor Water 1

Yes HPSB III.2 Outdoor Water 1

N/A HPSB III.3 Stormwater Management (LID Documentation per UFC 3-210-10) 1

0.0 Change in Impervious Area (SF)

$4,298,968.00 Pre-Award Cost Estimate ($)

N/A Project addressed EISA 438

EISA Technical Constraints

0.0%

Percent Increase in Stormwater Runoff for 95 Percentile Storm (%) -or- Percent Increase in Stormwater Runoff from continuous simulation model, published data, studies, or other established tools (Reference UFC 3-210-10 Figure 2-1 Implementation of EISA Section 438)

On-Site LID Features Locations

1 Integrated Management Practices Employed

Drop-Down Box No Entry Required Custom Entry

Solar PV

Solar CP

Solar Thermal Electric

Geothermal

GSHP Wind

Hydro Waste to Energy

Renewables were not lifecycle cost effective

Cool roof

Green roof

Solar electric

Solar thermal

Solar Passive

Retaining stormwater impact receving water flow

Site too small to infiltrate significant volume

State or local restrict water harvesting

Shallow bedrock, contaminated soil, high ground water table, underground utilities

Non-potable water demand to small Structural, plumbing, and other mods not feasible

Soil infiltration capacity limited

State or local restrict use of green infrastructure or LID

Other

Bio-Retention

Infiltration Trench

Soil Amendments

Dry Wells

Inlet Pollution Removal Device

Permeable Pavement/Pavers

Filter Strips Grassed Swells

Rain Barrels/Cisterns

Tree Box Filters Vegetated Buffers Vegetated Roof

Other

5/8/2018 2

HPSB CHECKLIST

ALERT SHELTER

(Am-0007)

Final LID Construction Cost ($)

Post Construction Analysis (Name of DOR)

N/A HPSB III.4 Water used for heating and cooling 1

N/A Water efficient measures were implemented with heating and cooling equipment when life cycle effective

HPSB IV: Enhance Indoor Environmental Quality (UFC 1-200-02 para 2-6) Total Points 7 Possible Points 7

N/A HPSB IV.1 Thermal Comfort 1

N/A HPSB IV.2 Ventilation 1

N/A HPSB IV.3 1

Yes HPSB IV.4 Daylighting 1

Yes HPSB IV.5 Low Emitting Materials 1

Yes HPSB IV.6 Protect Indoor Air Quality during Construction 1

Yes HPSB IV.7 Environmental Tobacco Smoke Control

HPSB V: Reduce Environmental Impact of Materials (UFC 1-200-02 para 2-7) Total Points 6 Possible Points 6

Yes HPSB V.1 Recycled Content 1

Yes HPSB V.2 Biologically-based Products 1

Yes HPSB V.3 Environmentally Preferable Products 1

Yes HPSB V.4 Waste and Materials Management - Recycling 1

Yes HPSB V.5 Waste and Materials Management - Divert 60% from Disposal 1

N/A 60% or greater diverted

60.0% Insert percentage diverted from landfill

Yes HPSB V.6 Ozone Depleting Substances 1 Possible Points 23

22 Federal Requirements - Yes or N/A 1 Federal Requirements - No

96% Percentage of Federal Requirements Met

Moisture Control

5/8/2018 3

HPSB CHECKLIST

ALERT SHELTER

SECTION 01 33 29 ATTACHMENT 1

Executive Order (EO) 13693, Planning for Federal Sustainability in the Next Decade

HPSB I: Employ Integrated Design Principles Integrated Design

HPSB I.1

UFC 1-200-02 para 2-2.1

Use a collaborative, integrated planning and design team, composed of user, government support staff, and appropriate professionals, to identify requirements and to establish performance goals for siting, energy, water, materials, indoor environmental quality, and other comprehensive design goals. Ensure incorporation of these goals throughout the design and lifecycle of the building, including deconstruction.

Site attributes, including climate and local and regional context, impact the design of the building. Evaluate the site and building components to determine whether passive and natural design strategies and features are cost effectively incorporated before the active and mechanical systems are designed.

Use the following sequential approach:

• Analyze potential sites and associated climate including local and regional context.

• Select a sustainable site.

• Design building to site analysis focusing on orientation, configuration and massing.

• Select and integrate into the design, high performance and sustainable building envelope strategies and components (e.g. roofs, walls, fenestrations).

• Select, design and integrate into the overall design, high performance and sustainable systems (e.g. HVAC, plumbing, water heating systems, lighting systems, control systems, elevators, and fire protection systems).

