W9128A-18-B-0002_Am-0007.pdf

PDF 1 MB Posted

Attached to
FY16 MCAF KNMD043004, Fighter Alert Facility, Joint Base Pearl Harbor-Hickam (JBPHH), Oahu, Hawaii
Solicitation number
W9128A-18-B-0002
Issued by

About this file

Am-0007

View the file

Other files

File Type Posted
W9128A-18-B-0002_Abstract_of_Bids.pdf PDF
W9128A-18-B-0002_Am-0013.pdf PDF
W9128A-18-B-0002_Am-0013_Specifications.pdf PDF
W9128A-18-B-0002_Am-0013_Drawings.pdf PDF
W9128A-18-B-0002_Am-0012.pdf PDF
W9128A-18-B-0002_Am-0011_Drawings_(3_of_3).pdf PDF
W9128A-18-B-0002_Am-0011_Drawings_(2_of_3).pdf PDF
W9128A-18-B-0002_Am-0011_Drawings_(1_of_3).pdf PDF
W9128A-18-B-0002_Am-0011_Specifications.pdf PDF
W9128A-18-B-0002_Am-0011.pdf PDF
W9128A-18-B-0002_Am-0010_Specifications.pdf PDF
W9128A-18-B-0002_Am-0010.pdf PDF
W9128A-18-B-0002_Am-0010_Drawings_(1_of_3).pdf PDF
W9128A-18-B-0002_Am-0010_Drawings_(3_of_3).pdf PDF
W9128A-18-B-0002_Am-0010_Drawings_(2_of_3).pdf PDF
W9128A-18-B-0002_Am-0009.pdf PDF
W9128A-18-B-0002_Am-0008.pdf PDF
W9128A-18-B-0002_Am-0008_Specifications.pdf PDF
W9128A-18-B-0002_Am-0007_Drawings_(2_of_6).pdf PDF
W9128A-18-B-0002_Am-0007_Drawings_(5_of_6).pdf PDF
W9128A-18-B-0002_Am-0007_Drawings_(6_of_6).pdf PDF
W9128A-18-B-0002_Am-0007_Drawings_(3_of_6).pdf PDF
W9128A-18-B-0002_Am-0007_Drawings_(4_of_6).pdf PDF
W9128A-18-B-0002_Am-0007_Drawings_(1_of_6).pdf PDF
W9128A-18-B-0002_Am-0006.pdf PDF
W9128A-18-B-0002_Am-0005_Drawings_(2_of_3).pdf PDF
W9128A-18-B-0002_Am-0005_Drawings_(1_of_3).pdf PDF
W9128A-18-B-0002_Am-0005_Specifications.pdf PDF
W9128A-18-B-0002_Am-0005.pdf PDF
W9128A-18-B-0002_Am-0005_Drawings_(3_of_3).pdf PDF
W9128A-18-B-0002_Am-0004.pdf PDF
W9128A-18-B-0002_Am-0003_Drawings_(1_of_2).pdf PDF
W9128A-18-B-0002_Am-0003.pdf PDF
W9128A-18-B-0002_Am-0003_Drawings_(2_of_2).pdf PDF
W9128A-18-B-0002_Am-0003_Specifications.pdf PDF
W9128A-18-B-0002_Am-0002.pdf PDF
W9128A-18-B-0002_Am-0001.pdf PDF
W9128A-18-B-0002_Specifications.pdf PDF
W9128A-18-B-0002_Drawings_(2_of_2).pdf PDF
W9128A-18-B-0002_IFB.pdf PDF
W9128A-18-B-0002_Drawings_(1_of_2).pdf PDF
SECNAV_5512-1.pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

See Continuation Page.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 6

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9128A18B0002

X 9B. DATED (SEE ITEM 11)

01-Feb-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

Am-0007

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

8-Jun-2018

CODE

CECT - CONTRACTING DIVISION

USACE, HONOLULU DISTRICT

BLDG 252 (CECT-POH)

FT. SHAFTER HI 96858-5440

W9128A 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9128A18B0002 Am-0007

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

1. CHANGES TO SPECIFICATIONS. Attached hereto are revised pages/paragraphs to the specifications. The revision mark “(Am-0007)” is shown on each revised page.

a. REVISED SECTIONS. The following are revised pages/paragraphs to the solicitation. Changes are marked in “*” asterisks or indicated in bold.

Coversheet Standard Form 1442 – Page 1 Section 00 10 00 – Pages 1, 3, 5 Section 00 60 00, Appendix C – Page 8

b. NEW PAGES. The following are new pages to the solicitation.

Section 00 60 00, Appendix A – Requests for Information (#83 through 108)

2. CHANGES TO DRAWINGS.

a. REVISED DRAWINGS. The following revised drawings replace like-numbered drawings and are issued herewith.

Sheet ID Sheet Number Mark Revision Date G-001 1 of 410 3 6/1/18

GI001

GI002

GI002a

GI005

3a of 410

6/1/18 6/1/18 6/1/18 6/1/18

CG001

CD101

CD102

CD104

CD104a

CD202

CD204

CD208

CD209

CD210

C103 C105 C108 C109 C110 C111a C112 C131 C154 C161 C162 C163 C165 C501 C502 C511 C512 C513

19a of 410 31a of 410 43a of 410 70a of 410 78a of 410

6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18

C514 C517 C518 C519 C522 C531 C532 C541 C542

86a of 410

6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18

S001 S111 S121 S131 S141 S151 S152 S154 S331 S501 S502 S503 S531 S541

122a of 410 122c of 410

6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18

AD100

AD104

6/1/18 6/1/18

A-100 A-101 A-102 A-121 A-122 A-130 A-141 A-142 A-150 A-210 A-220 A-221 A-226 A-230 A-231 A-240 A-241 A-320 A-330 A-340 A-420 A-421 A-430 A-431 A-442 A-506 A-510 A-531 A-532 A-551

6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18

A-600 A-602 A-603 A-605 A-606 A-607 A-701 A-801

6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18

F-001

FX121

FX431

FA121

FA131

FA132

FA501

FA601

FA602

6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18

P-125 P-150 P-151 P-152 P-901 M-121 M-122 M-501 M-502 M-601 M-605 M-801 M-802 M-804 M-805

265a of 410 265b of 410 265c of 410

6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18

E-001

ES102

ES103

ES104

ES105

ES110

ES112

ES113

ES114

ES115

ES116

ES117

ES118

ES503

ES504

ES505

ES506

ES507

ES508

ES509

ES601

ES602

ES603

308a of 410 317a of 410 317b of 410 317c of 410 324a of 410 324b of 410 325a of 410 325b of 410

6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18

ES604

EL110

EL130

EL131

EL132

EL140

EP123

EP124

EP129

EP130

EP133

EP134

EP140

EP430

EP510

EP601

EP602

EP702

EP703

T-001

TS102

TS103

TS104

TS105

TS111

TS112

TS113

TS114

TS402

TS403

TS501

TS503

T-110 T-120 T-130 T-140 T-420 T-501 T-502 T-506 T-601 T-602 T-701

TY001

TDY100

TDY101

TDY102

TY102

TY110

TY120

TY130

TY140

TY420

TY440

TY501

325c of 410 408a of 410 408b of 410 408c of 410 408d of 410 408g of 410 408h of 410 408i of 410 408j of 410 408k of 410 408l of 410

408m of 410 408n of 410

6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18

TY502

TY503

TY504

TY601

TY602

TY701

TY702

TY801

TY901

408o of 410 408p of 410 408q of 410 408r of 410 408s of 410 408t of 410 408u of 410 408v of 410 408w of 410

6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18 6/1/18

K120 409 of 410 3 6/1/18

b. NEW DRAWINGS. The following new drawings are issued herewith.

Sheet ID Sheet Number Title A-102a 145a of 410 SENTRY ALOHA OPEN STORAGE SITE PLAN A-102b 145b of 410 PARKING LOT A-607a 212a of 410 SIGNAGE SCHEDULE AND DETAILS S551 136 of 410 HUSH HOUSE – FOUNDATION SECTIONS S552 137 of 410 HUSH HOUSE – FOUNDATION SECTIONS S553 137a of 410 HUSH HOUSE – FOUNDATION SECTIONS S554 137b of 410 HUSH HOUSE – FOUNDATION SECTIONS S555 137c of 410 HUSH HOUSE – FOUNDATION SECTIONS S556 137d of 410 HUSH HOUSE – FOUNDATION SECTIONS S557 137e of 410 HUSH HOUSE – FOUNDATION SECTIONS S558 137f of 410 HUSH HOUSE – FOUNDATION SECTIONS

c. DELETED DRAWINGS. The following drawings are deleted in their entirety.