Incorporate integrated design as described in ASHRAE 189.1 Informative Appendix H (Integrated Design). Follow the steps of design optimization, as applicable, in ASHRAE 189.1 Section H1.1.1 (Charrette Process).

Commissioning

HPSB I.2

UFC 1-200-02 para 2-2.2

Employ commissioning practices appropriate to the size and complexity of the building and its system components in order to verify performance and ensure that design requirements are met. This must include an experienced commissioning provider. The use of contracted services or Government personnel as the commissioning provider will be determined at project level.

Meet the requirements of ASHRAE 189.1 Section 10.3.1.2 (Building Project Commissioning), with the following modifications:

• For buildings and systems that are less complex, commissioning can be tailored as determined by the DoD Component AHJ . For Air Force projects, the Project Delivery Team must determine the level of commissioning activities required.

• “Schematic design” is the design charrette or similar conceptual design activity.

• Delete the requirement to meet ASHRAE 55 Section 6.2 (Documentation).

Requirement Source Document(s) Executive Order 13693

UFGS 01 91 00.15, Total Buiding Commissioning Program

High Performance Sustainable Building Requirements, UFC 1-200-02 References References

HPSB CHECKLIST

ALERT SHELTER

(Am-0007)

High Performance Sustainable Building Requirements, UFC 1-200-02 References HPSB II: Optimize Energy Performance (UFC 1-200-02, 2.4)

Energy Efficiency

HPSB II.1

UFC 1-200-02 para 2-4.1

Design the building to achieve at least 30% energy consumption reduction from ASHRAE 90.1 (2013) baseline.

Percentage improvement = 100 x (Baseline building consumption—Proposed building consumption) ÷(Baseline building consumption—Receptacle and process loads).

Design Federal low-rise residential buildings to achieve at least 30% energy consumption reduction from International Energy Conservation Code (IECC) baseline.

If a 30% reduction is not life-cycle cost-effective, the design of the proposed building must be modified so as to achieve an energy consumption level at or better than the maximum level of energy efficiency that is life-cycle cost-effective.

Requirement Source Document(s) 10 CFR 433, EPAct 05

On-site Renewable Energy - Solar Hot Water Heater System

HPSB_II.2

UFC 1-200-02 para 2-4.2.1

Per the Energy Independence and Security Act (EISA) Section 523, meet at least 30% of the hot water demand through the installation of solar hot water heaters, when lifecycle cost effective.

Requirement Source Document(s): EISA Sec. 523

On-site Renewable Energy HPSB II.3 UFC 1-200-02 para 2-4.2

Provide on-site renewable energy systems in accordance with ASHRAE 189.1 Section 7.4.1.1 (On-Site Renewable Energy Systems) where life-cycle cost effective considering climate, infrastructure condition, mission compatibility, and effects on base wide electrical system (grid) power quality. Exception: Purchase of renewable energy certificates (RECs) must not be used as a substitute for the Section 7.4.1.1 new building requirement.

When renewable systems are provided, comply with IEEE 1547 for renewable systems interface to the electrical system grid. Note:

The IEEE 1547 Series of Interconnection Standards are available from IEEE (http://grouper.ieee.org/groups/scc21/dr_shared/) as design guides for IEEE 1547 implementation.

Designs must include the following requirements in order to limit the risk to energy security:

a. Direct interconnection of system to installation-wide electrical system (grid):

• For renewable systems that include a tie-in by a direct connection to the primary distribution system, provide a cumulative renewable load analysis of both the direct connection and building renewable power systems.

• Evaluate the proposed systems and verify there are no adverse effects on the installation-wide electrical system frequency control, voltage regulation and power quality. See Appendix B for issues that should be considered.

b. Direct interconnection of system to buildings that utilize engine generators that may operate in parallel with the renewable energy generation:

• Evaluate the proposed systems and verify there are no adverse effects on the generator’s ability to maintain frequency control, voltage regulation and power quality. See Appendix B for issues that should be considered.

• If the stability of the combined systems cannot be confirmed, then design system to automatically disconnect renewable power generation when the backup generator is in operation.

c. Direct interconnection of system to buildings that either do not utilize engine generators or have backup power systems that would never operate in parallel with the renewable energy generation, such as a backup generator supplying power via an automatic transfer switch:

• Provide analysis validating that electrical system design address the electrical characteristics (real and reactive power output) of the renewable system.

Requirement Source Document(s): Executive Order 13693

HPSB CHECKLIST

ALERT SHELTER

(Am-0007)

Measurement and Verification

HPSB II.4

UFC 1-200-02 para 2-4.4 , 2-4.5, and2-5.5

A utility meter must be installed at each building, for each utility serving the building (e.g. district steam, district hot and chilled water, electricity, natural gas, fuel oil, etc.) in the normal units of the measure (i.e. kWh, kW, cf, gallons, etc.). Meters must be connected to a base wide energy and utility monitoring and control system using the installation’s advanced metering protocols. The installation of meters is required per DODI 4170.11, Installation Energy Management.