Sheet ID Sheet Number Title

T-504 400 of 410 Door Access Control Rough-In

3. PROJECT TITLE. All previous references made for “RNMD043004” are revised to “KNMD043004”. The project titled for this solicitation is “FY16 MCAF KNMD043004, F-22 Fighter Alert Facility, Joint Base Pearl Harbor- Hickam (JBPHH), Oahu, Hawaii”.

4. The bid opening date and time is EXTENDED (see SF1442, Page 1, Block 13A).

Invitation for Bids No. W9128A-18-B-0002

FY16 MCAF KNMD043004

F-22 Fighter Alert Facility

Joint Base Pearl Harbor Hickam (JBPHH) Oahu Hawaii

U.S. Army Corps of Engineers

HONOLULU DISTRICT

(Am-0007)

FY16 MCAF KNMD043004, F-22 Fighter Alert Facility, Joint Base Pearl Harbor-Hickam (JBPHH), Oahu, Hawaii

X

COLIN K WAKI 808-835-4393

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

01-Feb-2018

(RFP)

(IFB)

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance within _______7 calendar days and complete it within ________721 calendar days after receiving award, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________52.211-10

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the work required are due at the place specified in Item 8 by ___________ local time ______________ 10 July 2018 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______ 90 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

CECT - CONTRACTING DIVISION

USACE, HONOLULU DISTRICT

BLDG 252 (CECT-POH)

FT. SHAFTER HI 96858-5440

W9128A

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

02:00 PM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX: TEL: TEL: FAX:

W9128A18B0002 90

W9128A-18-B-0002

Section 00 10 00 – Page 1

SECTION 00 10 00

BID SCHEDULE

FY16 MCAF KNMD043004, F-22 Fighter Alert Facility, Joint Base Pearl Harbor-Hickam (JBPHH), Oahu, Hawaii

CLIN DESCRIPTION QUANTITY UNIT AMOUNT

BASE SCHEDULE

0001 F-22 Fighter Alert Facility 1 JOB $_____________

OPTIONS

0002 OPTION 1: Install Hangar Doors and Fire 1 JOB $_____________ Protection Systems

0003 OPTION 2: Install Blast Windows, Frames 1 JOB $_____________ and Fixtures

0004 OPTION 3: Electronic Security System (ESS) 1 JOB $_____________

TOTAL PRICE FOR BASE SCHEDULE AND ALL OPTIONS $_____________

THE FOLLOWING WILL BE COMPLETED BY THE CONTRACTING OFFICER UPON

CONTRACT AWARD:

TOTAL AWARD AMOUNT (BASE SCHEDULE PLUS OPTION(S) _________) $ _____________

BIDDER ELECTS TO WAIVE THE PRICE EVALUATION PREFERENCE FOR HUBZone

SMALL BUSINESS CONCERNS: ( ) NO ( ) YES

______ Bid DOES include Facilities Capital Cost of Money

______ Bid DOES NOT include Facilities Capital Cost of Money

NOTES TO BID SCHEDULE:

1. This procurement is UNRESTRICTED.

2. Bidders must bid on each CLIN item and the TOTAL PRICE. Failure to provide a price on each item in the Bid Schedule may cause the bid to be rejected as non-responsive.

Section 00 10 00 – Page 3

e. Section 00 45 00 - Representations & Certifications, Appendix A - SF LLL, Disclosure of Lobbying Activities

9. All Bidders shall provide one (1) copy of the entire bid on a CD within seven (7) calendar days after the date of bid opening.

10. The micropile quantities and the 40 foot length are identified in Drawing S503. If the actual required quantities and lengths, as finally approved by the Contracting Officer or authorized representative, are materially different from what was identified in Drawing S503, the Government will negotiate an equitable adjustment (increase or decrease to the contract price).

Unanticipated conditions encountered during construction may necessitate quantities of work that vary from that shown on the drawings. To minimize delays associated with encountering unanticipated conditions during construction, provide a unit price for each of the following items. If unanticipated conditions are encountered during construction, promptly notify the Contracting Officer that such a condition has been encountered, describe the condition encountered, and provide a listing of which the following items may be necessary. Upon notification, the Contracting Officer will promptly investigate the matter, and if necessary, may issue a Change Order directing the Contractor to proceed with any or all of the required items. Bidders are advised the following unit prices will not be part of the contract, but are a starting point for initiating the change order process.

DESCRIPTION UNIT UNIT PRICE

1) Micropiles – Additional Length LF $___________

2) Micropiles – Omitted Length LF $___________

11. The magnitude of the construction project is between $25,000,000 and $50,000,000.

12. Request for Information (RFIs) must be submitted no later than June 18, 2018, 2:00 PM Hawaii Standard Time. The Government Points of Contact for RFIs are as follows:

Mr. Colin Waki Telephone Number: (808) 835-4393 E-mail Address: colin.k.waki@usace.army.mil

Mr. Kent A. Tamai Telephone Number: (808) 835-4377 E-mail Address: kent.a.tamai@usace.army.mil

13. SITE VISIT INFORMATION: Cameras, including cell phones, will not be allowed during the site visit.

Section 00 10 00 – Page 5

Quarter construction will consist of a new pump room and installation of pump, piping, controls and connections to the Alert Shelter fire suppression system, demolition and disposal, site work and utilities, debris removal and disposal, ground clearing, testing, cleanup, and all incidental items necessary to complete the work.

CLIN 0003 – OPTION 2: Install Blast Windows, Frames and Fixtures

CLIN 0003 will be paid for at the contract price, complete in place and ready for use including the construction of new high pressure rated windows and frames on the south side of the building of the crew quarters, demolition and disposal, site work and utilities, debris removal and disposal, cleanup, and all incidental items necessary to complete the work.

CLIN 0004 – OPTION 3: Electronic Security System (ESS)

CLIN 0004 will be paid for at the contract price, complete in place and ready for use including but not limited to: submittals for review and approval, purchasing and installing the electronic security system as identified in Section 28 10 05, subparagraph 2.1, System Description, the related ESS acceptance testing as identified in Section 28 08 10, Electronic Security System Acceptance Testing, disposal, clean up, and all incidental items necessary to make the security system operable and functional for the intended purposes and existing installation security system.

FY16 MCAF RNMD043004, F‐22 Fighter Alert Facility Joint Base Pearl Harbor Hickam (JBPHH), Oahu, Hawaii

RFI # References Question Government Response 83 Sheet S503 Detail C4 & C5. What are the rebar callouts for the electrical pit

SOG as shown on both those detail drawings?

Please see revised Drawings S131 and S503, per Am-0003.

84 Sheet S503 Detail C4 & C5. What type of grating is required at the electrical pit slab openings?

Please see revised Drawings S131 and S503, per Am-0003.

85 sheets S-121, A-120 & C-104

On sheets S-121, A-120 & C-104, there is a pad shown just south of the pump room at the crew quarters building. What is the size, thickness and reinforcing requirements for this pad?

Please see new Drawing A-421, per Am-0007.

86 Will it be possible to perform phase 1 and some of phase 2 activities concurrently as long as we do not disrupt bldg 3435 activities and access?

Please see revised Drawing GI005, per Am-0007.

87 Drawings AD-101, AD- 102, AD-103, and AD-

Are as-built drawings for these buildings available, including a foundation drawing for Building 3435? If so, will you please provide?

As-built drawings are not available.

88 HEF detection and control system

Drawing FA-602, FIRE SUPPRESSION CONTROL PANEL MATRIX includes TAMPER SWITCHES.

Drawing FA-631, FIRE ALARM RISER DIAGRAM shows no tamper switches connected to FSCP.

UFC 4-211-01 Functional Matrices (Tables 3-3 and 7-2) also indicate tamper switches are to be connected to the building fire panel and not the releasing panel.

Please confirm FA-602 is incorrect or specify quantity of tamper switches that will be connected to the releasing panel.

Please see revised Drawing FA602, per Am-0007.

89 TS104 On drawing TS104, a 2-way ductbank is shown to be routed to existing building 4069. There does appear per the plan to be an existing handhole to connect the proposed ductbank to the existing infrastructure at Building 4069. Will the connecting point be at the exterior of the building? If the connection point is to routed to the building interior, where is the room per plan located, and how the connecting conduits route through this existing building? Please confirm the exact location of the connecting node in Building 4069.