Implement submetering when authorized in writing by the Installation. Utilize ASHRAE 189.1 Section 7.3.3 (Energy Consumption Management) as guide for subsystem implementation.

Install water meters to monitor use in buildings consuming indoor and outdoor water as required by DODI 4170.11.

The installation of separate water meters for locations with outdoor water use is encouraged.

Requirement Source Document(s): EPAct 2005 Section 103, EISA 2007 Section 434

Links Energy Policy Act of 2005

HPSB III: Protect and Conserve Water Indoor Water

HPSB III.1

UFC 1-200-02 para 2-5.1, 2-5.2

Meet the requirements of ASHRAE 189.1 Section 6.3.2.1 (Plumbing Fixtures and Fittings). Water closet replacements in major renovations may have a flush value of up to 1.6 GPF (6.1 LPF) to accommodate existing plumbing capacity.

Specify EPA WaterSense-labeled products, where appropriate and available.

Meet the requirements of ASHRAE 189.1 Section 6.3.2.2 (Appliances).

Requirement Source Document(s): EPAct 1992

Outdoor Water

HPSB III.2

UFC 1-200-02 para 2-5.3

Use water efficient landscape and irrigation strategies, such as water reuse, xeriscaping and the use of harvested rainwater, to reduce outdoor potable water consumption by a minimum of 50%. This requirement must be demonstrated by comparison to a baseline building using the EPA WaterSense landscape water budget tool version 1.01 or later, or a Component approved tool.

Meet the requirements of UFC 3-201-02 and the following requirements of ASHRAE 189.1 when life cycle cost effective: Section 6.3.1 (Mandatory Provisions: Site Water Use Reduction) and either Section 6.4.1 (Prescriptive Option: Site Water Use Reduction) or Section

6.5.1 (Performance Option: Site Water Use Reduction).

Show preference for irrigation contractors who are certified through a WaterSense labeled program.

Requirement Source Document(s): Executive Order 13693

Stormwater Management

HPSB III.3-4 UFC 3-210-10

Meet the requirements of UFC 3-210-10.

Employ design and construction strategies that reduce storm water runoff and discharges of polluted water offsite. Per EISA Section 438, to the maximum extent technically feasible, maintain or restore the predevelopment hydrology of the site with regard to temperature, rate, volume, and duration of flow using site planning, design, construction, and maintenance strategies. This question includes both construction storm water discharge controls and stormwater design.

LID Documentation (UFC 3-210-10) and EPA 841-B-09-001, Technical Guidance on Implementing the Stormwater Runoff Requirements for Federal Projects under Section 438 of the Energy Independence and Security Act Dec 2009:

Compliance with this section is required on all projects than construct facilities with a footprint greater than 5,000 gross square feet or expand existing facilities by the amount. The project footprint consists of all horizontal hard surfaces and disturbed areas associated with the project development, including both building area and pavements (such as roads, parking, and sidewalks). These requirements do not apply to internal renovations, maintenance, or resurfacing of existing pavements. Existing facilities that have an overall footprint of 5,000 square feet or greater that disturb less than 5,000 square feet of land area as part of any single development or redevelopment project are not subject to Section 438 requirements. Consistent with the purpose of Section 438 to preserve or restore pre-development hydrology, the term “footprint” includes all land areas that are disturbed as part of the project.

Pre-final data is to be provided at the final design stage. Final data is to be provided at the completion of the construction contract.

- Per EISA Section 438, to the maximum extent technically feasible, maintain or restore the pre-development condition of the site (i.e.

soil conditions, groundwater table of the project site, description of typical surrounding natural lands, and a brief history of existing development; including impervious area, lawns, meadows, forested area, wetlands, and water bodies) DoD defines “predevelopment hydrology” as the pre-project hydrologic conditions of temperature, rate, volume, and duration of storm water flow from the project site.

- Employ design and construction strategies that reduce storm water runoff and discharge of polluted water offsite. Provide calculations for pre-development and post-development runoff volumes and rates using:

o The 95th percentile rainfall event to identify the volume of storm-water requiring management and the extent to which the design objective was met.