Please see revised Drawing TS104, per Am-0007.

Section 00 60 00, Appendix A (Am‐0007)

90 TS102, TS103, TD101,

TD103

On Sheets TS102, TS103, TD101, and TD103, it is noted that existing pathways, cabling, and equipment are to be removed.

On the drawings the size of the cabling, nor types and quantities and equipment are listed, or provided. Can as-builts be provided that reference this information?

Please see revised Drawings TS102 and TS103, per Am-0007.

91 Door access control Please confirm all door access control cabling is furnished and installed by the goverment, or will be contractor furnished and installed.

Please see revised Drawing TY001, General Note 26, per Am- 0007.

92 Drawings EP-130 and

EP-133

Detail references call out detail C1/EP-430 for the foam room, but there is not detail C1 on EP-430. Please clarify or confirm B1/EP-430 is correct.

Please see revised Drawing EP430, Detail C1, per AM-0007.

93 Drawing ES-115 Please confirm that the new 3 Phase Pad Mount Transformer shown will be in the Hush House Relocation contract and not in the base bid of CLIN 1 of this contract. Please confirm the Hush House refurbishing contractor will connect and provide the conduit between between the newly proposed electric handhole on Sheet ES 115, and the newly proposed 3 phase Pad Mount Transformer. Please confirm that the Hush House refurbishing contractor will connect to the (4) 500 kcmil and (1) #2 Grd Feeder being installed at the newly proposed handhole and terminate that circuit to the primary side of the newly proposed 3 phase Pad Mount Transformer.

Please see revised Drawings ES115 and ES604, per Am-0007.

94 Drawing ES-115 Please confirm that in the existing switchboard referenced on Sheet ES-115, the spare circuit breaker shown will have adequate spacing to terminate (3) 500 kcmil conductors at the breaker itself, and spacing to terminate (1) 500 kcmil conductor at the neutral bus of the existing switchboard. Can the manufacturer and nameplate data of the existing switchboard be provided so it can determined if larger lugs are needed for terminations of the conductor sizing referenced?

Please see revised Drawings ES115 and ES604, per Am-0007.

95 Drawing ES-115 Please confirm that the existing conduit shown to be routed from the existing switchboard to the existing secondary system handhole is adequate to pull in the conductors of (4) 500 kcmil and (1) #2 AWG ground as shown on Sheet ES -115.

Please see revised Drawings ES115 and ES604, per Am-0007.

96 Drawing ES-104 Note 2 on drawings ES-104 states the taxiway series circuit should be de-energized at the regulator vault prior to work.

Where is the location of the existing vault? Will lock out/ tag out of the constant current regulator be by JBPHH authorities be with our locks placed on top?

Please see revised Drawing ES104, per Am-0007.

97 Drawing ES-104 Please confirm the height and size of the existing poles to be removed along with any existing hardware that may, or may not need to be salvaged.

Please see revised Drawing ES105, per Am-0007.

98 Drawing ES-112 Please confirm the height and size of the existing pole R-155, and any, or all hardware that may, or may not need to be salvaged.

Please see revised Drawings ES105 and ES112, per Am-0007.

99 Drawings CD-202 and

CD-204

Please clarify if the concrete barriers on the asphalt paving are cast in place or Jersey style barriers.

Please see revised Drawings CD202 and CD204, per Am-0007.

100 On A-506 Alert Shelter – Wall Sections the 2 hour rated external wall UL Design U425 appears to be located outside the Option #1 Wall Section at Foam Room. Please confirm it is the intend of the drawings that all the exterior walls in the Alert Shelter are to be this 2 hour rated exterior wall UL Design U425.

Please see new Drawings A-430, A431, and A-506, per Am- 0007.

101 Sheets A-605 & A-606 (Signage Plans) and sheet A-607 (Sign Schedule) shows signage in the ECP, Crew Quarters, and Sentry Aloha. Is no Signage needed for the Alert Shelter?

Please see new Drawing A-607a, per Am-0007.

102 A-600 Finish schedule lists room AS301 Foam Room as FRF-1, please confirm you would like Fuel Resistant Coatings in the foam room?

Please see revised Drawing A-600, per Am-0007.