Or o Hydrologic analysis to determine the performance design objective to design, construct, and maintain stormwater management practices that preserve the pre-development runoff conditions following construction. This option allows the designer to conduct a site-specific hydrologic analysis to determine the pre-development runoff conditions instead of using the estimated volume approach of the 95% percentile rainfall event. Under this option, the pre-development hydrology would be determined based on site-specific conditions

Requirement Source Document(s): EISA 2007 Sec 438

HPSB CHECKLIST

ALERT SHELTER

(Am-0007)

Water Used for Heating and Cooling

HPSB III.4

UFC 1-200-02 para 2-5.4

Meet the requirements of the following sections of ASHRAE 189.1 when life cycle cost effective.

• Meet the requirements of Sections 6.3.2.3(a) and (b) (HVAC Systems and Equipment).

• Section 6.3.2.3(c) (HVAC Systems and Equipment). Condensate collection is not required if there is no practical use for the collected condensate.

• Section 6.4.2.1 (Cooling Towers).

Per EPAct 2005 Section 109, when potable water is used to improve a building’s energy efficiency, implement lifecycle cost effective water conservation measures.

Requirement Source Document(s): EPAct 2005, Sec. 109

HPSB CHECKLIST

ALERT SHELTER

(Am-0007)

HPSB IV: Enhance Indoor Environmental Quality (UFC 1-200-02, 2-6)

Thermal Comfort

HPSB IV.1

UFC 1-200-02 para 2-6.1

Meet the requirements of ASHRAE 189.1 Section 8.3.2 (Thermal Environmental Conditions for Human Occupancy). Documentation as described in ASHRAE 55 Section 6.2 is not required. Compliance with standards by providing passive (non-mechanical) thermal comfort methods are allowed and encouraged as described in paragraph 2-2.1 in the UFC.

Requirement Source Document(s): Executive Order 13693

Ventilation

HPSB IV.2

UFC 1-200-02 para 2-6.1

Meet the requirements of ASHRAE 189.1 Section 8.3.1 (Indoor Air Quality). ASHRAE 62.1

Requirement Source Document(s): Executive Order 13693

Moisture Control

HPSB IV.3

UFC 1-200-02 para 2-6.2

Establish and implement a moisture control strategy for controlling moisture flows and condensation to prevent building damage, minimize mold contamination, and reduce health risks related to moisture. Meet the requirements of ASHRAE 189.1 Section 10.3.1.5 (Moisture Control) and UFC 3-101-01 Chapter 3, Building Envelope Requirements.

Requirement Source Document(s): Executive Order 13693

Daylighting

HPSB IV.4

UFC 1-200-02 para 2-6.3

Meet the requirements of ASHRAE 189.1 Section 8.4.1 (Daylighting by Sidelighting) or Section 8.5.1 (Daylighting Simulation). Provide automated lighting controls in accordance with UFC 3-530-01.

Requirement Source Document(s): Executive Order 13693

Low Emitting Materials

HPSB IV.5

UFC 1-200-02 para 2-6.4

Specify materials and products with low pollutant emissions, including composite wood products, adhesives, sealants, interior paints and finishes, carpet systems, and furnishings. Meeting the requirements of ASHRAE 189.1 Sections 8.4.2 (Prescriptive Option:

Materials) or Section 8.5.2 (Performance Option: Materials) demonstrates compliance.

Requirement Source Document(s): Executive Order 13693

Protect Indoor Air Quality during Construction

HPSB IV.6

UFC 1-200-02 para 2-6.5

Follow the recommended approach of SMACNA 008. After construction and prior to occupancy, conduct a minimum 72-hour flush-out with maximum outdoor air consistent with achieving relative humidity no greater than 60%. After occupancy, continue flush-out as necessary to minimize exposure to contaminants from new building materials. Meet the requirements of ASHRAE 189.1 Section

10.3.1.4 (Indoor Air Quality (IAQ) Construction Management).

Requirement Source Document(s): Executive Order 13693

Environmental Tobacco Smoke Control

HPSB IV.7

UFC 1-200-02 para 4-6.6

Prohibit smoking within the building and within 25 feet (7.62 meters) of all building entrances, operable windows, and building ventilation intakes.

Requirement Source Document(s): Federal Register: December 22, 2008 (Volume 73, Number 246) - EO 13058

HPSB CHECKLIST

ALERT SHELTER

(Am-0007)

HPSB V: Reduce Environmental Impact of Materials (UFC 1-200-02, 2-7)

Recycled Content

HPSB V.1

UFC 1-200-02 para 2-7.2

Meet the requirements of ASHRAE 189.1 Section 9.4.1.1 (Recycled Content) when products are available.