No, the Contractor will need to bid the project as shown on the plans and spec.

The following specifications contain deleterious requirements for airfield pavement aggregates;

Section 32 13 11 Concrete Pavement For Airfield Pavements;

Table 5 (Limits Of Deleterious Materials In Coarse Aggregate For Airfield Pavements) of these specifications lists the classification for the aggregates as “Moderate Weather”.

Per ASTM C33 (Standard Specification For Concrete Aggregates), table 3, note 1 defines the category above as listed below.

Table 3 - Limits For Deleterious Substances And Physical Property Requirements Of Coarse Aggregate For Concrete;

(S) Severe Weathering Region – A cold climate where concrete is exposed to deicing chemicals or other aggressive agents, or where concrete may become saturated by continued contact with moisture or free water prior to repeated freezing and thawing.

(M) Moderate Weathering Region – A climate where occasional freezing is expected, but where concrete in outdoor service will not be continually exposed to freezing and thawing in the presence of moisture or to deicing chemicals.

(N) Negligible Weathering Region – A climate where concrete is rarely exposed to freezing in the presence of moisture.

Hawaii is unique among the United States in that it has warm weather conditions yearround.

Ambient air temperatures for this project average in the 70’s - 80’s Fahrenheit so there is no risk of exposure to freeze thawing cycles or the use of deicing chemicals. Fig. 1 from page 7 of ASTM C33 is a map showing the “Location of Weathering Regions”.

Although Hawaii is not shown on the map, Hawaii has a milder climate than coastal southern California which is classified as “negligible weathering”.

Therefore, based on the definitions of the aggregate categories per ASTM C33, table 3, note 1, will the design team reclassify the deleterious requirements for the airfield pavement aggregates to be categorized as “Negligible Weather” for this project?

Section 32 13 11 Concrete Pavement For Airfield Pavements

Sheet A-531, A330 / Detail C1

(SEE PHOTO "SHEET

A-330 / DETAIL C1")

On Sheet A‐531 the “Section at Door Hoist” shows supporting steel and calls out a bottom of steel (BOS) elevation to be coordinated with the Vertical Lift Fabric Door (VLFD) manufacturer.

Per the technical information provided by the VLFD manufacturer the bottom of steel (BOS) elevation needs to be 38’‐5 ½” which is 6 ½” below the Top of Rigid Frame Column as shown on A‐330 / Detail C 1 at Gridlines 1 & 3 as noted below. The VLFD manufacturer needs an additional 1’‐8” clear for above the Top of Steel (TOS) to allow for clearance and operation of the sheave units at the eave.

Please confirm if the clear height of the VLFD door system can be reduced or if the PEMB building height needs to be increased.

Please see Am-0007 revised Drawings A-230 and A-330, and Drawing S331, Detail A1 for additional framing and loads due to door.

Sheet S531 / Details A1 & B1

(SEE PHOTO "SHEET

S531 / DETAIL A1 &

B1")

On Sheet S531 / Details A1 & B1 reference “Option # 1” however these details do not appear to reflect the framing requirements or design interface details of the Vertical Lift Fabric Door details shown on A‐531 / Detail 1A. “Door Detail 22 – Hoist Up head Door”.

Please confirm structural framing details to support the Vertical Lift Fabric Door.

Please see revised Drawings S331, Detail A1 (for additional framing and loads due to door) and S531 Details C1 and C2 (for pedestal dimensions), per Am- 0007)

RFI # Question Government Response 106 Drawing S-121 and all associated architectural/Mechanical drawing shows that the construction of Pump Room CQ 232 is option #1. However, the price proposal schedule does not have this cost item. Option #1 on the price proposal schedule is for installing Hangar doors and fire protected system. Please clarify it.

Please see Section 00 10 00, Page 4, per the original solicitation, for a detailed description of Option 1.

107 I represent a manufacturer with interest in bidding on a portion of the JBPHH - Fighter Alert Facility.

My question is: As a Canadian based company would we be precluded from bidding?

If not precluded: Could you identify local qualiifed vendors of drywall and/or lumber to us? We would like to bid through local vendors.

In order to bid, a contractor must be registered in SAM.gov and meet the requirements in this solicitation.