Per RCRA Section 6002, for EPA-designated products, specify products meeting or exceeding EPA's recycled content recommendations. For other products, specify materials with recycled content when practicable. EPA’s recycled content product designations and recycled content recommendations are available on EPA’s Comprehensive Procurement Guideline web site at http://www.epa.gov/epawaste/conserve/tools/cpg/index.htm. Requirements will be met when products are available.

Requirement Source Document(s): RCRA 2002, Sec 6002

Biologically-based Products

HPSB V.2

UFC 1-200-02 para 2-7.3

Per Section 9002 of the Farm Security and Rural Investment Act, specify products composed of the highest percentage of biobased content consistent with the USDA BioPreferred Program, if products meet performance requirements and are available at a reasonable cost. USDA’s biobased product designations and biobased content recommendations are available on USDA’s BioPreferred web site at http://www.biopreferred.gov/.

Requirement Source Document(s): FSRIA 2002 Section 9002

Environmentally Preferable Products

HPSB V.3

UFC 1-200-02 para 2-7.1

Use products that have a lesser or reduced effect on human health and the environment. Consider product life-cycle when compared with competing products or services serving the same purpose. A number of standard and eco-labels are available in the marketplace to assist specifiers in making environmentally preferable decisions. Electronic devices, products and appliances purchased should be EPEAT certified. For a list of products and recommendations designated for Federal procurement, consult the Green Products Compilation at http://www.gsa.gov/greenproductscompilation and the Federal Green Construction Guide for Specifiers.

Requirement Source Document(s): Executive Order 13693

Waste and Materials Management

- Recycling

HPSB V.4

UFC 1-200-02 para 2-7.4

Meet the requirements of ASHRAE 189.1 Section 9.3.4.1 (Storage and Collection of Recyclables – Recyclables), where markets or onsite recycling opportunities exist or are anticipated.

Incorporate adequate space, equipment, and transport accommodations for recycling in the building design. During a project's planning stage, identify local recycling and salvage operations that could process site-related construction and demolition materials. Provide salvage, reuse and recycling services for waste generated from major renovations, where markets or onsite recycling opportunities exist.

Requirement Source Document(s): Executive Order 13693

Waste and Materials Management, Divert 60% from Disposal

HPSB V.5

UFC 1-200-02 para 2-7.4

Meet the requirements of ASHRAE 189.1 Section 9.3.1.1 (Construction Waste Management-Diversion) , where markets or onsite recycling opportunities exist or are anticipated.

During a project's planning stage, identify local recycling and salvage operations that could process site-related construction and demolition materials. Provide salvage, reuse and recycling services for waste generated from major renovations, where markets or onsite recycling opportunities exist. During construction, recycle or salvage at least 50 percent of the non-hazardous construction, demolition and land clearing materials, excluding soil, where markets or onsite recycling opportunities exist.

Requirement Source Document(s): Executive Order 13693

Ozone Depleting Substances

HPSB V.6

UFC 1-200-02 para 2-7.5

Meet the requirements of ASHRAE 189.1 Section 9.3.3 (Refrigerants). Exceptions: Refer to UFC 3-600-01 for fire system requirements.

Requirement Source Document(s): Executive Order 13693

HPSB CHECKLIST

ALERT SHELTER

(Am-0007)

HPSB CHECKLIST

ALERT SHELTER

(Am-0007)

Gray Text Recommended (Federal Requirement not fully defined at this time) Light Gray Cell Cell is populated by other cells. User is not required to enter values.

Cell provides a drop-down box for the user to select which LEED Credits and HPSB Requirements that the project is attempting. When a "Yes" or "No" is selected the cell follows the stoplight convention to visually represent progress. The stoplight convention is also used for "Yes" or "No" totals. Some light green boxes also have an option for "N/A" when used for subquestions

Cell uses a drop down box and user is designating "Yes" or "N/A" when applicable Cell uses a drop down box and user is designating "No"

Light Yellow Cell

Cell is for custom entry on how the project is pursuing HPSB requirements. These are subquestions and also general information questions. Boxes that appear when cell is selected give further instruction on entering data. Some cells restrict values that can be entered - which is explained if incorrectly entered

AF Sustainable Building Requirements Legend

Light Green Cell (When used, conditional formatting changes cell to Green or Red depending on entry)

HPSB CHECKLIST

ALERT SHELTER

(Am-0007)

Federal Requirements for High Performance and Sustainable Buildings (HPSB) & UFC 1-200-02 Instructions: Provide a common or project specific justification for an element to be non-applicable, when completed, the Scoresheet tab will allow an N/A response.

Justification for Non-Applicable Answers Common Justification Project Specific Justification Complete?

HPSB I: Employ Integrated Design Principles (UFC 1-200-02, 2-2)

HPSB I.1

Integrated Design

Four different schemes were prepared taking into account various considerations.

However, the location was highly depenedent on the location of the existing runways and taxiways.

Applicable

HPSB I.2 Commissioning Yes Applicable HPSB II: Optimize Energy Performance (UFC 1-200-02, 2-4)

HPSB II.1

Energy Efficiency

The building is naturally ventilated with the majority of both long sides of the building open. There are only lighting and process loads. Lighting is already higly efficient LED. With so little consumption, it's not possible to achieve a 30% reduction.

Applicable

HPSB II.2 On-site Renewable Energy - Solar Hot Water Heater System There is no hot water in the building. Yes

HPSB II.3

On-site Renewable Energy

The installation of a PV system would have required a glare study to be performed. Given that the proejct was already close to the budget ceiling, the project would not be able to afford the first-cost of a photovoltaic system.

Yes

HPSB II.4 Measurement and Verification

Water Metering: Select N/A if no service

The only water use in the building consists of two eye wash/emergency showers.

There will be no regular water consumption.

Applicable

Electric Metering: Select N/A if no service

There's so little electrical consumption in the building that it's being fed off of the adjacent Crew Quarters Building, which is separately metered.

Applicable

Natural Gas Metering: Select N/A if no service N/A Yes Steam Metering: Select N/A if no service N/A Yes

HPSB III: Protect and Conserve Water (UFC 1-200-02, 2-5)

HPSB III.1

Indoor Water

The only indoor water are the two emergency eyewash/shower units.

Applicable

HPSB III.2 Outdoor Water No outdoor water. Applicable HPSB III.3-4 Stormwater Management

HPSB CHECKLIST

ALERT SHELTER

(Am-0007)

Project addressed EISA 438

No. The building is located next to the ocean where the water table is 5' or less (depending on the tide) below the ground surface. In addition, the building is being constructed on top of an existing concrete pad. To the extent possible, surface water will be directed to open grassed areas but site isn't conducive to LID strategies due to the high ground water levels.

Yes

HPSB III.4 Water used for heating and cooling N/A Yes HPSB IV: Enhance Indoor Environmental Quality (UFC 1-200-02, 2-6)

HPSB IV.1

Thermal Comfort

The building is open on the two long sides for natural ventilation.

Yes

HPSB IV.2 Ventilation No mechanical ventilation provided. Yes HPSB IV.3 Moisture Control N/A Yes

HPSB IV.4

Daylighting

Most of the lighting will be from daylighting from the two open sides of the building.

Artifical lighting is also provided as well as task lighting.

Applicable

HPSB IV.5

Low Emitting Materials

Low emitting material requirements are included in the project specifications.

Applicable

HPSB IV.6

Protect Indoor Air Quality during Construction

Indoor air quality during construction requirments are included in the project specifciations.

Applicable

HPSB V: Reduce Environmental Impact of Materials (UFC 1-200-02, 2-7)

HPSB V.1

Recycled Content

Recycled content requirements are included in the specifications.

Applicable

HPSB V.2

Biologically based products

Biologically based product requirements are included in the specifications.

Applicable

HPSB V.3

Environmentally Preferable Products

Environmentally preferred product requirements are included in the specifications.

Applicable

HPSB V.4

Waste and Materials Management - Recycling

Wate recylcing requirements are included in the specifications.

Applicable

HPSB V.5

Waste and Materials Management - Divert 50% from Disposal

Waste diversion requirements are included in the specifications to the extent feasible. Generally, there is minimal waste in pre-engineered metal buildings. It's questionable whether a 50% diversion rate is possible.

Applicable

HPSB V.6

Ozone Depleting Substances

Not applicable. The project does not have air conditoning.

Applicable

HPSB CHECKLIST

ALERT SHELTER

(Am-0006)

SECTION 01 33 29 ATTACHMENT 1

(Am-0007)

General Information INCOMPLETE KNMD043004 Project ID:

Real Property Unique ID: * Facility Number *

F22 Ready Alert Crew Quarters Building Name:

Joint Base Pearl Harbor-Hickam Installation:

Honolulu City: Honolulu HI State: Hawaii

Yes

CONUS

PACAF MAJCOM

USACE Construction Agent

Fukuchi, Dean AFCEC DM/CM:

$3,274,000.00 PA

5,595 Building Size (SF):

2016 Program Year:

Design Complete Project Phase:

5/4/2016 Design Started (MM/DD/YY)

12/28/2017 BOD (MM/DD/YY)

GBI GP Guiding Principles Compliance Certification Method

50% HPSB Compliant 5% Energy Efficiency Achieved (% below ANSI/ASHRAE/IESNA

Standard 90.1-2010) 2016V1 Scoresheet version

SURVEY

INCOMPLETE

Date Project Registered (MM/DD/YY)