A list of local qualified vendors is not available. For a list of interested vendors, please review the solicitation posting on http://www.fbo.gov. There is an "Interested Vendors List" tab at the top of the posting, which provides information for all interested contractors that have elected to add their information onto the list. In order to view this list, you must register for a "vendor" account on the website.

In addition, please see Section 00 60 00, Appendix D, per Amendment 0003, for the Site Visit Attendance Roster which includes the names of individuals, and their respective firms, who were cleared to attend the site visit.

These resources may help you in identifying firms that are interested in this project.

108 G-001 OPTION 003 has been added but no updated Section 00 10 00 Bid Schedule page was included in Amendment 005.

Please advise.

Please see revised Section 00 10 00, per Am-0007.

Section 00 60 00, Appendix C – Page 8

(c) "The contractor's own organization" means those individuals who are employed and paid by the contractor, whether full or part time. If a joint venture or partnership, members (and their paid employees) of the joint venture or partners are considered part of "the contractor's own organization." If a corporation, wholly-owned subsidiary elements of the corporation and their paid employees, are considered part of "the contractor's own organization."

Any individual who is employed or paid, even on an occasional basis by an entity other than the contractor (such as a subcontractor), or any subcontractor or supplier to the contractor, is not considered part of "the contractor's own organization."

[End of Statement]

S-36.21 AVAILABILITY AND USE OF UTILITY SERVICES (JAN 2006)

(a) The Government will make all reasonably required amounts of utilities available to the Contractor from existing outlets and supplies, as specified in the contract. Unless otherwise provided in the contract, the amount of each utility service consumed shall be charged to or paid for by the Contractor at prevailing rates charged to the Government or, where the utility is produced by the Government, at reasonable rates determined by the Contracting Officer. The Contractor shall carefully conserve any utilities furnished without charge.

(b) The Contractor, at its expense and in a workmanlike manner satisfactory to the Contracting Officer, shall install and maintain all necessary temporary connections and distribution lines, and all meters required to measure the amount of each utility used for the purpose of determining charges. Before final acceptance of the work by the Government, the Contractor shall remove all the temporary connections, distribution lines, meters, and associated paraphernalia.

(c) Schedule of utilities available from the Government without charge: None

[End of Statement]

52.231-5000 EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE.

EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE (MAR 1995) — EFARS

(a) This clause does not apply to terminations. See 52.249-5000, Basis for settlement of proposals and FAR Part 49.

(b) Allowable cost for construction and marine plant and equipment in sound workable condition owned or controlled and furnished by a contractor or subcontractor at any tier shall be based on actual cost data for each piece of equipment or groups of similar serial and series for which the Government can determine both ownership and operating costs from the contractor's accounting records. When both ownership and operating costs cannot be determined for any piece of equipment or groups of similar serial or series equipment from the contractor's accounting records, costs for that equipment shall be based upon the applicable provisions of EP 1110-1-8, Construction Equipment Ownership and Operating Expense Schedule, Region [insert Roman numeral for the appropriate region of the schedule]. Working conditions shall be considered to be average for determining equipment rates using the schedule unless specified otherwise by the contracting officer. For equipment not included in the schedule, rates for comparable pieces of equipment may be used or a rate may be developed using the formula provided in the schedule. For forward pricing, the schedule in effect at the time of negotiations shall apply. For retroactive pricing, the schedule in effect at the time the work was performed shall apply.

(c) Equipment rental costs are allowable, subject to the provisions of FAR 31.105(d)(ii) and FAR 31.205-36. Rates for equipment rented from an organization under common control, lease-purchase arrangements, and sale-leaseback arrangements, will be determined using the schedule, except that actual rates will be used for equipment leased from an organization under common control that has an established practice of leasing the same or similar equipment to unaffiliated lessees.

(d) When actual equipment costs are proposed and the total amount of the pricing action exceeds the small purchase threshold, the contracting officer shall request the contractor to submit either certified cost or pricing data, or partial/limited data, as appropriate. The data shall be submitted on Standard Form 1411, Contract Pricing Proposal Cover Sheet.

(End of clause)

18-B-0002 Am-0007
Cover
SF1442
00 10 00 - Pages 1, 3, 5 (From Am-0006)
00 60 00, App. A (RFI #83-108)
RFI-0001
RFI-0002
RFI-0003
RFI-0004
RFI-0005

00 60 00 Appendix C - Page 8 (From Am-0003)