Date Project Certified (MM/DD/YY)

5/8/2018 1

(Am-0007)

SECTION 01 33 29 ATTACHMENT 1

HPSB CHECKLIST

CREW QUARTERS

Color Coding: See Instructions Tab for more detail Yes or N/A No Recommended not Required

90.1-2013 HPSB I: Employ Integrated Design Principles (UFC 1-200-02 para 2-2) Total Points 2 Possible Points 2

Yes HPSB I.1 Integrated Design 1

Yes HPSB I.2 Commissioning 1 HPSB II: Optimize Energy Performance (UFC 1-200-02 para 2-4) Total Points 3 Possible Points 4

No HPSB II.1 Energy Efficiency 1

No Reduce energy use 30% below ANSI/ASHRAE/IESNA Standard 90.1-2010 or if not - achieve maximum energy efficiency that is lifecycle cost effective

4.9% Insert percentage below ANSI/ASHRAE/IESNA Standard 90.1-2010 in terms of energy use (e.g. 32)

74,291 Insert building energy intensity (kBtu/yr-sqft) calculated IAW 10 CFR

No Roof Attributes (Recommended) Select roof types (Check below)

N/A HPSB II.2 On-site Renewable Energy - Solar Hot Water Heater System 1

N/A Installed solar hot water heater system or found installation not lifecycle cost effective

0.0 Insert generation capacity (MMBtu/yr)

0.0% Insert percentage of demand N/A HPSB II.3 On-site Renewable Energy 1

N/A Installed renewable energy elements or projects were not lifecycle cost effective Renewable energy types (check below)

0.0 Insert generation capacity (kW)

0.0% Insert percentage of total building Yes HPSB II.4 Measurement and Verification 1

Yes Water Metering: Select N/A if no service

Yes Electric Metering: Select N/A if no service

N/A Natural Gas Metering: Select N/A if no service N/A Steam Metering: Select N/A if no service

HPSB III: Protect and Conserve Water (UFC 1-200-02 para 2-5) Total Points 4 INCOMPLETE Possible Points 4

Yes HPSB III.1 Indoor Water 1

Yes HPSB III.2 Outdoor Water 1

N/A HPSB III.3 Stormwater Management (LID Documentation per UFC 3-210-10) 1

Change in Impervious Area (SF) * Pre-Award Cost Estimate ($) *

N/A Project addressed EISA 438

EISA Technical Constraints

Percent Increase in Stormwater Runoff for 95 Percentile Storm (%) -or- Percent Increase in Stormwater Runoff from continuous simulation model, published data, studies, or other established tools (Reference UFC 3-210-10 Figure 2-1 Implementation of EISA Section 438) LID Features Locations

Integrated Management Practices Employed

Drop-Down Box No Entry Required Custom Entry

Solar PV

Solar CP

Solar Thermal Electric

Geothermal

GSHP Wind

Hydro Waste to Energy

Renewables were not lifecycle cost effective

Cool roof

Green roof

Solar electric

Solar thermal

Solar Passive

Retaining stormwater impact receving water flow

Site too small to infiltrate significant volume

State or local restrict water harvesting

Shallow bedrock, contaminated soil, high ground water table, underground utilities

Non-potable water demand to small Structural, plumbing, and other mods not feasible

Soil infiltration capacity limited

State or local restrict use of green infrastructure or LID

Other

Bio-Retention

Infiltration Trench

Soil Amendments

Dry Wells

Inlet Pollution Removal Device

Permeable Pavement/Pavers

Filter Strips Grassed Swells

Rain Barrels/Cisterns

Tree Box Filters Vegetated Buffers Vegetated Roof

Other

5/8/2018 2

(Am-0007)

SECTION 01 33 29 ATTACHMENT 1

HPSB CHECKLIST

Final LID Construction Cost ($)

Post Construction Analysis (Name of DOR)

N/A HPSB III.4 Water used for heating and cooling 1

N/A Water efficient measures were implemented with heating and cooling equipment when life cycle effective

HPSB IV: Enhance Indoor Environmental Quality (UFC 1-200-02 para 2-6) Total Points 6 Possible Points 7

Yes HPSB IV.1 Thermal Comfort 1

Yes HPSB IV.2 Ventilation 1

Yes HPSB IV.3 1

No HPSB IV.4 Daylighting 1

Yes HPSB IV.5 Low Emitting Materials 1

Yes HPSB IV.6 Protect Indoor Air Quality during Construction 1

Yes HPSB IV.7 Environmental Tobacco Smoke Control

HPSB V: Reduce Environmental Impact of Materials (UFC 1-200-02 para 2-7) Total Points 5 INCOMPLETE Possible Points 6

Yes HPSB V.1 Recycled Content 1

Yes HPSB V.2 Biologically-based Products 1

Yes HPSB V.3 Environmentally Preferable Products 1

Yes HPSB V.4 Waste and Materials Management - Recycling 1

HPSB V.5 Waste and Materials Management - Divert 60% from Disposal 1

N/A 60% or greater diverted

Insert percentage diverted from landfill * Yes HPSB V.6 Ozone Depleting Substances 1

Possible Points 23 20 Federal Requirements - Yes or N/A 2 Federal Requirements - No

87% Percentage of Federal Requirements Met

Moisture Control

5/8/2018 3

(Am-0007)

SECTION 01 33 29 ATTACHMENT 1

HPSB CHECKLIST

CREW QUARTERS

Integrated Design

HPSB I.1

UFC 1-200-02 para 2-2.1

Use a collaborative, integrated planning and design team, composed of user, government support staff, and appropriate professionals, to identify requirements and to establish performance goals for siting, energy, water, materials, indoor environmental quality, and other comprehensive design goals. Ensure incorporation of these goals throughout the design and lifecycle of the building, including deconstruction.

Site attributes, including climate and local and regional context, impact the design of the building. Evaluate the site and building components to determine whether passive and natural design strategies and features are cost effectively incorporated before the active and mechanical systems are designed.

Use the following sequential approach:

• Analyze potential sites and associated climate including local and regional context.

• Select a sustainable site.

• Design building to site analysis focusing on orientation, configuration and massing.

• Select and integrate into the design, high performance and sustainable building envelope strategies and components (e.g. roofs, walls, fenestrations).

• Select, design and integrate into the overall design, high performance and sustainable systems (e.g. HVAC, plumbing, water heating systems, lighting systems, control systems, elevators, and fire protection systems).

Incorporate integrated design as described in ASHRAE 189.1 Informative Appendix H (Integrated Design). Follow the steps of design optimization, as applicable, in ASHRAE 189.1 Section H1.1.1 (Charrette Process).

Commissioning

HPSB I.2

UFC 1-200-02 para 2-2.2

Employ commissioning practices appropriate to the size and complexity of the building and its system components in order to verify performance and ensure that design requirements are met. This must include an experienced commissioning provider. The use of contracted services or Government personnel as the commissioning provider will be determined at project level.

Meet the requirements of ASHRAE 189.1 Section 10.3.1.2 (Building Project Commissioning), with the following modifications:

• For buildings and systems that are less complex, commissioning can be tailored as determined by the DoD Component AHJ . For Air Force projects, the Project Delivery Team must determine the level of commissioning activities required.

• “Schematic design” is the design charrette or similar conceptual design activity.

• Delete the requirement to meet ASHRAE 55 Section 6.2 (Documentation).

Requirement Source Document(s) Executive Order 13693

UFGS 01 91 00.15, Total Buiding Commissioning Program

High Performance Sustainable Building Requirements, UFC 1-200-02 References References

(Am-0007)

SECTION 01 33 29 ATTACHMENT 1

HPSB CHECKLIST

Energy Efficiency

HPSB II.1

UFC 1-200-02 para 2-4.1

Design the building to achieve at least 30% energy consumption reduction from ASHRAE 90.1 (2013) baseline.

Percentage improvement = 100 x (Baseline building consumption—Proposed building consumption) ÷(Baseline building consumption—Receptacle and process loads).

Design Federal low-rise residential buildings to achieve at least 30% energy consumption reduction from International Energy Conservation Code (IECC) baseline.

If a 30% reduction is not life-cycle cost-effective, the design of the proposed building must be modified so as to achieve an energy consumption level at or better than the maximum level of energy efficiency that is life-cycle cost-effective.

Requirement Source Document(s) 10 CFR 433, EPAct 05

On-site Renewable Energy - Solar Hot Water Heater System

HPSB_II.2

UFC 1-200-02 para 2-4.2.1

Per the Energy Independence and Security Act (EISA) Section 523, meet at least 30% of the hot water demand through the installation of solar hot water heaters, when lifecycle cost effective.

Requirement Source Document(s): EISA Sec. 523

On-site Renewable Energy HPSB II.3 UFC 1-200-02 para 2-4.2

Provide on-site renewable energy systems in accordance with ASHRAE 189.1 Section 7.4.1.1 (On-Site Renewable Energy Systems) where life-cycle cost effective considering climate,…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.